Redacted SSJ.pdf
PDF 185 KB Posted
- Attached to
- Sea Valve Operators - USNS WASHINGTON CHAMBERS
- Solicitation number
- N3220526Q0015
About this file
This is a Memorandum justifying the use of other than full and open competition for a simplified acquisition threshold procurement. The acquisition is for SEA VALVES with a required delivery date of 30 April 2026, to be procured from a single source: CRANE ChemPharma & Energy. The valves are required to replace existing equipment during a ROH/DD (Repair and Overhaul/Drydock) availability period.
The justification for single-source procurement is based on multiple factors. CRANE ChemPharma & Energy owns proprietary rights to the drawings and will sell only through direct sales or authorized distributors, establishing restrictive intellectual property rights. The valves are classified as critical ship equipment under SMS Procedure 10.6-002-ALL; their failure would compromise seawater supply to critical systems including the firemain, navigation, and propulsion systems, creating hazards to the vessel, crew, and environment in violation of ABS and USCG regulations. The specification calls for CRANE model 302-20024-00, which is standardized across the entire TAKE-class ship fleet (Ships 1-14). The equipment must maintain form, fit, and function compatibility with existing 30-inch Crane Valve P/N 30BG67731X. The Government lacks the manufacturing and technical information required to evaluate equivalent non-OEM components; only approved technical representatives and providers authorized by CRANE are permitted to service this equipment, and OEM representatives have exclusive access to original technical data and drawings required for USCG and ABS certification compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - N3220526Q0015.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Ver 2.0 (01 July 2018)
Date: 29 JAN 2026
MEMORANDUM
Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER
THE SIMPLIFIED ACQUISITION THRESHOLD
Ref: (a) PR Number(s): TBD
I. BACKGROUND:
1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
1. Provide a description of the item or service required, to include SEA VALVES
a) the name of the required source or brand name
CRANE ChemPharma & Energy
b) the required delivery date/period of performance and
30 APR 2026
c) its intended use.
REQUIRED TO REPLACE EXISTING SEA VALVES DURING THE ROH/DD
AVAILABILITY.
2. List the source(s) or known vendor(s) who are able to provide the above described item or service.
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED
ON THE FOLLOWING (select all that apply):
A. X BRAND NAME LIMITED SOURCE (select all that apply):
1. _X RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.
a. Explain what is subject to the restrictive rights.
2 Ver 2.0 (01 July 2018)
CRANE ChemPharma & Energy owns the proprietary rights to the drawings of the material and will sell only direct or to authorized distributors.
b. If drawings are included, who is identified as “owning” the drawings.
2. EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.
a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
b. Identify the distributor / authorized technical representative for the item or service.
Provide evidence of the exclusive licensing agreement as an attachment to this document.
(NOTE: If there is more than one distributor / authorized technical representative, then use Part B – Brand Name.)
3. X OTHER REASON:
a. X CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.
i. SMS Procedure Number: 10.6-002-ALL
ii. Describe how it applies to the critical piece of equipment: ENSURES THAT
VESSEL EQUIPMENT IS MAINTAINED IN ACCORDANCE WITH
ORIGINAL EQUIPMENT MANUFACTURER (OEM)
RECOMMENDATIONS, MSC POLICY AND REGULATORY BODY
REQUIREMENTS. SEA VALVES PROVIDES SEAWATER TO THE
ENGINEERING PLANT THAT FEEDS CRITICAL SYSTEMS
THROUGHOUT THE ENTIRE VESSEL, E.G., FIREMAIN SYSTEM,
NAVIGATION SYSTEM AND PROPULSION PLANT. WITHOUT THE
EFFECTIVE ALIGNMENT AND ISOLATION OF THE SEA WATER
SYSTEM THE SHIPS PROPULSION, FIREFIGHTING CAPABILITIES
AND NAVIGATION SYSTEM WOULD NOT OPERATE PUTTING THE
VESSEL AT RISK IN VIOLATION OF THE ABS AND USCG
REGULATIONS.
b. X STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.
i. Identify Make / Model Number(s): CRANE (302-20024-00).
ii. Identify other vessels with this Make / Model:
THE ENTIRE TAKE CLASS SHIP; SHIP’S 1-14.
c. _X FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.
i. Identify Make / Model of existing equipment:
3 Ver 2.0 (01 July 2018)
CRANE (302-20024-00
iii. Describe how the equipment must be compatible with the existing configuration.
Gear operator must be able to fit onto existing 30IN Crane Valve P/N:
30BG67731X.
d. X OTHER:
MSC DOES NOT HAVE MANUFACTURING AND TECHNICAL INFORMATION
REQUIRED TO EVALUATE AND DETERMINE WHETHER NON-OEM
COMPONENTS AND REPLACEMENT PARTS OFFERED ARE EQUIVALENT TO THE
OEM COMPONENTS AND REPLACEMENT PARTS. THE DESIGN OF THE T-AKE
SEA VALVES WAS DEVELOPED SPECIFICALLY FOR THE T-AKE CLASS; ONLY
APPROVED TECHNICAL REPRESENTATIVES AND PROVIDERS ARE
AUTHORIZED TO SERVICE THIS EQUIPMENT. OEM REPS HAVE ACCESS TO
PROVIDE PARTS AND TECHNICAL DATA / DRAWINGS FROM THE ORIGINAL
MANUFACTURER AS REQUIRED BY USCG AND ABS CERTIFICATION FOR
MAINTENANCE.
4. UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:
a. Date on which the requirement was identified:
b. Required delivery date / Period of Performance:
c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.
d. Estimated production lead time:
e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)
f. CASREP Number:
| Date: 29 JAN 2026 |
| Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER THE SIMPLIFIED ACQUISITION THRESHOLD |
| I. BACKGROUND: |
| II. DESCRIPTION OF ITEM OR SERVICE: |
| CRANE ChemPharma & Energy |
| 30 APR 2026 |
| REQUIRED TO REPLACE EXISTING SEA VALVES DURING THE ROH/DD AVAILABILITY. |
| CRANE ChemPharma & Energy |
| III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED |
ii. Describe how it applies to the critical piece of equipment: ENSURES THAT VESSEL EQUIPMENT IS MAINTAINED IN ACCORDANCE WITH ORIGINAL EQUIPMENT MANUFACTURER (OEM) RECOMMENDATIONS, MSC POLICY AND REGULATORY BODY REQUIREMENTS. SEA VALVES PROVIDES SEAW...
| THE ENTIRE TAKE CLASS SHIP; SHIP’S 1-14. |
| CRANE (302-20024-00 |
| MSC DOES NOT HAVE MANUFACTURING AND TECHNICAL INFORMATION REQUIRED TO EVALUATE AND DETERMINE WHETHER NON-OEM COMPONENTS AND REPLACEMENT PARTS OFFERED ARE EQUIVALENT TO THE OEM COMPONENTS AND REPLACEMENT PARTS. THE DESIGN OF THE T-AKE SEA VALVES WAS DE... |
File details come from the government source that posted it. Updated .