CallAtch4SampleTO_TA2 3v2.doc

DOC document 38 KB Posted

Attached to
HIGH ENERGY RESEARCH & APPLICATIONS (HERA) CALL 0002 THEORETICAL & COMPUTATIONAL R&D (TECHNICAL AREA 4) Federal contract opportunity
Solicitation number
Reference-Number-BAA-08-RD-01
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

ATCH 4 - SAMPLE TO HPM/PP SOURCES AND POWER DELIVERY SYSTEMS R D

View the file

Other files for this federal contract opportunity

Other files attached to HIGH ENERGY RESEARCH & APPLICATIONS (HERA) CALL 0002 THEORETICAL & COMPUTATIONAL R&D (TECHNICAL AREA 4), newest first.
File Type Posted
CALL 0004 Q A 3.pdf PDF
CALL 0004 Q A 2.pdf PDF
CALL 0004 Q A 1.pdf PDF
HERA CALL 0004 Amendment 01.pdf PDF
CALL 0004 Clarification 1.pdf PDF
BAA CALL 0004 27Jun12 Fedbizops.pdf PDF
BAA 08-RD-01 Annual Update Amendment 4.doc DOC document
FedBizOps-Annual Update- Jun 2010.doc DOC document
QAToARA(07-6-2010).docx DOCX document
Proposal Content Checklist for KTR.doc DOC document
Reps and Certs.DOC DOC document
CALL 0003 - TA 4 - NOTICE.docx DOCX document
Proposal Content Checklist for KTR.doc DOC document
Approved CDRLs for call.docx DOCX document
Care and Feeding FEDBIZOPPS notice 2009.doc DOC document
SUMMARY OF CHANGES Amd 02.doc DOC document
call TA4 solicitation v8 16Apr2008.doc DOC document
HERA DD254 TA 4 draft v3 front page.doc DOC document
HERA DD254 TA 4 draft v2 front page.doc DOC document
SUMMARY OF CHANGES.doc DOC document
HERA CALL 0002 Q A 08Apr2008.doc DOC document
call TA4 solicitation v7 9Apr2008.doc DOC document
HERATA4CDRLsA001-A0067Feb08.doc DOC document
CallAtch2TO000210Mar2008v3.doc DOC document
HERADD254TA4draftfrontpage.doc DOC document
CallAtch1TO000106Mar2008v2.doc DOC document
CallAtch3TO000310Mar2008v3.doc DOC document
callTA4solicitationv627Mar2008.doc DOC document
HERACALL0001Q A.doc DOC document
CallAtch3SampleTO-A_TA118Mar2008.doc DOC document
SUMMARYOFCHANGES.doc DOC document
callTA1-3solicitation18Mar2008.doc DOC document
CallAtch1TO0001CFTO18Mar2008.doc DOC document
CallAtch4SampleTO-B_TA2 318Mar2008.doc DOC document
HERA-CDRLsA001-A012APPVD13Mar2008.doc DOC document
HERA-CDRLsA001-A012APPRD7Feb08.doc DOC document
CallAtch2TO0002_TA2MTF-FRC05Feb2008.doc DOC document
callTA1-3solicitation04Mar2008.doc DOC document
CallAtch3SampleTO_TA1.doc DOC document
CallAtch1TO0001CFTO05Feb2008.doc DOC document
HERADD254DraftPG1.doc DOC document
DraftGFPList.xls XLS spreadsheet
BAA_20080211_APPROVED.doc DOC document
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BAA 08-RD-01

CALL 0001

Attachment 4 High energy Research and applications (HERA)

Technical Area 2 – Pulsed Power and Pulsed Power Systems R&D Technical Area 3 – Prime Power Systems

Sample Task Order Statement HPM/PP Sources and Power Delivery Systems R&D 12 Feb 2008

1.0 Objective and scope:

1.1 Objective: The objective of this task order is to investigate the strengths and weaknesses of enabling repetitive nanosecond timescale opening switch technology coupled to inductive storage elements through modeling, simulation, and experiment and to develop and to implement improvements to the state of the art for staged flux compression generators, sources of intense x-rays, and magnetized plasma compression experiments.

1.2 Scope: The scope of work conducted under this task order will include a modeling and simulation effort to assess the performance of the subject components and pulse power based systems. The scope includes necessary design, development, engineering, fabrication, assembly, analysis, experiment and testing of these components and systems. In addition, scope will include follow-on cost and schedule plans, design reviews, and technical interchange meetings.

2.0 Background: The Pulse Power Technical Area of the High Power Microwave High Power Systems Branch, (a branch of the High Power Microwave Division of AFRL’s Directed Energy Directorate), seeks to advance the state of the art of pulse power systems, applications of pulse power and component technologies and to develop enabling component technologies that will enable robust, high power, low mass, deployable pulse power based systems.

3.0 Applicable Documents: Security Classification Guide (SCG) for High Power Microwave (HPM) Weapon / Counter High Power Microwave (CHPM) Weapon Technology – 21 June 1999. All applicable health, safety and environmental regulations.

4.0 Technical Requirements/Tasks:

4.1 Staged flux compression generators: Perform engineering and scientific research to develop and implement an experiment series in which explosive flux compression generators (FCGs) are staged to amplify a 10 kiloamp initial current to put 100 megamps into a 20 nanoHenry load, with a current rise time ~ 10 microseconds. Desired features are compact size, simplicity, and reliability. Another desirable feature is self contained prime power. One suggested approach is to use flux trapping connections. Consider this and alternate approaches. The goal is to achieve performance as close to that described above, in 2 years, and to understand the scaling and technical paths to higher performance and more compact devices. (CDRLs: A003, A004, A005, A006, A007, A008)

4.2 Repetitive Opening Switch Coupled to Inductive Storage Element: The contractor shall pursue the research and development of such opening switches and use them on an inductive store – narrow band microwave load system for feasibility tests. The objective of Phase I will be to experimentally and theoretically assess the feasibility of the opening switch under the proposed conditions and the final phase will be to perform the research necessary to develop the best switches possible that meet specified performance objectives (pulsed power appropriate to drive 0.1 to 1 Gigawatt, ~ Gigahertz wavelength, ~ 50 to 100 nanosecond range NB source for several pulses at either 0.1 to 1 KHz or 0.1 to 1 MHz range repetition rate) in less than 2 years. That is, propose either a 0.1 to 1 KHz or a 0.1 to 1 MHz range scheme. (CDRLs: A003, A004, A005, A006, A007, A008)

4.3 Compact X-ray source: Develop, design, construct, and test a very compact source of >100 KeV X-rays, with source strength of approximately 1 Joule, source size less than 1 mm in diameter, driver size approximately 2 m length by 0.5 m diameter, with a (single) pulse duration less than 50 nanoseconds in duration. Develop a system for achieving this objective, keeping in mind that the mechanism used is not critical, though Bremsstrahlung is an obvious candidate. Simplicity, robustness, and reliability are preferred design goals. Trigger jitter should be less than 50 nanoseconds. The system should be self contained, including having its own prime power. The goal is to implement a device that comes as close as feasible to meeting this objective in less than 1 year. (CDRLs: A003, A004, A005, A006, A007, A008)

4.4 Magnetized Plasma Compression Experiments: Perform engineering and scientific research to develop and implement a magnetized plasma compression experiment, in which a high speed magnetized deuterium plasma is formed and injected into the interior of a quasi-cylindrical metal shell (liner), and subsequently compressed by liner implosion. This should use a several megajoule capacitor discharge. The magnetized plasma parameters, prior to compression, should be approximately ~1016 ions/cc, > KeV temperature, a greater than 2 Tesla field, approximately 100 cc volume, species deuterium. A possible formation technique is to imitate the Plasma Flow Switch scheme. The recommended compression technique is by metal shell implosion, where the metal shell is imploded by magnetic pressure from a high current discharge. Important features of this effort, besides achieving the pre-compression plasma parameters, are the diagnostics. It is important to be able to measure the implosion compression ratio, presence or absence of instability growth, pre-compressed and compressed plasma density and temperature and purity. The compression time needs to be on the order of 10 microseconds or faster. The ability to reliably implement the compression scheme hardware and operation is critical. (CDRLs: A003, A004, A005, A006, A007, A008)

5.0 Schedule, DATA ITEMS and OTHER Deliverables:

5.1 Start Work:

DOA

5.2 End of Technical Effort (ETE):

DOA + 36 Months

5.3 CDRL A003: Presentation Materials

5 work days after request

5.4 CDRL A004: Status Report

Quarterly

5.5 CDRL A005: Final Scientific and Technical Report

ETE + 90 days

5.6 CDRL A006: Developmental Design Drawings and Associated Lists As required

5.7 CDRL A007: Test Plan

30 days prior to event

5.8 CDRL A008: Environmental Health and Safety Plan

DOA & annually

6.0 Task Order Officers:

Primary: Dr. James Degnan, AFRL/DEHP, (505) 846-1235, DSN 246-1235

Alternate: Dr. Mathew Domonkos, AFRL/DEHP, (505) 853-4507, DSN 263-4507

7.0 Other Considerations: This work requires coordination with in-house personnel at Bldg. 322. Work will be on Kirtland AFB, primarily at Bldg. 322 and the Chestnut range, but will also include other sights such as Los Alamos National Lab. Participation in system tests at remote locations may be required.

File details come from the government source that posted it. Updated .