This is a Request for Information (RFI) issued by the Air Force Materiel Command's Control and Reporting Center (CRC) Program Office seeking potential substitute heat exchangers for the AN/TPS-75 radar system. The RFI targets a heat exchanger that can cool critical radar components including a pulse forming network, focus coil, twystron body, twystron collector, and SF6 tank, with specific technical requirements such as using 60% ethylene glycol coolant, being forklift transportable, capable of outdoor operation, and able to function without supervision for up to 4 hours.
Interested vendors are requested to provide detailed company information, equipment data sheets, cost estimates, and lead times by August 13, 2025. The initial purchase is planned during USAF Fiscal Year 2025, with delivery expected during FY26 (starting October 2025). Responses should be submitted electronically to the Contracting Officer, limited to 5 single-sided pages excluding product data sheets, with proprietary information clearly marked. The RFI emphasizes that this is an information-gathering exercise only and does not constitute a commitment to procurement.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
AFMC AFLCMC/
C3BYC CRC AN/TPS-75 Radar System RFI-HX-JUL25
Hill AFB, UT Substitute Radar Heat Exchanger/Chiller For Review 1 PMO Request For Information (RFI) 23 JUL 2025
Controlled By: AFLCMC/C3BYC CUI Category: CTI Distribution/ Dissemination Controls: D POC: Dane Feher 801-586-4730
AN/TPS-75 3D Radar Sustainment Support for Control and Reporting Center (CRC) Program Office (AFLCMC/HBZI) at Hill AFB, Utah
REQUEST FOR INFORMATION (RFI)
1. Description
1.1. The Control and Reporting Center (CRC) Program Office is seeking information on a suitable substitute for TPS-75 radar system heat exchanger, which functions as a chiller for the transmitter compartment equipment. This heat exchanger would cool a pulse forming network, focus coil, twystron body, twystron collector, and SF6 tank within the TPS-75 radar. The PMO is seeking heat exchangers for initial use to support depot maintenance operations, then CONUS unit locations, and eventually distributed for mission operational use once reliability and performance are proven. Manufacturer maintenance support of field level repair of the provided equipment would be sought separately. The potential duration of the effort would encompass a period of 5 years.
1.2. A fully integrated solution will incorporate filtration and purification of the cooling loop. If the proposed solution does not incorporate adequate coolant purification equipment, the PMO will install legacy filtration and purification equipment in-line to cover the need.
1.3. Requirements
1.3.1. Objective requirements are sought but not a essential feature of a solution
1.3.2. Threshold requirements are critical to a solution being considered viable
Solution Requirements List
# Requirement Objective
Threshold
Detailed Description
1. Ethylene Glycol used as coolant Threshold 60% Ethylene Glycol 40% H20
2. Capable of using distilled H20 as coolant Objective
3. Forklift transportable Threshold
4. Employed extended from radar Objective Capable of meeting design requirements with a 30ft hose extension for supply and return
5. Operable without supervision Objective Must not require operator intervention for up to 4 hours
6. Coolant reservoir must be contained within skid perimeter Objective
7. Heat rejection must be to atmosphere Threshold
8. Capable of outdoor operation without overhead cover Threshold
9.
Possess monitoring gauges:
Supply pressure, supply temperature, return pressure, return temperature
Objective
AFMC AFLCMC/
C3BYC CRC AN/TPS-75 Radar System RFI-HX-JUL25
Distribution/ Dissemination Controls: D
1.4. Key Performance Characteristics:
Description Value Unit 1 Primary Fluid Ethylene Glycol - 2 Mixture Concentration 60 % 3 Alternate Fluid Distilled H20 - 4 Legacy Maximum Flow 9.5 gpm 5 Legacy Minimum Flow 7.75 gpm 6 Available Primary Power, Voltage 120V/208V 3 Phase WYE 60 Hz - 7 Available Alternate Power, Voltage 208/120V 3 Phase WYE 400 Hz -
8 Legacy Minimum Measured Pressure * 85 psig
9 Legacy Nominal Supply Pressure* 120 psig
10 Legacy Maximum Measured Pressure* 135 psig
11 Minimum Required Inlet Temperature 10 °C
12 Maximum Permissible Inlet Temperature 40 °C
13 Maximum Operating Pressure 150 psig 14 Total Heat Dissipation Required** 24.5 kW 15 Heat Capacity Requirement** 83597.47 Btu/hr 16 Heat Capacity Requirement** 6.966 ton of refrigeration 17 Minimum Ambient Temperature -40 °F 18 Maximum Ambient Temperature 125 °F 19 Minimum Reservoir Size*** 5 gal
*Measured inside radar shelter. Pressure losses following supply pump are unknown. Pump must be capable of achieving this range when installed.
**Equipment close to this capacity will be evaluated for adequacy by the PMO.
***reservoir size assumes the system is filled and all normally wetted parts are wetted.
Solution Requirements List
# Requirement Objective
Threshold
Detailed Description
10. Operable without nearby crew requiring hearing protection Objective
11. Variable frequency drive pump Objective
AFMC AFLCMC/
C3BYC CRC AN/TPS-75 Radar System RFI-HX-JUL25
Distribution/ Dissemination Controls: D
1.5. Applicable Legacy TPS-75 System Standards (for information only)
1.5.1. Intended application is less severe than indicated by below standards and thresholds.
1.5.2. Not all required for RFI responses
1.5.3. Substitutions would be considered
1.5.4. Omissions will be considered
1.5.5. Design parameters outside of desired thresholds will be considered at risk by the
PMO
Applicable Legacy TPS-75 System Standards (for information only) Item Service Condition
Parameter Relevant Standard
Standard Test Method
Test Parameter Objective
Test Parameter Threshold
1. High Temperature, Operating
MIL-STD-810H
w/CHANGE 1
METHOD
501.7
120 °F (49 °C) TBD by PMO
2. High Temperature, Non-Operating
MIL-STD-810H
w/CHANGE 1
METHOD
501.7
160 °F (71 °C) TBD by PMO
3. Low Temperature, Operating
MIL-STD-810H
w/CHANGE 1
METHOD
501.7
-40 °F (-40 °C) TBD by PMO
4. Low Temperature, Non-Operating
MIL-STD-810H
w/CHANGE 1
METHOD
501.7
-80 °F (-62 °C) TBD by PMO
5. Humidity, Operating
MIL-STD-810H
w/CHANGE 1
METHOD
507.6
High: 95% RH @ 80°F Low: 5% RH @ 80°F TBD by PMO
6. Humidity, Non-Operating
MIL-STD-810H
w/CHANGE 1
METHOD
507.6
High: 100% RH @ 80°F Low: 5% RH @ 80°F TBD by PMO
7.
Low Pressure
(High Altitude), Operating
MIL-STD-810H
w/CHANGE 1
METHOD
500.6
10.12 psia (simulating 10,000ft) TBD by PMO
8.
Low Pressure
(High Altitude), Non-Operating
MIL-STD-810H
w/CHANGE 1
METHOD
500.6
1.69 psia (simulating 50,000ft) TBD by PMO
9. Shock MIL-STD-810H w/CHANGE 1
METHOD
516.8
Characteristic shock from transport by truck, aircraft, & helicopter and exposure to transit drop to extent of package size & weight
TBD by PMO
10. Vibration MIL-STD-810H w/CHANGE 1
METHOD
514.8
Characteristic vibration from transport by truck, aircraft, rail, & helicopter
TBD by PMO
AFMC AFLCMC/
C3BYC CRC AN/TPS-75 Radar System RFI-HX-JUL25
Distribution/ Dissemination Controls: D
Applicable Legacy TPS-75 System Standards (for information only) Item Service Condition
Parameter Relevant Standard
Standard Test Method
Test Parameter Objective
Test Parameter Threshold
11. Temperature Shock
MIL-STD-810H
w/CHANGE 1
METHOD
503.7
Non-Operating:
-40°C to +24°C
And +18°C to +71°C
Storage/Transport:
-40°C to +71°C
TBD by PMO
12. Sand & Dust MIL-STD-810H w/CHANGE 1
METHOD
510.7
Blowing Sand Concentration:
2.2 g/m3, -0.0/+0.2 g/m3
Particle Size:
150 to 850 µm
Air Velocity:
18 m/s
Blowing Dust
Concentration:
10.6 ±7 g/m3 Particle Size:
<149 µm Air Velocity:
8.9 ± 1.3 m/s
TBD by PMO
13. EMI/EMC MIL-STD-461G
CE101, CS114,
CS115, CS116,
CS118, RS103
TBD by PMO
14. Rain
MIL-STD-810H
w/CHANGE 1 METHOD
506.6
4 in rain/hr and 2 in windblown snow/hr without leakage or moisture penetration
TBD by PMO
15. Wind Exposure to 90 knots wind speed TBD by PMO
16. Salt Atmosphere
MIL-STD-810H
w/CHANGE 1 METHOD
509.8
Exposure to a salt fog atmosphere with a salt concentration of at least 5%
TBD by PMO
17. Ice Load
MIL-STD-810H
w/CHANGE 1 METHOD
521.4
2 inch ice accumulation on any exposed surface N/A
18. Fungus
MIL-STD-810H
w/CHANGE 1 METHOD
508.8
Show no signs of fungal growth after prolonged exposure to
AFMC AFLCMC/
C3BYC CRC AN/TPS-75 Radar System RFI-HX-JUL25
Distribution/ Dissemination Controls: D
1.6. Request For Information (RFI) Only. This RFI is issued solely for information and planning purposes; it does not constitute as a Request for Proposal (RFP) or a promise to issue an RFP in the future. This RFI does not commit the Government to contract for any supply or service whatsoever. Further, the Government is not at this time seeking proposals. The RFI respondents are advised that the Government will not pay for any information or administrative costs incurred in response to this RFI; all costs associated with responding to this RFI will be solely at the interested party’s expense. Not responding to this RFI does not preclude participation in any future RFP, if any is issued. If a solicitation is released, it will be synopsized on the Contract Opportunities website (https://sam.gov/content/opportunities). It is the responsibility of the potential offerors to monitor these sites for additional information pertaining to this requirement.
Applicable Legacy TPS-75 System Standards (for information only) Item Service Condition
Parameter Relevant Standard
Standard Test Method
Test Parameter Objective
Test Parameter Threshold fungus growth as encountered in tropical climates
19. Sunshine, Operating
MIL-STD-810H
w/CHANGE 1 METHOD 505.7
Operating: -40°C to +49°C plus solar load of
1120 W/m2 TBD by PMO
20. Sunshine, Non-operating
MIL-STD-810H
w/CHANGE 1
METHOD 505.7
survive exposure to sunshine for 10 years with regular preventative maintenance
TBD by PMO
21. Noise
MIL-STD-740-
OSHA 1910.95
Sound levels under 90 dBA for work day exposure (<8hr)
AFMC AFLCMC/
C3BYC CRC AN/TPS-75 Radar System RFI-HX-JUL25
Distribution/ Dissemination Controls: D
2. Background
2.1. The AN/TPS-75 radar system is an “S” band, mobile, tactical, transportable ground radar system capable of rapidly detecting and identifying airborne targets within a 240-nautical-mile area. The system is hardened against ECM and has ECCM capabilities as well as the ability to “burn through” most types of jamming. It provides a "real-time" radar airspace picture and data in support of the Joint Force Air Component Commander (JFACC). This decades old Radar system can be and is now deployed in support of worldwide wartime operations and national security missions. The AN/TPS- 75 radar system must endure movement by truck, air or rail. This system serves as the AF’s primary deployable, long range surveillance radar providing tactical Battle Management Command and Control (BMC2) data supporting the JFACC in all manner of operational situations. System Operational Availability (Ao) has declined since the mid ‘90’s due to aging system components based upon 1960’s technology (TPS-43 fielded in the 1950’s, with the only major tech-refresh being an upgraded antenna and solid state receiver group in the ‘80’s which then re-designated the system “TPS-75”) and DMSMS (obsolescence) issues.
2.2. System Example Clarification
2.2.1.
2.2.1.1. Legacy heat exchanger employed standalone on right side of picture
2.3. Legacy heat exchanger clarification
AFMC AFLCMC/
C3BYC CRC AN/TPS-75 Radar System RFI-HX-JUL25
Distribution/ Dissemination Controls: D
2.3.1.
2.3.1.1. Use incorporated in support equipment pallet (not required for proposed solutions)
2.3.2.
2.3.2.1. Legacy Heat Exchanger shown for reference
AFMC AFLCMC/
C3BYC CRC AN/TPS-75 Radar System RFI-HX-JUL25
Hill AFB, UT Substitute Radar Heat Exchanger/Chiller For Review 1 PMO Request For Information (RFI) 23 JUL 2025
Controlled By: AFLCMC/C3BYC CUI Category: CTI Distribution/ Dissemination Controls: D POC: Dane Feher 801-586-4730
3. Requested Information
3.1. The CRC is requesting the following information to evaluate potential equipment options.
4. Delivery Date
4.1. Delivery would occur during USAF FY26 (starting October 2025). Initial purchase would occur during FY25.
5. Limitations
5.1. None specified at this time.
6. Security Requirements
6.1. None specified at this time.
7. Responses
7.1. It is suggested interested parties respond to this RFI with the table listed above along with product data sheets that represent a potential product solution.
7.1.1. Responses can be in either Microsoft 365 word or excel compatible format for the request list and pdf format for datasheets and due NLT13 AUG 2025, 1600 MST.
# Requested Item Detailed Description
1. Company Name
2. Company CAGE Code
3. Point of Contact (POC) Name
4. POC Email
5. Telephone Number
6. Fax Number
7. Company Website Link
8. Company Location
9. Experience with military systems
If applicable, identify military systems using the provided equipment
10. Contract Vehicles Available
If applicable, what contract vehicles/avenues are available to your company?
11. Equipment data sheet
Equipment Data sheet for potential solution equipment
12. Cost estimate Rough estimate for cost to purchase 1 unit of potential solution equipment
13. Lead time Rough estimate for procurement lead time for 1 unit of solution equipment
1152325793C Highlight
1152325793C Highlight
1152325793C Highlight
AFMC AFLCMC/
C3BYC CRC AN/TPS-75 Radar System RFI-HX-JUL25
Distribution/ Dissemination Controls: D
Any response is limited to 5 single-sided pages, excluding product data sheets, and submitted via e-mail only to the Government Point of Contract (POC): Wendy Farley, Contracting Officer, wendy.farley@us.af.mil.
7.1.2. Proprietary information, if any, should be kept to minimum and MUST BE CLEARLY MARKED. To aid the Government, segregate proprietary information.
Please be advised that all submissions become Government property and will not be returned. If any respondent does not currently have a Proprietary Data Protection Agreement (PDPA) that would permit the Government’s personnel to review and evaluate the submitted response to this RFI, the respondent should request to sign PDPAs with the Government.
7.1.3. Please note that all CRC Program Office government or contractor personnel have executed Non Disclosure Agreements (NDA) for all related project information.
8. Meetings and Discussions
8.1. The Government representatives may or may not choose to meet with potential RFI respondent. Such meetings and discussions would only be intended to get further clarification of potential capability and risks.
9. Questions
9.1. Questions and responses regarding this RFI should be submitted in writing by e-mail to the CRC Program Office Contracting Officer, Wendy Farley, wendy.farley@us.af.mil.
10. Summary
10.1. This RFI is only intended for the Government to identify sources that can provide
AN/TPS-75 heat exchanger solutions. The information provided in this RFI is subject to change and is not binding to the Government. The Government has not made a commitment to procure any of the RFI requirements discussed, and release of this RFI should not be construed as such a commitment or as authorization to incur cost for which reimbursement would be required or sought. All submissions become Government property and will not be returned.