REDACTED SSJ N3220525Q2202 USNS PEARY FLOW METER.pdf
PDF 614 KB Posted
- Attached to
- USNS ROBERT PEARY JP-5 FLOW METER Federal contract opportunity
- Solicitation number
- N3220525Q2202
About this file
This is a Justification for Other Than Full and Open Competition (JOTFOC) memorandum for an acquisition under the simplified acquisition threshold for the Military Sealift Command. The procurement is for JP-5 fuel system components from Micro Motion, Inc./Kessler-Ellis Products Co, with a required delivery date of 4/22/2025 and an anticipated value of $12,625.96.
The specific items being procured are: a drainable Coriolis meter (part #F200S418CQBAEZZZZ), a Coriolis flow/density transmitter (part #2700R12ABAEZZZ), and a dual totalizer with RS485 & Modbus protocol (part #BATDT-M-3-B-CSA-TRX). The justification cites restrictive rights as Micro Motion owns proprietary rights to the drawings, and standardization requirements as these specific make/model components are needed to maintain compatibility with existing equipment on AKE vessels. The document notes that MSC lacks the technical information to evaluate non-OEM components for equivalency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| COMBINED SYNOPSIS N3220525Q2202 USNS PEARY FLOW METER.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Ver 2.0 (01 June 2018)
Date: 1/23/2025
MEMORANDUM
Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER
THE SIMPLIFIED ACQUISITION THRESHOLD
Ref: (a) PR Number(s): ERP # 1301224715, REQ # N2319550284050
I. BACKGROUND:
1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
1. Provide a description of the item or service required, to include
a) the name of the required source or brand name
MICRO MOTION, INC./ KESSLER-ELLIS PRODUCTS CO
b) the required delivery date/period of performance and
RDD: 4/22/2025
c) its intended use.
JP-5 FUEL SYSTEM
2. List the source(s) or known vendor(s) who are able to provide the above described item or service.
MICRO MOTION, INC
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED
ON THE FOLLOWING (select all that apply):
A. __X___ Only one responsible source (select all that apply):
1. __X___ RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.
a. Explain what is subject to the restrictive rights.
2 Ver 2.0 (01 June 2018)
MICRO MOTION, INC OWNS THE PROPRETARY RIGHTS TO THE DRAWINGS OF THE
MATERIAL.
b. If drawings are included, who is identified as “owning” the drawings.
MICRO MOTION, INC
2. _____ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.
a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
b. Identify the distributor / authorized technical representative for the item or service.
Provide evidence of the exclusive licensing agreement as an attachment to this document.
(NOTE: If there is more than one distributor / authorized technical representative, then use Part B – Brand Name.)
3. ___X__ OTHER REASON:
a. _____ CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.
i. SMS Procedure Number: _____________________________
b. ___X_ STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.
i. Identify Make / Model Number(s):
Description Part No. Source
DRAINABLE CORIOLIS METER 2IN 316L SS F200S418CQBAEZZZZ MICRO MOTION, INC.
CORIOLIS FLOW/DENSITY TRANSMITTER 2700R12ABAEZZZ MICRO MOTION, INC.
DUAL TOTALIZER WITH RS485 & MODBUS PROTOCOL BATDT-M-3-B-CSA-TRX KESSLER-ELLIS PRODUCTS CO
ii. Identify other vessels with this Make / Model:
3 Ver 2.0 (01 June 2018)
All AKEs
c. __ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.
i. Identify Make / Model of existing equipment:
ii. Describe how the equipment must be compatible with the existing configuration.
d. __X__ OTHER:
MSC does not have manufacturing and technical informa on required to evaluate and determine whether non-OEM components and replacement parts offered are equivalent to the OEM components and replacement parts. The Responsible Source has access to equipment, parts, provide service and technical data / drawings as required to properly repair, replace and maintain the equip
4. ____ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:
a. Date on which the requirement was identified: ___________
b. Required delivery date / Period of Performance: ___________
c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.
d. Estimated production lead time: ___________
e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)
f. CASREP Number: ___________
4 Ver 2.0 (01 June 2018)
IV. ANTICIPATED DOLLAR VALUE OF PROCUREMENT: $12,625.96
V. CERTIFICATIONS AND APPROVALS:
Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
Requester Signature / Date
Level Higher (Suppo / SPE / ASPE) / Date
Contract Specialist / Date
Contracting Officer / Date
File details come from the government source that posted it. Updated .