Redacted SSJ.pdf

PDF 232 KB Posted

Attached to
USNS ROBERT E. PEARY Vane Axial Fan
Solicitation number
N3220525Q2190
Issued by

About this file

This is a Justification for Other Than Full and Open Competition (JOTFOC) memorandum dated 17 DEC 2024 for the USNS ROBERT E PEARY (T-AKE 5) to procure a vane axial fan (FAN, VANEAXIAL BCS-135,A4,CW,TH,184T) from American Fan Company. The requirement is for an M6 Engineers Workshop Fan with delivery required by 17 FEB 2025.

The justification cites restrictive rights (American Fan Company owns proprietary drawings) and standardization/brand name requirements as the basis for limited competition. The procurement is also justified under unusual and compelling urgency due to the existing fan's inoperability from heavy degradation, with an estimated 2-week production lead time. The requirement was identified on 11 NOV 2024 and delayed due to technical research. The specific model required is American Fan Company MFR ID-BM043635, which is standardized across T-AKE 1 through T-AKE 10 vessels. CASREP number 24034 is associated with this requirement.

View the file

Other files

File Type Posted
Combined_Synopsis_Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .