Request for Information -WRAIR Specimen Shipping.docx

DOCX document 81 KB Posted

Attached to
Walter Reed Army Institute of Research Specimen Shipping
Solicitation number
HT942524R0009
Issued by

About this file

This document is a draft performance work statement for a specimen shipping contract opportunity with the Defense Health Agency. The contractor will provide global shipping and logistics support for specimens collected from various military and government organizations to be tested at the Walter Reed Army Institute of Research. Services include supplying collection kits and medical consumables to sites, electronic inventory management, shipping specimens domestically and internationally in compliance with regulations, and tracking shipments using an online system. The performance period is one base year starting April 2024 with four one-year options. The contractor must meet requirements for quality control, training, security, and customer service while complying with all applicable laws and regulations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information (RFI)

Specimen Shipping: Walter Reed Army Institute of Research

This is an RFI as defined in FAR 15.201(e) to ascertain whether a commercial item exists that provides the capabilities described herein.

This RFI is issued solely for information and planning purposes and does not constitute a solicitation. All information received in response to this RFI will be treated as business confidential information. Nonetheless, submitters should properly mark their responses if the information is confidential. Responses to the RFI will not be returned. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expense associated with responding to this RFI.

RFI Response and due date: 30 October 2023 no later than 10:00AM ET

Instructions to Responders:

Responses from all capable and qualified sources are encouraged to respond to this request.

White papers should adhere to the following formatting and outline instructions:

1. All submissions shall be made electronically and be in one of the following formats: Microsoft Word or Adobe PDF.

2. Cover Page (1page)

· Title

· Organization

· Responders technical and administrative points of contact (names, addresses, phone, fax number and email addresses)

· Topic area(s) addressed

3. Please note that the response shall provide sufficient technical data to determine how you fully meet the requirements as specified in the DRAFT Performance Work Statement.

Please note that responses are due no later than 30 October 2023 @ 10:00AM ET. The preferred method of submission is via email. The point of contact for this action is Ms. Flodean Billings, Contract Specialist flodean.p.billings.civ@health.mil . Only electronic responses are requested. No evaluation letters and/or results will be issued to the respondents. At this time no solicitation exists; therefore, please do not request a copy of the solicitation.

DRAFT PERFORMANCE WORK STATEMENT (PWS)

Specimen Shipping and Supply Management

Part 1

General Information

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide medical consumables globally for acquisition and routing of specimens to Walter Reed Army Institute of Research (WRAIR) Fort Detrick, MD, for Human Immunodeficiency Virus (HIV)/Hepatitis C Virus (HCV)/ Hepatitis B Virus (HBV) and Leishmania testing.

1.2 Background: Since 1893, the WRAIR has been a leader in solving the most significant threats to Soldier readiness and lethality such as disease and battle injury. WRAIR’s broad research capabilities at its Washington, D.C., area, and expeditionary laboratories function in concert to afford Soldiers the best medical protection and support possible before, during, and after deployment by addressing both longstanding and emerging threats. Though WRAIR’s research is focused on Soldier health, its products have important civilian applications, saving countless lives around the world.

The Diagnostics and Countermeasures Branch (DCB), formerly the Department of Laboratory Diagnostics and Monitoring, works to provide effective, state-of-art diagnostic countermeasures to ensure force health and readiness. Branch efforts include the development of new diagnostic assays, and identification of optimal diagnostic testing platforms, assays and algorithms using evidenced based approaches.

DCB evaluates the performance characteristics and cross-comparison of current and emerging diagnostic and surveillance methodologies for evidenced-based down-selection of the most appropriate countermeasures for disease detection, screening, confirmation, and monitoring for enhanced patient management. DCB boasts standout accomplishments in their work related to leishmaniasis, HIV, and COVID-19. They have evaluated 63% of HIV diagnostics in use today.

1.3 Scope: The Contractor shall provide material and specimen shipping services identified in this contract for various organizations, including, but not limited to U.S. Military Operations (i.e., Army, Navy, Air Force), Military Entrance Processing Stations (MEPS), U.S. Embassies, other international organizations such as North Atlantic Treaty Organization sites, and other U.S. National interests worldwide.

1.3.1 Period of Performance: The period of performance shall be as follows:

Base Period
01 April 2024 – 31 March 2025
Option Period 1
01 April 2025 – 31 March 2026
Option Period 2
01 April 2026 – 31 March 2027
Option Period 3
01 April 2027 – 31 March 2028
Option Period 4
01 April 2028 – 31 March 2029

1.4 Objectives:

The Contractor shall provide medical consumables globally for acquisition and routing of specimens to WRAIR for HIV/HCV/HBV, Leishmania, and any other applicable diagnostics testing. All shipping costs are to be included as part of the contract. There shall be no additional cost to the Government. The contractor shall provide:

· Shipping of Biosafety Level 2 (BSL2) specimens in accordance with (IAW) applicable Code of Federal Regulations (CFR) and International Air Transport Association (IATA) regulations

· Shipping logistics and establishment and maintenance of a tracking methodology for specimen shipment, to include but not limited to on-line tracking and customer support assistance.

· Shipment and tracking of material and specimens.

· Electronic inventory management of packaging materials and medical consumables at each site, including alerts when inventory is low.

· Shipping and management of specimens IAW Protected Health Information (PHI), Personally Identifiable Information (PII), and Health Insurance Portability and Accountability Act (HIPAA) regulations and requirements.

The Contractor shall support Department of Defense (DoD) Force screening for HIV/HCV/HBV, Leishmania, and other applicable diagnostics specimens throughout the six geographical Combatant Commands (COCOMS), the Intelligence and Security Command (INSCOM), and other U.S. organizations as directed.

· U.S. Central Command (CENTCOM) – Area of operations (AOR) covers 20 nations in the Middle East, and Central and South Asia

· U.S. Africa Command (AFRICOM) – AOR covers African nations, the African Union, and African regional security organizations.

· U.S. European Command (EUCOM) - AOR covers Europe and parts of the Middle East and Eurasia

· U.S. Northern Command (NORTHCOM) - AOR covers the continental United States, Alaska, Mexico, Canada, and portions of the Caribbean and surrounding waters.

· U.S. Pacific Command (PACOM) - AOR covers from the waters of the United States west coast to the western border of India, and from Antarctica to the North Pole, encompassing 36 diverse nations.

· U.S. Southern Command (SOUTHCOM) - AOR covers 31 nations in Latin America south of Mexico, Central and South America, and the Caribbean Sea

· U.S. INSCOM – Alice Springs, Australia

1.5 General Information:

Contracting Officer Representative (COR):

TBD

1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.

The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within ten days after date of contract award (A.001).

The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within 30 days. If the Government has provided comments, the Contractor shall then have 30 days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the KO’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the KO no later than 30 days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:

(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.

(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals).

(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses.

(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including DoD Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance.

(e) How the Contractor will ensure all keys issued will remain controlled items, if applicable (Paragraph 1.7 Key Control).

(f) How the Contractor will inventory and track maintenance of all Government Provided Equipment / Materials, if applicable.

(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future.

(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.

1.5.1.1Analysis of Quality Control and Timeliness of Submittals (i.e., deliverables) shall be provided to the COR within 30 days upon completion of each option period or Task Order (A.002).
1.5.1.2The Contractor shall inform the COR of issues or potential issues that might affect the performance within 48 hours of identifying those issues. Verbal reports shall be followed up by written reports within two days (A.003).

1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract IAW the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.

1.5.3.1 U.S. Holidays: Work shall be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the KO. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in January Presidents’ Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th

1.5.4Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.
1.5.4.1Government Facility Office Hours: The Government facility office hours are 0800 to 1700, Monday through Friday except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.5.4.2Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0600 to 1800, Monday through Saturday. The Government facility is the facility is open for operations during the recognized U.S. Holidays identified in paragraph 1.5.3.1 above. The facility may close due to local or national emergencies, administrative closings, or host nation national holidays.
1.5.4.3Contractor Support Hours: The Contractor shall provide support during the same hours as the supported Government organization.
1.5.4.3.1Contractor Work Plan: The Contractor shall prepare and maintain a Work Plan. The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.). The Contractor’s proposed Work Plan shall be submitted to the KO via the COR for review within ten days after date of contract award (A.004). The Government will review and either accept or return their comments to the Contractor within ten days. The Contractor shall then have three days to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan is required to be resubmitted via the COR for review and acceptance by the Contracting Officer at a minimum 30 days prior to implementation. The timeline noted above shall apply for review and acceptance for proposed changes.
1.5.4.3.2Mission Essential Contractor Plan: The Contractor shall prepare and submit a Mission Essential Contractor Plan for continuation of essential services. The Mission Essential Contractor Plan shall be due with the proposal and shall be updated on an annual basis (A.005). Services identified in Section 5.2 are deemed essential services.

The Mission Essential Contractor Plan shall address:

· A description of the Contractor’s emergency management procedures and policy as they apply to this award.

· Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed in the event of a crisis situation.

· Challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves.

· The approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis.

· Plan to accommodate delayed delivery of specimens to HIV Diagnostics and Reference Laboratory (HDRL) during such emergencies as adverse weather conditions/power outages ensuring specimen integrity and temperature requirements are maintained.

· How the Contractor shall communicate with WRAIR during a crisis situation

· A list of primary and alternate Contractor points of contact, each with primary and alternate telephone numbers and e-mail addresses

· Procedures for protecting Government furnished equipment (if any)

1.5.5Training Holidays: WRAIR has historically granted military personnel training holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday.
1.5.6Place of Performance: The services of this contract will be performed worldwide for delivery of specimens and material to the WRAIR at Fort Detrick, Maryland.
1.6Security Requirements: The following information is provided on security related matters.
1.6.1Security Program: Reserved.
1.6.2Personnel Security Clearance Requirements: Reserved.
1.6.3Installation Access: Reserved.
1.6.3.1Installation Pass Log: Reserved.
1.6.3.2Individual Termination or Expiration of Employment: Reserved
1.6.3.3Contract Termination or Cancellation: Reserved
1.6.3.4Common Access Cards (CAC) and CAC Log: Reserved.
1.6.4Background Checks: Reserved.
1.6.4.1U.S. Citizen: Reserved.
1.6.4.2Local Nationals and Third Country Nationals: Reserved.
1.6.5Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13).
1.6.6Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.
1.7Key Control: Reserved.
1.8Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation

(FAR) Subpart 42.5. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.8.1The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
1.9Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the KO, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the KO. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10Key Personnel: Reserved.
1.11Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.12Contractor Identification:
1.12.1Contractor Workspace: Workspace (staging site, on-site office, desk or work area, etc.) shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the KO via the COR for review and acceptance 10 calendar days after contract award (A.006). Workspace sign location shall be coordinated with the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting, or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name. Requirements for Contractor vehicles is addressed under Part 4 paragraph 4.4.

1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). The Contractor (to include subcontractors) shall provide each of their employees an easily readable identification badge. The badge must include the employee’s name, the contractor’s company name, the functional area of assignment, and a recent color photograph of the employee. Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee. A listing of issued ID cards shall be furnished to the KO prior to the contract performance date and updated as needed to reflect Contractor personnel changes (A.007).

1.13Contractor Travel: Reserved.
1.14Other Direct Costs (ODCs): Shipping costs under this contract will be invoiced as ODCs. The Contractor shall manage and account for all shipping costs not to exceed the price ceiling listed in this contract.
1.14.1Invoices:

The contractor shall submit invoices monthly to Wide Area Work Flow (WAWF) with sufficient documentation to provide certification of invoice (A.008).

The contractor is responsible for properly preparing and forwarding to the appropriate Government official, the invoice and receiving report for payment. The contractor shall attach back up information to receiving reports for ODCs.

Backup information for ODCs shall list all elements of costs. All ODCs exceeding $3,000 requires the contractor to conduct appropriate competition and obtain approval from the COR prior to purchase. Equipment purchases are not authorized under this contract. The WAWF – Receipt and Acceptance application is the required method of submission.

Where applicable, the Contractor shall include additional ODC invoice details as required per protocol for any volunteer payments in support of this PWS.

1.15Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.16Non-Disclosure Requirements: Reserved.
1.17Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/, the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.18Non-Disclosure Statements: The Contractor shall provide signed non-disclosure agreements to the Government no later than 30 days (A.009) prior to commencement of work under the contract. Disclosure of information by Contractor personnel may result in removal of Contractor personnel from performance under this contract.
1.19Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI (A.010). The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.20Phase In /Phase Out Period: Reserved.
1.21Safety: The following provides information pertaining to Safety and Accident Prevention:
1.21.1Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g., U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)).

The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:

(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated on-site Government safety personnel (A.011). Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.

(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, Activity Hazard Analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1) (A.011).

(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work

(d) The Contractor shall discuss the plans in conferences convened by the KO prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within 15 calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than 15 calendar days prior to initiation of work on each major phase; and

(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site: short sleeve shirt, long trousers, steel-toed safety boots, and hard hat.

1.21.1.1In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.
1.21.1.2The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. For the compliance with host nation laws and regulations, the Contractor shall comply with the non-exclusive list of duties described in this paragraph.
1.22Environmental Compliance: The following provides information on Environmental Compliance.
1.22.1Environmental Compliance Plan and Program: Reserved.
1.23Required Training: The following provides information on training requirements.
1.23.1Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within 15 days as required on the AT/OPSEC Cover Sheet after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 15 days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the KO if a COR is not assigned) within 30 days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training every 12 months except AOR specific AT Level I training which shall be completed as required by local AT policies (A.012)

If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within 15 days after completion of the training (A.012).

1.23.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within 15 days of employment under this contract Verification of the training shall be provided to the COR within 15 days after completion of the training OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months Verification of the training shall be provided to the COR within 15 days after completion of the training (A.013).

If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within 15 days after completion of the training (A.013).

1.23.3iWATCH Training: Reserved.
1.23.4Information Assurance (IA) Training: Reserved.
1.23.5Personally Identifiable Information (PII): Reserved.
1.24Authorization to Perform Services in Kenya: Reserved.
1.25Notice to Proceed: Reserved.
1.26Electromagnetic Compatibility Directive: Reserved.
1.27Government Property and Services: Reserved.
1.28Conventional Forces Europe (CFE) Treaty Verification Inspection: Reserved.

PART 2

DEFINITIONS & ACRONYMS

2.Definitions and Acronyms
2.1Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.

Contracting Officer (KO) – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

Contracting Officer's Representative (COR) – As defined in Defense Federal Acquisition Regulation Supplement (DFARS 202.101), means an individual designated and authorized in writing by the KO to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified IAW this instruction. For example, local terminology can be COR, KO’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation (AR)70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the KO as alternate CORs.”

Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.

Day – means, unless otherwise specified, a calendar day.

Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable – means anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

Government Property - means all property owned or leased by the Government. Government property includes both Government-furnished and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

Property Administrator - means an authorized representative of the KO appointed IAW agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.

High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are like Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.

Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.

Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.

Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.

Quality Control – means all necessary measures taken by the Contractor to assure that the quality of a product or service shall meet contract requirements.

Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however, they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are like Level 3 in a Work Breakdown Structure.

Subcontractor – means one that enters a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

Workday - The number of hours per day the Contractor provides services IAW the contract.

Work Week - Monday through Friday, unless otherwise specified.

2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.

AFRICOMAfrica Command
AHAActivity Hazard Analysis
AORArea of Responsibility
ARArmy Regulation
ATAnti-terrorism
BSL2Biosafety Level 2
CLINsContract Line Item Numbers
CFRCode of Federal Regulations
CMRAContract Manpower Reporting Application
COCOMSCombatant Commands
CONUSContinental United States (excludes Alaska and Hawaii)
CORContracting Officer’s Representative
COTSCommercial-Off-the-Shelf
DADepartment of the Army
DD250Department of Defense Form 250 (Receiving Report)
DD254Department of Defense Contract Security Requirement List
DCBDiagnostics and Countermeasures Branch
DFARSDefense Federal Acquisition Regulation Supplement
DHADefense Health Agency
DoDDepartment of Defense
DoDIDepartment of Defense Instruction
EUCOMEuropean Command
FARFederal Acquisition Regulation
FYFiscal Year
GPGovernment Property
HBVHepatitis B Virus
HCVHepatitis C Virus
HDRLHIV Diagnostics and Reference Laboratory
HHSHealth and Human Services
HIVHuman Immunodeficiency Virus
HLOHigh Level Objective
IAInformation Awareness
IAWIn Accordance With
IDIdentification
IATAInternational Air Transport Association
INSCOMIntelligence and Security Command
KOContracting Officer
MEDCOM HQMedical Command Headquarters
MEPSMilitary Entrance Processing Stations
MPRMonthly Progress Report
NLTNo Later Than
NORTHCOMNorthern Command
OCIOrganizational Conflict of Interest
OCONUSOutside Continental United States (includes Alaska and Hawaii)
ODCOther Direct Costs
OPSECOperations Security
PACOMPacific Command
PHIProtected Health Information (
PIIPersonally Identifiable Information
POCPoint of Contact
PRSPerformance Requirements Summary
PWSPerformance Work Statement
QAQuality Assurance
QASPQuality Assurance Surveillance Plan
QCQuality Control
QCPQuality Control Program
RSLRemove Ship List
SOUTHCOMSouthern Command
SSTSerum Separator Tube
TETechnical Exhibit
UICUnit Identification Code
WAWFWide Area Work Flow
WRAIRWalter Reed Army Institute of Research

PART 3

GOVERNMENT PROPERTY (GP) AND SERVICES

3.Government Property and Services
3.1Services: Reserved.
3.2Facilities: Reserved.
3.3Utilities: Reserved.
3.4Equipment: Reserved.
3.5Special Tooling and Test Equipment: Reserved.
3.6Materials: Reserved.
3.7Training: The Government will provide the training required in Section 1.23 of this PWS.
3.8Common Access Cards (CAC): Reserved.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4.Contractor Furnished Property and Services
4.1General: Reserved.
4.2Secret Facility Clearance: Reserved.
4.3Materials: Reserved.
4.4Vehicles and Equipment: Reserved.
4.5Background Checks: Reserved.

PART 5

SPECIFIC TASKS

5.1Basic Services: This is a non-personnel performance based support contract. The Contractor shall provide material and specimen shipping services identified in this contract for various organizations, including, but not limited to U.S. military operations (i.e., Army, Navy, Air Force), MEPS, U.S. embassies, other international organizations such as North Atlantic Treaty Organization sites, and other U.S. national interests worldwide. This shall include material and shipping services for the six geographical COCOMs and INSCOM as identified in section 1.4 above. The total annual requirement of specimens to be shipped will be a minimum of 200,000 and a maximum of 2,100,000. All shipping costs shall be managed by the Contractor and shall be included as part of the contract. All shipments, specimen collection kits, as well as specimens shall be sent IAW shipping regulations.
5.2Tasks: Tasks consist of the following:
5.2.1Management of Medical Consumables, Packing Materials, and Shipping Containers: The Contractor shall provide medical consumables globally for the collection of specimens for HIV/HCV/HBV and Leishmania testing (PRS-1). This shall include the following:
5.2.1.1Provide all materials (i.e., shipping materials, blood transfer kits, blood tubes, etc.) to sites and meet all shipping requirements shipping to and from sites. This shall include providing each site a supply (quantity to be determined at the task order level) of blood tubes (10 ml Tiger Top Serum Separator Tube (SST); substitutions for blood tubes permitted with COR approval), and the appropriate shipping containers and shipping labels for delivery of collected specimens to the testing facility. Specific requirements include the following:

· The commercially available blood tube required is a red/grey conventional closer, 10mL plastic, SST, brand name or equal to Becton Dickinson tube, catalog number 367988. Any substitutions must be approved by the COR.

· Specimens that will be shipped from sites to WRAIR will adhere to Code for Federal Regulations (42 CFR Part 72 and 49 CFR Part 171 – 178), for all domestic as well as international shipping requirements. At a minimum, per WRAIR best practices, the specimens will be packed utilizing the following items; kit box with UN3373 labeling (the Contractor shall be responsible for creating mailing labels), foam with cavities for the blood tubes (the Contractor shall provide a description of the foam cavities to ensure they are shipping to HDRL specifications (see 1.4 (A)), absorbent pad (the Contractor shall provide a description of pad absorbency to ensure they are supplying a pad sufficient to handle the amount of liquid in each container), kit content check list (the Contractor shall provide a sample, should HDRL have certain scanning limitations/requirements), FedEx or equivalent UN3373 Labpak, FedEx or equivalent Remote Ship List (RSL) for overnight delivery. The contractor shall provide a variety of sizes of kits that hold anywhere from maximum of 5 – 40 specimens for shipping. Currently WRAIR uses kits that can ship up to 40 specimens.

· Shipping containers and blood collection tubes shall be provided and delivered to the sites within three working days of the request by the site or HDRL.

· Used shipping containers that are in serviceable condition shall be recycled for restocking of sites. HDRL will return the containers to the Contractor for redistribution to the sites. The contractor shall credit this contract for all recycled shipping containers. The Government will only incur the shipping fee when recycled containers are reused. The Contractor shall include a report on the number of recycled containers reused per reporting period in the monthly report as described in section 5.2.4.4 below.

5.2.1.2Provide electronic inventory management of packaging materials and medical consumables at each site, including alerts when inventory is low, as described in Section 5.2.4.1 below.
5.2.2Management and Shipment of Specimens:
5.2.2.1Biosafety Level 2 Specimens: The Contractor shall support global shipping of Biosafety Level 2 specimens IAW with all applicable customs requirements, laws, and regulations, inclusive of but not limited to, CFR, IATA regulations, PHI / PII / HIPAA regulations, and requirements to support screening for HIV. (PRS-2)
5.2.1.2Temperature Monitoring: The Contractor shall provide disposable temperature monitoring devices, for both domestic and international shipping containers, capable of indicating if shipping containers have exceeded 30 degrees Celsius during transit and if the excessive temperature was exceeded for a brief or prolonged duration. The Contractor shall, if applicable, require subcontractors to proactively respond in the event of a shipping delay, immediately refrigerate the affected specimen(s) and prioritize delivery.
5.2.1.3Specimen Packaging for Shipments to HDRL: The contractor shall wrap all vials individually to avoid contact; surrounding individually wrapped specimens with enough absorbent material to contain spillage (preferred method is use of a foam separator that tubes insert into; and packing the specimen in a watertight primary and secondary container).
5.2.3.4Shipment to Alternative Facilities: In the event that HDRL is not available to conduct testing, the Contractor shall ship specimens for testing to a facility to be determined as per COR directive. Change in the ship-to address will not occur prior to notification and written approval from the KO and COR.
5.2.3.5Expedited Shipments: The Contractor shall provide expedited overnight or two-day shipping when requested. Shipment shall not occur prior to review/approval of the COR.
5.2.3.6Domestic Shipping Requirements:

· All domestic specimen shipments are to be at ambient temperature of 18-30° Celsius.

· Delivery to HDRL shall be no later than 0800 the day after pick-up (including Saturday for Friday afternoon pick-up) for domestic shipments.

· The Contractor shall provide CONUS shipping for up to 28 Saturdays per year; locations will collect patient specimens that will be required to arrive at HDRL No Later Than (NLT) 0800 on the subsequent Monday. These shipments shall be maintained at a temperature range of 2-8° Celsius during transport utilizing frozen gel packs and specimen shipping standards.

· Specimens collected the day before a holiday are to arrive at the testing laboratory at no later than 0800 two days after the specimens are shipped.

5.2.3.7 OCONUS/International Shipping Requirements:

· International shipments are to arrive at HDRL by 0800 two days following specimen pick-up at the OCONUS site.

· All Outside Continental United States (OCONUS) specimen shipments and day before holiday shipments are to be maintained at a temperature range of 2-8 ° Celsius using utilizing at least six frozen gel packs. The Contractor shall ensure shipments en route to HDRL that depart the day prior to a holiday are shipped using the international blood transfer kit to assist in maintaining 2-8° Celsius temperature for the extended duration in transit.

· The package shall be shipped IAW IATA guidelines.

· Outbound shipment from the Contractor can be the most cost effective manner available while inbound must be expedited and arrive at HDRL within five calendar days.

· The Contractor shall be responsible for all requirements to ensure OCONUS shipments clear customs.

5.2.4 Tracking of Material and Specimens:

5.2.4.1The contractor shall provide a “near real time,” electronic mechanism (including maintenance) to track and report; shipments of specimens and supplies, delivery of shipping supplies, to include blood tubes for shipment of specimens, and subsequent shipment of specimens to WRAIR, HDRL (PRS-3). The Contractor shall ensure that all shipments from sites to HDRL are tracked via the on-line management system (website) that is updated and accessible by HDRL before 0800 the day following domestic shipments from sites and before 0800 two days following international shipments from OCONUS sites. The on-line management system (website) shall provide the following capabilities/information:
•Batch orders
•Client User access
•Medical Command Headquarters (MEDCOM HQ) Program Manager/User access
•Management of client information pertaining to shipping address and primary Point of Contact (POC) for ordering
•Supply stocking tracking
•Specimen transport tracking
•Preprinted air bill
•Supply quantity reporting monthly to HDRL
•Contractor managed inventory with auto replenishment
•Client inventory management for view and analysis of inventory
•Client users shall be able to generate shortage/out-of-cycle orders based on inventory levels and client par levels of supplies shall be maintained once established
•The system shall monitor shipments for delay. In the event of a delay, the system shall proactively send an immediate notification to designated contractor personnel.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .