REDACTED MEMO BN.pdf

PDF 202 KB Posted

Attached to
ECDIS DIRECT CONNECT MATERIAL USNS POINT LOMA (T-EPF 15)
Solicitation number
N3220526Q0005
Issued by

About this file

This is a Memorandum justifying the use of other than full and open competition for a simplified acquisition under the Federal Acquisition Regulation (FAR). The acquisition covers ECDIS Direct Wire Connection to primary navigation sensors, with a required delivery date of 18 June 2026. The potential sources identified are Northrup Grumman and Furuno U.S.A Inc.

The justification for limiting competition is based on three factors: standardization and brand name requirements, form-fit-function compatibility, and critical ship equipment considerations. Specifically, the Government requires two specific models—VL-66213 Video Extender and 008-555-680 Power Supply 24 VDC—that are already installed on vessels EPF 14 and FWD. These components must be direct replacement parts compatible with existing primary navigation sensor configurations, as any deviation from original equipment manufacturer (OEM) installed parts may require re-engineering and modification to the existing systems. The procurement is justified under the Government's standardization initiative to ensure compatibility across multiple vessels and to avoid unnecessary system modifications. The requirement does not exceed the simplified acquisition threshold, and no urgency-related information was provided in the documented justification.

View the file

Other files

File Type Posted
REDACTED MEMO BN.pdf PDF
Combined Synopsis Solicitation.docx DOCX document
CLSExport_N3220526Q0005.pdf PDF
Combined Synopsis Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Ver 2.0 (01 June 2018)

Date: 15JAN26

MEMORANDUM

Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER

THE SIMPLIFIED ACQUISITION THRESHOLD

Ref: (a) PID Number(s): N 3 2 2 0 5 - 26 - S I M A C Q - D S M - P M 8 - 0 0 5 9

I. BACKGROUND:

1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

1. Provide a description of the item or service required, to include

a) the name of the required source or brand name

Northrup Grumman or Furuno U.S.A Inc.

b) the required delivery date/period of performance and

18JUN26

c) its intended use.

ECDIS Direct Wire Connection to primary navigation sensors.

2. List the source(s) or known vendor(s) who are able to provide the above described item or service.

Northrup Grumman

Furuno U.S.A. Inc.

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED

ON THE FOLLOWING (select all that apply):

A. Only one responsible source (select all that apply):

1. RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.

a. Explain what is subject to the restrictive rights.

2 Ver 2.0 (01 June 2018)

b. If drawings are included, who is identified as “owning” the drawings.

2. EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.

a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

b. Identify the distributor / authorized technical representative for the item or service.

Provide evidence of the exclusive licensing agreement as an attachment to this document.

(NOTE: If there is more than one distributor / authorized technical representative, then use Part

B – Brand Name.)

3. X OTHER REASON:

a. CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.

i. SMS Procedure Number:

b. X STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.

i. Identify Model Number(s):

a. VL-66213 Video Extender

b. 008-555-680 Power Supply 24 VDC

ii. Identify other vessels with this Make / Model: EPF 14 and FWD

c. X FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.

i. Identify Make / Model of existing equipment:

VL-66213 Video Extender

008-555-680 Power Supply 24 VDC

3 Ver 2.0 (01 June 2018)

ii. Describe how the equipment must be compatible with the existing configuration.

Any deviation from OEM installed parts may require re engineering and modification to existing primary navigation sensors.

d. OTHER:

4. UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:

a. Date on which the requirement was identified:

b. Required delivery date / Period of Performance:

c. If the difference between a. and b. is more than one week, explain the delay in submitting t he requirement.

d. Estimated production lead time:

e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)

f. CASREP Number:

4 Ver 2.0 (01 June 2018)

File details come from the government source that posted it. Updated .