Refurbishment of 30 Ton Kleeco Mobile Boat Hoist for IPD Cape May SOW.a.docx

DOCX document 24 KB Posted

Attached to
REFURBISHMENT OF 30 TON KLEECO MOBILE BOAT HOIST
Solicitation number
70Z080-20-P-3IE02800
Issued by

View the file

Other files

File Type Posted
FAR CLAUSE 52.212-5.docx DOCX document
REPS CERTS 52 212-3.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Refurbishment of 30 Ton Mobile Boat Hoist for IPD Cape May

IOD-C

1. GENERAL

1.1 Background

The Coast Guard has refurbished a Mobile Boat Hoist (MBH) located at the Industrial Production Facility Miami, FL. The MBH is a Kleeco 30 Ton, model number SP600H, with serial number 6282991818 years old, so refurbishment vice replacement would be fiscally prudent. Kleeco brand MBH is no longer an operational company and the Coast Guard has several of these MBH’s that cannot be replaced at the same time. The Coast Guard has determined that multiple components must be replaced to ensure the MBH is fully operational.

Industrial Production Detachment (IPD) Cape May's MBH was decertified after inspection as per recommendation of National Crane, INC. The primary factors leading to decertification were extensive rust and metal loss on several key components and framing.

1.2 Scope

The vendor shall, disassemble various worn out/broken or excessively rusted parts, procure and install the new components per industry standards. The following list of required repairs/component replacement shall be accomplished by the vendor at due diligence to complete the entire repair within 6 months:

QTY
PART
PART NUMBER
221 FT
5/8 6x25 GIWRC EIP Cut Length
98900633-1
242 FT
5/8 6x25 GIWRC EIP Cut Length
98900633-1
231 FT
5/8 6x25 GIWRC EIP Cut Length
98900633-1
243 FT
5/8 6x25 GIWRC EIP Cut Length
98900633-1
5pc
KDN Seal
25160100-010
4
Tires, tubes, Flaps & Wheels
46x16 Lugged
1
Complete Decal Kit
Kleeco
1
Pin-Strongback Hinge Pin
7035 (Kleeco)
2
Load Bar 3047D-24" Steel Unpainted
3047 (Kleeco)
2
Motor-Hoist/Winch Motor
3600238 (Kleeco)
2
Brake-Hoist/Winch Brake
0370635M (Kleeco)
2
Reducer-Hoist/Winch Reducer
0037033S6 (Kleeco)
2
Sheave -12" plastic 5/8" wire rope, Use 1.18" dia. Pin w/bearing and inner race
00200012P (Kleeco)
52
Bearing-Sheave Roller Bearing
2300007 (Kleeco)
52
Bearing- Inner Race
2300008 (Kleeco)
1
Cat Engine Model# 3054C Serial# 033418247
458-9576
2
Mount Assembly
207-1706
2
Mount Assembly
207-1707
1
Tube As-No
230-8995
1
Tube As-No
230-8996
1
Tube As-No
230-8997
1
Tube As-No
230-8997
1
Flange
6I-4013
1
Gasket
6I4039
1
Clamp Hose
141-1667
1
Gasket
194-5390
1
Tube As
225-8525
4
Washer -Coppe
225-8526
1
Gasket-Turbo
353-3477
1
Gasket-Turbo
353-3478
1
Gasket-Manif
225-8536
1
Adaptor
302-0581
1
Line As-Iol
507-5019
1
Turbo GP BAS/Core Deposit
2OR-4009
1
Hose
234-3029
1
Gasket
492-3310
1
Tube-Crossov
367-5799
1
Hose-Air
236-8750
1
Manifold-EXH
371-6059
1
Bracket
307-2805
1
Bracket0MTG
286-4339
1
Indicator-AI
315-4691
1
Bracket
418-3216
1
Cleaner GP
110-2556
1
Cap
101-7856
1
Clamp-Hose
324-3528
2
Spacer
7W-2601
2
Mounting
320-9211
1
Mounting
101-7546
1
Hose Water
292-2946
1
Hose WTR INL
251-8410
3
Clamp-Hose
103-1067
1
Connection A
254-2267
1
Seal-O-Ring
254-2270
1
Vee Belt
5L-3307
1
Connector-SP
215-9508
1
Connector-SP
215-9509
1
Clip-Pipe
232-1115
1
Tube AS-Fuel
233-7421
1
Tube-Leak OF
274-5043
1
Bracket
237-0285
1
Kit-Pump (Lif
467-7011
1
MTG Kit-EFPM
240-9756
1
Bracket-MTG
236-7763
250’
All Hydraulic SS Tubing
Various
100’
All Hydraulic Hoses & Fittings
Various
Various
Bolt & Hardware (Refab Parts & Material)
As required

1. All Cables shall be reeved IAW with the OEM manual. All Cables shall be coated with grease IAW OEM.

2. Install all new components so that they are fully operational/functioning.

3. Replace all bolts, washer and nuts removed with OEM specified fasteners.

4. Conduct operational test of the MBH with Coast Guard representative.

5. Provide all documentation of repairs to the Supervisor of IPD Cape May.

6. Conduct Paint Touch-up as required.

2. REQUIREMENTS

2.1 Capacity

The MBH shall have the capability rating of a minimum of 30 Tons. The tested capacity and the date of certification shall be permanently affixed in an obvious/visible location.

2.3 References

The MBH shall be in accordance with the standards and specifications of the referenced technical organizations for the construction methods, materials, application and environment as applicable. These may include but not be limited to:

a. ISO Standards.

b. American National Standards Institute (ANSI).

c. National Electrical Vendors Association (NEMA).

d. All applicable OSHA standards.

e. ASTM B117 Standard Practice for Operating Salt Spray (fog) Apparatus.

f. ASTM D714 Standard Test Method for Evaluating Degree of Blistering of Paints.

g. ASTM 522 Standard Test Methods for Mandrel Bent Test of Attached Organic Coatings.

h. ASTM D523 Standard Test Method for Specular Gloss.

i. ASTM D1014 Standard Practice for Conduction Exterior Exposure Test of Paints and Coatings on Metal Substrates.

j. ASTM D2247 Standard Practice for Testing Water Resistance of Coating in 100% Relative Humidity.

k. ASTM D2794 Standard Test Method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact).

l. ASTM D3359 Standard Test Methods for Measuring Adhesion by Tape Test.

m. ASTM D3363 Standard Test Method for Film Hardness by Pencil Test.

n. ASTM D4060 Standard Test Method for Abrasion Resistance of Organic Coatings by the Taber Abraser.

o. ASTM D5402 Standard Practice for Assessing the Solvent Resistance of Organic Coatings Using Solvent Rubs.

p. ASTM D870 Standard Practice for Testing Water Resistance of Coating Using Water Immersion.

q. ASTM D3170 Standard Test Method for Chipping Resistance of Coatings.

r. IAW with Industry standards and best practices of OEM.

2.4 Submittals and Approvals

a. Provide Condition Found Reports (CFR) to Contracting Officer upon discovery or growth work. Condition Found Reports must cite additional cost (if any), additional time request (if any), additional parts required (if any).

b. Paint procedures and processes, including Quality Control measures.

c. Submittals shall be delivered to the Government Contracting Officer within seven (7) Calendar days after the award of the contract.

3. ACCEPTANCE

3.1 On-site Testing

a. The MBH shall be operated through a minimum of three complete cycles of each function, including lifting a weight equal to the maximum pick, carry, and load operation and all related functions the MBH which is capable of performing. If any part, subsystem or system fails during testing, the defective equipment shall be repaired and retested.

4. PERIOD OF PERFORMANCE

The period of performance is 06 months from date of contract award. If applicable, award of Optional Item is expected to take place within 45 calendar days of award of base items.

4.1 Contracting Officer’s Representative

a. COR information will be provided at time of award.