Redacted SSJ.docx
DOCX document 45 KB Posted
- Attached to
- USNS MEDGAR EVERS Cargo Refrigeration Brine Pump Federal contract opportunity
- Solicitation number
- N3220525Q2279
About this file
This document is a Memorandum for Use of Other Than Full and Open Competition for an acquisition under the Simplified Acquisition Threshold for the USNS MEDGAR EVERS. The procurement involves a repair kit and parts for a cargo refrigeration brine pump, specifically from ALLWILERAG (Manufacturer: ALLWILER GMBH), with a required delivery date of 02/17/2025. The acquisition is justified under multiple criteria, including critical ship equipment standardization, brand name specifications, and unusual and compelling urgency, with a production lead time of 3-4 weeks.
The solicitation (N3220525Q2279) is issued by the Department of the Navy Military Sealift Command for a cargo refrigeration brine pump (AC Motor) with an end item application of PUMP, SIZE 80-250. The procurement is for a specific make/model (MFR ID- NISM80-250/01/249) that is deemed critical to ship operations, with the government determining that only the specified manufacturer can provide the required components due to standardization needs and potential hazards associated with using alternative parts.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| REV3 Combined_Synopsis_Sol_25Q2279.docx | DOCX document | |
| REV2 Combined_Synopsis_Sol_25Q2279.docx | DOCX document | |
| REV Combined_Synopsis_Sol_25Q2279.docx | DOCX document | |
| Combined_Synopsis_Sol_25Q2279.docx | DOCX document | |
| Combined_Synopsis_Solicitation_.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: J2/16/2024
MEMORANDUM
| Subj: | USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER THE SIMPLIFIED ACQUISITION THRESHOLD | |
| Ref: | (a) | PR Number(s): LTCN N290024266W38 l I USNS MEDGAR EVERS |
I. BACKGROUND:
1. In considering the references, FAR 13.106-l(b)(l )(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).
2. As required by FAR l3.l06-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
l. Provide a description of the item or service required, to include
REPAIR KIT FOR CARGO REFRIGERATION BRINE PUMP CHILL
a) the name of the required source or brand name
ALLWILERAG
b) the required delivery date/period of performance and 02/17/2025
c) its intended use.
REPAIR PARTS FOR CARGO REFRIGERATION BRINE PUMP CHILL
2. List the source(s) or known vendor(s) who are able lo provide the above described item or service.
ALLWILERAG
Trident Maritime Systems ill. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED ON THE FOLLOWING (select all that apply):
A. Only one responsible source (select all that apply):
l. RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.
a. Explain what is subject to the restrictive rights.
b. If drawings are included, who is identified as "owning" the drawings.
Ver 2.0 (01 July 2018)
2. _NIA_ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.
a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
b. Identify the distributor/ authorized technical representative for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document. (NOTE: If there is more than ona distributor I authorized technical representative, than use Part B-Brand Name.)
3. _X_ OTHER REASON:
a. CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.
i. SMS Procedure Number:
b. _X_ STANDARDIZATION I BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government's needs for additional units or replacement items.
i. Identify Make/ Model Number(s): MFR ID- NISM80-250/01/249 U3.ID-WO/ MFR- ALLWILER GMBH
ii. Identify other vessels with this Make/ Model:
c. FORM, FIT, AND FUNCTION: Item is direct replacement parts/ components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment/ configurations.
i. Identify Make/ Model of existing equipment:
ii. Describe how the equipment must be compatible with the existing configuration.
d. _NIA_ OTHER: Other reasons not identified above: MSC docs not have manufacturing and technical information required to evaluate and determine whether non-OEM components and replacement parts offered are equivalent to the OEM components and replacement parts. The OEM rep has access to provide parts and technical data / drawings from the original manufacturer, as required to properly repair and maintain the equipment.
4. _X_ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would
2 Ver 2.0 (0 I July 20I8) injure the Government. The determination that thl, procurement for the above is an urgent and compelling requirement is based on the following:
a. Date on which the requirement was identified: 09/22/24
b. Required delivery date/ Period of Performance: 02/17/25
c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.
DELAYEO DUE TO TECHNICAL RESEARCH.
d. Estimated production lead time: 3-4 WEEKS
e. Explanation of why delivery/ commencement of services by the date required is nee d: (explain the impact to the mission, an1_ special circumstances or conditions, etc.)
r::4-';;tA: e:GDEh ·n, Pi:£4:·A- CAf'-6--o
3 Ver 2.0 (OJ July 2018) image1.jpeg
File details come from the government source that posted it. Updated .