Scope of Work_MSST Honolulu Overhead Garage Door Curtain.pdf

PDF 390 KB Posted

Attached to
Remove and Replace Existing Door with Electrical Overhead Rollup Door Curtain
Solicitation number
REQ31060PR250000152
Issued by

About this file

This document is a Scope of Work for the replacement of an overhead garage door curtain at the MSST Honolulu Boat House located at 400 Sand Island Parkway in Honolulu, Hawaii. The project requires a contractor to remove the existing damaged overhead garage door curtain and mounting guides from the middle bay on the north side of the storage facility, and install a new curtain with all necessary hardware. The contractor must provide all labor, materials, and equipment, adhere to OSHA safety standards, and perform work between 7:00 AM and 4:00 PM, Monday through Friday, while minimizing interference with facility operations.

Key requirements include submitting a list of all on-site personnel for security clearance, maintaining photo identification, using available toilet facilities and utilities (water and 120V electricity), and coordinating with the Project Manager, DCCS John Peter Treme. The contractor must ensure proper installation, test the garage door opener and door functionality, and clean up the work area upon completion. The project emphasizes safety, facility continuity, and strict adherence to security protocols typical of a Coast Guard facility.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

BASE HONOLULU

HONOLULU, HAWAII 96819

SCOPE FOR

MSST HONOLULU REPLACEMENT OF OVERHEAD GARAGE DOOR CURTAIN

AT

BASE HONOLULU

HONOLULU, HAWAII

1.01 SCOPE OF WORK: Furnish all labor, materials, equipment, and professional services necessary to conduct the following for Base Honolulu:

A. Base Item: Remove damaged overhead garage door curtain and existing mounting guides and install new curtain.

1.02 DESCRIPTIONS

A. Prepare work area for safety and cleanliness.

B. Disassemble and remove existing overhead garage door curtain, middle bay, north side of

MSST HONOLULU boat house (storage).

C. Supply and install new overhead garage door curtain and all necessary hardware to safely install new curtain.

D. Inspect/test that existing overhead garage door opener is functioning correctly.

E. Once new curtain is installed, test overhead garage door for proper operation.

F. Breakdown and clean-up work area.

1.03 LOCATION: MSST HONOLULU Boat House (Storage), 400 Sand Island Parkway, Honolulu, Hawaii.

1.04 LIAISON: The Project Manager (PM) is DCCS John Peter Treme. He can be reached at (414) 510-5813 and/or via email at John.P.Treme@uscg.mil.

1.05 CONTRACTOR SECURITY REQUIREMENTS: The Contractor shall provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors), to the PM prior to any site visit. Contractor personnel not listed may be denied access to the Coast Guard facility. Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the Coast Guard facility. Contractor personnel shall have photo identification at all times while working on Coast Guard facilities.

1.06 CONTINUITY OF FACILITIES OPERATION: Schedule work to minimize interference with the facility's normal operations. Notify the Contracting Officer and the site POC 24 hours in advance of any shutdowns. Perform all on-site work between the hours of 7:00 AM and 4:00 PM, Monday through Friday (Federal Holidays excluded), unless otherwise approved by the

PM.

1.07 SAFETY: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations.

1.08 TEMPORARY FACILITIES:

A. SANITARY FACILITIES: Toilet facilities are available for Contractor use at or near the job site. The Contractor shall ensure the facilities remain clean or permission shall be revoked.

B. WATER AND ELECTRICITY: Water and 120V electricity are available at no cost to the Contractor. Cost of these utility connections and disconnections shall be the responsibility of the Contractor.

C. TELEPHONE: Not available at site.