This document is a Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction for a federal contract opportunity.
The key details are:
The contract opportunity is for a Global Transport Platform-as-a-Service (GTPaaS) to provide NIPRNET, SIPRNET, and AF JWICS network access for the Air Mobility Command (AMC) intelligence analysts. The GTPaaS is required to support the AMC worldwide mission and protect AMC and DoD personnel and aircraft. The exception to fair opportunity is justified under FAR 16.505(b)(2)(i)(B) as only one contractor, , has the unique capabilities and facility location within 2 nautical miles of an AMC base required to meet the strict accreditation and connection requirements. The total estimated value of the contract is $ over the base and option periods. Pricing will be determined through price analysis techniques to ensure fair and reasonable pricing. This solution is needed urgently to support upcoming training and operations, and the 32 JEFF-K deployable communications kits purchased in FY23 cannot be fully utilized without the GTPaaS.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction
CONTROLLED UNCLASSIFIED INFORMATION
v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 8v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 8
Independent Government Cost Estimate (IGCE). The IGCE is based on current approved labor categories and rates. A Purchase Request (PR) Form 9, was certified on 3 Mar 2024 and was certified 30 Apr 2024 using FY24 Air Force (AF) funds. All SEWP V Contracts have an effective ordering period of May 1, 2015 through April 30, 2025. The base contracts were awarded for 5 years with one 5 year option for a total of 10 years. Each contract has a $20 Billion contract limit. The current available ceiling for any given contract is a minimum of $18,121,581,386.79. Therefore, the total estimated price of this task order is within the NASA SEWP maximum ceiling amount.
The anticipated CLIN structure is as follows:
Base Period (30 Sep 2024 - 29 Sep 2025):
CLIN Description Unit of Measure Quantity Unit Price Total
0001 Starshield Each 25 $ $
0002 IntelSat Each 5 $ $
0003 MANTLE Each 1 $ $
0004 SD-WAN Each 1 $ $
0005 Admin Supp Monthly 12 $ $
0006 SEP Each 1 $ $
Total $
Option Period 1 (30 Sep 2025 - 29 Sep 2026):
1001 Starshield Each 25 $ $
1002 IntelSat Each 5 $ $
1003 MANTLE Each 1 $ $
1004 SD-WAN Each 1 $ $
1005 Admin Supp Monthly 12 $ $
1006 SEP Each 1 $ $
Option Period 2 (30 Sep 2026 - 29 Sep 2027):
2001 Starshield Each 25 $ $
2002 IntelSat Each 5 $ $
2003 MANTLE Each 1 $ $
2004 SD-WAN Each 1 $ $ v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 8v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 8
2005 Admin Supp Monthly 12 $ $
2006 SEP Each 1 $ $
Extension of Services (EOS) (30 Sep 2027 - 31 Mar 2027):
3001 Starshield Each 25 $ $
3002 IntelSat Each 5 $ $
3003 MANTLE Each 1 $ $
3004 SD-WAN Each 1 $ $
3005 Admin Supp Monthly 6 $ $
3006 SEP Each 1 $ $
Requirement Total: $
The specific exception that precludes the fair opportunity process for this acquisition is FAR 16.505(b)(2)(i) (B). In accordance with FAR 16.505(b)(2)(i)(B) only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized. The GTPaaS will provide NIPRNet, SIPRNet, & AF JWICS access for the AMC/A2 command wide intelligence analysts in support of the AMC world-wide mission. The intelligence data collected and distributed by the access provided by the GTPaaS will be used to protect AMC & DoD personnel, and the aircraft they fly. In FY23, 32 JEFF-Ks were purchased to replace the obsolete systems. In order for the JEFF- Ks to be fully operational they require access to the NIPRNet, SIPRNet, and AF JWICS network entry points provided by the GTPaaS. , who designed the JEFF-Ks has all the capabilities needed in order to make the JEFF-Ks operational. In addition the contractor must have a facility within two nautical miles of an AMC base. In accordance with the AFJWICS engineering office and the existing AFJWICS enterprise Authority to Operate (ATO) and System Impact Analysis (SIA) has strict policies on circuit accreditation and connections. Their process requires long haul circuit connections to be terminated at specific locations that are assigned to the requesting organization by the enterprise. The radius restriction is intended to ensure that a vendor has NSA accredited SCIF close enough to an AMC base that will allow AMC to request the connection without delay or additional cost. If the location is not near an AMC Base, the Air Force JWICS PMO would require the connection to be made to the closest regional transfer node. Because AMC/A2 staff does not have physical access, nor network rights at any location that is not physically on an AMC base and housed in an AMC accredited SCIF, we would be unable to complete the necessary steps required to allow the vendor to complete the scope of work required for GTPaaS. Additionally, all circuit actions require the Defense Information System Agency (DISA) to provide either a government-owned or contracted fiber optic v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 5 of 8v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 5 of 8 mean that there would be no global enterprise network for deployed AMC/A2 users since the current, SIPRNet operation only, communication kits have internal components no longer supported by the manufacturer. Any addition to cost or delay in implementation have second and third order affects leading to the potential loss of life and Aircraft in theater.
Finally, the JEFF-Ks will be useless if the GTPaaS is not purchased and would be a substantial duplication of cost to the Government that would not be recovered through competition. The current 32 each JEFF-Ks purchased in FY23, at a total cost of over $ , will sit on the shelf if there is not an access point for the NIPRNet, SIPRNet, & AF JWICS networks.
The Contracting Officer will use one or more of the price analysis techniques described at FAR 15.404-1(b)(2) to ensure the price to the Government is fair and reasonable.
Commander, Air Combat Command (COMAMC) has tasked the AMC Intelligence, Surveillance and Reconnaissance (ISR) enterprise with providing exquisite (TS/SCI) intelligence across the globe. To be successful AMC will need the Global Transport Platform as a Service (GTPaaS) and the JEFF-K deployable communications kits.
AMC requires a mobile, agile, and secure TS/SCI capability in the deployed environment. U.S. Forces need to have constant, near-real time awareness of the threat. This can only be accomplished through access to NIPRNet, SIPRNet, & AF JWICS in all locations across the globe. Additionally, this single solution is scoped to meet new AMC deployable unit type codes which match our small, deployed footprint ensuring AMC remains agile and provides full-scope threat data and analysis.
Furthermore, GTPaaS and JEFF-Kits are needed as early as late-Winter 2024 and early-Spring 2025 to support multiple lead up events, planning, and training for Op Mobility Guardian, ultimately ensuring AMC pilots and aircrews receive full-scope threat data and indications and warnings.
The current systems, which only operate on SIPRNet, do not allow analysts to synthesize full-scope threat data or provide that data to aircrews. Moreover, they are beyond the need for replacement and no longer meet AMC/A2 mission requirements. AMC/A2 cannot wait for another vendor to design a solution which may not meet our small footprint system requirements.
has the SCI facility (SCIF), knowledge, and experience to bring the GTPaaS to operational status in AMC/A2 required timeline. Additionally, provides tailored training for this solution to ensure AMC ISR analysts are ready to execute this no-fail mission. Any other vendor would result in unacceptable delays and would not meet COMAMC's intent to project power, maneuver and sustain the Joint Force.
v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 7 of 8v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 7 of 8
Instructions for Completing the Template IAW FAR 16.505(b)(2)(ii)(B)
(2) State whether the action is a new order or a modification to an existing order. Identify the basic multiple award contract number and the order number for the current action. Also identify the type of the order/line items on the order (e.g., Firm Fixed price, Cost Plus Fixed Fee, etc.).
(3) Specifically describe the supplies/services to be acquired including the price/cost and quantity of each item in the order and the total estimated value of the order. For services, state whether services are performance-based, and if not, provide rationale for not being performance based. State the delivery/performance schedule/period for the items under the order. Explain how the requirement/order fits under the scope of the basic multiple award contracts.
(Note: The Contracting Officer must ensure that the order is issued within the period of performance and within the maximum value of the contract).
(4) Include the appropriate exception from FAR 16.505 (b)(2) and the supporting rationale. FAR16.505(b)(1)(i) requires the Contracting Officer to provide each awardee under a multiple award contract, a fair opportunity to be considered for each order exceeding $3,000 unless a statutory exception applies. The specific exception that precludes the fair opportunity process for this acquisition is FAR 16.505(b)(2)(i)(__) [Insert A,B, C, D, or E]. If a brand name product description is being justified, use this section to explain why the particular brand name, product, or feature is essential to the Government's requirements and why other companies' similar products/services do not meet, or cannot be modified to meet, the agency's needs.
FAR 16.505(b)(2)(i)(A): �The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays�. When using this exception provide a detailed justification with supporting documentation that explains the exact urgency of the requirement and the mission impact if awarded to any other contractor. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements of urgency are not acceptable.
FAR 16.505(b)(2)(i)(B): �Only one awardee is capable of providing the supplies or services required at the level at the level of quality required because the supplies or services ordered are unique or highly specialized�. When using this exception provide a detailed justification, with supporting documentation, as evidence of the �unique or highly specialized� nature of the procurement. The user/customer typically provides this supporting information.
Supporting documentation may be attached to the back of the document. General statements are not acceptable.
FAR 16.505(b)(2)(i)(C): �The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order�. When using this exception provide information on the previously competed order under this contract and detail the economies and efficiencies that will be obtained by going sole source for the follow-on order. The user/customer typically provides this supporting information.
General statements are not acceptable.
FAR 16.505(b)(2)(i)(D): �It is necessary to place an order to satisfy a minimum guarantee.�
FAR 16.505(b)(2)(i)(E): �For orders exceeding the simplified acquisition threshold, a statute expressly authorizes or requires that the purchase be made from a specified source.�
Discuss the market research that was conducted by the user/technical team/contracting officer among the supplies/services of all awardees that resulted in the conclusion that a fair opportunity exception applied. The narrative in this section should provide a high level of confidence that the requirements of FAR 16.505(b)(1) and DFARS 216.505-70 could not be met. If no market research was conducted, state so and provide the rationale. If any other awardee expressed interest in fulfilling the requirement, but was not considered a potential source, explain why that awardee cannot provide the required supplies/perform the service.
v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 8 of 8v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 8 of 8
If the use of a brand name purchase description is being justified, the market research should include an analysis of any industry proposed alternative products or approaches to meeting the requirements. Additionally, the Government's efforts to identify as many potential sources as practicable offering the required brand name item(s) should be addressed.
(5) This paragraph needs to be tailored based on the types of CLINs in the order and the pricing arrangements on the basic multiple award contract. If the contract did not establish the price for the supply or service, the Contracting Officer must establish prices for each order IAW FAR 15.4. The paragraph needs to describe the steps that will ensure that the prices/estimated cost of the order will be fair and reasonable. For example, even if firm-fixed prices were obtained under adequate price competition in the award of the multiple award contract, the Contracting Officer still needs to consider market conditions and other factors that may have changed since contract award and explain the basis in the determination that prices/costs are fair and reasonable prior to award of the order.
(6) Provide any other facts supporting the use of exceptions to the fair opportunity process.
(7) Include a statement of the actions, if any, to be to be taken to remove or overcome any barriers that led to the exception to fair opportunity before any subsequent acquisition for the supplies or services is made. If no actions are planned, so state and provide reasons.