This document is a Request for Information (RFI) for a Diminishing Manufacturing Sources and Material Shortages (DMSMS) resolution on the ALE-50 Launcher Controller. The United States Air Force (USAF) is conducting market research to identify solutions for resolving multiple DMSMS-related issues with the Launcher Controller (NSN: 5865-01-481-1841, P/N: G555563-4), with particular focus on the power supply which is causing a large portion of failures. The government seeks information and a rough order of magnitude (ROM) for resolving these issues, which may include scrubbing the outdated bill of materials, locating new vendors, and utilizing previously qualified components.

Respondents are required to submit business and capability information by close of business on July 31, 2025, via email to specific government contacts (Kenneth Dicman and Matthew Moorman). The desired deliverables include two updated Launcher Controllers with resolved DMSMS issues, testing reports validating acceptance procedures, and formal engineering change proposal (ECP) documentation. The RFI notes that Raytheon Technologies is understood to be the sole source provider, and while no small business set-aside has been determined, the government encourages participation from both large and small businesses, including joint ventures and teaming arrangements. Respondents are warned that participation in this market research does not guarantee future solicitation or contract awards.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DMSMS resolution on the ALE-50 Launcher Controller

CAUTION:

The Government is conducting market research to identify information and a ROM for the DMSMS resolution on the ALE-50 Launcher Controller, NSN: 5865-01-481-1841, P/N:

G555563-4. The level of security clearance and amount of foreign participation in this requirement has not been determined.

The Government does not own or have access to the data for these items. The Government has determined that this system is not a commercial item.

When formulating market research level DMSMS resolution submission, the contractor shall assume furnishing all material, support equipment, tools, test equipment, and services. The contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor’s facility.

It is the government’s understanding Raytheon Technologies is the sole source provider.

Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey.

INSTRUCTIONS:

1. The description below contains a description of the ALE-50 requirement and a Contractor Capability Survey. The Survey allows Contractors to provide their company’s capability.

2. If, after reviewing the description, you desire to participate in the market research, you should provide documentation that supports your company’s capability in meeting these requirements. Failure to provide documentation may result in the government being unable to adequately assess your capabilities.

3. ATTENTION: SMALL BUSINESS RESPONDENTS who are interested in participation for this effort:

a. No set aside decision has been made; however, the Government will determine the final strategy after thorough analysis of the small business responses and other market research available, considering the demonstrated interest and capability.

Please ensure that you provide a thorough response to each question. If your company does not currently possess the full capability required to fulfill the entire requirement, what teaming/partnership/joint venture/subcontracting arrangement do you have in place to fulfill the government needs? Providing evidence of this arrangement, e.g. emails, letter, etc. that demonstrates a united response to this RFI is highly encouraged, but not required. The evidence should state the type of arrangement and the role each member will fulfill. If you are only interested in being a subcontractor to the future awardee, state the portion of the work that your organization has capability of fulfilling.

b. Identify any areas of work that your organization believes should be broken out exclusively for Small Business.

4. Both large and small businesses are encouraged to participate in this Market Research.

Joint ventures or teaming arrangements are encouraged.

5. Questions relative to this market survey should be addressed to the PCO.

PURPOSE/DESCRIPTION

USAF is requesting information and a ROM for the DMSMS resolution on the ALE-50 Launcher Controller, NSN: 5865-01-481-1841, P/N: G555563-4

The Launcher Controller currently has multiple DMSMS-related issues. The USAF (408th) is seeking to resolve these issues and ensure future demand can be repaired in a timely manner.

USAF is specifically concerned about the power supply resulting in a large portion of the failures but requests information to resolve all other DMSMS-related issues associated with the launcher controller.

Information and ROM should include necessary means to resolve DMSMS-related issues, which could include, but are not limited to, scrubbing the outdated BOM to find new sources, locating new potential vendors, and utilizing previously qualified components/sources to update the current configuration.

Planned testing will, at a minimum, be done using the currently approved Government Acceptance Test Procedure (ATP). Still, depending on the significance of the DMSMS-related issues, they may be subject to greater qualification testing at the piece part or LRU level. Any suggested testing will need USAF LCMC/HBY concurrence on testing greater than current ATP Requirements.

The aim of the information and ROM should be to achieve the following end result:

deliverables should include (2) -1841 Launcher Controllers with updated components that resolved the DMSMS issues, testing reports validating ATP or possibly more stringent testing, and formal ECP-noted changes describing the differences between the legacy configuration and the new modified configuration that resolved the DMSMS issues.

CONTRACTOR CAPABILITY SURVEY

Part I. Business Information

Please provide the following business information for your company/institution and for any teaming or joint venture partners:

• Company/Institute Name:

• Address:

• Point of Contact:

• CAGE Code:

• Phone Number:

• E-mail Address:

• Web Page URL:

Responses to the Capability Survey Part I and Part II must be received no later than close of business July 31, 2025. Please ensure data is in a readable electronic format that can be received through a firewall. Attachments shall not to exceed 10 MB per email. Multiple emails are acceptable. Responses must be sent via email to the following:

• PCO - Kenneth Dicman – kenneth.dickman@us.af.mil and

• ENG - Matthew Moorman - matthew.moorman.3@us.af.mil

Questions relative to this market research should be addressed to the PCO.

Part II. Capability Survey Questions

A. General Capability Questions:

1. Describe briefly the capabilities of your facility and nature of the goods and/or services you provide. Include a description of your staff composition and management structure.

2. Describe your company's past experience on previous projects similar in complexity to this requirement. Include contract numbers, a brief description of the work performed, period of performance, agency/organization supported, and individual point of contact (Contracting Officer or Program Manager).

3. Describe your company's capabilities and experience in generating technical data, engineering drawings and manuals. Identify what software programs are utilized to generate these data products and what formats are available for delivered items.

a. The Government may have additional questions, after reviewing any reponses provided.

DMSMS resolution on the ALE-50 Launcher Controller
DMSMS resolution on the ALE-50 Launcher Controller
PURPOSE/DESCRIPTION
CONTRACTOR CAPABILITY SURVEY
DMSMS resolution on the ALE-50 Launcher Controller
Part I. Business Information

File details come from the government source that posted it. Updated .