Request for Proposals.pdf

PDF 397 KB Posted

Attached to
RFP884 (abbr. ) - Uninterruptible Power Supply (UPS) Replacement
Solicitation number
PE-29016-NONST-2027-000000078
Issued by
Fulton County, Georgia

About this file

This Request for Proposals (RFP) issued by the Atlanta Regional Commission (ARC) seeks proposals from vendors to furnish, deliver, install, and commission one three-phase Uninterruptible Power Supply (UPS) system to replace an existing Schneider Electric MGE Galaxy 5000, 40 kVA unit at ARC's offices located at 229 Peachtree Street NE, Suite 100 in Atlanta. The replacement UPS must meet a minimum capacity of 40 kVA with 480 VAC three-phase input and output, include VRLA or lithium-ion batteries with runtime equal to or greater than the existing 70 Ah system, and feature internal static bypass capability or an external maintenance bypass panel. All equipment must pass through a 36-inch-wide doorway and fit within the existing room footprint. The RFP was posted on Friday, November 6, 2026, with questions due by Tuesday, November 10, 2026 at 5:00 PM EST and answers posted Thursday, November 12, 2026. Proposals are due Thursday, November 19, 2026 at 5:00 PM EST, with award anticipated for Friday, November 20, 2026. All delivery, installation, commissioning, and acceptance must be completed no later than December 31, 2026. The vendor must provide lead time information for both equipment delivery and installation, along with a guaranteed completion date, as meeting the December 31, 2026 deadline is a pass/fail requirement. Site registration and application approval on the ARC procurement website portal must occur prior to proposal submission.

The contract is awarded on a firm fixed-price basis to the responsive, responsible vendor offering the best value. ARC evaluates proposals using the following weighted criteria: Price (30%), Schedule including lead time and credibility of completion plan (30%), Technical Compliance with Exhibit A specifications (30%), and Qualifications including factory authorization, licensing, and references (10%). The vendor must provide a complete turnkey package including site survey, removal and disposal of the existing UPS with certificates, delivery and rigging, electrical installation by a Georgia-licensed contractor with required City of Atlanta permits and inspections, factory-authorized startup and commissioning with load-bank testing, after-hours or weekend cutover with ARC-approved plan, and on-site staff training. Pricing is firm for 60 days from proposal submission. The vendor must carry commercial general liability insurance of $1,000,000 per occurrence/$2,000,000 aggregate, automobile liability of $1,000,000, and workers' compensation at statutory limits, naming ARC as additional insured. Payment is made upon delivery, installation, and ARC's written acceptance, with invoices paid or rejected within 45 days of receipt. The vendor and any subcontractors must participate in E-Verify per Georgia law. No specific set-asides or funding source is identified in this RFP.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposals Uninterruptible Power Supply (UPS) Replacement

Site registration and application approval must be done prior to submitting a proposal.

All documents must be combined and submitted as one complete proposal.

Purpose and Background The Atlanta Regional Commission (ARC) is the regional planning and intergovernmental coordination agency for the metro Atlanta region. The ARC Office of Information Technology provides technology services to internal departments and partner agencies, with a focus on maintaining a secure, reliable, and highly available network infrastructure that protects the Agency’s data assets. The offices at 229 Peachtree Street NE, Suite 100 rely on a centralized UPS to maintain the server room and IDF closets during a loss of electrical power supply.

The existing unit is a Schneider Electric MGE Galaxy 5000, 40 kVA, with a 480 VAC three-phase input and output. Schneider discontinued the Galaxy 5000 line in July 2021, so parts and service support are limited.

Therefore, ARC is requesting proposals to furnish, deliver, install, and commission one three-phase Uninterruptible Power Supply (UPS) to replace its existing unit, with the work complete by December 31, 2026.

Because the unit must be delivered and installed by year end, every proposal must state the lead time for delivery and for installation, and proposals that cannot meet December 31, 2026 may be found non-responsive.

Exhibit A: Scope of Work and Technical Specifications The vendor shall provide a complete, turnkey replacement: equipment, freight, rigging, removal of the old system, installation, startup, and training.

Equipment requirements

Requirement Specification

Type Three-phase, double-conversion (online) UPS, UL 1778 listed

Capacity Minimum 40 kVA, equal to or greater than the existing unit; unity or 0.9 output power factor

Input voltage 480 VAC, 3-phase, 3-wire + ground (vendor to verify during site survey), 60 Hz

Output voltage 480 VAC, 3-phase, 60 Hz, matching existing downstream distribution

Electrical Connections Top Feed Flexible Conduit

Battery runtime Equal to or greater than the existing 70 Ah battery system; state runtime in minutes at 100% and 50% load

RFP884 (abbr.)

Requirement Specification

Batteries VRLA or lithium-ion, in matching cabinet(s); state type, design life, and warranty

Bypass Internal static bypass plus a maintenance bypass. The existing MGE has an integral maintenance bypass and no separate bypass panel is installed. The new UPS must include an integral maintenance bypass, or the vendor must furnish and install an external wrap-around bypass panel, included in the proposed price.

Footprint Each cabinet or shipping section must pass through a 36-inch-wide doorway; must fit the existing room; footprint should not exceed that of the existing MGE Galaxy 5000 system

Efficiency State efficiency at 25%, 50%, 75%, and 100% load

Monitoring Network management card required. Proposal must state what the card provides (e.g., SNMP, web interface, email alerts, dry contacts) and any available integrations with monitoring or automated shutdown software

Warranty Minimum 1-year parts and labor on UPS; state battery warranty separately

Equivalent products from Schneider Electric (e.g., Galaxy series) or other manufacturers are acceptable if they meet every requirement above.

Services required

1. Site survey to verify existing conditions, conductors, breakers, and clearances before ordering.

2. Delivery, rigging, and placement of all equipment, from ARC's loading dock, including any freight elevator coordination with building management. The delivery path includes a 36-inch-wide doorway; the vendor is responsible for any crating removal, disassembly, or sectioning needed to move new and old equipment through it.

3. Disconnection, removal, and lawful disposal or recycling of the existing UPS and batteries;

provide disposal certificates.

4. Electrical connections by a Georgia-licensed electrical contractor, with any required City of Atlanta permits and inspections.

5. Factory-authorized startup and commissioning, including load-bank or live-load test report.

6. Cutover performed after hours or on a weekend with a written plan approved by ARC to minimize downtime.

7. On-site training for ARC staff and delivery of as-built drawings, manuals, and warranty documents.

Delivery, Installation, and Lead Time The new UPS must be delivered, installed, commissioned, and accepted by ARC no later than December 31, 2026.

Each proposal must state, in calendar days from purchase order:

• Equipment lead time to delivery on site, and whether the unit is in stock or must be built to order.

• Lead time for batteries, if shipped separately.

• On-site installation and commissioning duration, including planned downtime hours.

• Earliest guaranteed completion date.

Vendors must identify any risks to the schedule (factory backlog, freight, permits, holiday closures) and how they will be managed. ARC's offices may have reduced staffing between December 21 and December 25th; cutover dates must be agreed upon in advance.

If an awarded vendor cannot meet its proposed delivery date, ARC may cancel the order and award to the next responsive vendor.

Schedule of Events The ARFP is open for fourteen days, with award targeted for November 20, 2026 to leave about six weeks for delivery and installation.

Milestone Date / Deadline (EST)

RFP (abbr.) posted Friday, November 6, 2026

Questions due (via portal) Tuesday, November 10, 2026, 5:00 PM

Answers posted Thursday, November 12, 2026

Proposals due Thursday, November 19, 2026, 5:00 PM

Anticipated selection / notice of intent Friday, November 20, 2026

Installation and acceptance complete No later than Thursday, December 31, 2026

All times are Eastern. The procurement system records submission time, and late proposals will not be accepted.

Proposal Submittal and Response Requirements All proposals must be submitted electronically through the ARC procurement website as one combined file (PDF or Word). Proposals sent by email, mail, fax, or hand delivery will not be accepted. Vendors must register and be approved on the ARC procurement website portal before submitting; only the latest upload per vendor is kept.

Questions must be submitted through the portal by the deadline. Only written answers posted to the website are binding. From posting through award, vendors may not contact ARC staff, board members, or consultants about this RFP except through the Q&A process; violations may result in rejection.

Each proposal must include:

1. Legal firm name and point of contact (name, title, phone, email, address).

2. Manufacturer, model number, capacity, and spec sheets for the proposed UPS, batteries, and bypass.

3. A statement confirming compliance with each item in Exhibit A, or a list of exceptions.

4. Lead time and completion schedule as required in the Delivery section.

5. Evidence the vendor is a factory-authorized dealer or service provider, and the Georgia electrical license number of the installer.

6. Three references for comparable three-phase UPS installations in the past five years.

7. Completed Exhibit B price form.

8. Signed required forms listed below.

Exhibit B: Price Form

Line item Price

UPS module (make/model: ) $

Battery cabinet(s) and batteries $

External maintenance bypass panel, if not integral to UPS (state "included" if integral) $

Freight, delivery, and rigging $

Removal and disposal of existing UPS and batteries $

Electrical installation, permits, and inspection $

Startup, commissioning, and training $

Total firm fixed price $

Optional: extended warranty / maintenance, years 2–3 (per year) $

Prices must be firm for [60] days. Proposals must state lead time in calendar days from PO.

Required forms

• Georgia Security and Immigration Compliance Act Affidavit (Contractor Affidavit), notarized, with E-Verify number

• Contractor/Vendor Information Form

• Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower

Tier Covered Transactions and Lobbying

• Current Certificate of Insurance

Evaluation and Award ARC will award to the responsive, responsible vendor offering the best value, with a guaranteed completion date of December 31, 2026 as a pass/fail requirement.

Criterion What ARC evaluates Weight

Price Total firm fixed price from Exhibit B [30%]

Criterion What ARC evaluates Weight

Schedule Lead time, guaranteed completion date, and credibility of the plan

[30%]

Technical compliance Degree to which the equipment meets Exhibit A [30%]

Qualifications Factory authorization, licensing, references [10%]

ARC reserves the right to select a proposal other than the lowest price; reject any or all proposals or portions of them; waive irregularities; request clarifications or best-and-final offers; and cancel this RFP at any time without obligation. ARC is not liable for any cost of preparing a proposal. A notice of intent to award and the list of submitters will be posted on the procurement website.

General Terms and Conditions Payment. The vendor invoices after delivery, installation, and ARC's written acceptance. ARC will pay or reject properly submitted invoices within 45 days of receipt. Invoices go to IT Purchasing, 229 Peachtree St NE, Suite 100, Atlanta, GA 30303, itpurchasing@atlantaregional.org, and must show a unique invoice number, description of work, and a valid payment address.

Insurance. Before work begins, the vendor shall provide certificates naming ARC as additional insured:

commercial general liability $1,000,000 per occurrence / $2,000,000 aggregate, automobile liability $1,000,000, and workers' compensation at statutory limits.

Open records. ARC is subject to the Georgia Open Records Act. Trade secrets must be marked "Confidential" on the specific pages; marking an entire proposal confidential will not be honored.

Conflicts of interest. Vendors must disclose any potential conflict, with names, facts, and proposed controls. Conflicts are governed by the ARC Standards of Ethical Conduct.

E-Verify. The vendor and any subcontractors performing physical services must participate in E-Verify per O.C.G.A. §13-10-91.

Nondiscrimination. ARC does not discriminate in the award or administration of contracts.

Safety and site rules. The vendor follows NFPA 70E and OSHA requirements, building management rules, and ARC's access and escort procedures.

mailto:itpurchasing@atlantaregional.org

CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY

AND VOLUNTARY EXCLUSION - LOWER TIER COVERED TRANSACTIONS AND LOBBYING

1. DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION- LOWER TIER COVERED

TRANSACTIONS

The prospective lower lier participant agrees by submitting this proposal that, should the proposed covered transaction be entered Into, It shall not knowingly enter into any lower lier covered transaction wllh a person who Is pmposed for debarment under 45 CFR Part 76, debarred, suspended, declared inellgfble, or voluntarily excluded from participation In this covered transaction, unless authorized by the department or agency with which this transaction originated.

The terms 'covered transaction", "debarred", ·suspended', "Ineligible", "lower-tier covered transaction·, "participant', 'person', "primary covered transaclion·, "principal", "proposal", and "voluntarily excluded", as used in this clause have the meaning set forth In the Definitions and Coverage sections of rules Implementing Executive Order 12549.

The prospective lower lier participant certlfles that, by submission of this proposal, that neither ii nor Its principals Is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency.

Where the prospective lower tier participant Is unable to certify to any of its statements In this certlficalion, such pmspectlve participant shall attach an explanation to this proposal.

2. LOBBYING

As required by Section 1352, Title 31 of the U.S. Code (as Implemented al 45 CFR Part 93), the applicant certifies that to the best of his or her knowledge and belief that:

(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for Influencing or attempting to lnHuence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress In connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal roan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment. or modification of any Federal contract, grant, loan, or cooperative agreement.

(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for lnnuencing or atlemptlng to Influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress In connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its tnslruclions.

(3) The undersigned shall require that the language of this certification be Included In the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subreclplents shall certify and disclose accordingly.

This certlficatfon Is a material representation of fact upon which reliance was placed when this transaction was made or entered Into.

Submission of this certification Is a prerequisite for making or entering Into this transaction imposed by Section 1352, Title 31, U.S. Code.

Any person who falls to file the required certification shall be subject lo a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

Statement for Loan Guarantees and Loan Insurance

The undersigned states, to the best of his or her knowledge and belief, that:

Ir any funds have been paid or will be paid to any persons for influencing or allempting lo influence an officer or employee or any agency, a Member of Congress, an officer or employee of Congress. or an employee of a Member of Congress In connection with this commitment providing for the United States to insure or guarantee a loan, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form lo Report Lobbying,' In accordance with its Instructions.

Submission of this statement is a prerequisite for making or entering Into this transaction Imposed by Section 1352, Title 31, U.S. Code.

Any person who falls to file the required statement shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 ror each such failure.

As the duly authorized representative of the applicant, I hereby certify that the applicant will comply with the above applicable certlficatlon(s).

NAME OF APPLICANT AWARD NUMBER and/or PROJECT NAME

PRINTED NAME OF AUTHORIZED REPRESENTATIVE TITLE OF AUTHORIZED REPRESENTATIVE

SIGNATURE OF AUTHORIZED REPRESENTATIVE DATE

REV ARC 05106

Request for Proposals_.pdf
Request for Proposals
Uninterruptible Power Supply (UPS) Replacement
Purpose and Background
Exhibit A: Scope of Work and Technical Specifications
Equipment requirements
Services required
Delivery, Installation, and Lead Time
Schedule of Events
Proposal Submittal and Response Requirements
Exhibit B: Price Form
Required forms
Evaluation and Award
General Terms and Conditions
ARFP884 – Uninterruptible Power Supply (UPS) Replacement.pdf
RFP - UPS Replacement
ARC-Contractor-Affidavit
ARC-ContractVendor-Information
Vendor Information Form-1.pdf

LobbyingDebarmentForm

File details come from the government source that posted it. Updated .