DRAFT SOW HVAC Prev Maint.docx

DOCX document 36 KB Posted

Attached to
HVAC Preventative Maintenance for Fort Hall Service Unit, Fort Hall, ID
Solicitation number
REQT-IHS-2026-00357
Issued by

About this file

This is a draft Statement of Work (SOW) for preventative maintenance services on HVAC systems, chillers, and controls at the Fort Hall Indian Health Service (IHS) facility in Fort Hall, Idaho. The contractor must perform comprehensive, operational, and specialized maintenance tasks on multiple pieces of equipment including air handler units (ranging from 3/4 HP to 25 HP), exhaust fans, gas-fired boilers, condensing units, pumps, and pneumatic compressors, with minimum service frequencies ranging from annually to twice yearly. Specific maintenance activities include visual inspections, filter and belt changes, coil cleaning, lubrication, electrical connection verification, temperature and pressure recording, combustion analysis, and refrigerant leak detection. All work must comply with ASHRAE 170 and ASHRAE 62.1 ventilation standards to maintain facility operations and energy efficiency without interrupting patient care at this AAAHC-accredited clinic serving federally recognized American Indian and Alaska Native populations.

The SOW establishes a base performance period of one year from award with four optional one-year renewal periods. The contractor must respond to emergency service calls within 48 hours, with anticipated costs of approximately $3,000 per call and one to four calls annually on a not-to-exceed basis. All work must be performed between 7:00 AM and 5:00 PM Monday through Friday, excluding federal holidays, except for emergency services and intrusive testing which may occur after hours with coordination. The contractor must provide at least three days advance notice of scheduled maintenance and obtain facility approval before work begins. The government will monitor performance through service ticket review, invoice examination, observation of services, and customer feedback. The related pre-solicitation notice indicates this is associated with REQT-IHS-2026-00357 and seeks to identify qualified vendors, with preference to be given to Indian Small Business Economic Enterprises (ISBEE) and Indian Economic Enterprises (IEE) under the Buy Indian Act.

View the file

Other files

File Type Posted
IHS Indian Economic Enterprise Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDIAN HEALTH SERVICE

Portland Area Requirements Document Template

1. Title Preventative maintenance service agreement for the HVAC system, Chiller and Controls at the Fort Hall Service Unit (FHSU), Fort Hall, ID.

2. Background The Fort Hall Service Unit is accredited by the Accreditation Association for Ambulatory Health Care (AAAHC). The FHSU continually demonstrates a clinic-wide effort to maintain the highest standards of care and to improve the health status of their patients. FHSU specializes in the promotion of comprehensive family healthy for federally recognized American Indian and Alaska Native people and their descendants. The clinic requires preventative maintenance of the HVAC system to optimize facility operations and energy efficiency without interruptions to patient care.

3. Scope Perform preventative maintenance services on the HVAC system, Chiller and Controls to ensure the facility is ventilated in accordance with the most current version of ASHRAE 170 – Ventilation of Health Care Facilities, and ASHRAE 62.1 – Ventilation for Acceptable Indoor Air Quality.

4. Specific Tasks or Specifications

A. Preventative Maintenance Tasks: At a minimum, the following task shall be completed unless the manufacture’s recommendations require additional task or intervals.

a. Air Handlers Units, Mixed Air, 25 HP (QTY=1), 3/4 HP (QTY=3). Return Air Fan, 10 HP (QTY=1).

i. Comprehensive – Minimum 1 per year Check with appropriate customer representative for operational deficiencies Visually inspect damper(s) Check condition of pulleys and belts Check for proper fan operation Check condition of coils Check condition of filters Record temperatures and pressures (if applicable) Check for unusual noise and vibration Check for deterioration of gaskets and seals Check overall condition of unit Visually inspect for fluid leaks of coils and connecting piping Check starter/contactor Check and tighten electrical connections Check damper operation and lubricate as required Visually check control valve(s) Lubricate blower and motor bearings Clean condensate pan and clear drain line Check condition of blower assembly Remove and dispose of any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative

ii. Operational – Minimum 1 per year Check with appropriate customer representative for operational deficiencies Inspect motor mounting isolators Check for integrity of cabinet hardware Visually inspect damper(s) Verify damper operation Check condition of pulleys and belts Check for proper fan operation Check condition of coils Check condition of filters Record temperatures and pressures (if applicable) Check condensate drain Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Visually inspect for fluid leaks of coils and connecting piping Document tasks performed during visit and report any observations to appropriate customer representative

iii. Belt Change – As needed Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose of any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative.

iv. Coil Cleaning – Minimum 1 per year Check with appropriate customer representative for operational deficiencies Clean condensate drain (if necessary) Spray coil(s) with chemical solution Rinse coil(s) thoroughly with water Remove and dispose of any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative

b. Exhaust Fans, EF ½ HP (QTY=1), EF ¼ HP (QTY=3), IEF ¼ HP (QTY=1), BEF ¼ HP (QTY=1)

i. Comprehensive – Minimum 1 per year Check with appropriate customer representative for operational deficiencies Check condition of pulleys and belts Check for proper fan operation Record temperatures and pressures (if applicable) Check for unusual noise and vibration Check overall condition of unit Check and tighten electrical connections Check condition of blower assembly Remove and dispose of any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative

ii. Operational – Minimum 1 per year Check with appropriate customer representative for operational deficiencies Check condition of pulleys and belts Record temperatures and pressures (if applicable) Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative

iii. Belt Change – As needed Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose of any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative.

c. Boilers, Gas-Fired, 850 Sonic Condensing (QTY=2)

i. Comprehensive – Minimum 1 per year Check with appropriate customer representative for operational deficiencies Inspect burner/oil pump contactors for wear Check and tighten electrical connections Check for proper gas supply pressure Check oil pump for proper operation Check and clean pilot assembly Clean combustion fan wheel Visually inspect combustion chamber, draft diverter and flue for accumulation of soot - clean as needed Check burner for proper sequence of operation Check operating controls Check all safety controls Lift relief valve to ensure proper operation Check boiler relief valves for leakage Check combustion blower motor operation and lubricate as needed Check for proper operation of oil preheaters (if applicable) Check factory supplied oil and gas piping and components for leakage Drain boiler, open hand hole covers and clean as needed (if applicable) Disassemble and clean low water cut-out Fill boiler and check for proper operation of make-up water valve Verify proper operation of low water cut-out control Check overall condition of unit Record and log all operating parameters (including pressures and temperatures) Remove and dispose of any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative

ii. Operational – Minimum 1 during winter season Check with appropriate customer representative for operational deficiencies Blow down boiler Check oil pump for proper operation Check factory supplied oil and gas piping and components for leakage Check burner for proper sequence of operation Check flame quality Visually inspect combustion chamber, draft diverter and flue for accumulation of soot Check boiler relief valves for leakage Verify proper operation of low water cut-out control Check combustion blower motor operation Check for proper operation of oil preheaters (if applicable) Check hot water/steam temperature and pressure Check proper operation of make-up water valve Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative

iii. Combustion Analysis - Minimum 1 per year Check with appropriate customer representative for operational deficiencies Perform combustion analysis/smoke test procedures and perform minor burner adjustments as needed Document tasks performed during visit and report any observations to appropriate customer representative

iv. Tube Brushing – Minimum 1 per year Check with appropriate customer representative for operational deficiencies Open boiler doors Mechanically brush tubes Close boiler doors Remove and dispose of any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative

d. Condensing Unit, Air Cooled, Scroll, York, 70 Ton (QTY=1). Split AC Unit, (QTY=1)

i. Comprehensive – Minimum 2 per year Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories Check for visual signs of refrigerant/oil leaks Conduct refrigerant leak check Check for proper crank case heater operation (if applicable) Perform lock-out and tag-out procedure Inspect condenser fan and compressor contactors for wear Check and tighten electrical connections Perform preventative procedures to flow proving devices Check for unusual noise and vibration Check overall condition of unit Record and log all operating parameters Remove and dispose of any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative

ii. Operational – Minimum 2 per year Check with appropriate customer representative for operational deficiencies Check for proper chilled water flow Check system pressures and temperatures Check refrigerant charge (sign glass) Check for proper capacity control operation Check for proper crank case heater operation (if applicable) Check for visual signs of refrigerant/oil leaks Check for unusual noise and vibration Check for proper condenser fan operation Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative

iii. Condenser Coil Cleaning – Minimum 1 per year Check with appropriate customer representative for operational deficiencies Spray coil(s) with chemical solution Rinse coil(s) thoroughly with water Remove and dispose of any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative

e. Pumps, QTY=4

i. Operational – Minimum 2 per year Check with appropriate customer representative for operational deficiencies Check for leaks Check couplings Lubricate pump and motor bearings per manufacturer’s recommendations Record and log all operating parameters Check for unusual noise and vibration Check overall condition of pumps Document tasks performed during visit and report any observations to appropriate customer representative

f. Pneumatic Compressor QTY=1

i. Operational – Minimum 2 per year Check with appropriate customer representative for operational deficiencies Check for air leaks Check couplings Lubricate pump and motor bearings per manufacturer’s recommendations Record and log all operating parameters Check for unusual noise and vibration Check overall condition of pumps and motor Check oil and filters on pumps Check condition of pulleys and belts Check air dryer refrigerant Check coalescent and charcoal filters Document tasks performed during visit and report any observations to appropriate customer representative

g. Variable Air Volume Box

i. Comprehensive – As needed Check with appropriate customer representative for operational deficiencies Create local back up of existing program and store on on-site computer and on-site media Run VAV box flow test and visually inspect suspect boxes (coordinate access with customer) Verify unit is controlling to set points by checking sequences of operations and PID loops Check that the damper actuators, valve actuators, variable speed drives, and protections (as applicable) are responding appropriately to control signals. Notify customer of any issues with those devices Verify sensor readings and field calibrate critical sensors used in control loops and alarming functions (as sensor type and controller options allow) on suspect boxes Visually validate system outputs on suspect boxes from the field controller Validate controls safety circuit and alarm verification on suspect boxes (coordinate with customer) Tighten electrical connections on suspect boxes Check overall condition of panel and perform visual inspection of unit and surrounding area Document tasks performed during visit and report any observations to appropriate customer representative

h. Controls (Controller/End Devices), Metasys Performance Verification, Johnson Controls, 1 engine (QTY=1) Comprehensive (all equipment) – Minimum 2 per year Check with appropriate customer representative for operational deficiencies Use compressed air to remove dust from computer case openings and verify operation of CPU and case fans Execute Performance Verification to identify abnormal supervisory device communications.

Execute Performance Verification to identify abnormal diagnostic results (e.g. unbound references, object count).

Back up all server repository databases (e.g. trends, alarms, etc.)

Archive object database for Metasys system Ensure security database is consistent across devices and that default passwords have been changed Back up all server repository databases (e.g. trends, alarms, etc.)

Check overall condition of panel and perform visual inspection of unit and surrounding area Document tasks performed during visit and report any observations to appropriate customer representative Complete and review the Performance Verification Summary report with the customer.

B. Emergency Service and Equipment Replacement: Contractor shall provide emergency services to troubleshoot and diagnose failed equipment. Contractor will be required to respond to emergency call within 48 hours. Equipment that needs to be replaced due to life expectancy or obsolete, contractor shall provide a quote prior to replacing. It is anticipated that there will be one to four emergency calls/year at around three thousand per call. This line item will be a Not To Exceed.

5. Performance Monitoring (if applicable) The Government will monitor performance through review of service tickets, invoice review, observation of services being performed, documentation of service issues, and customer feedback. Acceptance will be based on compliance with the Performance Work Statement and purchase order requirements. Nonconforming services may be rejected and required to be re-performed at no additional cost to the Government. The contractor will submit reports to facility and perform Lock out and tag out.

6. Security Requirements The contractor employees shall not have access to IHS sensitive or computer information and will not require routine access to IHS Facilities. The contractor employees shall require intermittent access only and will be escorted by IHS employees while at IHS Facilities. No background investigation is required.

7. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI) No GFE to be provided.

8. Other Pertinent Information or Special Considerations No loss of service can be incurred during the performance of any services listed above.

Where the awardee of this task order is the incumbent provider, the Contractor will waive any early termination fees from the previous contract if one was awarded.

a. Identification of Possible Follow-on Work Guidance: State whether additional phases or future related work may occur.

b. Inspection and Acceptance Criteria The Facilities Manager or designee will utilize inspection, report review, performance metrics, customer complaints, and random verification of completed services.

9. Risk Control (Contracting Officer to delete if not applicable) During scheduled maintenance of the HVAC system the Contractor shall notify IHS at least three days of the maintenance window. The Contractor shall obtain approval in advance from the appropriate service units/ facilities designated POC/ COR before scheduled maintenance occurs.

10. Place of Performance / Delivery Address / Location The place of performance will be the Fort Hall Indian Health Service, 33 N Mission Rd, Fort Hall, ID 83203.

11. Period of Performance

• Base Period: TBD – 1 year from date of award

• Option Year 1: TBD

• Option Year 2: TBD

• Option Year 3: TBD

• Option Year 4: TBD

12. Delivery Schedule Installation, maintenance, and/or disconnection of services shall commence between 7:00 am to 5:00 pm, Monday through Friday, excluding Federal Holidays. Work may be required outside of normal business hours due to system failures and other issues. Maintenance that requires intrusive testing will have to be completed after normal working hours unless the service is not currently functioning and coordinated with the COR. If services will be affected, then the Contractor must coordinate with the COR and be performed after hours.