Redacted_BOM.pdf
PDF 165 KB Posted
- Attached to
- FC0002375 Pure Storage for DR NAS Replacement
- Solicitation number
- BPM056613
- Issued by
- Maryland
About this file
This is a bill of materials and quotation document from Pure Storage, Inc. for the State of Maryland Department of Information Technology, specifically for a disaster recovery NAS replacement project (FC0002375). The quote includes one FA-C70R5 FlashArray storage system with 525TB capacity, chassis generation 2, and 4-port 10/25G connectivity; one month of Evergreen Forever subscription with 4-hour delivery and 24/7 support; five PEAK virtual instructor-led training sessions for one learner per day; networking components including 25G Ethernet SFP transceivers and 100GbE dual-port HBA adapters; installation services; and onboarding essentials including SafeMode QuickStart configuration and FA Design Operational Readiness training. The quote is addressed to Ben Lowe (blowe@purestorage.com) and purchase orders should be directed to the account executive with a copy to Pure Order Management at om@purestorage.com.
The quotation specifies payment terms of 45 days, with pricing on a cost-plus basis and excluding sales tax, use tax, value-added taxes, and shipping costs unless otherwise agreed. The Evergreen Forever subscription commences upon shipment of products and includes the latest maintenance release of Purity DR C70-525. Incoterm is FCA Origin with warehouse shipment pending buyer's purchase order. The quotation is governed by Pure Storage's standard end-user agreement and may only be honored if a valid purchase order is received by the expiration date specified in the quote. Pure reserves the right to fulfill orders with higher-performing or higher-capacity equipment at no additional charge at its sole discretion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment-J.-Mercury-Affidavit.pdf | ||
| FC0002375_PORFP_for_Pure_Storage_Hardware.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Company Pure Storage, Inc.
Address 2555 Augustine Dr. Santa Clara, CA 95054
US
Bill To Name
Bill To
Ship To
IOR Address
Prepared By
Prepared By Email
Payment Terms
Account Name
Distributor Reseller
PO Instructions
Incoterm
Ship Via
Freight Terms
Notes
Customer Purity Version
Ben Lowe blowe@purestorage.com
45 Days
Department of Information
Technology - State of Maryland
Purchase Orders should be sent to the account executive who quoted the order, with a copy to Pure Order
Management
(om@purestorage.com).
FCA Origin Warehouse
Pending Buyers PO
Pending Buyers PO
Latest maintenance release of
Purity
DR C70-525
Product Product Description
Quantity Sales Price Discount Net Unit Price
Total Price
FA-C70R5-CG2-ETH-525TB-14x37.5TB FA//C70R5 w/ Chassis Gen2,4 Port 10/25G,and
525TB
mailto:blowe@purestorage.com mailto:(om@purestorage.com
Product Product Description
Quantity Sales Price Discount Net Unit Price
Total Price
FA-C70R5-525TB, 1MO,PRM,FVR FA-C70R5-
525TB
1 Month Evergreen Forever Subscription, 4 Hour Delivery, 24/7 Support
PEAK-Virtual-1Day-1Learner Virtual instructor-led session for one learner per day. This is open registration and can be for multiple customers.
There needs to be a minimum of 8 learners and max 16 learners for class to be delivered.
Customer must complete class within 6 months see
PEAK
customer sessions guide for more info.
FA-XR2-25G-Eth-SFP-SR, 4-PACK FA-XR2- 25GEth-SFP-
SR,
4-PACK
FA-100G-ETH/TCP 2-Port ADD HBA, PCIe- Gen4 x16, 100GbE
DUAL-PORT
QSFP56,
P2100G
PS-DP-FAISINST00 FA //X, //C //E
Install
FA-XCR4R5-100G-ETH-SR, 4-Pack 100GbE iTemp
QSFP28,
ShortRange,SR for X/C R4 and R5, 4-pack
Discount
Subtotal
Product Product Description
Quantity Sales Price Discount Net Unit Price
Total Price
Onboarding Essentials Advanced fixed price and adhoc bundles providing operational readiness, automation and SafeMode consulting and configuration
PS-SAFEMODE-QUICKSTART Includes technology review, best practices configuration of single protection group as per Service Brief scope and knowledge transfer session to understand how SafeMode deployment can support customer policies
PS-FA-DESIGN-OPERATIONAL-READINESS-
ONBOARDING
Advanced engagement providing low level design, test plan, operations guide, and knowledge transfer for optimally deploying FlashArray.
Refer to the Service Brief for scope and details.
DR C70-525 TOTAL:
Grand Total
Authorized Signature:
Date:
Printed Name:
This Quote is governed by the terms of the applicable Pure agreement you entered into authorizing you to purchase directly from Pure ("Agreement") and constitutes an offer to provide products, support services, subscriptions, or professional services ("Products") on the terms and conditions set forth herein. Your acceptance of this Quote is expressly limited to the terms set forth herein and any alterations to this Quote made by you are of no effect.
You may accept this Quote by issuing a purchase order that commits your organization to the Products in the amounts and term length (if applicable) set forth herein or, if your organization is accepting an order from Pure for the first time, and does not issue purchase orders in the normal course of business, you may accept this Quote by signing in the space below and returning it to Pure. By signing this Quote, you represent and warrant that issuance of a purchase order is not required to issue payments to Pure for the order described herein. Quotes, including the Products, amounts, discounts, and special terms, are valid and will only be honored if a valid purchase order, including the applicable Ship To address, is received by Pure before the close of business on the Expiration Date set forth above. The Pure entity appearing on the invoice and authorized to sell the Products to you is determined based on the Ship To address identified in the applicable purchase order (or country location of End User in case of professional services purchased on a stand-alone basis). Pricing does not include sales, use, value-added taxes, or shipping costs, unless otherwise agreed in the Agreement. By accepting this Quote and purchasing the Products listed herein, you acknowledge that the End User of such Products agrees to be bound by the terms and conditions of the Pure Storage End User Agreement, which may be found here: https://www.purestorage.com/content/dam/ pdf/en/legal/pure-enduser-agreement.pdf (or other agreement executed between Pure and the End User covering the subject matter), and confirm that your purchase is based only on currently available Products, features and functionality, and that you have not relied on the future availability or announcements of unreleased products, features, or functions in your purchasing decision. End User's use of third-party products is subject to such third party's applicable end user terms.
To ensure timely fulfillment when Product availability is limited, Pure reserves the right to fulfill an order with higher performing or higher capacity equipment at no additional charge to you or the End User for such increased performance or capacity. Determination of whether to fulfill an order with higher performing or higher capacity equipment is at Pure’s sole discretion. Unless otherwise agreed upon in writing by the parties, all Evergreen// Forever and Evergreen//Foundation subscriptions commence upon shipment of Products. Notwithstanding anything to the contrary, Pure permits the following termination rights for these order types: (a) orders for the purchase of hardware may be terminated any time prior to shipment; (b) Evergreen //Forever and //Foundation subscriptions may be terminated if the underlying hardware order is terminated prior to shipment; (c) renewal orders of Evergreen //Forever or //Foundation subscriptions may not be terminated; (d) orders for Professional Services may not be terminated if the underlying hardware order has been shipped; (e) Evergreen //One, //Flex, Pure Protect, and any other subscriptions not otherwise described herein may be terminated if End User (i) provides Pure 60 days’ prior written notice and (ii) pays in full all Reserve Commitments outstanding from the date of termination through the end of the Service Term; and (f) Portworx orders can be terminated if End User (1) provides Pure 30 days’ prior written notice for any Term-Based, Consumption-Based, or Pay-As-You-Go Software licenses; and (2) pay for all utilization or consumption of the Software through the date of termination.
Pure Storage Finance solutions are subject to status, satisfactory credit approval, and standard terms and conditions. Finance facilities may be provided through Pure authorized finance providers, and any agreements required by such provider for End User will be determined between End User and the Pure authorized finance provider. Availability of the products and services listed in this quote may be subject to End User or Partner credit approval.
https://www.purestorage.com/content/dam/
File details come from the government source that posted it. Updated .