About this file

This is an Invitation to Bid (ITB) #24/25-91 issued by the Town of Manchester, Connecticut, specifically the Water and Sewer Department, for the rehabilitation and maintenance of Well 6 and Well 7A. The project involves providing comprehensive well rehabilitation services, prioritizing Well 7A, using the Aqua Freed CO2 injection system or equivalent methods. The contractor will conduct initial inspections, clean and rehabilitate the wells, perform pump maintenance, and complete performance testing. The bid was released on July 17, 2025, with a question submission deadline of July 28, 2025, and a bid response deadline of August 1, 2025, at 1:00 pm. The contract will be a 3-year service agreement from the date of award through October 31, 2028, with annual inspections and on-site interventions included.

The pricing structure is based on a lump sum for rehabilitation, annual inspections, and maintenance hourly rates. The bid includes specific requirements such as providing detailed documentation, complying with living wage ordinances, and meeting various insurance and quality assurance standards. The contractor must have the capability to provide all necessary tools, equipment, and personnel, and coordinate with the Water and Sewer Department to minimize disruption to water supply operations. Liquidated damages of $200 per calendar day will be assessed for failure to complete the work within the specified 90-day timeframe. The project aims to restore well performance, ensure regulatory compliance, and maintain water quality for the Manchester water supply system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

24/25-91

REHABILITATION AND MAINTENANCE OF WELL 6 AND WELL 7A

Town of Manchester

Lincoln Center

Manchester, CT 06040

RELEASE DATE: July 17, 2025

DEADLINE FOR QUESTIONS: July 28, 2025

RESPONSE DEADLINE: August 1, 2025, 1:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://secure.procurenow.com/portal/townofmanchester https://secure.procurenow.com/portal/%7bproject.government.code%7d

Town of Manchester

INVITATION TO BID

24/25-91

REHABILITATION AND MAINTENANCE OF WELL 6 AND WELL 7A

I. Introduction II. Instructions to Bidders

III. Insurance and Indemnification Requirements IV. Standard Instructions for Supplies, Materials & Equipment V. Project Details

VI. Living Wage Ordinance VII. Vendor Submissions

VIII. Pricing Table

Attachments:

C - Manchester Living Wage Certification

Invitation To Bid #24/25-91 Title: REHABILITATION AND MAINTENANCE OF WELL 6 AND WELL 7A

1. Introduction

1.1. Summary

The Town of Manchester Water and Sewer Department is seeking a capable and reliable contractor to provide rehabilitation services for Well 6 and Well 7A, located at the Town’s water supply facilities in Manchester, CT, with Well 7A to be completed first, and to enter into a

3 year service contract for ongoing well maintenance, including annual inspections. The project aims to restore optimal performance and ensure compliance with regulatory standards, utilizing the Aqua Freed CO2 injection system or equivalent methods for well cleaning.

1.2. Background

The Manchester Water and Sewer Department operates water and wastewater treatment facilities serving Manchester, Connecticut, and portions of Glastonbury and surrounding towns.

The water system includes 16,500 domestic service lines, 1,047 fire and irrigation services, and delivers an average of 5 million gallons of water daily. The water supply consists of seven reservoir impoundments and ten groundwater wells, with a total capacity of 9.8 million gallons per day. Well 6 and Well 7A, located at the New State Road Facility, are critical components of the groundwater supply, requiring rehabilitation to address biofouling, scaling, or sediment buildup and ongoing maintenance to sustain efficiency and water quality. The wells have onsite treatment, including air striping, chlorination, fluoridation, and corrosion control.

1.3. Contact Information

Cora Narracci

Purchasing Agent

494 Main Street

Purchasing Division

Manchester, CT 06040

Email: cnarracci@manchesterct.gov

Phone: (860) 647-3033

Department:

Water and Sewer

Department Head:

Shannon Miles

Chief Administrative Officer

1.4. Timeline

Release Project Date July 17, 2025 mailto:cnarracci@manchesterct.gov tel:(860)647-3033

Question Submission Deadline July 28, 2025, 4:00pm

Bid Opening Date and Time August 1, 2025, 1:00pm

Join Zoom Meeting https://us06web.zoom.us/j/89494227737?pwd=kH

Jgm40i5Efzg8PQJ3JS6Vq3BbaVOW.1

Meeting ID: 894 9422 7737

Passcode: 7F8e6f

One tap mobile

+13052241968,,89494227737#,,,,*861725# US

+13092053325,,89494227737#,,,,*861725# US

Dial by your location

• +1 305 224 1968 US

• +1 309 205 3325 US

• +1 312 626 6799 US (Chicago)

• +1 646 558 8656 US (New York)

• +1 646 931 3860 US

• +1 301 715 8592 US (Washington DC)

• +1 719 359 4580 US

• +1 720 707 2699 US (Denver)

• +1 253 205 0468 US

• +1 253 215 8782 US (Tacoma)

• +1 346 248 7799 US (Houston)

• +1 360 209 5623 US

• +1 386 347 5053 US

• +1 507 473 4847 US

• +1 564 217 2000 US

• +1 669 444 9171 US

• +1 689 278 1000 US

Meeting ID: 894 9422 7737

Passcode: 861725

Find your local number:

https://us06web.zoom.us/u/keD2KyXfVY https://us06web.zoom.us/j/89494227737?pwd=kHJgm40i5Efzg8PQJ3JS6Vq3BbaVOW.1 https://us06web.zoom.us/j/89494227737?pwd=kHJgm40i5Efzg8PQJ3JS6Vq3BbaVOW.1 https://us06web.zoom.us/u/keD2KyXfVY

2. Instructions to Bidders

2.1. INSTRUCTIONS TO BIDDERS

In accordance with the provisions of the Town Charter, sealed proposals will be received not later than the date and time set forth above, for furnishing the commodities and/or services listed herein.

Proposals must be executed in accordance with and subject to instructions and specifications contained herein.

The Town of Manchester is an equal opportunity employer and requires an affirmative action policy for all of its Contractors and Vendors as a condition of doing business with the Town, as per Federal Order

11246. By submitting the Proposal for this bid, all vendors and contractors agree to this condition of doing business with the Town, and should the Town choose to audit their compliance, the vendor agrees to cooperate fully.

2.2. ELECTRONIC BIDDING INFORMATION

Important Instructions for Electronic Submittal

Specifications and bid forms must be obtained online at Town of Manchester Procurement Portal

(opengov.com). The exclusive means by which all prospective bidders may obtain bid packages, direct inquiries, request and receive addenda and supplemental information, and submit bids and proposals, shall be through the Town of Manchester’s OpenGov portal.

Bids may be received up to the deadline date and time listed in the solicitation documents, via the

Town’s e-Procurement Portal. The Town e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. The

Town of Manchester strongly recommends completing your response well ahead of the deadline.

Addenda Notification and Acknowledgement

Addenda Notification: Bidders are required to register for an account via the Town’s e-Procurement

Portal hosted by OpenGov. Once the bidder has completed registration, you will receive addenda notifications to your email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each bidder to periodically check the site for any addenda at Town of Manchester Procurement Portal

(opengov.com).

Submitting Questions and Receiving Responses

Bidders shall submit all inquiries regarding this bid via the Town’s e-Procurement Portal. Please note any deadline for submitting inquiries. All answers to inquiries will be posted on the Town’s e-Procurement

Portal. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries.

When applicable, state bids will be considered for this service.

The Purchasing Authority reserves the right to waive any informality or reject any and all bids. In addition to the bid specifications, all bids are subject to the terms, provisions and conditions of the https://procurement.opengov.com/portal/townofmanchester https://procurement.opengov.com/portal/townofmanchester https://procurement.opengov.com/portal/townofmanchester

Manchester Charter, Code of Ordinances, and Purchasing Guidelines. By bidding on the proposed purchase, the bidder agrees to such terms, provisions and conditions.

An Equal Opportunity/Affirmative Action Employer

2.3. RULES AND REGULATIONS FOR COMPETITIVE BIDDING

These rules and regulations have been adopted by the Board of Directors of the Town of Manchester pursuant to Section 5-22 of the Town Charter. They are standard for all competitive bidding proposals issued by the Town of Manchester, Connecticut for contracts of all types where labor, materials, and necessary equipment to complete work is to be furnished to the Town, where the Town is to purchase supplies, materials, and equipment, where the Town is to sell surplus materials and equipment, or where the Town is to sell real estate. These rules and regulations shall be binding upon all prospective bidders and the Town of Manchester.

2.4. GENERAL RULES

1. The Purchasing Authority may delete or modify any of the instructions to bidders for a particular proposal, indicating such change in the appropriate section of the proposal documents. The Purchasing

Authority may insert special instructions in any special contracts which are subject to competitive bidding.

2. The proposal is signed by the bidder with full knowledge of, and agreement with, the general specifications, conditions, and requirements of this bid. In addition to the bid specifications, all bids are subject to the terms, provisions and conditions of the Manchester Charter, Code of Ordinances, and

Purchasing Guidelines. By bidding on the proposed purchase or service, the bidder agrees to such terms, provisions, and conditions.

3. The Town has transitioned to electronic bidding. Vendors should submit solicitation responses electronically via the Town of Manchester Procurement Portal. Vendors will be asked to register and should do so prior to submitting bid documents.

4.This bid and any addenda will be issued on the Town of Manchester website bidding portal. It shall be the responsibility of the bidder to download this information. THE TOWN OF MANCHESTER WILL NOT

MAIL A SEPARATE HARD COPY OF ADDENDUM TO BIDDERS. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents.

5. Bid prices may not be withdrawn by bidder for 90 days after bid opening.

6. Proposals received later than the time and date specified will not be considered. Amendments to, or withdrawals of bids received later than the time and date set for bid opening will not be considered.

7. All bids shall be opened via a virtual meeting link posted and read aloud. All bids shall be tabulated and copies of said tabulation shall be posted on the website

8. All deliveries of commodities or services hereunder shall comply in every respect with all applicable laws of the Federal Government and/or the State of Connecticut.

9. Purchases made by the Town of Manchester are exempt from payment of Federal Excise Taxes and the Connecticut Sales Tax and such taxes must not be included in bid prices. Federal Excise Tax exemption certificates, if requested, will be furnished.

10. The Bidder, where applicable, shall insert/include the price per stated unit and extend a total price for each item. In the event there is a discrepancy between the unit price and the extension, the unit price will govern. The total cost shall be the sum of the extended prices.

11. Bidders shall, where applicable, submit terms for payment in spaces provided in the proposal form, showing the amount of cash discount which shall apply to bid prices when paid within the stated number of days in the proposal.

12. All inquiries shall be submitted within the time limitations specified in the bid documents and shall be requested via the online portal Q&A. All information given by the Town other than through the

OpenGov portal shall be informal and shall not be binding upon the Town nor shall it furnish a basis for legal action by any bidder or prospective bidder against the Town.

12A. The Town reserves the right to reject any and all bids, to waive technical defects and to make such awards including accepting a bid, although not the low bid, as it deems in its sole discretion to be in the best interest of the Town. The Town reserves the right to reject any bid if the bidder, any officer of the bidder, or any other company owned in whole or in part by any officer(s) of the bidder, is delinquent in the payment of any taxes or fees owed to the Town. The Town reserves the right to require a disclosure statement from the bidder listing the name(s) of all officers of the company.

12B. In the event the Town determines that a contractor is delinquent in any payment due the Town, then the Town may offset the delinquent amount due to the Town against the sums owed the contractor.

13. The Town of Manchester may make such investigation as deemed necessary to determine the ability of the bidder to discharge a contract. The bidder shall furnish the Town with all such information and data as may be required for that purpose. The Town reserves the right to reject any bid if the bidder fails to satisfactorily convince the Town that he is properly qualified by experience and facilities to carry out the obligations of the contract and to satisfactorily complete the work called for herein, or if the bid is conditional in nature.

14. Except where otherwise provided, a contract between the Town and a successful bidder shall consist of the Invitation to Bid, Specifications, Plans, Bid including Proposal form and these Rules and

Regulations. Acceptance by the Town may be by purchase order for the portion of the work awarded to a contractor.

15. All Invitations to Bid shall be publicly advertised in a newspaper having a general circulation within the Town of Manchester, Connecticut.

16. Bids shall be made available on the Town of Manchester Purchasing Web Site via the Bidding site.

17. Alternate bids shall not be accepted unless otherwise specified in the bid documents.

18. Any act or acts of misrepresentation or collusion shall be a basis for disqualification of any bid or bids submitted by such persons guilty of said misrepresentation of collusion. In the event that the Town enters into a contract with any bidder who is guilty of misrepresentation or collusion and such conduct is discovered after the execution of said contract, the Town may cancel said contract without incurring liability, penalty, or damages.

19. In the event that any bidder wishes to protest the potential award of a bid, the bidder must make it’s protest in writing identify the protesting party and the bid number, title and shall include a factual summary of the basis of the protest including any documents that shall be considered and request a conference with respect thereto. Said protest must be received in the Town of Manchester Purchasing

Office, within FIVE (5) business days after the award decision.

20. A conference with respect to said protest shall be scheduled by the Purchasing Authority and shall be attended by the Purchasing Authority or their designee and such other persons as the Purchasing

Department and the Town Manager shall require attend. The subject matter of said conference shall be limited to the reasons for the protest specified in the written request for said conference. Said conference shall also include a discussion of all possibilities for a resolution of dispute. The Town shall make a decision in writing within three (3) business days after said conference and notify protesting bidder.

21. In the event that any protesting bidder wishes to take legal action against the Town, they must first fully comply with all of these Rules and Regulations, including those which have been changed by the

Purchasing Authority pursuant to paragraph 1 herein.

22. Except for special instructions inserted in special contracts by the Purchasing Authority pursuant to paragraph 1 herein, in the event of any conflicts between these Rules and Regulations and the terms and conditions of any document these Rules and Regulations shall prevail.

23. The contractor shall not transfer, sublet, or assign the contract by Power of Attorney or otherwise to any person, firm, or corporation, or in any way vary the terms of the contract without written permission from the Town. The Town has the right to terminate with a thirty (30) day written notice to the contractor. The Town reserves the right to terminate the contract at any time during the contract period. Such termination shall be effective immediately after giving written notice to the contractor that the Town is terminating the contract.

24. All Awards shall be made by the Purchasing Authority.

2.5. Bid Opening Information

Bid responses will be received by 1:00 pm on Friday, August 1, 2025

Bid openings will be held virtually through Zoom.

ZOOM meeting instructions are as identified in the Introduction Section above.

The virtual bid opening will be exactly the same as a regular bid opening – Purchasing staff will open the bids and read the results out loud. Results are not final until reviewed, tabulations compiled and then posted/distributed to participants. In addition, the requesting department will recommend an award after a complete review of the submissions.

3. Insurance and Indemnification Requirements

3.1. GENERAL CONDITIONS:

Within ten (10) business days of the award or notice, or prior to the start of work, whichever comes first, the contractor will provide, pay for, and maintain in full force and effect the insurance outlined here for coverage’s at not less than the prescribed minimum limits of liability. Such coverage is to remain in force during the life of the contract and for such additional time as may be required, and will cover the contractor/ independent insured’s activities, those of any and all subcontractors, or anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. Any failure to comply with reporting requirements and provisions of the policies shall not affect coverage provided to Town, its officers, officials, agents, or employees.

A.

Certificates of Insurance: The contractor will give the owner a certificate of insurance completed by a duly authorized representative of their insurer certifying that at least the minimum coverage’s required here are in effect and specifying that the liability coverage’s are written on an occurrence (or claims-made where applicable) form and that the coverage’s will not be canceled, non-renewed, or materially changed by endorsement or through issuance of other policy(ies) of insurance without sixty (60) days advance written notice to the Purchasing Division. Failure of the owner to demand such certificate or other evidence of full compliance with these insurance requirements or failure of the owner to identify a deficiency from evidence provided will not be construed as a waiver of the contractor’s obligation to maintain such insurance. Any failure to comply with reporting requirements and provisions of the policies shall not affect coverage provided to Town, its officers, officials, agents, or employees.

B.

Insurer Qualification: All insurance will be provided through companies authorized to do business in the

State of Connecticut and considered acceptable by the owner. Insurance Companies shall maintain a minimum A.M. Best rating of A-/VIII.

C.

Additional Insured: The policy or policies providing insurance as required, with the exception of professional liability and workers’ compensation, will defend and include the owner, directors, officers, representatives, agents and employees, and where applicable owner’s architects or engineers, as additional insureds on a primary and noncontributory basis for work performed under or incidental to this contract.

D.

Retroactive Date and Extended Reporting Period: Coverage, whether written on a claims made or occurrence basis, shall be maintained without interruption from the date of commencement of the

Work until date of final payment and then extended for an additional three (3) years from date of final payment.

If any insurance required here is to be issued or renewed on a Claims Made form as opposed to an

Occurrence form, the retroactive Date for coverage will be no later than the commencement date of the project. The Claims Made form will have an Extended Reporting Period of three years from the date of project completion. All Claims made policies cancelled or non-renewed and not replaced by a subsequent claims made policy will have an Extended Reporting period of three years from the date of cancellation or non-renewal.

E.

Subcontractors’ Insurance: The contractor will require each subcontractor hired by and/or employed by contractor to purchase and maintain insurance of the types specified below. When requested by the owner, the contractor will furnish copies of certificates of insurance evidencing coverage for each subcontractor.

F.

Waiver of Subrogation: The contractor/subcontractor will purchase required insurance policies that shall be endorsed with a waiver of subrogation and all rights of recovery in favor of the Town, its officers, officials, agents and employees. The contractor will require of subcontractors, by appropriate written agreements, similar waivers each in favor of all parties enumerated in this section.

G.

Indemnification/Defense/Hold Harmless: To the extent provided by law, the contractor shall indemnify, defend, and hold harmless the owner, officers, officials, agents and employees, and if applicable, the engineer and their agents and employees from and against all claims, damages, losses and expenses, including attorney’s fees of counsel selected by the owner, arising out of or resulting from the performance of the work and /or the supplying of materials, provided that any such claim, damage, loss or expense (a) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property including the loss of use resulting therefrom, and (b) is caused in whole or in part by any negligent act or omission of the contractor/ insured, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not they are caused in part by a party indemnified hereunder.

3.2. INSURANCE LIMITS AND COVERAGE:

A.

To the extent applicable, the amounts and types of insurance will conform to the minimum terms, conditions, and coverages of Insurance Services Office (ISO) policies, forms, and endorsements.

B.

If the contractor has self-insured retention’s or deductibles under any of the following minimum required coverage’s, the contractor must identify on the certificate of insurance the nature and amount of such self-insured retention’s or deductibles and provide satisfactory evidence of financial responsibility for such obligations. All self-insured retentions or deductibles will be the contractor/ independent insured’s sole responsibility.

C.

Workers’ Compensation Insurance: With respect to all operations the Contractor performs and all those performed for it by subcontractors, the Contractor shall carry, and require each subcontractor to carry

Workers’ Compensation insurance as required by the laws of the State of Connecticut.

Employer’s Liability insurance shall be provided in amounts not less than:

• $500,000 per accident for bodily injury by accident,

• $500,000 policy limit by disease; and

• $500,000 per employee for bodily injury by disease.

D.

Commercial General Liability Insurance: With respect to the operations the Contractor performs and also those performed for it by subcontractors, the Contractor shall carry, and require each subcontractor to carry, Commercial General Liability insurance, including Contractual Liability, Products and Completed Operations, Broad Form Property Damage and Independent Contractors in an amount not less than $1,000,000 combined single limit, per occurrence, and $2,000,000 aggregate. Owner shall be included as additional insured. Per project aggregate to apply.

Notes:

•If underground work is to be undertaken, each policy shall have coverage for and exclusions removed for “Explosion, Collapse and Underground” (“XCU”) hazards.

•Should blasting be required, all necessary permits for the use of explosives shall be obtained by the contractor or insured from the Fire Marshall.

E.

Automobile Liability Insurance: The Contractor shall obtain automobile liability insurance with a minimum limit of $1,000,0000 combined single accident, covering the operation of all motor vehicles, including those hired or borrowed, that are used in connection with the Project for all damages arising out of bodily injury to or death of all persons and/or injury to or destruction of property. This policy shall not be subject to an annual aggregate limitation.

F. Umbrella/Excess Coverage: contractor shall purchase and maintain umbrella/excess liability insurance with a limit of not less than $1,000,000 per occurrence/aggregate, covering all lines of insurance required by this contract. This coverage is required to sit above the underlying General Liability, Automobile Liability and Employer Liability part of the Workers Compensation policies. Depending on the scope and size of risk of the work to be performed, higher limits of coverage may be required.

G.

Owner’s and Contractor’s Protective Liability Insurance for and in the Name of the Town and/or State:

With respect to the Contractor’s operations and also those of its subcontractors, the Contractor shall carry, for and on behalf of the Town and/or State for each accident or occurrence resulting in damages from bodily injury to or death of persons and/or injury to or destruction of property, with a minimum of

$1,000,000 per occurrence.

Other Insurance Coverage That May Be Required:

• Professional Liability: Not less than $1,000,000 per claim and aggregate to be maintained for the duration of the agreement and three years following its termination. This insurance requirement applies when a contractor has a professional designation or license and/or is providing professional services.

The minimum limit for architects and engineers is $1,000,000 per claim and in the aggregate and may be increased depending upon the nature of the services to be provided to Owner.

• Cyber Risk Insurance: Not less than $1,000,000 per cyber incident to be maintained for the duration of the agreement and three years following its termination. This insurance requirement applies when a third party will be using, storing, or accessing private, confidential or protected information.

• Environmental Liability: Not less than $1,000,000 per claim and in the aggregate. This insurance requirement applies when a contractor will be performing environmental clean-up work

(decontamination/remediation), will be working with hazardous substance or waste, or may have similar such exposures while performing work under the proposed agreement. Higher limits of environmental liability coverage may be required depending upon the scope of work.

** Exceptions to the above requirements are subject to the sole discretion of the Town of Manchester

Version 4.2.2024

4. Standard Instructions for Supplies, Materials & Equipment

These instructions are standard for all proposals issued by the Town of Manchester, Connecticut, for the purchase of all supplies, materials, and equipment. The Town of Manchester may delete, supersede, or modify any of these standard instructions for a proposal by indicating such change in the section headed

“Special Instructions to Bidders.”

1. Unless otherwise stated, deliveries must consist of new merchandise.

2. Prices quoted shall be net delivered prices to the Town.

3. The Town may withhold acceptance of, or reject any merchandise which found, upon examination, not to meet the specifications’ requirements. When rejected, it shall be removed by the Contractor

(vendor) within ten (10) days after notification of rejection.

4. When the schedule indicates that an item to be purchased is to be specified, or equal, the bidder may offer an article which is certified to be equal in quality, performance, and in other essential characteristics to the bid standard. Bidder must furnish any information, such as specifications, test results, etc., which will help in determining whether an item is equal or superior to the Town’s bid standard. If a bidder fails to name a substitute, the specified item must be furnished.

5. Bidders agree to comply with all of the latest Federal and State safety standards and regulations and certify that all items furnished in this bid will conform to and comply with said standards and regulations. Bidder further agrees to indemnify and hold harmless the Town for all damages assessed against the Town as a result of the bidder’s failure to comply with said Standards and/or Regulations.

6. The Town reserves the right to make an award by item, total or by group, as may be in the best interest of the Town. If a Bidder desires to bid on an “all or nothing” basis, he shall so indicate on the bid schedule and the Town reserves the right to make an award as may be in the best interest of the Town.

7. The Bidder shall pay all royalties and license fees. He shall defend all suits or claims for infringement of any patent rights and shall save the Town of Manchester harmless from loss on account thereof except that the Town of Manchester shall be responsible for all such loss when a particular manufacturer, product, or process is specified by the Town of Manchester.

5. Project Details

5.1. SCOPE OF WORK

The contractor shall be capable of providing rehabilitation services for Well 6 and Well 7A, prioritizing Well 7A’s completion, including cleaning with the Aqua Freed CO2 injection system, pump maintenance, and testing, as well as a 3 year service contract with annual inspections for ongoing maintenance. All services will be performed at the well sites.

5.2. WELL ASSESSMENT

Initial Inspection: Conduct a thorough inspection of Well 6 and Well 7A to assess current conditions, including pump performance, casing integrity, and biofouling or sediment buildup, starting with Well 7A.

Data Collection: Record baseline data on water yield, quality, and operational efficiency for both wells.

5.3. CLEANING AND REHABILITATION

Prioritization: Complete rehabilitation of Well 7A before commencing work on Well 6 to ensure Well 7A is operational first.

Video: The well and screen components shall be videoed pre and post cleaning. The department must be provided with a digital copy of the video.

Well Cleaning: Utilize the Aqua Freed CO2 injection system to remove biofouling, mineral deposits, and sediments from the well casing and screen of each well. Alternative methods (e.g., jetting, surging, or chemical cleaning with pH ≤ 7) may be proposed if justified, subject to approval by the Water and Sewer

Department.

Re-Development of Chemicals: 5 gallons of Sodium Hypochlorite, 3 gallons of NuWell 220 and neutralization chemicals.

Pump Maintenance: Inspect, repair, or replace pump and motor components to restore optimal performance.

Complete vibration testing at a minimum of 8 points prior to removal and post start up. Provide the

Town with the reports.

Pump Maintenance at 6a: Sandblast the discharge head and paint with 3 coats of AWWA approved epoxy. Discharge head shall be rebuilt with completely new stuffing box. A new stainless steel stuffing box shaft shall be furnished.

Sanitary Seal: Repair or replace sanitary seals to prevent contamination.

Level Transducer: Replace the water level transducer and digital local readout to have a 4-20 mA output as to view the water level remotely.

5.4. TESTING AND VERIFICATION

Performance Testing: Conduct pump tests to measure water yield and drawdown post-rehabilitation, ensuring wells meet design specifications, starting with Well 7A.

Water Quality Testing: Test for bacteria (e.g., coliform), nitrate, and other contaminants to verify compliance with Connecticut DPH and Town standards.

Final Verification: Confirm wells operate efficiently and meet regulatory requirements, with Well 7A verified first.

5.5. SERVICE CONTRACT

Contract Term: Provide a 3 year service contract for Well 6 and Well 7A, commencing upon completion of rehabilitation.

Services Include:

o Annual Inspections: Conduct on-site inspections annually to assess well condition, pump performance, and water quality.

o On-Site Interventions: Perform cleaning (using Aqua Freed CO2 injection or equivalent), pump maintenance, water quality testing, and emergency repairs as requested.

Response Time: Commit to a maximum response time of 24 hours for emergency maintenance requests and 72 hours for non-emergency requests.

Reporting: Submit detailed reports for each maintenance activity, including biennial inspection findings, actions taken, and recommendations.

5.6. DOCUMENTATION

Rehabilitation Records: Maintain detailed records of the rehabilitation process, including inspection findings, Aqua Freed CO2 injection parameters (e.g., pressure, volume), pump repairs, and test results.

Maintenance Records: Provide records via for all maintenance activities, including biennial inspections, dates, services performed, and outcomes.

Certification: Certify that rehabilitation and maintenance results comply with DPH regulations and industry standards.

5.7. ADDITIONAL REQUIREMENTS

Comply with all applicable federal, state, and local regulations, including DPH, DEEP, EPA Underground

Injection Control (UIC) Class V requirements for CO2 injection, and OSHA standards.

Be capable of providing all necessary tools, equipment (including Aqua Freed CO2 injection systems or equivalent), personnel, and an online platform for the service contract.

Coordinate with Water and Sewer Department staff to minimize disruption to water supply operations during rehabilitation and maintenance activities.

5.8. QUALITY ASSURANCE

All pertinent American Water Works Associations Standards shall be met.

All pertinent American National Standards Institute Standards shall be met.

5.9. SUBMITTALS

When ordering materials for the Town, submittals are required. Two copies of the following items shall be submitted to the Town of Manchester Water Department for approval prior to shipment:

• Complete shop drawings showing dimensions, materials of construction and all particulars as herein specified.

• Certified pump curves showing the actual performance under factory testing of the pump to be supplied.

• Complete operations and maintenance manuals.

Parts list including the manufacturer's references and ordering numbers.

Recommended spare parts list with ordering numbers.

5.10. LIQUIDATED DAMAGES FOR FAILURE TO COMPLETE ON TIME

1. The attention of the bidder is called to the provision of the Contract to the requirement that the work be completed within 90 calendar days of the date the Town of Manchester submits a written purchase order to the Contractor or written Notice to Proceed for the work.

2. Owner and Contractor recognize that time is of the essence as to Substantial and Final

Completion and that the Owner shall suffer financial loss if the Work is not completed within the time specified above. Accordingly, if the Contractor shall neglect, fail or refuse to complete the

Work within the time specified for either Substantial or Final Completion, or any proper extension granted by the Owner, then the Contractor agrees, as partial consideration for the award of this Contract, then the Contractor agrees, as partial consideration for the award of this

Contract, to pay liquidated damages to the Owner the sum of Two Hundred Dollars ($200.00) for each and every calendar day that the Contractor shall be in default in completing the Work within the time stipulated above. Liquidated damages area not intended as a penalty but rather, shall be construed as a best estimate of damages which the Town will suffer due to a Bidder's refusal, failure or neglect to perform pursuant to his Bid and Contract Documents, if his Bid is accepted by the Town.

5.11. GENERAL

Workmanship and the method and materials of construction shall conform to the best practice and highest standards applicable for the design use as specified herein.

Pumping units furnished shall be complete in all particulars and ready for final assembly, installation and operation.

Pump manufacturers shall certify proof of successful operation experience during the last ten (10) years of five (5) installations of equipment comparable to the specifications herein.

The manufacturer's service representative on the job shall certify proof of having a minimum of experience of 50 installations of vertical turbine pumps.

The Contractor shall furnish, deliver, and erect at the site all necessary rigging and equipment to satisfactorily complete the work as specified.

5.12. STORAGE OF EQUIPMENT

Pump shafts and columns stored on site have covered and taped ends for protection. Pump equipment damaged or bent during shipping or storage shall be replaced by the Contractor at their expense.

All pump motors shall be stored on site according to motor manufacturer's recommendations until pumps are operational and accepted by the Town of Manchester.

5.13. SITE PROTECTION AND CLEANUP

The Contractor shall maintain the site in a clean and safe manner throughout the duration of work.

Upon the completion of the work and before final payment is made the Contractor shall clean and remove all surplus, discarded material and rubbish and restore in an acceptable manner all property which has been altered or damaged during the work. The Contractor shall leave the entire site in a neat and presentable condition.

5.14. CONTRACT TERM

The term of the contract shall be from Date of Award up to and including October 31, 2028.

Prices must be held firm during the contract term.

The contractor shall not transfer, sublet, or assign the contract by Power of Attorney or otherwise to any person, firm, or corporation, or in any way vary the terms of the contract without written permission from the Town. The Town has the right to terminate with a thirty (30) day written notice to the contractor. The Town reserves the right to terminate the contract at any time during the contract period. Such termination shall be effective immediately after giving written notice to the contractor that the Town is terminating the contract.

6. Living Wage Ordinance

6.1. Living Wage Ordinance

This contract is subject to provisions of the Town of Manchester Living Wage Ordinance. A summary description of the ordinance and the certification form is attached. Bidders are asked to indicate on the attached Certification Form if your firm would be considered a covered employer. The Certification Form shall be returned to the Town with the proposal.

6.2. Summary Description for Vendors Regarding Manchester’s Living Wage Ordinance

Effective February 1, 2010, the Town of Manchester adopted a living wage ordinance. This Summary

Description is designed to provide any vendor bidding on a Town of Manchester contract with the key provisions of that ordinance. It does not contain the full ordinance.

LIVING WAGE REQUIREMENT:

The ordinance requires that companies awarded service contracts by the Town of Manchester exceeding $25,000 in any one fiscal year pay their Eligible Employees a living wage. Companies considered Covered Employers subject to this requirement are defined below. The Town of Manchester has determined that the contract resulting from this bid or Request for Proposals will be subject to the ordinance if the total contract value is $25,000 or more in any one fiscal year.

The living wage is currently calculated to be $17.78 per hour for employees that are provided comprehensive health care benefits, or $26.07 per hour for employees that are not provided comprehensive health care benefits.

The living wage and health benefit requirements are adjusted annually each July, effective July 1, 2010.

Companies will be required to pay the applicable living wage rate in effect during the term of their contracts.

COVERED EMPLOYERS AND EXEMPTIONS:

The ordinance requires that Covered Employers pay the living wage rate. Certain employers are excluded from paying the living wage rate. They are as follows:

Non-profit organizations as defined by the ordinance, and

Entities that employ less than 25 eligible employees.

ELIGIBLE EMPLOYEES:

Eligible employees are all permanent, full time employees of the company (defined as a normal work week of at least 30 hours), working in the State of Connecticut, not just those working on the Town contract. The following are not considered eligible employees for the purposes of the living wage requirement:

Employees with a normal work week of less than 30 hours.

Seasonal or temporary employees.

Employees under the age of 18.

Employees hired as part of a school-to-work program.

Students who serves in a work-study program or as an intern.

Trainees participating for not more than six months in a training program.

Employees enrolled in a governmentally funded vocational rehabilitation program.

Volunteers working without pay.

Employees exempted under Section 14(c) of the Fair Labor Standards Act due to disabilities.

Any person whose wage rate is subject to a federal or State of Connecticut statute or regulation mandating a prevailing wage rate.

EMPLOYER OBLIGATIONS:

Covered Employers are required to do the following pursuant to the ordinance.

Certify with the submission of their bid or proposal a) that they will pay the required living wage to eligible employees if awarded a contract, or b) that they are exempt from requirements of the ordinance, Upon award, covered employers shall provide the Town a sworn affidavit affirming that all eligible employees of the covered employer working in the State of Connecticut are receiving the living wage and health benefits required by this ordinance.

This sworn affidavit shall be provided thereafter on an annual basis within 30 days of a request being made by the Town if the duration of the contract exceeds one (1) year.

Notify their employees of their rights under the Living Wage Ordinance by posting a copy of the ordinance and other materials prepared by the Town of Manchester in locations where employees will see them.

Make best efforts to attempt to hire residents of the Town of Manchester for all new positions which result from a service contract subject to the ordinance.

PROHIBITED PRACTICES:

Covered Employers cannot decrease non-wage benefits (such as insurance, vacation, or pension) as a means of complying with the living wage requirements.

Covered Employers cannot retaliate or discriminate against any employee for making a complaint against the covered employer regarding compliance with living wage requirements.

ENFORCEMENT:

The Town may enforce the provisions of this ordinance by the imposition of fines, suspension of contract or declaring the Covered Employer ineligible for future contracts.

WAIVERS:

The ordinance provides for the waiver of certain requirements in the ordinance. However, no waivers will be considered until the bidding process has been completed and a contract has been awarded.

Requests for waivers must be made by the Covered Employer, in writing, to the Town Manager. The

Town Manager shall submit the waiver request to the Board of Directors, which shall have the sole discretion as to whether it is granted.

The above is intended to be a summary of the requirements of the living wage ordinance as they affect covered employers and is provided for informational purposes only. Employers should read the entire

Living Wage Ordinance. It can be found online at www.townofmanchester.gov on the left side of the page. Click on Document Center, scroll to Purchasing and click on Living Wage Ordinance.

7. Vendor Submissions

7.1. Bid Requirements*

Did you read through the entire solicitation and confirm that you met all of the bid requirements therein?

☐ Yes

☐ No

*Response required

7.2. Addenda *

This bid and any addenda will be issued on the Town of Manchester website bidding portal. It shall be the responsibility of the bidder to download this information. THE TOWN OF MANCHESTER WILL NOT

MAIL A SEPARATE HARD COPY OF ADDENDUM TO BIDDERS. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents.

☐ Please confirm

*Response required

7.3. Document Uploads

Please upload any required information in this section.

7.4. Vendor Information *

Please provide your Company Name

Your Company Address

Your Company's FEIN Number

Your Company's System Award Management Number (SAM)

Your Company's State Contractor License Number (if applicable)

Main Contact Name and Title

Telephone Number

Email Address

*Response required

7.5. Have you completed and uploaded the Living Wage Certification? If the form is in the attachments section, then you must complete it and submit it with your bid.*

☐ Yes

☐ No

*Response required

7.6. Please provide the full name of the person who is authorized to sign contracts on behalf of the company in the event that your company is the successful bidder.*

*Response required

7.7. Please provide the email address of the person who is authorized to sign contracts on behalf of the company in the event that your company is the successful bidder.*

*Response required

8. Pricing Table

REHABILITATION AND MAINTENANCE OF WELL 6 AND WELL 7A

Line Item Description Quantity Unit of

Measure Cost Total

1 REHABILITATION OF WELL 6 AND

WELL 7A

1 LUMP SUM

2 ANNUAL INSPECTIONS 1 EACH

3 MAINTENANCE 1 HOURLY

RATE

TOTAL