Request for Quotations number19NL80-24-Q-0062 Preventive Maintenance Electrical Switchgear Equipment The Hague Final.pdf
PDF 2 MB Posted
- Solicitation number
- 19NL80-24-Q-0062
- Issued by
-
Department of State US Embassy The Hague
About this file
This document is a Request for Quotations (RFQ) for Preventative Maintenance Services of Electrical Switchgear Equipment for the U.S. Embassy in The Hague, Netherlands.
The U.S. Government intends to award a firm-fixed price contract/purchase order for one year, with up to four one-year option periods, to the responsible company submitting an acceptable offer at the lowest price. Quotations are due by September 20, 2024 at 5 p.m. local time. The solicitation outlines the required preventive maintenance services, equipment, and performance standards. Pricing is to be provided for the base year and all option years. Repairs are excluded from this contract, but labor rates for potential future repairs should be provided. No domestic preferences or set-asides apply. The U.S. Department of State is the issuing agency.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EMBASSY OF THE UNITED STATES OF AMERICA
JOHN ADAMS PARK 1, 2244 BZ WASSENAAR
THE NETHERLANDS
August 20, 2024
Dear Prospective Quoter:
Subject: Request for Quotations number 19NL80-24-Q-0062 Preventive
Maintenance Electrical Switchgear Equipment.
Enclosed is a Request for Quotations (RFQ) for Preventative Maintenance Services of Electrical
Switchgear Equipment. If you would like to submit quotation, follow the instructions in Section
3 of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form 1449 that follows this letter.
The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.
Quotations are due by September 20, 2024, at 5 p.m. local time. No quotations will be accepted after this time. Proposals must be in English and incomplete proposals will not be accepted.
Your quotation must be submitted electronically to TheHaguecontracts@state.gov. It is important to make sure the submission is made in specific size and format; in MS-Word 2007/2010 or MS-
Excel 2007/2010 or Adobe Acrobat (pdf) file format. The file size must not exceed 30MB. If the file size should exceed the 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each.
In order for a quotation to be considered, you must also complete and submit the following:
1. SF-1449
2. Section I, Pricing
3. Section 5 Representations and Certifications
4. Additional information as required in Section 3
5. Proof of SAM Registration
6. CYBERSECURITY SUPPLY CHAIN RISK MANAGEMENT (C-SCRM) C-SCRM Questionnaire and C-SCRM software Producer Attestation Form
Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under FAR 4.1102.
Failure to be registered at time of proposal submission may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given. Therefore, offerors are mailto:osei-bonsugy@state.gov https://www.sam.gov/ highly encouraged to register immediately if they are interested in submitting a response to this requirement.
Sincerely, Jonathan Wedd
Contracting Officer
Enclosure: (as noted)
AUTORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV. 02/2012)
PREVIOUS EDITION IS NOT USABLE Computer Generated Prescribed by GSA - FAR (48 CFR) 53.212
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
PR12721372
PAGE 1 OF 88 PAGES
2. CONTRACT NO. 3. AWARD/ EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER
19NL8024Q0062
6. SOLICITATION ISSUE
DATE
08/20/2024
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME Geoffrey Y. Osei-Bonsu
b. TELEPHONE NUMBER(No collect calls) +31703102248
8. OFFER DUE DATE/
LOCAL TIME
09/20/2024 / 17:00
9. ISSUED BY CODE NL800 10. THIS ACQUISITION IS x UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS
HUBZONE SMALL
BUSINESS
(WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM NAICS:
EDWOSB EMERGING SMALL BUSINESS
AMERICAN EMBASSY THE HAGUE
John Adams Park 1, 2244BZ Wassenaar, ATTN:
GSO/PROCUREMENT
THE HAGUE 2244 BZ
NETHERLANDS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS 8 (A) SIZE STANDARD:
13b. RATING11. DELIVERY FOR FOB DESTINAT-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS 13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
14. METHOD OF SOLICITATION
x RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
AMERICAN EMBASSY THE HAGUE
John Adams Park 1, ATTN: The Hague GSO Wassenaar 2244 BZ
NETHERLANDS
AMERICAN EMBASSY THE HAGUE
John Adams Park 1, 2244BZ Wassenaar, ATTN: GSO/PROCUREMENT
THE HAGUE 2244 BZ
NETHERLANDS
CODE FACILITY
CODE
17a. CONTRACTOR/
OFFERER
TELEPHONE NO.
18a. PAYMENT WILL BE MADE BY
AMERICAN EMBASSY THE HAGUE
John Adams Pk 1, 2244BZ Wassenaar The NL, ATTN: FMC Wassenaar
NETHERLANDS
CODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED
27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _ __ COPIES
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REF. _ _______________ OFFER DATED
_ __________. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY
ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS
TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
Please refer to Section 1, paragraph 2 and complete pricing for Base and all Option Years
Jonathan P. Wedd 8/20/2024 x x x x x 1
ITEM NO. 20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _______________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
36. PAYMENT 37. CHECK NUMBER
PARTIAL FINAL COMPLETE PARTIAL FINAL
38. S/R ACCOUNT NO. 39. S/R VOUCHER NO. 40. PAID BY
41.a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print) 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41C. DATE
42b. RECEIVED AT (Location)
42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
TABLE OF CONTENTS
SECTION 1 - THE SCHEDULE
• SF 1449 cover sheet
• Continuation To SF-1449, RFQ Number 19NL80-24-Q-0062 Prices, Block 23
• Continuation To SF-1449, RFQ Number 19NL80-24-Q-0062. Schedule Of Supplies/
Services, Block 20 Description/Specifications/Work Statement
• Exhibit A - List of Tasks to be Performed (Statement of Work) and Equipment List
• Attachment 2 CYBERSEUCRITY SUPPLY CHAIN RISK MANAGEMENT (C-
SCRM) SOFTWARE PRODUCER ATTESTATION FORM
• SECTION 2 - CONTRACT CLAUSES
• Contract Clauses
• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12
SECTION 3 - SOLICITATION PROVISIONS
• Solicitation Provisions
• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in
Part 12
SECTION 4 - EVALUATION FACTORS
• Evaluation Factors
• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in
Part 12
SECTION 5 - REPRESENTATIONS AND CERTIFICATIONS
• Offeror Representations and Certifications
• Addendum to Offeror Representations and Certifications - FAR and DOSAR
Provisions not Prescribed in Part 12
JAMES ZADROGA 9/11 VICTIMS HEALTH AND COMPENSATION ACT OF
2010 NOTICE: UNLESS A WAIVER OR EXCEPTION APPLIES, PAYMENTS
SUBSEQUENT TO THIS PROCUREMENT ARE SUBJECT TO AN EXCISE
TAX OF 2% PERSUANT TO 26 U.S.C. 5000C.
SECTION 1 - THE SCHEDULE
CONTINUATION TO SF-1449
RFQ NUMBER 19NL80-24-Q-0062
PRICES, BLOCK 23
1. PERFORMANCE WORK STATEMENT
The American Embassy in the Hague, The Netherlands requires preventive maintenance services on the facility’s main service electrical distribution switchgear. These services shall result in all systems being serviced under this agreement being in good operational condition when activated.
1.1. Type of Contract
This is a firm fixed price contract payable entirely in US Dollars or local currency (EUR). Prices for all
Contract Line-Item Numbers (CLIN) shall include proper disposal of toxic substances as per Item 8.4 where applicable. No additional sums will be payable for any escalation in the cost of materials, equipment, or labor, or because of the contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required. The contract price will not be adjusted due to fluctuations in currency exchange rates.
1.2. Period of Performance
The contract will be for a period of one-year, with a maximum of four one-year optional periods of performance.
QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)
This plan provides an effective method to promote satisfactory contractor performance. The
QASP provides a method for the Contracting Officer's Representative (COR) to monitor
Contractor performance, advise the Contractor of unsatisfactory performance, and notify the
Contracting Officer of continued unsatisfactory performance. The Contractor, not the
Government, is responsible for management and quality control to meet the terms of the contract.
The role of the Government is to monitor quality to ensure that contract standards are achieved.
2. PRICING
The rates below include all costs associated with providing preventive maintenance services in accordance with the attached scope of work, and the manufacturer’s warranty including materials, labor, insurance (see FAR 52.228-4 and 52.228-5), overhead, profit and GST (if applicable).
2.1. Base Year. The Contractor shall provide the services shown below for the base period of the contract and continuing for a period of 12 months.
2.2. Option Year 1. The Contractor shall provide the services shown below for Option Year
1 of the contract and continuing for a period of 12 months.
2.3. Option Year 2. The Contractor shall provide the services shown below for Option Year
2 of the contract and continuing for a period of 12 months.
2.4. Option Year 3. The Contractor shall provide the services shown below for Option Year
3 of the contract and continuing for a period of 12 months.
CLIN Description Quantity of Equipment
Type of services
No. of service
Unit price / service ($)
Total per year ($)
001 Unit 1 _UTL >50 Initial Check 1
002 Unit 2 _ NOB >50 Initial Check 1
Total Base Year
CLIN Description Quantity of Equipment
Type of services
No. of service
Unit price / service ($)
Total per year ($)
101 Unit 1 _UTL >50 3–5-year check
102 Unit 2 _ NOB >50
Total Option Year 1
CLIN Description Quantity of Equipment
Type of services
No. of service
Unit price / service ($)
Total per year ($)
201 Unit 1 _UTL >50 3–5-year check
202 Unit 2 _ NOB >50
Total Option Year 2
2.5. Option Year 4. The Contractor shall provide the services shown below for Option Year
4 of the contract and continuing for a period of 12 months.
2.6.
Total for all years:
Base Year $
Option Year 1 $
Option Year2 $
Option Year 3 $
Option Year 4 $
TOTAL (Base and all Options) $
2.7 Repair option. Repairs are NOT included under this agreement (see 7.1.3) and are to be done outside this contract. However, we would like to have current labor rates in the event that there is an issue discovered during the preventive maintenance of the specified equipment. Please provide your current labor rates in the Repair Option fields below. As stated in 7.1.3 any necessary repairs
CLIN Description Quantity of Equipment
Type of services
No. of service
Unit price / service ($)
Total per year ($)
301 Unit 1 _UTL >50 3–5-year check
302 Unit 2 _ NOB >50
Total Option Year 3
CLIN Description Quantity of Equipment
Type of services
No. of service
Unit price / service ($)
Total per year ($)
401 Unit 1 _UTL >50 3–5-year check
402 Unit 2 _ NOB >50
Total Option Year 4 or parts will be submitted for approval and then billed against a separate PO. The Contractor is not approved to do any additional work without approval.
Repair Labor Rates
Base Year $ /hr
Option Year 1 $ /hr
Option Year 2 $ /hr
Option Year 3 $ /hr
Option Year 4 $ /hr
3. VALUE ADDED TAX
VALUE ADDED TAX. Value Added Tax (VAT) is not applicable to this contract and shall not be included in the CLIN rates or Invoices because the U.S. Embassy has a tax exemption certificate from the host government.
3.1 NOTICE TO PROCEED
After Contract award and submission of acceptable insurance certificates and copies of all applicable licenses and permits, the Contracting Officer will issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of ten (10) days from date of Contract award unless the Contractor agrees to an earlier date) on which performance shall start.
4.0 DESCRIPTION/SPECIFICATION/WORK STATEMENT
EQUIPMENT AND PERFORMANCE REQUIREMENTS
4.1. The American Embassy in The Hague requires the Contractor to maintain the following systems in a safe, reliable, and efficient operating condition. Please see Statement of Work and equipment lists included in Exhibit A for a more detailed description.
4.2. Performance Standards
The electrical distribution switchgear should be clean and in good operating condition upon completion of the service. The preventive maintenance service should result in the parts of the system serviced being in a condition to operate efficiently and effectively.
5.0 HOURS OF PERFORMANCE
5.1. The Contractor shall maintain work schedules. The schedules shall take into consideration the hours that the staff can effectively perform their services without placing a burden on the security personnel of the Post. The Contractor shall deliver standard services between the hours of
08.30 AM and 16.30 PM Monday through Friday. No work shall be performed on US Government and local holidays.
652.237-72 OBSERVANCE OF LEGAL HOLIDAYS AND ADMINISTRATIVE
(FEB 2015)
The Department of State observes the following days as holidays:
New Year’s Day
Martin Luther King’s Birthday
Washington’s Birthday
Good Friday
Easter Monday
King’s Day
Liberation Day
Ascension Day
Whit Monday
Memorial Day
Juneteenth National Independence Day
Independence Day
Labor Day
Columbus Day
Veterans Day
Thanksgiving Day
Christmas Day
2nd Christmas Day
Any other day designated by Federal law, Executive Order, or Presidential Proclamation.
(b) When New Year’s Day, Independence Day, Veterans Day or Christmas Day falls on a
Sunday, the following Monday is observed, if it falls on Saturday the preceding Friday is observed. Observance of such days by Government personnel shall not be cause for additional period of performance or entitlement to compensation except as set forth in the contract. If the contractor’s personnel work on a holiday, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, unless authorized pursuant to an overtime clause elsewhere in this contract.
(c) When the Department of State grants administrative leave to its Government employees, assigned contractor personnel in Government facilities shall also be dismissed. However, the contractor agrees to continue to provide sufficient personnel to perform round-the-clock requirements of critical tasks already in operation or scheduled and shall be guided by the instructions issued by the contracting officer or his/her duly authorized representative.
(d) For fixed-price contracts if services are not required or provided because the building is closed due to inclement weather, unanticipated holidays declared by the President, failure of Congress to appropriate funds, or similar reasons, deductions will be computed as follows:
(1) The deduction rate in dollars per day will be equal to the per month contract price divided by 21 days per month.
(2) The deduction rate in dollars per day will be multiplied by the number of days services are not required or provided.
If services are provided for portions of days, appropriate adjustment will be made by the contracting officer to ensure that the contractor is compensated for services provided.
(e) If administrative leave is granted to contractor personnel as a result of conditions stipulated in any “Excusable Delays” clause of this contract, it will be without loss to the contractor. The cost of salaries and wages to the contractor for the period of any such excused absence shall be a reimbursable item of direct cost hereunder for employees.
whose regular time is normally charged, and a reimbursable item of indirect cost for employees whose time is normally charged indirectly in accordance with the contractors accounting policy.
(End of clause)
6.0 ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT
6.1 General. The Contractor shall designate a representative who shall supervise the
Contractor’s technicians and be the Contractor’s liaison with the American Embassy. The
Contractor’s employees shall be on-site only for contractual duties and not for any other business or purpose. Contractor employees shall have access to the equipment and equipment areas and will be escorted by Embassy personnel.
6.2 Personnel Security. The Government reserves the right to deny access to U.S.-owned and
U.S.-operated facilities to any individual. The Contractor shall provide the names, biographic data and police clearance on all Contractor personnel who shall be used on this Contract prior to their utilization. Submission of information shall be made within 5 days of award of contract. No technician will be allowed on site without prior authorization. Note: this may include cleared personnel if advance notice of visit is not given at least one week before the scheduled visit.
6.2.1 Vehicles. Contractor vehicles will not be permitted inside the embassy compound without prior approval. If you need to have vehicle access, please submit your vehicle information (Make, Model, License Plate #) along with a written justification as to why access is necessary. This should be submitted to the Facility Manager at least one (1) week prior to the visit.
6.2.1 Government shall issue identity cards to Contractor personnel, after they are approved.
Contractor personnel shall display identity card(s) on the uniform at all times while providing services under this contract. These identity cards are the property of the US Government. The
Contractor is responsible for their return at the end of the contract, when an employee leaves
Contractor service, or at the request of the Government. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual.
6. 3 Security Clearances. All Work under this contract occurs in LAA (Limited Access Areas) and may be performed by un-cleared American or local workers under cleared American escort. The
Contractor shall work closely with the COR, the Post Facility Manager [FM] or the General
Services Officer [GSO].
6.3.1 The Contractor must comply with all of the following requirements relating to the protection of U.S. Embassy in The Hague, Netherlands Diplomatic personnel, property, and compound project information and cooperate fully in all security matters.
Contractor personnel may be exposed to various documents, such as blueprints, drawings, sketches, notes, surveys, reports, photographs, and specifications, received or generated in conjunction with this contract. These documents contain information associated with diplomatic facilities for the U.S. Department of State. These documents have been marked with the handling designations “Unclassified” or “Sensitive But Unclassified” and US Government warnings against reproduction and distribution. These documents require special handling and dissemination restrictions. All handling designations and warnings on original documents must be reproduced on subsequent copies.
The loss, compromise, or suspected compromise or loss of any SBU information, contract related information (personnel files, payroll information, etc.), any post or diplomatic facility related information (documents, notes, drawings, sketches, surveys, reports, exposed film, negatives, or photographs), or ANY information which may adversely affect the security interests of the United
States, must be immediately brought to the attention of the Contracting Officer (CO) and
Contracting Officer’s Representative (COR).
Photographs of any diplomatic overseas building or facility must be authorized in advance by the
COR and Regional Security Officer (RSO), who will establish any controls, limits, and/or restrictions as necessary. Exposed film depicting any Controlled Access Area and/or sensitive equipment must be developed in a U.S.- controlled environment by appropriately cleared personnel. No further dissemination, publication, duplication, or other use beyond that which was requested and approved is authorized without specific, advance approval from DS. DS reserves the right to demand retention of all copies of said photographs and/or negatives, following fulfillment of the previously authorized usage.
Transmission of any information marked Sensitive But Unclassified (SBU) or contract/personnel sensitive information, via the Internet, is prohibited. SBU information can be transmitted via
ProjNet, mail, FedEx (or other commercial carrier) or fax, or hand carried by authorized contractor personnel.
Discussion of U.S. Diplomatic post activities while not on post, to include in homes, hotel rooms, restaurants, and all other public places, is prohibited. Any contact with host or third country nationals that seems suspicious (such as undue curiosity in the project or project personnel) shall be reported immediately to the COR and RSO.
The Contractor and its employees shall exercise utmost discretion in regard to all matters relating to their duties and functions. They shall not communicate to any person any information known to them by reason of their performance of services under this contract which has not been made public, except to the extent necessary to perform their required duties in the performance of the contract requirements or as provided by written authorization of the Contracting Officer. All documents and records (including photographs) generated during the performance of work under this contract shall be for sole use of and shall become the exclusive property of the U.S.
Government. No article, book, pamphlet, recording, broadcast, speech, television appearance, film or photograph concerning any aspect of the work performed under this contract shall be published or disseminated through any media, to include company or personal websites, without the prior written authorization of the Contracting Officer. These obligations do not cease upon the expiration or termination of this contract or at any other point in time. The Contract shall include the substance of this provision in all subcontracts hereunder.
6.4 Standards of Conduct
6.4.1 General. The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance, and integrity and shall be responsible for taking such disciplinary action with respect to employees as may be necessary. Each Contractor employee shall adhere to standards of conduct that reflect credit on themselves, their employer, and the
United States Government. The Government reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The
Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.
6.4.2 Uniforms and Personal Equipment. The Contractor's employees shall wear clean, neat, and complete uniforms when on duty. All employees shall wear uniforms approved by the
Contracting Officer's Representative (COR). The Contractor shall provide, to each employee and supervisor, uniforms, and personal equipment. The Contractor shall be responsible for the cost of purchasing, cleaning, pressing, and repair of the uniforms.
6.4.3 Neglect of Duties. Neglect of duties shall not be condoned. This includes sleeping while on duty, unreasonable delays, or failures to carry out assigned tasks, conducting personal affairs during duty hours, and refusing to render assistance or cooperate in upholding the integrity of the worksite security.
6.4.4 Disorderly Conduct. The Contractor shall not condone disorderly conduct, use of abusive or offensive language, quarreling, and intimidation by words, actions, or fighting. Also included is participation in disruptive activities that interfere with normal and efficient Government operations.
6.4.5 Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.
6.4.6 Criminal Actions. Contractor employees may be subject to criminal actions as allowed by law in certain circumstances. These circumstances include but are not limited to the following actions: falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records; unauthorized use of Government property, theft, vandalism, or immoral conduct; unethical or improper use of official authority or credentials; security violations; organizing or participating in gambling in any form; and misuse of weapons.
6.4.7 Key Control. The Contractor will not be issued any keys. The keys will check out from
Post 1 by a “Cleared American” escort on the day of service requirements.
6.4.8 Notice to the Government of Labor Disputes. The Contractor shall inform the COR of any actual or potential labor dispute that is delaying or threatening to delay the timely performance of this contract.
7.0 SCHEDULED PREVENTIVE MAINTENANCE
7.1. General
7.1.1. The Contractor shall perform preventive maintenance as outlined in Exhibit A -
STATEMENT OF WORK. The objective of scheduled preventive maintenance is to eliminate system malfunction, breakdown, and deterioration when units are activated/running.
7.1.2. The Contractor shall inventory, supply, and replace expendable parts (e.g., filters, belts, hoses, gaskets) that have become worn down due to wear and tear. The Contractor shall maintain a supply of expendable and common parts on site so that these are readily available for normal maintenance to include: hoses, belts, oil, chemicals, coolant, filters (Air, Fuel, Oil), grease, sealant, thermostat, fuses; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment (hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits. The contractor should inventory the supply after each visit and order replacement supplies and have them delivered on site.
7.1.3. Exclusion. This contract does NOT include repair of equipment and replacement of hardware. Hardware replacements will be separately priced out by the Contractor for the
Government’s approval and acceptance. The Government has the option to accept or reject the
Contractor’s quote for parts and reserves the right to obtain similar spare parts from other competitive sources. If required by the Government, the Contractor shall utilize Government-purchased spare parts, if awarded the work. Such repairs/replacements will be accomplished by a separate purchase order. However, this exclusion does not apply if the repair is to correct damage caused by Contractor negligence.
7.1.4. Replacement/repair of any electronic or electrical parts must be approved by the COR prior to installation of the part. If the Contractor proceeds to replace any electronic or electrical parts without COR approval, the Contractor shall de-install the parts at no cost to the Government.
7.2 Checklist Approval
The Contractor shall submit to the COR a schedule and description of preventive maintenance tasks which the Contractor plans to provide. The contractor shall customize a work sheet to match the equipment or use a factory supplied one outlining the sequence of events and tasks to be performed. The Contractor shall prepare this schedule, work sheet, and task description in a checklist format for the COR’s approval prior to contract work commencement.
7.2.1. The Contractor shall provide trained technicians to perform the service at frequencies stated in Exhibit A and on the equipment called out in this SOW. The technician shall sign off on every item of the checklist and leave a copy of this signed checklist with the COR or the
COR's designate after the maintenance visit.
7.2.2. It is the responsibility of the Contractor to perform all manufacturers recommended preventive maintenance as well as preventive maintenance recommended by the manufacture technical manuals for the respective equipment.
8.0 PERSONNEL, TOOLS, CONSUMABLE MATERIALS AND SUPPLIES
The Contractor shall provide trained technicians with the appropriate tools and testing equipment for scheduled maintenance, safety inspection, and safety testing as required by this Contract.
The Contractor shall provide all of the necessary materials and supplies to maintain, service, inspect and test all the systems to be maintained.
8.1 Contractor furnished materials will include but not limited to appropriate tools, testing equipment, safety shoes and apparel for technicians, hands, hearing, and eye protection, MSDS, cleaning material and oil spill containment kit. Expendable/consumable items (e.g., hoses, belts, oil, chemicals, coolant, filters (Air, Fuel, Oil), generator starting batteries, grease, sealant, thermostat, fuse), will be maintained in the onsite inventory. See 7.1.2.
8.2 Repairs. Repairs are not included in this contract. See Item 7.1.3. Exclusions.
8.3 Disposal of used oil, fuel, battery, and other toxic substances. The Contractor is responsible for proper disposal of toxic/hazardous substances. All material shall be disposed of according to
Government and Local law. After proper disposal the contractor must show proof of authorized disposal of these toxic/hazardous substances.
9.0 Test and inspection field report: The contractor shall provide one copy of a typed summary report within 30 days of site work statement completion. The report must be written in the
English language. At a minimum the report must include:
• Provide a narrative summary site report to include all findings, repairs, or corrective measures, completed inspection/testing checklists.
• Provide a detailed report noting any noted discrepancy, include photos of the problem and a narrative summary of the corrective action required. The repair action will be contracted separately.
• Provide a Bill of Materials (BOM) as necessary for any required repair parts for future corrective action or repair. The BOM must note component name, part #, vendor or source, approximate lead time, suggested retail price.
• Provide a separate Bill of Materials (BOM) as necessary for any recommended spare parts for system. This can include applicable electrical safety PPE that post does not have onsite.
• Detail report covering all aspects of equipment upgrading, system modification, new part installation in all locations.
• Provide a “marked-up” as-build drawing as necessary to indicate any modifications or differences found during inspection.
• In the final report list, any Locally Employed Staff that assisted in this planned maintenance action. This is not a training requirement, but rather to document the personnel involved in the work.
10. DELIVERABLES
The following items shall be delivered under this contract:
Description QTY Delivery Date Deliver to
Names, biographic data, police clearance on Contractor personnel (#6.2)
1 5 days after contract award COR
Certificate of Insurance (#10.2) 1 10 days after contract award COR
Checklist and work sheet (7.2) 1 Prior to commencement of work
COR
Checklist signed by Contractor’s employee (#7.2.1)
1 After completion of each maintenance service
COR
Test and Inspection Field Report (#9.0) 1 30 days after each completion of service
COR
Invoice (#15) 1 After completion of each maintenance service
COR
11.0 INSURANCE REQUIREMENTS
11.1 Personal Injury, Property Loss, or Damage (Liability). The Contractor assumes absolute responsibility and liability for any and all personal injuries or death and property damage or losses suffered due to negligence of the Contractor’s personnel in the performance of this Contract.
The Contractor’s assumption of absolute liability is independent of any insurance policies.
11.2 Insurance. The Contractor, at its own expense, shall provide and maintain during the entire period of performance of this Contract, whatever insurance is legally necessary. The
Contractor shall carry the following minimum insurance:
Public Liability Insurance
Bodily Injury $1,000,000,00 per occurrence $2,500,000
Cumulative
Property Damage $1,000,000,00 per occurrence $2,500,000
Cumulative
Workers’ Compensation and Employer’s Liability
11.3 Worker's Compensation Insurance. The Contractor agrees to provide all employees with worker's compensation benefits as required under local laws (see FAR 52.228-4 “Worker’s
Compensation and War-Hazard Insurance Overseas”).
12.0 LOCAL LAW REGISTRATION
If the local law or decree requires that one or both parties to the contract register the contract with the designated authorities to ensure compliance with this law or decree, the entire burden of this registration shall rest upon the Contractor. Any local or other taxes which may be assessed against the Contract shall be payable by the Contractor without Government reimbursement.
13.0 QUALITY ASSURANCE PLAN (QAP).
13.1 Plan. This plan is designed to provide an effective surveillance method to promote effective Contractor performance. The QAP provides a method for the Contracting Officer's
Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The
Contractor, not the Government, is responsible for management and quality control to meet the terms of the Contract. The role of the Government is to conduct quality assurance to ensure that
Contract standards are achieved.
Performance Objective PWS Para Performance Threshold
Services.
Performs all services set forth in the performance work statement (PWS)
1 thru 12 &
Exhibit A
All required services are performed and no more than one
(1) customer complaint is received per month
13.2 Surveillance. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the
Contractor for corrective action.
13.3 Standard. The performance standard is that the Government receives no more than one (1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR
52.212-4, Contract Terms and Conditions-Commercial Items), if any of the services exceed the standard.
13.4. Procedures.
13.4.1 If any Government personnel observe unacceptable services, either incomplete work or required services not being performed, they should immediately contact the COR.
13.4.2 The COR will complete appropriate documentation to record the complaint.
13.4.3 If the COR determines the complaint is invalid, the COR will advise the complainant.
The COR will retain the annotated copy of the written complaint for his/her files.
13.4.4 If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.
13.4.5 The COR shall, as a minimum, orally notify the Contractor of any valid complaints.
13.4.6 If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.
13.4.7 The COR will consider complaints as resolved unless notified otherwise by the complainant.
13.4.8. Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the
Inspection clause.
14. TRANSITION PLAN/CONTACTS
Within 10 days after contract award, the Contracting Officer may ask the contractor to develop a plan for preparing the contractor to assume all responsibilities for preventive maintenance services.
The plan shall establish the projected period for completion of all clearances of contractor personnel, and the projected start date for performance of all services required under this contract.
The plan shall assign priority to the selection of all supervisors to be used under the contract.
14.1 On site contact. The following are the designated contact personnel between the US Embassy and the Contractor
Facility Manager: TheHagueFacPR@state.gov
Contracting Officer: TheHagueContracts@state.gov mailto:TheHagueFacPR@state.gov mailto:TheHagueContracts@state.gov
CONTINUATION TO SF-1449,
RFQ NUMBER 19NL8024Q0062
SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
EXHIBIT A
Statement of Work
I. GENERAL INFORMATION:
The United States Embassy in The Hague requires professional services and contractor cost proposals to perform preventive maintenance services on the facility’s Electrical Switchgear equipment as described in the equipment list below.
II. PROJECT REQUIREMENTS:
DESCRIPTION OF EQUIPMENT *:
*Please see attachment equipment lists (2) at the end of this sheet for more details
III. GENERAL REQUIREMENTS:
The Contractor under this SOW will be responsible for labor, tools, and materials required to carry out all preventive maintenance as outlined in this SOW. Embassy staff has service manuals for all Electrical Switchgear on site.
IV. SCOPE OF WORK - - PREVENTIVE MAINTENANCE
Contractor shall provide all materials, supervision, labor, tools, and equipment to perform preventive maintenance. This must include, but not limited to, batteries for the trip units, fuses, and dielectric lubricant.
All personnel working in the vicinity shall wear and /or use safety protection while all work is performed. Strict adherence to
NFPA70-E and applicable OSHA standards must be maintained at all times. Regular safety meetings shall be held among on-site contractor personnel, LES staff assisting. Any questions or injuries shall be brought to the attention of the Post Occupation
Safety and Health Officer (POSHO). Material Safety Data Sheets (MSDS) shall be provided by the Contractor for all
HAZMAT materials. Copies will be provided to the COR for approval.
Prior to beginning any site work the contractor must submit to the embassy FM an isolation Standard Operating Procedure
(SOP) and schedule to reflect the planned work and sequence. The contractor must obtain written approval from the embassy
Facility Manager noting the planned servicing schedule, and all required generator transfers, tie-breaker switching, or switchgear outages.
If any discrepancies are found with the generator system that are not covered under this scope of work then the contractor must provide the following:
1. Detailed report noting the discrepancy found.
2. Bill of Materials (BOM) to include component name, quantity, part #, and price for any repair material required and material lead time.
3. Price quote for repair labor.
At a minimum, the following work must be done:
Task Description
A. Step-One, Visual Inspection:
1) Visual and Mechanical Inspection to ensure the proper operation of all factory and vender installed meters, breakers, remote power monitoring equipment associated with the switch gear.
2) Inspect physical, electrical, and mechanical condition including evidence of moisture or corona.
3) Inspect that all filters are in place, and the vents are clear.
4) Inspect that the working space is maintained in front of all the electrical gear per the National Electrical Code (NEC) requirements.
5) Inspect that the electrical room is free from foreign articles not associated with the room.
B. Step-Two, Verify:
1) Compare the installed metering measurements with voltage and power readings from a True RMS meter. Make calibration corrections as necessary to ensure accurate voltage and power readings.
2) Verify the switchgear circuit breakers sizing match the drawings.
3) Verify the proper labeling of all the breakers in the switchgear.
4) Verify that the Post as-build drawings (electrical one-line) match the switchgear distribution. Make “Red Ink” corrections on a paper copy as necessary. Inform the FM of any discrepancies or changes to the drawings.
5) Verify that the required NFPA70-E safety equipment is available and in good condition for local staff to use.
6) Refer to the manufacture’s recommendations for additional maintenance requirements.
C. Step-Three, Test/Clean/Correct:
1) Inspect anchorage, alignment, grounding for the equipment.
2) Test the system earth ground (25 ohms or less).
3) Perform infrared testing on all conductor connections, buss terminations. Only record hot spots on digital format for review.
4) Before shutdown ensure that all components are operational. Record ones that are not at this time. Make the FM aware of all components that are not functioning prior to shut down.
5) Schedule power outage of equipment for cleaning. Coordinate any required outage with post. (Outage may require off hours work).
6) As applicable perform function tests on “rack-out” breakers, test trip units and settings. Replace any faulty battery, fuse, or switch.
7) Perform proper Lock-out/Tag-out and ensure the system is de-energized before removing panel covers and exposing any electrical bus or cabling. Under no circumstances should the equipment be energized during the maintenance operation.
8) Clean each compartment. Check for damage, excessive wear, or corrosion
9) Spot check and correct any loose components or connections.
10) Torque loose connections identified during the infrared test or during inspection.
11) Confirm correct operation and sequencing of electrical and mechanical interlock systems.
12) Use appropriate dielectric lubrication on moving current-carrying parts and on moving and sliding surfaces.
13) Correct any faulty, damaged, discolored, and worn components using site spares.
14) Exercise all active components. This includes racking the breakers out than back in.
15) Inspect mechanical indicating devices for correct operation.
16) Inspect all power control transformers for physical damage, cracked insulation, broken leads, tightness of connections, defective wiring, proper overload protection, and over all general wiring.
17) After re-energizing the equipment ensure that all components are up and functioning properly.
18) Refer to the manufactures suggested recommendations for additional maintenance requirements.
19) Clean or replace any air filters present.
20) Make calibration corrections as necessary to ensure accurate voltage and power readings on permanently installed switchgear metering.
EXHIBIT A. Equipment List:
Main Distribution Double Ended SG Caterpillar Low Voltage Switchgear Utility
Equipment List: Manufacturer Make Model Specification Location
Low Voltage, Metal Enclosed CaterPillar Eaton Eaton Magnum DS Metal Enclosure Utility Level 1 drawout Switchgear with Circuit breakers
Eaton Magnum DS
Circuit breakers
Eaton Magnum DS Cutler-Hammer Eaton MDS-632 65 kA 65 kA 3200 A Utility Level 1
Circuit breakers
Series NRX™ Eaton Eaton 800 NRX serie A 800 A Utility Level 1
Low Voltage Power Circuit Breaker
Power Xpert Meter 2000 Series Eaton Eaton Utility Level 1
Power Meter
Instrument Transformer ITI Eaton Model 468 Thermal rating 500VA Utility Level 1
Industrial Control Transformers Schneider Electronics Square D Type T Source Voltage 500 Utility Level 1
9070T1000D1 Load Voltage 115
9070T500D1 Load Voltage 115
9070T1500D1 Load Voltage 115
Surge Arrester Eaton SPD 250 - 220 V Utility Level 1
Relay 256 PLD series Crompton Crompton 256-PLDU-PQBX-C7 Three phase - Utility Level 1 four wire system
FAZ Eaton Eaton Eaton FAZ D40/1-SP Single Pole Utility Level 1 supplementary protectors UL 1077 DIN 40 A
Monitoring Utility Level 1
Gateway Eaton Eaton Power Xpert Gateway 800E
Uninterruptable Power Supply Caterpillar Phoenix Contact QUINT-UPS/ 24DC/ Utility Level 1
UPS Phoenix
Distribution feeders Caterpillar GP-Parts GP part serie750/760 Directional time, Utility Level 1
Protection Management phase overcurrent protection
LCD Open-Frame Tyco Electronics 1939L 19" LCD Touch Monitor Utility Level 1
Touchmonitor Open-Frame
Switchgear SWG1 Schneider Electric Low Voltage Switchgear Utility
Equipment List: Manufacturer Make Model Specification Location
Low Voltage, Metal Enclosed Square D Power-Zone® 4 NEMA Type 1, Utility level 2 drawout Switchgear with
Masterpact NW and NT Low Voltage
Power Circuit Breaker
Masterpact NW ANSI Rated Square D Masterpact NW Line NWH32H1 3200 A Utility level 2
Low Voltage Power Breaker
Power Logic PM800 Square D Power Logic PM800 Utility level 2
Power Meter
Micrologic Electronic Trip Units Schneider Electric Micrologic Micrologic 6.0P Utility level 2
Instrument Transformer Square D Square D Model 450 R Thermal rating 500VA Utility level 2
Industrial Control Transformers Schneider Electric Square D Type T Source Voltage 380. Utility level 2
Load Voltage 115
Instrument Transformer Square D Model 120R 600V Utility level 2
Surge Arrester Schneider Electric Square D SDSA3650 Utility level 2
Relay 250 series Schneider Electric Square D 252 PSG Three phase - Utility level 2 four wire system
Switchgear MSBE Schneider Electric Low Voltage Switchgear NOB
Equipment List: Manufacturer Make Model Specification Location
Low Voltage, Metal Enclosed Square D Power-Zone® 4 NEMA Type 1, NOB level 1 drawout Switchgear with
Masterpact NW and NT Low Voltage
Power Circuit Breaker
Masterpact NW ANSI Rated Square D Masterpact NW Line NWH1 3200 3200 A NOB level 1
Low Voltage Power Breaker NWH1 800 800 A
Power Logic PM800 Square D Power Logic PM870 PM8ECC Ethernet NOB level 1
Power Meter communication card
Micrologic Electronic Trip Units Schneider Electric Micrologic Micrologic 6.0P
Instrument Transformer Square D Square D Model 450 R 380 Thermal rating 500VA NOB level 1
Industrial Control Transformers Schneider Electric Square D Type T Source Voltage 380. NOB level 1
9070T1000 Load Voltage 115
Instrument Transformer Square D Model 120R -202 600V NOB level 1
Surge Arrester Schneider Electric Square D SDSA3650 NOB level 1
Relay 250 series Schneider Electric Square D 252 PVP - 252 PSG 3- phase - 4Wire NOB level 1
253-PHD 256 PLL 1- phase - 4Wire
Reversing contactor Schneider Electric TeSys D LC2D 7.5 hp at 575/600 V AC NOB level 1
3 phases motors touchscreen panel Schneider Electric Magelis XBTGT6330 SCGA 12.1" - TFT LCD NOB level 1
Magelis XBTGT SVGA - - 24 V DC
Unity processor Schneider Electric 2 racks 12 slots NOB level 1
Generator Switchgear Caterpillar Low Voltage Switchgear Utility
Equipment List: Manufacturer Make Model Specification Location
Low Voltage, Metal Enclosed CaterPillar Eaton Eaton Magnum DS Metal Enclosure Utility Level 1 drawout Switchgear with Circuit breakers
Eaton Magnum DS
Circuit breakers
Eaton Magnum DS Cutler-Hammer Eaton MDS-632 65 kA 65 kA 3200 A Utility Level 1
Circuit breakers
Series NRX™ Eaton Eaton 800 NRX serie A 800 A Utility Level 1
Low Voltage Power Circuit Breaker
Power Xpert Meter 2000 Series Eaton Eaton Utility Level 1
Power Meter
Instrument Transformer ITI Eaton Model 468 Thermal rating 500VA Utility Level 1
Industrial Control Transformers Schneider Electronics Square D Type T Source Voltage 500 Utility Level 1
9070T1000D1 Load Voltage 115
9070T500D1 Load Voltage 115
Surge Arrester Eaton Industrial Logic SPD 250 - 220 V Utility Level 1
TR N B24 AD
Relay 256 PLD series Crompton Crompton 256-PLD Three phase - Utility Level 1 four wire system
FAZ Eaton Eaton Eaton FAZ D40/1-SP Single Pole Utility Level 1 supplementary protectors UL 1077 DIN 40 A
Main Distribution Double Ended SG Low Voltage Switchgear Caterpillar
Switchgear SWG1 Schneider Electric Low Voltage Switchgear Utility
Generator Switchgear Caterpillar Low Voltage Switchgear Utility
END OF EXHIBIT A
SECTION 2 - CONTRACT CLAUSES
52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS
(NOV 2023) IS INCORPORATED BY REFERENCE. (SEE SF-1449,
BLOCK 27A)
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES
OR EXECUTIVE ORDERS-COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (MAY 2024)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan
2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations
Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance
Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C.
3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (Aug 1996) ( 31 U.S.C. 3553).
(7) 52.233-4, Applicable…