REDACTED JA Enclosure.pdf
PDF 160 KB Posted
- Solicitation number
- N3220526C1204P00003
About this file
This is a Justification and Authorization (J&A) document detailing ship maintenance and repair work orders for a federal vessel.
The document lists seven critical work orders (CCO items 011, 014, 015, 017, 019, 026, and 030) required to address mission-critical and U.S. Coast Guard (USCG)-mandated repairs and procurements. Item 011 involves changing a failed seal on the forward fire pump, which is essential for vessel safety. Item 014 requires electrical repairs to Lifeboat No. 5 to comply with a USCG 835 notice due in February 2026. Item 015 addresses mandatory MSD (Marine Sanitation Device) repairs requiring crew absence from the vessel. Items 017 and 019 involve overhauling critical ship pumps: the MSD seawater supply pump and the JP-5 service pump (with AVCERT certification required). Item 026 requires procurement of USCG-mandated lifejackets. Item 030 addresses repairs to the 1JV vital communication system, which has an active CASREP and USCG 835 notice due February 28, 2026. All items are justified as mission-critical or regulatory compliance requirements necessary for safe vessel operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REDACTED COMF MTA P0003 JA-NewWork Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enclosure to J&A No. N10426C1204P00003 CCO WI Description/Justification 011 515-Fire Pump Seal Change FWD Fire Pump Seal Change. The FWD fire pump is not operational due to a failed seal. Fire pumps are mission critical.
014 604-Lifeboat No. 5 Repairs Lifeboat no. 5 Repairs. The lifeboat has an electrical fault and USCG has written an 835 due in Feb 2026 requiring it to be repaired.
015 517-MSD Repairs (Inspect/ Elect
Grooming) MSD Repairs. The MSD is required by USCG and needs to be repaired when crew of off the ship.
017 517-MSD SW Pump No. 1 Inspection +Overhaul (remove/inspect/reinstall)
Pump repairs. The following pumps are critical to the ship and need to be overhauled: No. 1/No. 2 MSD SW Supply Pump
019 518-JP-5 Pump Inspection Pump repairs. The following pumps are critical to the ship and need to be overhauled: No. 1 JP5 Service Pump (AVCERT required)
026 605- Procure Lifejackets Procure Lifejackets-Life Jackets are USCG required.
030 401-Repair 1JV 1JV is a vital communication system and required by USCG. There is a current
CASREP and USCG 835 on the system, due 28FEB2026.
File details come from the government source that posted it. Updated .