redacted other than full and open.pdf

PDF 426 KB Posted

Attached to
USNS CHOCTAW COUNTY Mooring Material Federal contract opportunity
Solicitation number
N3220525Q2237
Issued by
Department of the Navy Military Sealift Command

About this file

This is a Justification for Other Than Full and Open Competition (JOFOC) memorandum for an acquisition under the simplified acquisition threshold for mooring materials for the USNS Choctaw County. The acquisition requires specific brand name products from three manufacturers: Ocean Guard (Support Buoy SB-50 and Chain Thru Buoy CTB 275), Sea-Link (2-1/2" and 1-3/4" Double Nut Shackles), and Samson Rope (1-1/4" Quantum 12 rope with specified configurations).

The justification cites restrictive rights and standardization as the primary reasons for limiting competition. The materials will be used to support safe mooring of the vessel at MARAD's James River Reserve Fleet for at least three years. MARAD, as the operator of the reserve fleet responsible for safe mooring, has specified these particular products based on their proven reliability and technical compatibility within their anchorage. The required delivery date is 07/01/2025, with a period of performance from 08/01/2025 to 09/01/2025. The procurement number referenced is 1301223976.

View the file

Other files for this federal contract opportunity

Other files attached to USNS CHOCTAW COUNTY Mooring Material, newest first.
File Type Posted
Combined_Synopsis_Solicitation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Ver 2.0 (01 July 2018)

Date: 25 February 2025

MEMORANDUM

Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER

THE SIMPLIFIED ACQUISITION THRESHOLD

Ref: (a) PR Number(s): 1301223976

I. BACKGROUND:

1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

1. Provide a description of the item or service required, to include

a) the name of the required source or brand name

Ocean Guard (for Support Buoy, SB-50 and Chain Thru Buoy, CTB 275, 2-1/2" chain capture plate)

Sea-Link (for 2-1/2" Double Nut Shackle, Anchor Style Regular Jaw and 1-3/4" Double Nut Shackle, Anchor Style Regular Jaw)

Samson Rope (for 1-1/4" Quantum 12, 300 feet w/ 30 foot 2-1/4" RP12 mooring tail with Cor- Gard covered eyes and Chafe-Pro FS, size D)

b) the required delivery date/period of performance and

RDD 07/01/2025; PoP 08/01/2025 09/01 2025

c) its intended use.

The materials to be procured will be used to support safe mooring of the USNS Choctaw County in MARAD s James River Reserve Fleet while the vessel is maintained as a logistics support asset for an anticipated period of at least three years.

2. List the source(s) or known vendor(s) who are able to provide the above described item or service.

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED

ON THE FOLLOWING (select all that apply):

A. X Only one responsible source (select all that apply):

2 Ver 2.0 (01 July 2018)

1. X RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.

a. Explain what is subject to the restrictive rights.

The brands listed above are commercial and can be provided by any vendor who can source.

b.

Ocean Guard (for Support Buoy, SB-50 and Chain Thru Buoy, CTB 275, 2-1/2" chain capture plate)

Sea-Link (for 2-1/2" Double Nut Shackle, Anchor Style Regular Jaw and 1-3/4" Double Nut Shackle, Anchor Style Regular Jaw)

Samson Rope (for 1-1/4" Quantum 12, 300 feet w/ 30 foot 2-1/4" RP12 mooring tail with Cor- Gard covered eyes and Chafe-Pro FS, size D)

2. EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.

a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

b. Identify the distributor / authorized technical representative for the item or service.

Provide evidence of the exclusive licensing agreement as an attachment to this document.

(NOTE: If there is more than one distributor / authorized technical representative, then use Part B Brand Name.)

3. X OTHER REASON:

a. CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.

i. SMS Procedure Number:

b. X STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, additional units or replacement items.

i. Identify Make / Model Number(s):

3 Ver 2.0 (01 July 2018)

Ocean Guard (for Support Buoy, SB-50 and Chain Thru Buoy, CTB 275, 2-1/2" chain capture plate)

Sea-Link (for 2-1/2" Double Nut Shackle, Anchor Style Regular Jaw and 1-3/4" Double Nut Shackle, Anchor Style Regular Jaw)

Samson Rope (for 1-1/4" Quantum 12, 300 feet w/ 30 foot 2-1/4" RP12 mooring tail with Cor- Gard covered eyes and Chafe-Pro FS, size D)

ii. Identify other vessels with this Make / Model:

These brand names are being selected under the direction of MARAD s James River Reserve Fleet and represent products that have been used by the reserve fleet successfully to moor other vessels in their anchorage. As the operators of the reserve fleet, MARAD is the entity that is responsible for providing safe mooring, as well as caretaking, for USNS Choctaw County and has selected products that have performed reliably within their anchorage for many years and have technical characteristics that are compatible with their intended mooring.

c. FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.

i. Identify Make / Model of existing equipment:

ii. Describe how the equipment must be compatible with the existing configuration.

d. X OTHER: These brand names are being selected under the direction of MARADs James River Reserve Fleet and represent products that have been used by the reserve fleet successfully to moor other vessels in their anchorage. As the operators of the reserve fleet, MARAD is the entity that is responsible for providing safe mooring, as well as caretaking, for USNS Choctaw County and has selected products that have performed reliably within their anchorage for many years and have technical characteristics that are compatible with their intended mooring. MSC cannot deviate as MARAD will be responsible for mooring of the vessel and as such MSC must adhere to their requirements. Any deviation could result in MSC being held liable.

4. UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:

a. Date on which the requirement was identified:

b. Required delivery date / Period of Performance:

4 Ver 2.0 (01 July 2018)

c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.

d. Estimated production lead time:

e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)