REQUEST FOR QUALIFICATIONS PTC 24_04A.pdf

PDF 5 MB Posted

Attached to
RFQ PTC 24-04A SS4A Traffic Safety Plan
Solicitation number
PE-66790-NONST-2027-000000033
Issued by
Gwinnett County, Georgia

About this file

This Request for Qualifications is issued by the City of Peachtree Corners, Georgia, for the development of a comprehensive citywide Safety Action Plan aligned with the U.S. Department of Transportation's Safe Streets and Roads for All (SS4A) Program. The project requires consultants to deliver services including leadership commitment development, expanded safety analysis of 5-7 years of crash data, high injury network identification, policy and process review, project prioritization, demonstration quick-build projects, funding and implementation roadmap development, progress tracking framework, and final plan adoption. Sealed technical proposals are due December 18, 2026, at 4:00 PM EST, with questions accepted until December 9, 2026, at 4:00 PM EST. The anticipated notice of award is January 26, 2027. Proposals must be submitted to James Nguyen, PE, at the City's address or via email at jnguyen@peachtreecornersga.gov, and must remain valid for ninety days following the opening date. Consultants shall submit a maximum ten-page proposal (excluding cover page, table of contents, and exhibits) including a cover letter, project summary, methodology, schedule, project staff qualifications, and at least three similar project references from the past five years.

The project is funded through a federal SS4A Grant Agreement (Federal Award No. 693JJ32540044) with total project funding of $387,000, comprised of $309,600 in federal funds and $77,400 in recipient share. The period of performance extends from November 26, 2024, through November 26, 2029. Evaluation of proposals will be conducted using weighted criteria: Methodology (30 points), Project Staff (25 points), Similar Experience (30 points), and Schedule (15 points), for a total of 100 points. The City reserves the right to interview one or more highly ranked firms and to reject any or all proposals. No set-asides are explicitly identified in this solicitation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUALIFCATIONS PTC 24-04A

SS4A Traffic Safety Plan

I. Invitation to Service Providers

The City invites you to submit a Qualifications from your firm that clearly presents your experience, expertise, and professional capabilities on a project of this nature. The City of

Peachtree Corners (hereinafter called “City”) will receive sealed technical proposals until

December 18, 2026, 4:00 PM EST, for the above referenced project and the City invites consultants to submit proposals responsive to the specific requirements set forth in this Request for

Qualifications (RFQ).

Any questions and/or specifications that may need clarification shall be submitted via email to the

City’s representative at jnguyen@peachtreecornersga.gov. The email shall include the correspondent’s name, company, mailing address, email address, and a direct phone number. It shall be the consultant’s responsibility to seek clarification as early as possible prior to the opening of proposals. The deadline for the submission of questions via email is December 9, 2026, 4:00

PM EST. All responses to questions and clarifications will be issued as an Addenda uploaded to the City’s website and sent to all parties who notified the City as an interested consultant. Only questions answered by Addenda will be binding. The proposals must be sent via FTP, hard copy, or email to:

James Nguyen, PE

City of Peachtree Corners

310 Technology Parkway

Peachtree Corners, Georgia 30092 jnguyen@peachtreecornersga.gov

The proposal should be marked with the proposing firm’s full legal name and “RFQ 24-04A SS4A

Traffic Safety Plan.” If submitted electronically, both the Email Subject and document should have the proposing firm’s full legal name and “RFQ 24-04A SS4A Traffic Safety Plan.”

Electronic submissions are adequate and are encouraged. Hard copy submittals must bear on the outside the name and address of the consultant and include an electronic version of the proposal on a flash drive. No proposal may be withdrawn or modified in any way after the deadline for the proposal. Proposals must be valid for ninety (90) days following the opening date.

The City may request additional information from suppliers to clarify elements of their proposals.

The City also reserves the right to make independent investigations as to the qualification of each proposal.

The City reserves the right to reject any or all Proposals. The city further reserves the right to reject the Proposals of any consultant whom it finds non-responsive. The city may also reject the mailto:jnguyen@peachtreecornersga.gov mailto:jnguyen@peachtreecornersga.gov

Proposal of any consultant if the city believes that it would not be in the best interest of the Project to make an award to that consultant.

II. Project Description

The proposed project will deliver a comprehensive, citywide Safety Action Plan that fully aligns with USDOT’s Safe Streets and Roads for All (SS4A) Action Plan requirements and Safe System principles. The work program is structured to move from leadership commitment and data driven analysis through policy evaluation, project prioritization, and implementation planning, culminating in a formally adopted plan. Together, these tasks will provide the City with a transparent, equitable, and actionable framework to eliminate traffic fatalities and serious injuries for all roadway users while positioning the City for future SS4A Implementation Grant funding.

This project is supported by the U.S. Department of Transportation’s Safe Streets and Roads for

All (SS4A) Grants Program. The SS4A program funds regional, local, and Tribal initiatives through grants to prevent roadway deaths and serious injuries.

We invite you to submit a Proposal from your firm that clearly presents your experience, expertise, and capabilities on a project of this nature.

The safety plan shall be prepared under the guidance of a professional Consultant and shall be in accordance with AASHTO, Georgia Department of Transportation & Gwinnett County

Department of Transportation Design Policies.

III. Scope of Services

The services to be performed by the consultant pursuant to this Project, include, but are not limited, to the following:

Task 1: Leadership Commitment & Safety Goal

• Development of an adopted leadership commitment statement and a formalized goal to eliminate fatalities and serious injuries.

Task 2: Expanded Safety Analysis

• A full systemwide analysis of the past 5–7 years of crash data.

• Development of a High Injury Network (HIN).

• Inclusion of speed analysis, roadway characteristics, land-use context, and vulnerable user exposure.

Task 3: Publish Data & Analysis online and in the City's APP

• Crash Data Maps

• Land Use Maps

• Infrastructure Maps

Task 4: Policy & Process Review

• Review of existing standards and operating procedures.

• Recommendations for changes such as design speed policies, crosswalk criteria, speed management strategies, and default multimodal safety practices.

Task 5: Project Strategy & Prioritization

• Development of a comprehensive project pipeline (corridor, spot, systemic, and programmatic).

• Prioritization methodology that incorporates crash risk and feasibility.

Task 6: Demonstration / Quick Build Projects

• Concept design and evaluation plans for 2–5 demonstration or quick build treatments.

Task 7: Funding & Implementation Roadmap

• Identification of funding pathways, bundling strategies, and a 1–3–5 year delivery pipeline.

Task 8: Progress & Transparency Framework

• Performance measures, dashboard specifications, and an annual reporting structure.

Task 9: Final Action Plan & Adoption

• Production of the draft and final plan, including public review cycles and formal adoption.

IV. Proposal Format

Consultants shall submit an original Qualification Proposals. Proposals should be marked with the firm’s full legal name and “RFQ 24-04A SS4A Traffic Safety Plan.” Hard copy submittals must bear on the outside the name and address of the consultant and should include an electronic copy provided on a flash drive. Electronic submissions are adequate and are encouraged. Proposals must be in strict compliance with this Request for Proposal. Failure to comply with all provisions of the

RFP or to provide complete responses to all sections may result in disqualification.

Responses shall be concise while completely providing all information required. All responses shall be typed and kept to a maximum of ten (10) 8.5” x 11” one sided page. The Cover Page, Table of Contents, and Exhibits will not count toward the 10-page limit. Exhibits can include

Addenda Signature Pages, Project Staff’s Resumes, Disadvantage Business Enterprise

Commitment Letters, and additional information on Similar Experiences. Exhibits may also be printed as 11” x 17” sheets and folded to fit the proposal. The required font size is 12-pt with the exclusion of fonts associated with tables, charts, and exhibits.

For the City to adequately compare and evaluate proposals, all proposals must include:

Cover Letter: A one-page letter that summarizes the key elements of the proposal. The letter must include the consultant’s company name, the address where the business resides, website, and contact information of the primary proposing person. The letter should state why the contractor feels they should be selected. The letter is required to be signed by an authorized officer and must provide a statement that they understand the contents of the Request for Proposal and the proposal will be valid for ninety (90) days from the opening date.

Project Summary: A summary of the project displaying the consultant’s understanding of the proposed project and the impacts it may have on the City of Peachtree Corners. The summary shall include the consultant’s understanding of the scope of work and the purpose of the proposal.

Methodology: Description of the overall approach the consultant will take to complete the scope of work within this Request for Proposal, including any innovative efforts that may occur. Include all the tools or applications that will be used to complete the project. Include details on how the project team will ensure the City’s satisfaction and what task is required by the city to assist.

Proposed Schedule: Provide a GANTT chart styled schedule for completion of the scope of work that gives specific time frames for each phase of the project. Include a brief narrative describing the project schedule, anticipated milestones, and any factors that may affect project delivery.

Project Staff: Provide the anticipated list of individuals who will be tasked to work on this project and indicate the functions that each will perform. Describe each individual's role, qualifications, relevant experience, and anticipated level of involvement.

Similar Experience: Provide no fewer than three (3) project references completed in the last five years similar in size and scope to the proposed project that prove that the consultant and corresponding project staff have the experience capable of completing this proposed project. Each reference shall include project name, project description, key personnel, location, cost, status, and client contact information.

V. Proposal Schedule

Advertise Request for Proposal November 16, 2026

Deadline for questions submitted December 9, 2026, 4:00 PM EST

Last day for addendum publication December 11, 2026, 4:00 PM EST

Proposals due December 18, 2026, 4:00 PM EST

Potential notice of award January 26, 2027

VI. Proposal Evaluation Process

Consultants will be selected by an evaluation team based on the weighted criteria below:

Criteria Points

Methodology 30

Schedule 15

Project Staff 25

Similar Experience 30

Total 100

The City reserves the right to interview one or more of the highest ranked firms if deemed necessary to assist in the selection process.

ATTACHMENT I

SS4A GRANT AGREEMENT

1. Federal Award No.

693JJ32540044

Amendment No.: 0001

4. Award To City of Peachtree Corners 310 Technology Parkway Peachtree Corners, GA 30092

Unique Entity Id.: C8DLXPC8ULK5 TIN No.: 46-0587460

6. Period of Performance

I I /26/24 - I I /26/2029

8. Type of Agreement Grant

10. Procurement Request No.

HSA260485PR

12. Submit Payment Requests To See Article 5.

14. Description of the Project

2.

5.

7.

9.

11.

13.

Effective Date 3. Assistance Listings No.

See No. 16 Below 20.939

Sponsoring Office U.S. Departmen! of Transportation Federal Highway Administration Office of Safety 1200 New Jersey A venue, SE HSSA-1, Mail Drop W56-485 Washington, DC 20590

Total Amount Federal Share: $309,600 Recipient S0are: $77,400 Other Federal Funds: $0 Other Funds: $0 Total: $387,000

Authority Section 24112 of the Infrastructure Investment and Jobs Act (IIJA, Pub. L. 117-58, November 15, 202 I)

Federal Funds Obligated $309,600

Accounting and Appropriations Data

I 5XO I 73E50.0000.055SR I 0500.5592000000.4 IO I 0.61006600

This project will develop a comprehensive, citywide Safety Action Plan that aligns fully with the U.S. Department of Transportation's Safe Streets and Roads for All (SS4A) Action Plan requirements and advances the City's commitment to eliminating traffic fatalities and serious injuries. The effort transitions the project from a limited, intersection focused safety review to a holistic Safe System-based framework that evaluates and addresses roadway safety across the entire transportation network.

RECIPIENT

15. Signature of Person Authorized to Sign

�JZ- �AvWl.

� Date Name: Brian L. Johnson Title: City Manager

FEDERAL HIGHWAY ADMINISTRATION

16. Signature of Agreement Officer

HECTOR RAMON Digitally signed by HECTOR

RAMON SANT AMAR IA

SANT AMARI A Date: 2026.08.11 09:04:45 -04'00'

Signature Date Name: Hector R. Santamaria Title: Agreement Officer