This is a Memorandum recommending other than full and open competition for a federal procurement. The Naval Surface Warfare Center, Dahlgren Division (NSWCDD) seeks to acquire five (5) Rubidium Disciplined Oscillators, part number SRO-5680, manufactured by Safran Timing Technologies. The procurement is referenced as 0302-06 – Safran GPSDO Package with delivery required 12-15 weeks after receipt of the order. The estimated cost is redacted in the document. The SRO-5680 Rubidium oscillator is identified as a necessary component for a datalink system, with the component being critical to ensure proper system function. Redesigning the system with an alternative oscillator would require in excess of 160 direct productive hours for evaluation and integration, plus additional effort for new mounting hardware, cabling, and related components, with total redesign costs exceeding the threshold shown in redacted text. These duplicated costs cannot be recovered through full and open competition, and delays in equipment purchase would be operationally detrimental.
Market research conducted via internet searches, subject matter expert consultation, vendor conversations, and market research quotes identified multiple authorized resellers for support services available under NASA Solutions for Enterprise-Wide Procurement (SEWP) contract vehicles. The Contracting Officer has determined that only one or limited sources are reasonably available to meet the government's minimum requirements. The memorandum includes certification sections for both the originator and the Contracting Officer, with signature lines and dates requiring completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N0017826Q67100001 SF 30.pdf | ||
| Question_Answer.pdf | ||
| 0302-06 - Safran GPSDO - Reqts List.docx | DOCX document | |
| Solicitation - N0017826Q6710.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3 Mar 2026
MEMORANDUM
Subj: RECOMMENDATION FOR OTHER THAN FULL AND OPEN COMPETITION
Ref: (a) 0302-06 – Safran GPSDO Package
1. It is recommended that other than full and open competition be used to acquire reference (a) for five (5) Rubidium Disciplined Oscillators, part number SRO-5680, manufactured by Safron Timing Technologies. The estimated cost is with delivery required 12-15 weeks after receipt of the order. The requested material represents the minimum requirements of the government.
2. The requiring activity is the Naval Surface Warfare Center, Dahlgren Division (NSWCDD), Rubidium clock required to provide This hardware allows the datalink to The SRO-5680
Rubidium oscillator is a necessary component . This component ensures highly Without this component, the
A redesign with a different oscillator would require significant effort in excess of
160 direct productive hours. Furthermore, the evaluation and integration of an alternative oscillator would require 160 hours of labor. The total effort required to change to a new design with new mounting hardware, cabling, and other components would be in excess of .
This duplication of costs could not be recovered through full and open competition. Delays in purchasing the equipment would
3. Market research conducted via internet searches, consulting with subject matter experts, conversations with vendors and obtaining a market research quote. This market research has shown that there are multiple authorized resellers for the required support services to include under the National Aeronautics and Space Administration Solutions for Enterprise-Wide Procurement contract vehicles.
CERTIFICATION
I certify that the facts and representations under my cognizance, which are included in the above recommendation, are accurate to the best of my knowledge and belief. I understand that the processing of this recommendation precludes the use of full and open competition.
Date: _________ ________________________________ Signature of Originator
The Contracting Officer has determined that only one or limited sources are reasonably available.
Date: _________ ________________________________ Signature of Contracting Officer