Request for Quotation Chip Seal-Crack filling 2021.pdf
PDF 471 KB Posted
- Solicitation number
- Not on record
- Issued by
- Wisconsin
About this file
Summary
This is a Request for Quotation (RFQ) issued by the City of Rhinelander, Wisconsin for chip seal, fog seal, GSB-88 sealer binder, and preparation work for 2021 road maintenance across eight street segments. The project encompasses chip seal and fog seal applications totaling approximately 32,469 square yards across named street segments including E. Monico Street, Vincent Street, Glenwood, Upland, Coolidge, Larch, Mason, and Alban streets, along with spray patching and crack sealing work on each segment. An alternate item includes 22,400 square yards in a to-be-determined area. Sealed RFQ submissions must be received by the City of Rhinelander at 135 S. Stevens St., Rhinelander, WI 54501 by 12 noon on March 5, 2021. Contractors may not commence work prior to May 17, 2021, with all work required to be completed no later than June 30, 2021. A pre-paving on-site meeting between the contractor and the city engineer will be held prior to beginning work to review work schedules, traffic control plans, and equipment calibration.
The contract will be awarded as a single prime contract to the lowest responsible, responsive bidder based on total pricing as determined in the owner's best interest. Payment will be made upon completion and satisfaction of work by the city. Unit prices must include all materials, labor, insurance, taxes, overhead, and profit. Contractors must submit a Certificate of Insurance providing proof of required coverage and execute a sworn statement certifying knowledge of contract documents, contractor experience, site conditions, and pricing basis. RFQ forms must be completed in ink or typewritten with prices stated in both words and figures, and the entire project manual must be submitted in a sealed envelope marked with the project name. Alterations to forms, additions not specified, incomplete manuals, unbalanced prices, and irregularities will result in rejection, and submissions may not be withdrawn or modified for 45 days following the deadline.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ AND PROJECT MANUAL
FOR:
CHIP SEAL, FOG SEAL, GSB-88 AND PREP WORK
2021 ROAD MAINTENANCE
1. PREPERATION OF RFQ
A. Request for quotes shall be prepared on the form provided in this Project Manual and submitted as specified. RFQs will be received for the contract listed on the Form. All blank spaces for prices shall be completed, in ink or typewritten, in both words and figures where provided. In case of discrepancy, written words shall govern over figures and unit prices shall govern over extended amounts.
B. RFQs may be rejected for the following reasons: alterations of the form, additions to the form, alterations not specified, incomplete manuals, unbalanced prices, and irregularities of any kind.
C. Submit original RFQ Form and required supporting documents in a sealed envelope to:
City of Rhinelander
135 S. Stevens St.
Rhinelander, WI 54501
Do not remove RFQ Form from Project Manual; submit entire Project Manual. Mark the exterior of the envelope as follows:
RFQ
Chip Seal, Fog Seal, GSB-88 and Prep Work 2021
City of Rhinelander, Wisconsin
(Contractor’s Name and Address)
D. If forwarded by mail, the sealed envelope containing the RFQ shall be enclosed in another envelope addressed as specified.
2. FAX TRANSMISION
A. Facsimile transmission will not be acceptable.
3. WITHDRAWL OR MODIFICATION OF RFQ
A. A contractor may withdraw or modify his RFQ, provided a written request is in the hands of the official or person authorized to receive prior to the Deadline. Thereafter, a submission may not be withdrawn or modified for 45 days.
4. SUPPLEMENTAL UNIT PRICE
A. Contractors shall state such supplemental unit price requested on the RFQ Form. If included in the
Contract, supplemental unit prices will be used for additions to and deductions from the amount of work required under the Contract. Unit prices shall include all costs of materials, labor, insurance, taxes, overhead and profit. Owner reserves the right to reject any supplemental unit prices as submitted in the RFQ or to accept any or all such unit prices.
5. AWARD OF CONTRACT
A. A single prime contract will be awarded based on lowest responsible, responsive total amount in the
Owner’s best interest.
B. The Owner reserves the right to reject any or all quotes, including responses which, in the opinion of
Owner, are excessive or not enough to properly carry out the work.
6. PAYMENT TO CONTRACTOR
A. Payment to the contractor will be made for of each application type upon completion and satisfaction of the Owner.
RFQ FORM
PROJECT: Chip Seal, Fog Seal, GSB-88 and Prep Work 2021
BID DEADLINE: 12 Noon, March 5, 2021
TO: CITY OF RHINELANDER
We _____________________________________________________(Name of Contractor) acknowledge that we have received the Contract Documents prepared by the City of Rhinelander. We hereby agree to provide all labor, materials, equipment and services required to complete the work in strict accordance with the Contract Documents for the following stated amount(s).
RFQ FORM
Chip Seal, Fog Seal, GSB-88 and Prep Work 2020
CITY OF RHINELANDER
SCHEDULE OF PRICES
ITEM DESCRIPTION OF WORK QUANTITY UNIT UNIT PRICE TOTAL PRICE
1 E. Monico Street, Iverson to Caukins
1-001 Chip Seal 4720 sq. yd. $ $
1-002 Fog Seal 4720 sq. yd. $ $
1-003 Spray Patching lump sum $ $
1-004 Crack Seal lump sum $ $
2 Vincent Street, Monico to Stevens
2-001 Chip Seal 3234 sq. yd. $ $
2-002 Fog Seal 3234 sq. yd. $ $
2-003 Spray Patching lump sum $ $
2-004 Crack Seal lump sum $ $
3 Glenwood, Vincent to Dwight
3-001 Chip Seal 1950 sq. yd. $ $
3-002 Fog Seal 1950 sq.yd. $ $
3-004 Crack Seal lump sum $ $
4 Upland, Vincent to Dwight
4-001 Chip Seal 1633 sq. yd. $ $
4-002 Fog Seal 1633 sq. yd. $ $
4-003 Spray Patching lump sum $ $
4-004 Crack Seal lump sum $ $
5 Coolidge, Johnson to Larch
5-001 Chip Seal 3131 sq. yd. $ $
5-002 Fog Seal 3131 sq. yd. $ $
5-003 Spray Patching lump sum $ $
5-004 Crack Seal lump sum $ $
6 Larch, Stevens to Coolidge
6-001 Chip Seal 5070 sq. yd. $ $
6-002 Fog Seal 5070 sq. yd. $ $
6-003 Spray Patching lump sum $ $
6-004 Crack Seal lump sum $ $
7 Mason, Monico to Alban
7-001 Chip Seal 9876 sq. yd. $ $
7-002 Fog Seal 9876 sq. yd. $ $
7-004 Crack Seal lump sum $ $
8 Alban, Thayer to Mason
8-001 Chip Seal 2875 sq.yd. $ $
8-002 Fog Seal 2875 sq.yd. $ $
8-004 Crack Seal lump sum $ $
RFQ FORM
TOTAL BASE PRICING
TOTAL OF UNIT RATE ALL ITEMS #1-8 above:
ALTERNATE: 22,400 sq yards area TBD.
ORGANIZATION & AUTHORITY
The undersigned herby certifies that the contractor is organized as indicated below and that all statements herein are made on behalf of such contractor.
Business Name: _____________________________________________________________________
Business Address: _____________________________________________________________________
Telephone Number: _________________________ Fax Number:____________________________________
SWORN STATEMENT
I, being duly sworn, hereby certify that I have examined and carefully prepared this from the Contract
Documents and have checked the same in detail before submitting this; that I have full authority to make such statements and submit this RFQ on behalf of the above contractor; and that said statements are true and correct.
Signature: _______________________________________________
Name & Title: ____________________________________________
(Seal, if submission is by a corporation)
Subscribed and sworn to me this _____________________day of
_________________________, 20_________________________
__________________________________________ Notary Public
___________________ County, ___________________________
My Commission Expires _________________________________
TIME OF COMPLETION
By the act of submitting pricing the contractor also agrees to the following completion date.
The contractor may not start work on this project sooner that May 17th, 2021. The City of Rhinelander requires that all work under this contract be completed no later than June 30th, 2021.
Contractor must continue work without voluntary suspension once construction commences.
CONTRACTOR’S WARRANTY
By the act of submitting pricing for the proposed work, the contractor warrants that:
1. Contractor and its subcontractors have carefully and thoroughly reviewed the Contract Documents and have found them complete, free of ambiguities and sufficient for the purpose intended; further that,
2. Contractor and all workers, employees, and subcontractors are skilled and experienced in the type of work represented in the Contract Documents; further that,
3. Pricing is based solely on the Contract Documents and not upon any other written representation;
further that,
4. Contractor has carefully examined the site of the work and that from its investigations is satisfied as to the nature and location of work, the character, quality, quantities of material and difficulties to be entered, the kind and extent of equipment and other facilities needed for performance of the work, the general and local conditions, and other items which may, in any way, affect the work or its performance.
PROOF OF INSURANCE
In order to provide proof of insurance coverage, the Contractor will need to provide a Certificate of Insurance, which is the official document provided by the Contractors insurance agent. It certifies that the Contractor has the necessary coverage.
TECHNICAL SPECIFICATIONS
CHIP SEAL
1. Description This work shall consist of furnishing all materials, equipment, labor and preparation necessary for the application of the polymer modified asphaltic rejuvenating emulsion - Chip Seal. The applied material shall completely seal the pavement surface and provide a uniform textured surface, suitable for placement of hot mixed asphalt, micro-surfacing, slurry seal, fog seal or as a finished surface.
The work shall be completed as follows: Prepare the pavement surface; apply the asphaltic emulsion; apply aggregate, roll the aggregate, broom the aggregate with a secondary broom when specified, sweep and dispose of excess aggregate.
2. Materials
A. Bituminous Material: The bituminous material to be furnished and applied shall be CRS-2P emulsion. The emulsion shall be applied at a rate of 0.32 +/- .03 gallons per square yard. The bitumen shall be applied at the appropriate temperature for the grade.
B. Cover Aggregate: The cover aggregate shall meet the Sieve Specifications, Physical Requirements and conform to the following sieve size.
Sieve Size Percent Passing
1/2" 100% 3/8" 100% 1/4" 100% No. 4 0-100% No. 8 0-45%
No. 16 0-15%
No. 50 0-7%
No. 100 0-4%
No. 200 0-2%
Physical Requirements for FA2 Aggregate
Test - Description Specification
MTM 102 - L.A. Abrasion Resistance 35% Maximum
MTM 110 - Deleterious Particles in Aggregate
3.5% Maximum (a)
ASTM D - Flat and Elongated Ratio, 3:1 (b) 15.0% Maximum
MTM 111 - Aggregated Wear Index ADT < 4,000 2200 Minimum
Moisture Content at time of placement 4% Maximum
a. Includes the sum of shale, silt stone, structurally weak and clay ironstone.
b. As determined for material retained on the No 4. sieve. The ratio between any combination of length, width and thickness.
c. All aggregate must be washed.
3. Equipment
All equipment required for performance of the work shall be approved before construction is to begin and shall be maintained in satisfactory operating condition. The Contractor shall furnish an accurate thermometer, hand brooms and other small tools and equipment essential for the completion of the work.
PRESSURE DISTRIBUTOR
The pressure distributor shall have a computerized rate control that automatically adjusts the distributor’s pump to the ground speed. The pressure distributor shall be capable of heating and re-circulating the bituminous binder to the specified temperature. The proper nozzles shall be used for the material and rate specified.
AGGREGATE SPREADER
The aggregate spreader shall be self-propelled and shall be equipped with hoppers, revolving cylinders and adjustments necessary to produce a uniform distribution of material at the specified rate.
PNEUMATIC TIRE ROLLER
The pneumatic tire rollers shall weigh a minimum of five (5) tons.
4. Pre-Paving On-Site Meeting
A meeting between the Contractor and Engineer will be held at the project site prior to beginning work. The agenda for this meeting will include:
• Review of Contractor’s detailed work schedule
• Review of the traffic control plan
• Inspection of equipment
• Calibration and adjustment to equipment as needed
5. Weather Limitations
The chip seal shall be places when the pavement and atmospheric temperature is 50°F and rising. Placement is not permitted if it is raining, when the pavement surface has standing water, or when temperatures are forecasted to be below 40°F within 24 hours of placement.
6. Construction
The Contractor shall follow the construction methods as described:
• Give the city a minimum two-week notice of start of work so that Road Work Ahead signs can be installed by the city crew.
• Preparation of the surface shall include removal of all vegetation, dirt and debris from the roadway. The surface will be cleaned by the City and shall be reasonably dry when the bituminous binder is applied.
• The chip seal shall be applied from edge of pavement to edge of pavement. The edges of the limits of the chip seal application on both sides of the road shall be maintained in a neat and uniform line.
• The specified aggregate shall be spread uniformly onto the bituminous binder prior to the emulsion breaking and as agreed to by the city & contractor in field.
• Projects with segments greater than 20,000 square yards shall use a minimum of two (2) rollers. Rollers shall proceed at a maximum speed of 5 mph. the entire surface shall receive a minimum of two (2) roller passes. The first roller pass shall be performed within one minute of aggregate spreading.
• Sweeping of the completed surface shall be accomplished prior to fog sealing.
• The Contractor shall protect all utility castings using tarpaper, plastic, or other approved material. All covers shall be properly fitted to the casting and protective covering removed upon completion of sweeping.
8. Application of Bituminous Binder and Coarse Aggregate
The bituminous binder shall be heated to specified temperature and uniformly placed to prevent ridges or streaks in the surface.
BITUMINOUS BINDER
The bituminous binder shall be applied at a temperature of 110°F to 180°F, and at the rate specified.
COARSE AGGREGATE
• Stockpiling and loading methods shall permit ready identification of material and minimize segregation and contamination of the aggregate.
• The moisture content of the course aggregate shall be below 4% and maintained throughout the project.
• Coarse aggregate shall be spread uniformly without ridges or gaps at the specified rates.
• Spreading of the aggregate shall be adjusted to produce a minimum of excess loose particles, shall provide complete coverage, and there shall be no “excessive” bleed-through after rolling.
• The spreading operation shall be accomplished in such a manner that neither the tires of trucks nor the spreader comes into contact with the newly applied bituminous material.
MATERIAL APPLICATION RATES
AGGREGATE APPLICATION RATE
Pounds per Square Yard
APPLICATION TYPE APPLICATION TOLERANCE
Chip Seal 21 In Field Adjustments
BINDER APPLICATION RATE
Gallons per Square Yard
Chip Seal 0.32 ± 0.05
The supplier of the chip seal binder shall determine the application rate for emulsion and aggregate based on the existing pavement condition and aggregate size. This information shall be reported to the Engineer prior to beginning work and shall include an aggregate gradation on the job-specific materials
9. Quality Control
To measure compliance, the Contractor shall use the methods described in this section:
• Aggregate Gradation
• Aggregate Moisture Content
• Yield Check on Bituminous Binder
• Temperature Check on Bituminous Binder
If the Contractor’s test results exceed any of the identified quality control tolerances, the city shall be immediately notified. The city will review the explanation and the corrective action taken by the Contractor. Another test will be taken and if the results still exceed he quality control tolerance, placement shall stop. The Contractor shall immediately notify the city and identify the cause of the excessive deviation and detail corrective action necessary to bring the deficiency into compliance. The city will give approval prior to resuming work.
BITUMINOUS BINDER
The application rate shall not exceed a tolerance of +/-0.05 gallons per square yard from the specified rate, and within the temperature range as specified.
COURSE AGGREGATE
The aggregate shall be clean, uniform and shall be within the gradation range as specified. Moisture content shall not exceed the tolerance as specified. Apply the aggregates at a minimum rate of 21.0 pounds per square yard. Take all precautions to minimize contamination of the aggregate. All stockpiles will be in place a minimum of 10 calendar days prior to seal coat operations to allow time to sample, test and accept the stockpile.
10. Method of Measurement
The chip seal will be measured by the square yard as provided for in the Contract Documents. The accepted quantities, measured as provided for above, will be paid for at the contract unit price for chip seal.
11. Basis of Payment
Chip seal shall be paid for per square yard for furnishing all preparation, materials, equipment, labor, clean-up and incidentals necessary to complete the work as specified.
Item Description Unit
001 Chip Seal Square Yard
FOG SEAL
1. Description
This work consists of furnishing all materials, equipment, labor and preparation necessary for an application of a fog seal following a chip seal. A fog seal is a light application of a slow-setting emulsified diluted with water. All work and materials shall be in accordance with the Standard Specifications for Construction, except as modified herein.
2. Materials
The materials shall meet the following requirement; Asphalt Emulsion: CSS-1h or CQS-1h
3. Equipment
All equipment required for performance of the work shall be approved before construction is to begin and shall be maintained in satisfactory operating condition. The Contractor shall furnish an accurate thermometer, hand brooms and other small tools and equipment essential for the completion of the work.
PRESSURE DISTRIBUTOR
The pressure distributor shall have a computerized rate control that automatically adjusts the distributor’s pump to the ground speed. The pressure distributor shall be capable of heating and re-circulating the bituminous binder to the specified temperature. The proper nozzles shall be used for the material and rate specified.
4. Pre-Paving On-Site Meeting
A meeting between the Contractor and Engineer will be held at the project site prior to beginning work. The agenda for this meeting will include:
• Review of Contractor’s detailed work schedule
• Review of the traffic control plan
The fog seal shall be places when the pavement and atmospheric temperature is 50°F and rising. Placement is not permitted if it is raining, when the pavement surface has standing water, or when temperatures are forecasted to be below 40°F within 24 hours of placement.
• Give the city a minimum two-week notice of start of work so that Road Work Ahead signs can be installed by the city crew.
• Preparation of the surface shall include removal of all vegetation, dirt and debris from the roadway. The surface will be cleaned by the City and shall be reasonably dry when the bituminous binder is applied.
• The fog seal shall be applied from edge of pavement to edge of pavement. The edges of the limits of the fog seal application on both sides of the road shall be maintained in a neat and uniform line.
Fog Seal 0.10 ± 0.03
If the Contractor’s test results exceed any of the identified quality control tolerances, the city shall be immediately notified. The city will review the explanation and the corrective action taken by the Contractor. Another test will be taken and if the results still exceed the quality control tolerance, placement shall stop. The Contractor shall immediately notify the city and identify the cause of the excessive deviation and detail corrective action necessary to bring the deficiency into compliance. The city will give approval prior to resuming work.
BITUMINOUS BINDER
The application rate shall not exceed a tolerance of +/-0.03 gallons per square yard from the specified rate, and within the temperature range as specified.
10. Method of Measurement
The fog seal will be measured by the square yard as provided for in the Contract Documents. The accepted quantities, measured as provided for above, will be paid for at the contract unit price for fog seal.
11. Basis of Payment Fog seal shall be paid for per square yard for furnishing all preparation, materials, equipment, labor, clean-up and incidentals necessary to complete the work as specified.
002 FOG SEAL Square Yard
SPRAY PATCHING
Spray Injection Patching shall consist of repairing pavement distressed areas including potholes, low pavement areas and cracks.
The material utilized shall consist of CRS-2 asphalt emulsion and a 100% fractured 5/16” Class A Hardrock Chip
Cover Aggregate.
3. Equipment
The spray injection equipment must be a self-contained unit with a 300 gallon heated emulsion tank. The stone hopper capacity should be a minimum of 5 cubic yards and be calibrated to match the flow rates of emulsion applied. The oil shall be pumped to the injector nozzle by compressed air and mixed in an injector ring that coats 100% of the aggregate before it leaves the spray nozzle.
4. Construction
The construction shall consist of preparation of the surface utilizing air from the injection blower, application of the tack coat on the bottom and sides of the distressed area, spray application of a mixture of emulsion and aggregate to a level grade, and a final layer of aggregate.
5. Measurement and Payment
Measurement and payment for spray injection patching shall be paid lump sum per road. Payment will be made at the contract price, which shall be considered full compensation for surface preparation, application of oil, application of aggregate, traffic control, furnishing all labor, equipment and incidentals necessary to complete the work.
003 SPRAY PATCH Lump sum
CRACK SEALING
The work shall consist of routing, cleaning, and sealing of random cracks and existing transverse and longitudinal joints.
The material used must be a premium quality Rubber Asphalt joint Sealer. The sealer must meet and/or exceed the ASTM D6690 Type II specification for Hot Pour Rubber Asphalt Joint Sealants.
The sealant shall be in manufacturer’s original sealed containers. Each container shall have the manufacturer’s name, batch number, and manufacturer’s recommendation for melting and application.
3. Equipment
A. The routers must be a minimum of 24 H.P. using star wheel carbide tipped router blades attached to a main cutting head. It must have In-line wheels and cutting head capable of following random cracks. It must have an automatic depth control to insure consistent and accurate routing depths.
B. When performing cutting or routing operations equipment must be fit with a dust suppression system capable of meeting the Occupational Safety and Health Administration (OSHA), Respirable Crystalline Silica construction standard, 29 CFR § 1926.1153. The dust suppression system must be attached to the routers/cutters directly to avoid any leakage of dust. The debris path created shall be confined to a windrow of approximately 8 inches (20.3 cm) for easy clean-up. Routed surfaces of cracks are subject to acceptance or rejection at the Engineer’s discretion.
C. Any contractor not following these guidelines will be stopped from doing any further work until the requirement is met. No compensation for lost time due to the enforcement of these guidelines will be granted.
D. The kettle used for heating the sealant must be an oil jacketed double boiler type melting unit, which is, equipped with both agitation and recirculation systems. It must have separate temperature thermometers for both the oil bath and melting vat to insure proper temperature for the sealant. It must be equipped with a pump to pressure fill cracks with a wand applicator.
4. Construction
All new cracks and joints must be routed to a minimum of 1 ¼” x 5/8” width versus depth. Cracks shall be blown out with 120 PSI compressed air. The road surface shall also be blown off at this time to clear it of any routed debris. Using the second compressor the cracks shall be blown out using a heat lance. All cracks shall be pressure filled by a wand applicator from the bottom up. They shall be slightly overfilled and disc squeegee to create an over-band 1” wide on each side of the routed reservoir. Also include any refilling and/or touching up of any previously filled cracks as needed that are exposed.
The cracks will then have a single ply toilet paper applied to prevent any material from tracking.
5. Measurement and Payment
Payment for Crack Sealing will be made lump sum per road. The price shall be full compensation for furnishing all materials.
For all preparation, delivering and placing of these materials and for all labor, equipment, tools and incidentals necessary to complete the work per specifications.
004 CRACK SEALING Lump sum
GSB-88 SEALER BINDER
This work consists of furnishing all materials, equipment, labor and preparation necessary for an application of GSB-88.
GSB-88 Emulsified Sealer/Binder is a chemically engineered asphalt pavement sealer/binder comprised of a cationic emulsion of Gilsonite Ore, and specially selected plasticizers. This chemical colloid stabilized emulsion has been specifically formulated for sealing asphalt parking lots, city streets, county roads, airport taxiways, and airport parking aprons. GSB-88® provides a durable, yet flexible top coat, while special plasticizers and oils penetrate and rejuvenate asphalt pavements. The result is an emulsified sealer/binder that restores vital components to asphalt pavements lost during the aging and oxidation process. The gilsonite seal provides a long wearing anti-oxidative seal for the surface of the asphalt pavement. GSB-88® beautifies asphalt pavements by drying to an absolute black color.
The materials shall meet the following requirement;
GSB-88 Emulsified Sealer Binder
3. Equipment
All equipment required for performance of the work shall be approved before construction is to begin and shall be maintained in satisfactory operating condition. The Contractor shall furnish an accurate thermometer, hand brooms and other small tools and equipment essential for the completion of the work.
PRESSURE DISTRIBUTOR
The pressure distributor shall have a computerized rate control that automatically adjusts the distributor’s pump to the ground speed. The pressure distributor shall be capable of heating and re-circulating the bituminous binder to the specified temperature. The proper nozzles shall be used for the material and rate specified.
4. Pre-Paving On-Site Meeting
A meeting between the Contractor and city will be held at the project site prior to beginning work. The agenda for this meeting will include:
• Review of Contractor’s detailed work schedule
• Review of the traffic control plan
GSB-88 shall be places when the pavement and atmospheric temperature is 50°F and rising. Placement is not permitted if it is raining, when the pavement surface has standing water, or when temperatures are forecasted to be below 40°F within 24 hours of placement.
• Give the city a minimum two-week notice of start of work so that Road Work Ahead signs can be installed by the city crew.
• Preparation of the surface shall include removal of all vegetation, dirt and debris from the roadway. The surface will be cleaned by the City and shall be reasonably dry when the bituminous binder is applied.
• The chip seal shall be applied from edge of pavement to edge of pavement. The edges of the limits of the chip seal application on both sides of the road shall be maintained in a neat and uniform line.
• The specified aggregate shall be spread uniformly onto the bituminous binder prior to the emulsion breaking and as agreed to by the city & contractor in field.
• Permanent pavement marking will be removed prior to applying GSB-88 by water blasting or scarifying.
• GSB-88 shall be applied from edge of pavement to edge of pavement. The edges of the limits of the application on both sides of the road shall be maintained in a neat and uniform line.
Dilution:
GSB-88® Concentrate must be diluted with heated water prior to application to asphalt pavements. Always add water to the concentrate emulsion; never add concentrate emulsion to the water. Two dilution rates are recommended as follows:
• 2 parts GSB-88® to 1 part water for use on hills where run off may be of concern, or on very rough surface textured pavements.
• 1 part GSB-88® to 1 part water for most applications is recommended.
Rate of Spread:
Rate of spread is normally determined by the texture, porosity, and age of the asphalt pavement to be sealed.
Application rate can vary from 0.08 to 0.15 gallons per square yard.
• For 2:1 dilution 0.08 to 0.12 gallons per square yard is recommended.
• For 1: 1 dilution 0.10 to 0.15 gallons per square yard is recommended.
Cure Time:
Under normal conditions, cure time for GSB-88® is 2 to 8 hours. Sheltered or shady areas may require longer cure times.
Application Precautions:
GSB-88® should not be applied to wet or damp pavement surfaces. Do not apply during rainy or damp weather, or when rain is anticipated within 8 hours after application is completed. Pavement surface temperatures should be 65°F (18°C) and rising before application of GSB-88® is initiated. At least three hours of daylight should remain after completion of the application. Material temperature will be applied at 130oF or above, but not to exceed 160oF during application.
GSB-88® should not be applied on extremely windy days.
Preparation of Pavement Surfaces:
Repair and patch all major pavement defects. All cracks, other than hairline cracks, should be filled with a suitable bituminous crack-filler. Scrape all oil spots to remove excess oil and dirt. Just before applying GSB-88® clean the asphalt surface of all loose dust, dirt, and other debris.
If the Contractor’s test results exceed any of the identified quality control tolerances, the city shall be immediately notified. The city will review the explanation and the corrective action taken by the Contractor. Another test will be taken and if the results still exceed the quality control tolerance, placement shall stop. The Contractor shall immediately notify the city and identify the cause of the excessive deviation and detail corrective action necessary to bring the deficiency into compliance. The city will give approval prior to resuming work.
BITUMINOUS BINDER
The application rate shall not exceed a tolerance of +/-0.03 gallons per square yard from the specified rate, and within the temperature range as specified.
10. Method of Measurement
The GSB-88 emulsified sealer/binder will be measured by the square yard as provided for in the Contract Documents.
The accepted quantities, measured as provided for above, will be paid for at the contract unit price for fog seal.
11. Basis of Payment GSB-88 shall be paid for per square yard for furnishing all preparation, materials, equipment, labor, clean-up and incidentals necessary to complete the work as specified.
005 GSB-88 Square Yard