About this file

4. Section C - Desccription/Specification/Qualifications Statement

View the file

Other files

File Type Posted
NAC.SHORTLIST.doc DOC document
AMENDTWO.SF30COVER.ATTACH.doc DOC document
AMENDTWO.SF30COVER.DOC DOC document
NAC.AMENDONE.SF-30.pdf PDF
14.Sect L.General Instructions To Offerors.doc DOC document
2.Section A.doc DOC document
5.Section D.doc DOC document
10.Section I.doc DOC document
11.Section J.doc DOC document
8.Section G.doc DOC document
9. Section H.doc DOC document
13.Section L.doc DOC document
12.Section K.doc DOC document
3.Section B.doc DOC document
1.Cover Page Phase1.doc DOC document
6.Section E.doc DOC document
14.Sect L.General Instructions To Offerors.doc DOC document
7.Section F.doc DOC document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Phase I RFQ – D-B Services Eisenhower Executive Office Building Modernization

State Place Wing (Phase II)

GS11P??MKC????
Washington, D.C.

SITE UTILITY UPGRADES – 13.8 KV PRIMARY ELECTRICAL DISTRIBUTION SYSTEM

NEBRASKA AVENUE COMPLEX

SOLICITATION NO. WPJ-08-0289/GS-11P-08-YT-C-0173

Request for Qualifications

Design - Build Services for

SITE UTILITY UPGRADES – 13.8 KV PRIMARY ELECTRICAL DISTRIBUTION SYSTEM, NEBRASKA AVENUE COMPLEX, WASHINGTON, DC

Procurement No. WPJ-08-0289

Solicitation No. GS-11P-08-YT-C0173

PHASE I REQUEST FOR QUALIFICATIONS

PART 1 -- THE SCHEDULE

SECTION C

DESCRIPTION/SPECIFICATION/QUALIFICATIONS

STATEMENT

1. Background Information and Project Description

The purpose of this Phase One Solicitation is to solicit Proposals from Offerors for evaluations by GSA to determine which Offerors demonstrate the highest qualifications to successfully deliver the project.

The Site Utility Upgrades – 13.8kV Primary Electrical Distribution System is a renovation of an electrical system on an occupied facility. The GSA is the lead federal agency for the design and construction.

The project is located at the Nebraska Avenue Complex situated in northwest Washington, D.C. The site covers approximately 25 acres, bounded by Nebraska Avenue, Massachusetts Avenue, Rock Creek and private property.

The scope of the project is to provide a three feeder spot network electrical system including utility metering switchgear, underground distribution, underground vaults and connections to the existing buildings. Critical programmatic requirements include the need to keep the existing buildings in operation until the new system is complete.

The design-build scope of work includes all engineering, architectural, construction, and other related services necessary to design and to construct the electrical distribution system. Related services include, but are not limited to, archaeological monitoring, permitting, testing and inspection during construction, commissioning and potential additional geotechnical analysis, such as soil borings, of the site. Preliminary approvals have been secured from National Capital Planning Commission and Commission of Fine Arts for the current design. Additional submissions will be required to secure final approvals.

Section C

4/1/08

PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICIAL USE ONLY

Do not remove this notice – Properly destroy documents when no longer needed

SUMMER CONSULTANTS, INC.

Section C - 1

MCLEAN, VIRGINIA

File details come from the government source that posted it. Updated .