Redacted other than full and open.pdf

PDF 461 KB Posted

Attached to
USS EMORY S. LAND HARDIE TYNES FORCE DRAFT BLOWER PARTS
Solicitation number
N3220525Q2154
Issued by

About this file

This is a Justification for Other Than Full and Open Competition memorandum dated 31OCT2024 for the repair of a Force Draft Blower aboard the USS EMORY S. LAND (AS-39). The requirement is for Hardie-Tynes equipment (Model 60-805) with a delivery date of 30JAN2026.

The justification cites restrictive rights and critical ship equipment as the basis for limited competition. The technical documentation and design information for the Force Draft Blower is proprietary to Steward Machine/ACME Products. The equipment is designated as critical ship equipment under SMS Procedure 106.10-002 ALL, requiring exact form, fit and function compatibility as a one-to-one replacement. The blower is standardized equipment used on AS CLASS VESSELS (AS-39/AS-40), and its failure would pose a hazard to the ship, crew, and environment. The procurement is being handled by the Department of the Navy Military Sealift Command.

View the file

Other files

File Type Posted
Combined_Synopsis_Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hardie-Tynes

File details come from the government source that posted it. Updated .