Redacted Statement of Work.pdf

PDF 377 KB Posted

Attached to
Heat Shielding- Industrial Furnace
Solicitation number
N4215826QS018
Issued by

About this file

This is a Performance Work Statement (PWS) for the manufacture, delivery, and installation of heat shielding components on an ITS Car Bottom Furnace at Norfolk Naval Shipyard.

Scope and Deliverables: The contractor shall provide all labor, materials, tooling, and supervision to design and install insulated stainless steel heat shields protecting critical furnace components from excessive heat during door operations. The four major heat shield components required are: door mast heat shield (protecting door lift cylinder, safety lock-out cylinders, bearings, and grease lines), lift seal cylinder heat shields (individual units for cart seal-raising cylinders), cart drive heat shield, and cart power reel heat shield.

Contractor and Shipyard Responsibilities: The vendor is responsible for shipping equipment, re-assembly of components removed for shipping, field painting with standard colors and touch-up work, and electrical field wiring between equipment and remote-control panels including all conduit and wire. Norfolk Naval Shipyard assumes responsibility for equipment unloading, clearing pathways and work areas, site preparation and cleaning, pre-installation notifications and training coordination, provision of plant PPE requirements, assigning a customer site manager, and assisting with unloading and handling. Safety and Access Requirements: All contractor personnel must comply with Federal and State OSHA requirements, Norfolk Naval Shipyard OSHE Program Manual, NAVSHIPYDNORINST P5090.2 requirements, and OSHE Control Manual (OSHECM) requirements. Contractor personnel require CIA access and appropriate PPE. Operational testing of the oven will be performed upon completion. No certification of work requirements or critical time constraints are specified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance: On-site

Scope: Contractor shall Provide all labor, materials, tooling and supervision to manufacture, deliver and install Heat Shielding on the ITS Car Bottom Furnace to protect parts from excessive heat when opening the doors of the furnace when it is at temperature. The heat shielding to be provided shall include but is not limited to the following major components.

• Door mast heat shield

• Lift seal cylinder heat shield

• Cart drive heat shield

• Cart power reel heat shield

Heat Shielding Specifications: Heat shielding shall meet a minimum of the following specifications.

Door Mast: Door Mast shall be constructed from insulated stainless steel and shall be designed to protect the following components associated with the door mast. (Door Mast

Components):

• Door lift cylinder

• Door safety lock-out cylinders

• Bearings at the top of the door mast

• Grease lines to the bearings

Cart Bottom Seal: Individual insulated stainless steel heat shields shall be installed to protect the cylinders that raise the cart seal.

Cart: An insulated stainless steel heat shield will be supplied to protect the cart drive and power cord reel. Those components are:

Cart drive

Cart retractable power cord reel

Period of Performance:

Equipment Specifications: N/A

Contractor Responsibilities: "Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements; Norfolk Naval Shipyard OSHE Program Manual, NAVSHIPYDNORINST

P5090.2 requirements; OSHE Control Manual (OSHECM) requirements; or safety requirements for site specific location of the contract."

Vendor is responsible for:

- Shipping equipment.

- Installation service including:

o Mechanical

▪ Re-assembly of equipment and components removed for shipping.

▪ Field painting of required fabricated equipment with standard colors as required.

▪ Any necessary touch-up painting.

o Electrical

▪ Field wiring between equipment and/or remote-control panels, including all conduit and wire.

Shipyard Responsibilities: NNSY Is responsible for:

- Unloading of equipment.

- Clearing pathways from unloading site to installation site for moving equipment and personnel access.

- Clearing the work area around installation site.

- Any required site cleaning before equipment arrival.

- Notification to the vendor of the requirement for any pre-installation meetings or training necessary for plant access.

- Plant PPE requirements for the vendors installation crew.

- Customer site manager.

Lifting and Handling Requirements: NNSY will be required to assist with the unloading of the parts and equipment delivered by the vendor.

Certification of Work Requirements: N/A

Testing: Operational testing of the oven will be performed.

Safety or Security: Contractor will need CIA access and PPE. "Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements and Norfolk Naval Shipyard