Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron.pdf
PDF 336 KB Posted
- Attached to
- Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
- Solicitation number
- 8660 26 & 8665 26
- Issued by
- Hillsborough County, Florida
About this file
This is an Invitation to Bid issued by the Hillsborough County Aviation Authority for the rehabilitation of Runway 1L-19R and associated taxiways and construction of a new Northwest Remain Overnight (RON) aircraft parking apron at Tampa International Airport in Florida. The project encompasses extensive civil, electrical, drainage, and lighting work including asphalt and concrete pavement removal and replacement, subgrade stabilization, base course installation, runway and taxiway lighting and marking systems, drainage infrastructure, fencing, water utilities, and landscaping. The bid schedule contains over 200 line items with quantities ranging from individual units to thousands of linear feet and square yards. The mandatory Pre-Bid Conference is scheduled for September 9, 2026, at 10:00 am with a mandatory site inspection to follow. A non-mandatory site inspection is available on September 15, 2026. The deadline for questions and clarifications is September 23, 2026, at 5:00 pm, with an addendum to be posted by September 30, 2026. Bids are due electronically on October 8, 2026, at 2:00 pm, and the Authority's Board will make the award determination by November 5, 2026.
Bidders must meet thirteen minimum qualifications including Florida business registration, absence from various convicted vendor and suspension lists, attendance at the mandatory Pre-Bid Conference and site inspection, insurance capability, and completion of multiple certifications and forms covering bid bonds, safety, small business enterprise participation, non-collusion, e-verify compliance, and anti-human trafficking certification. Bidders must submit financial statements and a current contractor's license qualifying them for the work. Mobilization is capped at ten percent of total project cost. An owner's allowance of $2,000,000 is included in the bid schedule. Bidders are required to register with PaymentWorks and utilize electronic payment methods if awarded. The solicitation enforces a Cone of Silence on communications during the competitive procurement process, with all inquiries directed to the Senior Procurement Agent.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HILLSBOROUGH COUNTY AVIATION AUTHORITY
INVITATION TO BID
FOR
REHABILITATE RUNWAY 1L-19R AND ASSOCIATED
TAXIWAYS AND NORTHWEST REMAIN OVERNIGHT (RON)
PARKING APRON
POST DATE: August 25, 2026
QUESTION AND CLARIFICATION DEADLINE: September 23, 2026, 5:00 pm BID DEADLINE: October 8, 2026, 2:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/tampaairport/
Tampa International Airport Invitation to Bid Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
HILLSBOROUGH COUNTY AVIATION AUTHORITY
INVITATION TO BID
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
1. Introduction
2. Respondent Questionnaire
3. Bid Schedule
Attachments:
A - Division 0 B - Division 1 C - Technical Specifications D - Construction Safety and Phasing Plan (CSPP) E - Plans - Volume 1 F - Plans - Volume 2
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
1. Introduction
The Hillsborough County Aviation Authority (Owner) has a Cone of Silence applicable to all competitive procurement processes which places restrictions on communications. Refer to the Cone of Silence in the Solicitation document for more information. All inquiries regarding this Solicitation must be submitted in writing to the Procurement Agent assigned to this Solicitation.
The Bidder must supply all information and documents required by the Solicitation documents through the Owner’s e-Procurement Portal located at https://procurement.opengov.com/portal/tampaairport by the Bid Submittal Time and Date.
1.1. Summary
This Project consists of the rehabilitation of the Runway 1L-19R and associated taxiways and the construction of a new Northwest Remain Overnight (RON) aircraft parking apron at Tampa International Airport.
1.2. Contact Information
Rayesha Cotton Senior Procurement Agent P.O. Box 22287 Tampa, FL 33622 Email: rcotton@tampaairport.com Phone: (813) 554-1448 Department:
Planning and Development
1.3. Timeline
Contract Documents Posted August 25, 2026 https://procurement.opengov.com/portal/tampaairport mailto:rcotton@tampaairport.com tel:(813)554-1448
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Mandatory Pre-Bid Conference (Mandatory)
September 9, 2026, 10:00am The mandatory Pre-Bid Conference will be held in the SkyCenter Boardroom, which is located on the fourth floor of the SkyCenter One Office Building at 5411 SkyCenter Dr., Tampa, FL 33607.
OR
Microsoft Teams ®
Call-In: +1 813-694-2596 Phone Conference ID: 562 252 24#
Click here to join the Microsoft Teams Meeting:
https://teams.microsoft.com/meet/263455750 451480?p=EAEp731HLXnRM6fAZN
Mandatory Site Inspection September 9, 2026, as a part of the scheduled Mandatory Pre-Bid Conference. Details will be announced during the Mandatory Pre-Bid Conference. The Mandatory Site Inspection will commence immediately following the conclusion of the Pre-Bid Conference.
Non-Mandatory Site Inspection (Non- Mandatory)
September 15, 2026, 10:00am Bus will depart from SkyCenter Curb at 10:00 am for this site inspection. The site inspection will give participants an opportunity to get on Runway 1L-19R and Associated Taxiways.
Request for Clarification Deadline September 23, 2026, 5:00pm
Addendum posted on Owner’s e- Procurement Portal website
September 30, 2026, 5:00pm https://teams.microsoft.com/meet/263455750451480?p=EAEp731HLXnRM6fAZN https://teams.microsoft.com/meet/263455750451480?p=EAEp731HLXnRM6fAZN
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Bid Submittal Time and Date October 8, 2026, 2:00pm RCC Conference Room - Rental Car Center
OR
Microsoft Teams ®
Call-In: +1 813-694-2596 Phone Conference ID: 501 669 884#
Click here to join the Microsoft Teams Meeting:
https://teams.microsoft.com/meet/244672451 649541?p=69HagqakIPFXfr0dlA
Award by Authority's Board November 5, 2026 https://teams.microsoft.com/meet/244672451649541?p=69HagqakIPFXfr0dlA https://teams.microsoft.com/meet/244672451649541?p=69HagqakIPFXfr0dlA
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
2. Respondent Questionnaire
Bidder shall review and complete the Respondent Questionnaire in its entirety. Failure to complete the Respondent Questionnaire may deem the Bid as non-responsive.
2.1. Minimum Qualifications
Minimum qualifications have been established as a basis for determining the eligibility of each submitted Bid. A submitted Bid will be determined non-responsive and will not be considered unless sufficient documentation is provided to determine whether the Bidder meets the minimum qualifications listed below:
2.1.1. Bidder is registered with the Florida Department of State, Division of Corporations to do business in the State of Florida. (www.sunbiz.org)*
Attach proof of registration
*Response required
2.1.2. Bidder is required to confirm that, if awarded by the Board, Bidder will register with PaymentWorks and select one of the Authority's electronic payment methods.*
☐ Please confirm *Response required
2.1.3. Bidder is NOT listed on the Florida Department of Management Services, Convicted Vendor List as defined in Section 287.133(3)(d), Florida Statutes.*
☐ Please confirm *Response required
2.1.4. Bidder is NOT listed on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List or the Scrutinized Companies that Boycott Israel List or is engaged in business operations in Cuba or Syria, as detailed in this Solicitation. *
☐ Please confirm *Response required
2.1.5. Bidder is NOT listed on the Federal Convicted Vendor list. (www.sam.gov)* ☐ Please confirm *Response required
2.1.6. Bidder is NOT listed on the Florida Department of Transportation Contractor Suspension List. *
☐ Please confirm
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
*Response required
2.1.7. Bidder had a representative sign-in and attend the Mandatory Pre-Bid Conference or had a representative attend the Mandatory Pre-Bid Conference on-line via Microsoft Teams®. *
NOTE: To be considered as attending the Mandatory Pre-Bid Conference, the prospective Bidder must have signed in on a sign-in sheet prior to the start of the Mandatory Pre-Bid Conference or signed in to Microsoft Teams® and be identified by the Procurement Agent at the start of the Mandatory Pre-Bid Conference.
Provide the name of Bidder’s representative who attended the mandatory Pre-Bid Conference in-person or via Microsoft Teams®
*Response required
2.1.8. Bidder had a representative sign-in and attend the Mandatory Site Inspection. * NOTE: To be considered as attending the Mandatory Site Inspection, a prospective Bidder must have signed in on a sign-in sheet prior to the start of the Mandatory Site Inspection.
Provide the name of Bidder’s representative who attended the Mandatory Site Inspection.
*Response required
2.1.9. Bidder confirms that the Bidder has the ability to obtain the insurance coverage and limits as required in Section 00650 - INSURANCE REQUIREMENTS.*
☐ Please confirm *Response required
2.1.10.Bidder has completed Section 00300 - BID FORM.* Please download the below documents, complete, and upload.
• 00300_bid_form.pdf
*Response required
2.1.11.Bidder confirms that its Bid includes any applicable Tariffs imposed by the Bid Submittal Due Date and Time.*
☐ Please confirm *Response required
2.1.12.Bidder has completed Section 00350 - BID AFFIDAVIT* Please download the below documents, complete, and upload.
• 00350_-_bid_affidavit.pdf
*Response required
2.1.13.Bidder has submitted Section 00400-1 - BID BOND or Cashier's Check and Section https://government-project.s3.us-west-2.amazonaws.com/270179/33f3f6ad-e927-484a-8de4-1aa77cc7e51d_00300_bid_form.pdf https://government-project.s3.us-west-2.amazonaws.com/270179/f6b6192f-43c8-4568-a0c0-48e2e25ca1b4_00350_-_bid_affidavit.pdf
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
00400-2 SURETY BOND AFFIDAVIT.*
Please download the below documents, complete, and upload.
• 00400-1_-_bid_bond_7-29-26.pdf
*Response required
2.2. Additional Required Documents
2.2.1. Bidder has completed Section 00415 - TRENCH SAFETY CERTIFICATION.* Please download the below documents, complete, and upload.
• 00415-TrenchSafety_7-29-26.pdf
*Response required
2.2.2. Bidder has completed Section 00417 - SMALL BUSINESS ENTERPRISE (SBE)
ASSURANCE AND PARTICIPATION.*
Please download the below documents, complete, and upload.
• 00417-SBE.pdf
*Response required
2.2.3. Bidder has completed Section 00420 – BIDDER’S GENERAL BUSINESS
INFORMATION.*
Please download the below documents, complete, and upload.
• 00420_Bidder's_General_Busi...
*Response required
2.2.4. Bidder has completed Section 00421 – SCRUTINIZED COMPANY CERTIFICATION.* Please download the below documents, complete, and upload.
• 00421_-_Scrutinized_Company...
*Response required
2.2.5. Bidder has completed Section 00422 – E-VERIFY CERTIFICATION.* Please download the below documents, complete, and upload.
• 00422_-_E-Verify_Certificat...
*Response required
2.2.6. Bidder has completed Section 00423 – NON-COLLUSION CERTIFICATION.* Please download the below documents, complete, and upload.
• 00423_Non-Collusion_Certifi...
https://government-project.s3.us-west-2.amazonaws.com/270179/05e989ca-490e-45e0-9c65-d2eea0f1f433_00400-1_-_bid_bond_7-29-26.pdf https://government-project.s3.us-west-2.amazonaws.com/270179/ee156ca6-b7a5-4f10-9b5b-cee4038950f8_00415-TrenchSafety_7-29-26.pdf https://government-project.s3.us-west-2.amazonaws.com/270179/f31d9c1f-0bc2-49c1-a902-0e059f0349d7_00417-SBE.pdf https://government-project.s3.us-west-2.amazonaws.com/270179/c82ea262-bd6c-4c45-ab43-6dbce1e5b27b_00420_Bidder%27s_General_Business_Information_7-29-26.pdf https://government-project.s3.us-west-2.amazonaws.com/270179/37b901c7-b863-4d15-9ec4-88d9ec385814_00421_-_Scrutinized_Company_Certification_Form_7-29-26.pdf https://government-project.s3.us-west-2.amazonaws.com/270179/f8f0cff4-3356-42b2-8c51-0ec1795b0a90_00422_-_E-Verify_Certification_Form_7-29-26.pdf https://government-project.s3.us-west-2.amazonaws.com/270179/07e35a48-4e60-4eca-8dac-26269db4f2c1_00423_Non-Collusion_Certificate_7-29-26.pdf
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
*Response required
2.2.7. Bidder has completed Section 00430 – SUBCONTRACTORS LIST * Please download the below documents, complete, and upload.
• 00430_-_sub_contractor_list...
*Response required
2.2.8. Bidder has completed Section 00440 - PAYMENT METHOD*
Please download the below documents, complete, and upload.
• 00440_-_Payment_Method_7-29...
*Response required
2.2.9. Bidder has completed Section 00450 - Affidavit of Compliance with Anti-Human Trafficking Laws.*
Please download the below documents, complete, and upload.
• 00450_-_Trafficking_Cert_7-...
*Response required
2.2.10.Bidder has included their Financial Statement(s).* *Response required
2.2.11.Bidder has provided a copy of a current and active Contractor's License that qualifies Bidder to bid on the work.*
*Response required
2.2.12.If the Bid Affidavit is signed by a person other than the President or Vice President of the corporation, such person will furnish a corporate resolution showing their authority to bind the corporation.
https://government-project.s3.us-west-2.amazonaws.com/270179/55db8f0d-3cf1-4306-bf11-ddacf634cbcd_00430_-_sub_contractor_list_Non-Fed_7-29-26.pdf https://government-project.s3.us-west-2.amazonaws.com/270179/8f583704-3265-4efb-a9a9-30de75ee1c29_00440_-_Payment_Method_7-29-26.pdf https://government-project.s3.us-west-2.amazonaws.com/270179/a2d9cc97-358f-41a1-9edb-ac6e2a1a211b_00450_-_Trafficking_Cert_7-29-26.pdf
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
3. Bid Schedule
The Owner will be accepting electronic submissions of the Bid Schedule via the Owner’s e- Procurement portal partner, OpenGov Procurement. Bidder will submit Bidder's pricing using the online Bid Schedule.
TABLE 1
Line Item Description Quantity Unit of Measure
Unit Cost Total
C-100-14.1 CONTRACTOR QUALITY CONTROL
PROGRAM (CQCP)
1 LS
C-102-5.1 EROSION CONTROL MEASURES 1 LS
C-105-10.1 MOBILIZATION (MOBILIZATION IS
LIMITED TO TEN PERCENT (10%) OF
THE TOTAL PROJECT COST)
1 LS
C-105-10.2 MAINTENANCE OF TRAFFIC 1 LS
C-105-10.3 PORTABLE RUNWAY CLOSURE
MARKERS
2 EA
C-105-10.4 PROJECT SURVEY AND STAKEOUT 1 LS
M-104-10.1 SAFETY AND SECURITY 1 LS
P-101-5.1 ASPHALT PAVEMENT SURFACE
MILLING (2-3" NOMINAL)
42,000 SY
P-101-5.2 FULL DEPTH ASPHALT PAVEMENT
REMOVAL
37,000 SY
P-101-5.3 ISOLATED PAVEMENT REMOVAL
CONCRETE PAVEMENT VARIABLE (17"
NOMINAL)
2,500 SY
P-101-5.4 ISOLATED PAVEMENT REMOVAL
CONCRETE BASE (LCB OR AGGREGATE
BASE 6")
750 SY
P-101-5.5 FULL DEPTH CONCRETE PAVEMENT
REMOVAL INCLUDING BASE (17"
PCC+6" BASE)
51,000 SY
P-101-5.6 JOINT AND CRACK REPAIR
(CONCRETE)
1,000 LF
P-101-5.7 CONCRETE SPALL REPAIR 800 SF
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Line Item Description Quantity Unit of Measure
Unit Cost Total
P-101-5.8 CONCRETE VALLEY GUTTER REMOVAL 2,600 LF
P-101-5.9 FENCE DEMOLITION 2,900 LF
P-101-5.10 FUEL LINE DEMOLITION 2,800 LF
P-101-5.11 DEMO EXISTING STORM PIPE 3,000 LF
P-101-5.12 DEMO EXISTING UNDERDRAIN PIPE 10,700 LF
P-101-5.13 DEMO EXISTING STORM STRUCTURE 37 EA
P-101-5.14 REMOVE AND DISPOSE OF DERELECT
EQUIPMENT ON EXISTING APRON
20 EA
P-101-5.15 GENERAL DEMOLITION 1 LS
P-101-5.16 TAXIWAY A BRIDGE MSE WALL
EROSION REPAIR
1 LS
P-152-4.1 UNCLASSIFIED EXCAVATION 37,000 CY
P-152-4.2 OFFSITE BORROW 28,000 CY
P-152-4.3 UNSUITABLE EXCAVATION 2,000 CY
P-160-1 SUBGRADE STABILIZATION (6" THICK)
(LBR = 75)
153,000 SY
P-211-5.1 LIMEROCK BASE COURSE, SHOULDERS
(8" THICK)
38,000 SY
P-219-5.1 RECYCLED CONCRETE BASE COURSE
(6" THICK)
18,000 SY
P-219-5.2 RECYCLED CONCRETE BASE COURSE
(4" THICK)
1,300 SY
P-306-8.1 LEAN CONCRETE BASE COURSE (6"
THICK)
132,000 SY
P-403-8.1 ASPHALT MIXTURE SURFACE COURSE
(VARIOUS THICKNESSES)
15,900 TN
520-1-10 FDOT TYPE F CURB 220 LF
P-501-8.1 CEMENT CONCRETE PAVEMENT (18"
THICK)
100,300 SY
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Line Item Description Quantity Unit of Measure
Unit Cost Total
P-501-8.2 CEMENT CONCRETE PAVEMENT,
THICKENED EDGE (18"-23" THICK)
6,200 SY
P-501-8.3 CEMENT CONCRETE PAVEMENT (10"
THICK)
15,000 SY
P-501-8.4 CEMENT CONCRETE PAVEMENT,
THICKENED EDGE (10"-13" THICK)
2,700 SY
P-501-8.5 CEMENT CONCRETE PAVEMENT (12"
THICK)
19,000 SY
P-501-8.6 CEMENT CONCRETE PAVEMENT,
THICKENED EDGE (12"-15" THICK)
3,100 SY
P-501-8.7 CEMENT CONCRETE PAVEMENT,
FIBER REINFORCED (17" THICKNESS)
FOR ISOLATED SLABS
1,800 SY
P-501-8.8 CEMENT CONCRETE PAVEMENT,
FIBER REINFORCED (19" THICKNESS)
FOR ISOLATED SLABS
700 SY
P-605-5.1 CLEAN AND RESEAL CONCRETE /
CONCRETE - CONSTRUCTION,
CONTRACTION, AND EXPANSION
JOINTS
230,000 LF
P-605-5.2 CLEAN AND RESEAL CONCRETE /
ASPHALT JOINTS
19,000 LF
P-620-4 RUNWAY AND TAXIWAY PAINT
REMOVAL
363,000 SF
P-620-5.1 WATERBORNE PAVEMENT MARKING,
WHITE WITH GLASS BEADS
164,000 SF
P-620-5.2 WATERBORNE PAVEMENT MARKING,
YELLOW WITH GLASS BEADS
129,000 SF
P-620-5.3 WATERBORNE PAVEMENT MARKING,
RED WITH GLASS BEADS
15,000 SF
P-620-5.4 WATERBORNE PAVEMENT MARKING,
BLACK WITHOUT GLASS BEADS
195,000 SF
P-620-5.5 WATERBORNE PAVEMENT MARKING,
GREEN WITHOUT GLASS BEADS
30,000 SF
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Line Item Description Quantity Unit of Measure
Unit Cost Total
P-620-5.6 TEMPORARY PAVEMENT MARKINGS
WITH GLASS BEADS
94,000 SF
P-620-5.7 TEMPORARY PAVEMENT MARKINGS
WITHOUT GLASS BEADS
96,000 SF
P-621-5.1 SAW-CUT GROOVING 300 SY
P-631-7.1 REFINED COAL TAR EMULSION WITH
ADDITIVES FOR SLURRY COAT (TWO
COATS WITH SAND)
660,000 SF
F-162-5.1 NEW 8 FT HIGH FENCE WITH 3
STRANDS BARBED WIRE, 1 FT BARBED
WIRE EXTENSION ARMS, TOP RAIL,
AND BOTTOM TENSION WIRE,
INCLUDING GROUNDING AND SIGNS,
INSTALLED IN TURF
1,900 LF
F-162-5.2 NEW 8 FT HIGH DOUBLE SWING
VEHICLE GATE WITH 3 STRANDS
BARBED WIRE, 1 FT BARBED WIRE
EXTENSION ARMS, TOP RAIL, AND
BOTTOM TENSION WIRE, INCLUDING
GROUNDING AND SIGNS
2 EA
D-701-5.1 15" REINFORCED CONCRETE PIPE
(CLASS V)
142 LF
D-701-5.2 18" REINFORCED CONCRETE PIPE
(CLASS V)
140 LF
D-701-5.3 24" REINFORCED CONCRETE PIPE
(CLASS V)
450 LF
D-701-5.4 30" REINFORCED CONCRETE PIPE
(CLASS V)
1,005 LF
D-701-5.5 36" REINFORCED CONCRETE PIPE
(CLASS V)
531 LF
D-701-5.6 42" REINFORCED CONCRETE PIPE
(CLASS V)
80 LF
D-701-5.7 48" REINFORCED CONCRETE PIPE
(CLASS V)
1,000 LF
D-701-5.8 72" REINFORCED CONCRETE PIPE
(CLASS V)
460 LF
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Line Item Description Quantity Unit of Measure
Unit Cost Total
D-701-5.9 12"x18" HORIZONTAL ELLIPTICAL
REINFORCED CONCRETE PIPE
200 LF
D-701-5.10 43"x68" HORIZONTAL ELLIPTICAL
REINFORCED CONCRETE PIPE
960 LF
D-701-5.11 16-INCH DUCTILE IRON PIPE (CLASS
52)
571 LF
D-701-5.12 24-INCH DUCTILE IRON PIPE (CLASS
52)
18.57 LF
D-705-5.1 6 INCH PERFORATED, INCLUDING
BACKFILL, FILTER FABRIC
AND CONNECTION TO DRAINAGE
STRUCTURES
9,000 LF
D-705-5.2 8 INCH NON-PERFORATED,
INCLUDING BACKFILL
AND CONNECTION TO DRAINAGE
STRUCTURES
1,500 LF
D-705-5.3 INSTALL CLEAN OUT AND/OR
INSPECTION PORT
113 EA
D-705-5.4 ELECTRICAL DRAIN PIPES (1") 1 LS
D-751-5.1 TRENCH DRAIN (12" WIDE CHANNEL -
3' TOTAL WIDTH - W/ 6' FIRESTOPS)
2,560 LF
D-751-5.2 SEGMENTED TRENCH DRAIN (12"
WIDE CHANNEL - 3' TOTAL WIDTH -
W/ 6' FIRESTOPS)
195 LF
D-751-5.3 AIRCRAFT RATED DRAINAGE
MANHOLE STRUCTURE - TYPE A (8'
DIA)
5 EA
D-751-5.4 AIRCRAFT RATED DRAINAGE
MANHOLE STRUCTURE - TYPE A (10'
DIA)
1 EA
D-751-5.5 AIRCRAFT RATED DRAINAGE
MANHOLE STRUCTURE - TYPE B (4'X6')
4 EA
D-751-5.6 AIRCRAFT RATED DRAINAGE
MANHOLE STRUCTURE - TYPE B (5'X5')
1 EA
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Line Item Description Quantity Unit of Measure
Unit Cost Total
D-751-5.7 AIRCRAFT RATED DRAINAGE
MANHOLE STRUCTURE - TYPE B (5'X6')
1 EA
D-751-5.8 AIRCRAFT RATED DRAINAGE
MANHOLE STRUCTURE - TYPE B (6'X6')
1 EA
D-751-5.9 AIRCRAFT RATED DRAINAGE
MANHOLE STRUCTURE - TYPE B (7'X8')
1 EA
D-751-5.10 AIRCRAFT RATED DRAINAGE
MANHOLE STRUCTURE - TYPE B (8'X8')
2 EA
D-751-5.11 AIRCRAFT RATED DRAINAGE
MANHOLE STRUCTURE - TYPE B
(8'X10')
1 EA
D-751-5.12 AIRCRAFT RATED DRAINAGE INLET
STRUCTURE - TYPE C (5'X5')
3 EA
D-751-5.13 AIRCRAFT RATED DRAINAGE INLET
STRUCTURE - TYPE C (5'X6')
1 EA
D-751-5.14 AIRCRAFT RATED DRAINAGE INLET
STRUCTURE - TYPE C (6'X6')
1 EA
D-751-5.15 AIRCRAFT RATED DRAINAGE INLET
STRUCTURE - TYPE C (7'X10')
1 EA
D-751-5.16 AIRCRAFT RATED DRAINAGE INLET
STRUCTURE - TYPE C (10'X10')
1 EA
D-751-5.17 AIRCRAFT RATED DRAINAGE INLET
STRUCTURE - TYPE D (8'X7')
5 EA
D-751-5.18 FDOT MANHOLE (TYPE J8, 5' DIA),
INDEX 425-010
1 EA
D-751-5.19 FDOT INLET (TYPE D), INDEX 425-052 1 EA
D-751-5.20 CURB INLET (TYPE 2) FDOT INDEX 425-
1 EA
D-751-5.21 CURB INLET (TYPE 1) FDOT INDEX 425-
1 EA
D-751-5.22 BOX CULVERT MODIFICATION -
CONNECT 36" RCP TO EXISTING BOX
CULVERT
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Line Item Description Quantity Unit of Measure
Unit Cost Total
D-751-5.23 BOX CULVERT MODIFICATION -
CONNECT 48" RCP TO EXISTING BOX
CULVERT
1 EA
D-751-5.24 BOX CULVERT MODIFICATION -
CONNECT 68"X43" HERCP TO
EXISTING BOX CULVERT
1 EA
D-751-5.25 EXISTING STRUCTURE MODIFICATION
- CASE 1 AIRCRAFT RATED MANHOLE
STRUCTURE WITH RISER TO BE RAISED
OR LOWERED WITH H < 2'-0"
2 EA
D-751-5.26 EXISTING STRUCTURE MODIFICATION
- CASE 2 REMOVE EXISTING MANHOLE
RISER AND INSTALL NEW AIRCRAFT
RATED RISER AT THE TOP OF EXISTING
BOX CULVERT
2 EA
D-751-5.27 EXISTING STRUCTURE MODIFICATION
- CASE 3 AIRCRAFT RATED MANHOLE
STRUCTURE WITHOUT RISER TO BE
LOWERED
2 EA
D-751-5.28 CORE DRILL/MODIFY EXISTING
DRAINAGE MANHOLE AS NEEDED TO
PROVIDE FOR INSTALLATION OF NEW
DRAINAGE PIPE
2 EA
D-752-1 DOUBLE 24" MITERED END SECTION
(1:4 SLOPE) FDOT INDEX 430-021
2 EA
D-752-2 SINGLE 12"X18" MITERED END
SECTION (1:4 SLOPE) FDOT INDEX
430-021
2 EA
T-904-5.1 SODDING 70,000 SY
T-904-5.2 SHOULDER EDGE DRESSING
(INCLUDING SOD)
5,200 SY
L-100-01 VERIFICATION OF EXISTING
CONDITIONS
1 LS
L-100-02 ELECTRICAL CLOSE OUT DOCUMENTS 1 LS
L-104-01 TEMPORARY WIRING, BYPASSES, AND
SIGN & FIXTURE COVERING
1 LS
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Line Item Description Quantity Unit of Measure
Unit Cost Total
L-105-01 ELECTRICAL GENERAL DEMOLITION
REQUIREMENTS
1 LS
L-105-11 REMOVAL LIGHT FIXTURE - ELEVATED
TYPE (EXCLUDING BASE)
326 EA
L-105-12 REMOVAL LIGHT FIXTURE - INSET TYPE
(EXCLUDING BASE)
729 EA
L-105-21 REMOVAL OF AIRFIELD LIGHTING
CABLE - 1-1/C #8 AWG L-824
330,000 LF
L-105-31 REMOVAL OF LIGHT BASE - WITHIN
CIVIL DEMOLITION AREAS
224 EA
L-105-32 REMOVAL OF LIGHT BASE - WITHIN
NON-DEMOLISHED PAVEMENT AREAS
74 EA
L-105-41 REMOVAL OF HANDHOLE - NOT
PLANNED FOR REUSE
11 EA
L-105-42 REMOVAL OF HANDHOLE - PLANNED
FOR REUSE
2 EA
L-105-51 REMOVAL OF DUCT BANK - 1W2" OR
GREATER, NON ENCASED
21,900 LF
L-105-52 REMOVAL OF DUCT BANK - 1W4" OR
GREATER, CONCRETE ENCASED
3,200 LF
L-108-01 PRIMARY CABLE - 1-1/C #8 AWG, 5 KV,
L-824, TYPE C CABLE, INSTALLED
WITHIN RACEWAY
43,200 LF
L-108-02 PRIMARY CABLE - 2-1/C #8 AWG, 5 KV,
L-824, TYPE C CABLE, INSTALLED
WITHIN RACEWAY
134,000 LF
L-108-11 LIGHTNING ARRESTOR FOR PRIMARY
CABLE
128 EA
L-110-01 CLEAR EXISTING CONDUIT/DUCT
BANK RACEWAY BY WAY OF
MANDREL OF EXISTING RACEWAYS.
1 LS
L-110-11 DUCT BANK - 1W2" SCH 40 PVC
DIRECT BURIED W/ COUNTERPOISE
4,400 LF
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Line Item Description Quantity Unit of Measure
Unit Cost Total
L-110-12 DUCT BANK - 2W2" SCH 40 PVC
DIRECT BURIED W/ COUNTERPOISE
300 LF
L-110-13 DUCT BANK - 4W4" SCH 40 PVC
DIRECT BURIED W/ COUNTERPOISE
1,100 LF
L-110-21 DUCT BANK - 1W2" SCH 40 PVC
CONCRETE ENCASED W/
COUNTERPOISE
1,650 LF
L-110-22 DUCT BANK - 2W4" SCH 40 PVC
CONCRETE ENCASED W/
COUNTERPOISE
60 LF
L-110-23 DUCT BANK - 4W4" SCH 40 PVC
CONCRETE ENCASED W/
COUNTERPOISE
830 LF
L-110-24 DUCT BANK - 6W4" SCH 40 PVC
CONCRETE ENCASED W/
COUNTERPOISE
70 LF
L-110-25 DUCT BANK - 8W4" SCH 40 PVC
CONCRETE ENCASED W/
COUNTERPOISE
300 LF
L-110-41 DUCT BANK - 1W2" SCH 40 PVC IN
ASPHALT W/ COUNTERPOISE
11,400 LF
L-110-42 DUCT BANK - 2W4" SCH 40 PVC IN
ASPHALT W/ COUNTERPOISE
70 LF
L-110-43 DUCT BANK - 4W4" SCH 40 PVC IN
ASPHALT W/ COUNTERPOISE
1,700 LF
L-110-44 DUCT BANK - 6W4" SCH 40 PVC IN
ASPHALT W/ COUNTERPOISE
130 LF
L-110-45 DUCT BANK - 8W4" SCH 40 PVC IN
ASPHALT W/ COUNTERPOISE
130 LF
L-110-51 KERF CUT CONDUIT - 1W2" SCH 40
PVC CONDUIT INSTALLED WITHIN
EXISTING PAVEMENT (4"W X 8"D)
1,400 LF
L-113-01 DIRECTIONAL BORE - 1W2” HDPE W/
COUNTERPOISE
500 LF
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Line Item Description Quantity Unit of Measure
Unit Cost Total
L-113-02 DIRECTIONAL BORE - 2W4” HDPE W/
COUNTERPOISE
260 LF
L-113-03 DIRECTIONAL BORE - 4W4" HDPE W/
COUNTERPOISE
600 LF
L-113-04 DIRECTIONAL BORE - 6W4” HDPE W/
COUNTERPOISE
140 LF
L-115-01 CABLE PULLING STRUCTURE - L-867D
TYPE, SINGLE ELEMENT, CONCRETE
ENCASED, WITH 3/8" COVER PLATE
2 EA
L-115-11 AIRCRAFT RATED HANDHOLE - NEW 4'
X 4' X 4' WITH SPRING ASSIST LID
11 EA
L-115-12 AIRCRAFT RATED HANDHOLE -
RELOCATED 4’ X 4’ X 4’
2 EA
L-124-01 LIGHT BASE - TYPE NB1 - L-867B IA,
ADJUSTABLE STYLE, LOCATED IN NEW
SHOULDER, CONNECTED WITH
TRENCH CONDUIT
148 EA
L-124-02 LIGHT BASE - TYPE NB2 - L-867B IA,
ADJUSTABLE STYLE, LOCATED IN
EXISTING SHOULDER
18 EA
L-124-11 LIGHT BASE - TYPE NBB - L-868B IA,
SINGLE-SECTION ASSEMBLY, LOCATED
IN EXISTING FULL-STRENGTH
CONCRETE, CONNECTED VIA KERF
CUT CONDUITS
45 EA
L-124-12 LIGHT BASE - TYPE NBD - L-868B IA,
SINGLE-SECTION ASSEMBLY, LOCATED
IN RENOVATED FULL STRENGTH SLAB,
CONNECTED WITH CONDUITS IN
RENOVATED SLAB.
39 EA
L-124-13 REFLECTOR BASE - TYPE NBZ - 2' DIA.
8" DEEP FORMED FOUNDATION
2 EA
L-124-21 STUDY OF EXISTING LIGHT BASES 1 LS
L-124-22 RETROFIT EXISTING LIGHT BASE - ADD
INTERNAL GROUND LUG AND 6' #6
AWG, INSULATED, STRANDED
EQUIPMENT GROUND
736 EA
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Line Item Description Quantity Unit of Measure
Unit Cost Total
L-125-01 RUNWAY LIGHTING DEVICE - L-
850A(L) LED INSET RUNWAY
CENTERLINE LIGHT
219 EA
L-125-02 RUNWAY LIGHTING DEVICE - L-
850B(L) LED INSET RUNWAY
TOUCHDOWN LIGHT
180 EA
L-125-03 RUNWAY LIGHTING DEVICE - L-
850C(L) LED INSET RUNWAY EDGE
LIGHT
20 EA
L-125-04 RUNWAY LIGHTING DEVICE - L-862(L)
LED ELEVATED RUNWAY EDGE LIGHT
OR L-862E(L) LED ELEVATED RUNWAY
THRESHOLD END LIGHT
118 EA
L-125-11 TAXIWAY LIGHTING DEVICE - L-
852C(L) INSET TAXIWAY CENTERLINE
LIGHT
81 EA
L-125-12 TAXIWAY LIGHTING DEVICE - L-
852D(L) INSET TAXIWAY CENTERLINE
LIGHT
46 EA
L-125-13 TAXIWAY LIGHTING DEVICE - L-
852K(L) INSET TAXIWAY CENTERLINE
LIGHT
14 EA
L-125-14 TAXIWAY LIGHTING DEVICE - L-861T(L)
ELEVATED TAXIWAY EDGE LIGHT
239 EA
L-125-21 INTERSECTION LIGHTING DEVICE - L-
852G(L) LED INSET RUNWAY GUARD
LIGHTS
46 EA
L-125-31 EDGE MARKING DEVICE - L-853
RETROREFLECTIVE TAXIWAY MARKER
(BLUE, YELLOW, OR RED)
32 EA
L-125-41 COVER PLATE - L-894 3/8" FOR L-867B
LIGHT BASE
31 EA
L-125-42 COVER PLATE - L-894 3/4" FOR L-868B
LIGHT BASE
24 EA
L-126-1 SIGNAGE DEMOLITION 1 LS
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Line Item Description Quantity Unit of Measure
Unit Cost Total
L-126-2 L-858(L) SIGN – SINGLE/DOUBLE
FACE, LED, SIZE 3 - 2 MODULE
3 EA
L-126-2.2 L-858(L) SIGN – SINGLE/DOUBLE
FACE, LED, SIZE 3 - 2 MODULE (A)
4 EA
L-126-2.3 L-858(L) SIGN – SINGLE/DOUBLE
FACE, LED, SIZE 3 - 2 MODULE (N)
1 EA
L-126-3 L-858(L) SIGN – SINGLE/DOUBLE
FACE, LED, SIZE 3 - 3 MODULE
22 EA
L-126-3.2 L-858(L) SIGN – SINGLE/DOUBLE
FACE, LED, SIZE 3 - 3 MODULE (A)
1 EA
L-126-3.3 L-858(L) SIGN – SINGLE/DOUBLE
FACE, LED, SIZE 3 - 3 MODULE (N)
5 EA
L-126-3.4 L-858(L) SIGN – SINGLE/DOUBLE
FACE, LED, SIZE 3 - 3 MODULE (C)
1 EA
L-126-4 L-858(L) SIGN – SINGLE/DOUBLE
FACE, LED, SIZE 3 - 4 MODULE
7 EA
L-126-4.2 L-858(L) SIGN – SINGLE/DOUBLE
FACE, LED, SIZE 3 - 4 MODULE (A)
2 EA
L-126-4.4 L-858(L) SIGN – SINGLE/DOUBLE
FACE, LED, SIZE 3 - 4 MODULE (C)
3 EA
L-126-5 L-858B(L) SIGN – RUNWAY DISTANCE
REMAINING SIGN, LED, SIZE 4
10 EA
L-126-6 NON-LIGHTED BOUNDARY SIGN 1 EA
L-126-7 NON-LIGHTED TRAFFIC SIGN 2 EA
L-126-8 NEW SIGN PANEL 46 EA
L-131-01 REMOVAL OF CONSTANT CURRENT
REGULATOR
4 EA
L-131-11 CCR - L-828, 10 KW, 5-STEP, WITH L-
827 MONITOR IRMS TESTING OPTION
1 EA
L-131-12 CCR - L-828, 15 KW, 5-STEP, WITH L-
827 MONITOR IRMS TESTING OPTION
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Line Item Description Quantity Unit of Measure
Unit Cost Total
L-131-21 CCR - INSTALL OWNER FURNISHED 10
KW CCR FROM CLIENT STORAGE
1 EA
L-131-31 CONSTANT CURRENT REGULATOR
COMMISSIONING REPORT
1 LS
L-142-01 PHOTOMETRIC TESTING OF FIELD
FIXTURES
1 LS
L-143-01 FLIGHT CHECK COORDINATION AND
SUPPORT
1 LS
L-152-01 ALCMS GRAPHICS / RE-
CONFIGURATION - ALCMS VENDOR
1 AL
L-152-02 ALCMS GRAPHICS / RE-
CONFIGURATION - CONTRACTOR
1 LS
L-198-01 AIRFIELD LIGHTING MAINTENANCE
TOOLS PACKAGE
1 LS
L-199-01 AIRFIELD LIGHTING SPARE PARTS
PACKAGE
1 LS
05 50 00-1 NEW STEEL BOLLARD AND
FOUNDATION, IN PAVEMENT
57 EA
05 50 00-2 NEW STEEL BOLLARD AND
FOUNDATION, IN TURF
8 EA
05 50 00-3 REPAINTING EXISTING BOLLARD 35 EA
26 05 19-1 MODIFICATION TO EXISTING
ELECTRICAL DISTRIBUTION SYSTEM AT
EXISTING BLDG.
1 LS
26 05 33-1 CONDUIT AND WIRE (HML CIRCUITS,
CIB CIRCUITS, SPARES)
1 LS
26 05 33-2 ELECTRICAL PULL BOX 9 EA
26 09 23-1 LIGHTING CONTACTORS 2 EA
26 22 00-1 LOW VOLTAGE TRANSFORMERS 1 LS
26 24 16 -1 PANELBOARDS 1 LS
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Line Item Description Quantity Unit of Measure
Unit Cost Total
26 56 00-1 HIGH MAST LIGHT POLE (FIXTURES,
LIGHTNING PROTECTION,
GROUNDING)
9 EA
27 10 00-1 6-STRAND SINGLE MODE FIBER 4,000 LF
27 10 00-2 (2) 2" FIBER OPTIC DUCT 3,000 LF
27 10 00-3 EXTENSION OF EXISTING FIBER
BACKBONE
1 LS
27 10 00 -4 FIBER PULL BOXES 9 EA
28 15 00-1 PLWS CIRCUITS AND DISCONNECTS 1 LS
28 20 00-1 CCTV CAMERAS AND CAMERA
INTERFACE BOXES
5 EA
331100-1 RELOCATE/REMOVE EXISTING FIRE
HYDRANTS
2 EA
331100-2 UTILITY PIPE, REMOVE OUT OF
SERVICE, PVC, WATER, 5.0-7.9"
(EXISTING WATER MAINS -REMOVE 6"
WM)
600 LF
331100-3 INSTALL NEW FIRE HYDRANT
(FURNISH AND INSTALL INCLUDING
NEW 6" GATE VALVES AND NEW 8" X
6" TEES)
3 EA
331100-4 INSTALL NEW 8" PVC WATERLINE 900 LF
331100-5 INSTALL NEW 6" PVC WATERLINE 81 LF
331100-6 INSTALL NEW 8" GATE VALVE 4 EA
331100-7 INSTALL NEW 8" INSERTION VALVE 2 EA
331100-8 INSTALL NEW 8"X8" TEE 1 EA
331100-9 INSTALL NEW 8"X6" TEE 1 EA
331100-10 INSTALL NEW 8"X6" TAPPING SLEEVE 1 EA
331100-11 INSTALL NEW 8" CAP 2 EA
331100-12 ADJUST SANITARY SEWER MANHOLE 1 EA
Rehabilitate Runway 1L-19R and Associated Taxiways and Northwest Remain Overnight (RON) Parking Apron
Line Item Description Quantity Unit of Measure
Unit Cost Total
1020A OWNER'S ALLOWANCE 1 AL $2,000,000.00
TOTAL
| 1. Introduction |
| 1.1. Summary |
| 1.2. Contact Information |
| 1.3. Timeline |
| 2. Respondent Questionnaire |
| 2.1. Minimum Qualifications |
| 2.1.1. Bidder is registered with the Florida Department of State, Division of Corporations to do business in the State of Florida. (www.sunbiz.org)* |
| 2.1.2. Bidder is required to confirm that, if awarded by the Board, Bidder will register with PaymentWorks and select one of the Authority's electronic payment methods.* |
| 2.1.3. Bidder is NOT listed on the Florida Department of Management Services, Convicted Vendor List as defined in Section 287.133(3)(d), Florida Statutes.* |
| 2.1.4. Bidder is NOT listed on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List or the Scrutinized Companies that Boycott Israel List or is engaged in busines... |
| 2.1.5. Bidder is NOT listed on the Federal Convicted Vendor list. (www.sam.gov)* |
| 2.1.6. Bidder is NOT listed on the Florida Department of Transportation Contractor Suspension List. * |
| 2.1.7. Bidder had a representative sign-in and attend the Mandatory Pre-Bid Conference or had a representative attend the Mandatory Pre-Bid Conference on-line via Microsoft Teams®. * |
| 2.1.8. Bidder had a representative sign-in and attend the Mandatory Site Inspection. * |
| 2.1.9. Bidder confirms that the Bidder has the ability to obtain the insurance coverage and limits as required in Section 00650 - INSURANCE REQUIREMENTS.* |
| 2.1.10. Bidder has completed Section 00300 - BID FORM.* |
| 2.1.11. Bidder confirms that its Bid includes any applicable Tariffs imposed by the Bid Submittal Due Date and Time.* |
| 2.1.12. Bidder has completed Section 00350 - BID AFFIDAVIT* |
| 2.1.13. Bidder has submitted Section 00400-1 - BID BOND or Cashier's Check and Section 00400-2 SURETY BOND AFFIDAVIT.* |
| 2.2. Additional Required Documents |
| 2.2.1. Bidder has completed Section 00415 - TRENCH SAFETY CERTIFICATION.* |
| 2.2.2. Bidder has completed Section 00417 - SMALL BUSINESS ENTERPRISE (SBE) ASSURANCE AND PARTICIPATION.* |
| 2.2.3. Bidder has completed Section 00420 – BIDDER’S GENERAL BUSINESS INFORMATION.* |
| 2.2.4. Bidder has completed Section 00421 – SCRUTINIZED COMPANY CERTIFICATION.* |
| 2.2.5. Bidder has completed Section 00422 – E-VERIFY CERTIFICATION.* |
| 2.2.6. Bidder has completed Section 00423 – NON-COLLUSION CERTIFICATION.* |
| 2.2.7. Bidder has completed Section 00430 – SUBCONTRACTORS LIST * |
| 2.2.8. Bidder has completed Section 00440 - PAYMENT METHOD* |
| 2.2.9. Bidder has completed Section 00450 - Affidavit of Compliance with Anti-Human Trafficking Laws.* |
| 2.2.10. Bidder has included their Financial Statement(s).* |
| 2.2.11. Bidder has provided a copy of a current and active Contractor's License that qualifies Bidder to bid on the work.* |
| 2.2.12. If the Bid Affidavit is signed by a person other than the President or Vice President of the corporation, such person will furnish a corporate resolution showing their authority to bind the corporation. |
3. Bid Schedule
File details come from the government source that posted it. Updated .