Replace Comunitor B650 ( Incl. SOW) - Salient Characteristics.pdf
PDF 187 KB Posted
- Attached to
- Replace Communitor for PSFB
- Solicitation number
- Communitor_1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Replace Communitor B650 Sources Sought.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR COMMINUTOR B650 LIFT STATION
Salient Characteristics for Building 650 Comminutor
Kameron Lewis, NH-03 USSF 45 CES/CEOER kameron.lewis@spaceforce.mil
Statement of Work
1.0 SERVICE REQUIRED
Lift Station located at building 650 requires a new comminutor to replace current inoperable comminutor. Purpose of this piece of equipment is to be the final action of grinding sewage before sending Patrick Space Force Base (PSFB) wastewater to the City of Cocoa. Currently the sewage in grinded by hand by Infrastructure Shop. Work for this task include removing control panels, replacing control panel electrical connections, and installing the new comminutor.
2.0 REQUEST COMMODITY
Please refer to salient characteristic of the current comminutor for minimum requirements.
3.0 SALIENT CHARACTERISTICS
File details come from the government source that posted it. Updated .