Redacted JA.pdf

PDF 524 KB Posted

Attached to
MPDE PARTS
Solicitation number
412-24-434
Issued by

About this file

This document appears to be an Urgency Justification Form for a government requirement. It outlines the details and rationale for processing a requirement on an urgent basis in accordance with FAR 6.302-2. The key information includes:

The requirement was first identified on [date] and submitted to the contracting department on [date], with a required delivery of [date]. The justification explains the special circumstances and conditions that validate the urgency, such as the specific harm or impact to the mission if the material or service is not received by the required date. This could include work stoppage, inability to perform the mission, repair of essential equipment, or other critical needs. The document also estimates the production lead time for the item.

The related federal contract opportunity is a firm fixed-price contract awarded on a sole source basis under FAR 13.106-1(b)(1)(i) to an unknown vendor on 2024-07-03 for an unknown amount. The contracting agency is the Department of the Navy Naval Sea Systems Command.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

URGENT REQUIREMENTS

Urgent requests are for supplies or services that will result in work stoppage are mission essential, and normal processing time would result in injury to the government. Urgent requirements that are identified by the customer and documented with a valid urgency impact statement will be worked by MARMC immediately upon receipt.

Urgency Justification Form Please ensure your urgency impact statement explains the following:

The impact to your mission (i.e. the specific "harm" that will result) if you do not receive the material or service by the required delivery date, The special circumstances and conditions that exist validating the requirement as an "urgent"

Describe the compelling nature of the urgency, how the Government will be seriously injured, and the financial implications.

Provide a time line from when the need was identified. If a late identified item, explain why.

Identify manufacturing lead time.

Explain why the item is needed and what will happen if it's not received by the Required Delivery Date (RDD). Describe impact on overhaul/availability schedules, impact to base support, personnel safety issues, potential environmental damages, etc., and include the dollar value associated with late delivery.

Examples:

-Supplies or services needed at once because of fire, flood, hurricane, or other disaster.

-Supplies or services required at once for repairing roofs or windows to prevent water damage or destruction of computers, office areas, personnel records, etc.

-Essential equipment or repair needed at once to comply with orders for a ship to deploy or for an aircraft, which is grounded, and as a result the Navy cannot perform its mission.

-Essential equipment or repair needed at once to: (a) prevent work stoppage of ___employees at an average hourly rate of $____; or (b) repairs the AN/AIR-67 Electronic Counter Measuring System. Failure to repair would result in replacement of the system an estimated cost of $_____.

Urgent requirements can be hand carried, submitted electronically, faxed or emailed.

Commands, that fax or email requirements should call the purchasing office to confirm receipt.

Once the fax is received, immediate processing will begin. Good two-way communication is a key to successful transaction.

JUSTIFICATION FOR URGENCY

The service or material listed on is considered urgent for reasons indicated below.

This justification is provided to support the processing of on an urgent basis in accordance with FAR 6.302-2. Processing of a requirement on an urgent basis may allow the soliciting from a single source if Contracting Officer determines that the circumstances deem only one source reasonably available. This justification is based on the following facts:

Date on which the requirement was first identified:

Date on which the requirement was submitted to the contracting department:

Required delivery:

Explanation of the special circumstances and conditions that exist validating the requirement as "urgent".

How this requirement will impact your mission (i.e., the specific harm that would result) if you do not receive the material or service by the required delivery date. (Note: Delays in production schedules alone or failure to expend monies are not acceptable reasons for justifying urgency.)

Estimated production lead time for the item (how long will it take the contractor to produce the item or complete the service once the contract is awarded)