Recycled Water Pressure Tank Replacement Project.pdf
PDF 1 MB Posted
- Attached to
- Recycled Water Pressure Tank Replacement Project
- Solicitation number
- RW01
- Issued by
- Monterey County, Santa Monica City, California
About this file
Summary: Recycled Water Pressure Tank Replacement Project Specifications
This file contains the complete bidding documents and contract specifications for the City of Soledad's Recycled Water Pressure Tank Replacement Project, a public works project requiring a California C-36 Plumbing Contractors License. The project, located at 34520 Morisoli Rd, Soledad, CA 93960, involves field verification, furnishing and installation of a new ASME pressure tank to replace the existing tank, reconnecting piping, furnishing valves/fittings/anchors, and performing startup, pressure testing, leak testing, and commissioning activities. The work also includes providing operations and maintenance manuals, warranties, and training. Sealed bids must be submitted electronically via PlanetBids by August 21, 2026, at 2:00 p.m., with a non-mandatory but highly recommended bidders' conference scheduled for August 11, 2026, at 1:30 p.m. at the project site. The project must be fully completed within 60 calendar days from the Notice to Proceed, with an anticipated start date of October 1, 2026. The City reserves the right to reject any and all bids and will award the contract to the responsible bidder submitting the lowest responsive bid within 60 days after bid opening.
Bid security of ten percent of the maximum bid amount is required in the form of a cashier's check, certified check, or bid bond. The estimated construction cost is $55,000. Successful bidders must provide payment and performance bonds each for 100% of the contract price, obtain a City business license within ten days of award, and submit proof of California Department of Industrial Relations registration. The project is subject to prevailing wage requirements applicable to Monterey County, with rates available at http://www.dir.ca.gov/DLSR. Contractors must register with DIR to perform public work under Labor Code 1725.5, and all subcontractors performing work in excess of one-half of one percent of the total bid price must be listed and registered with DIR. The prime contractor must perform at least 30% of the work with its own forces. Liquidated damages will be assessed for failure to achieve completion within the contract time, and the contract is subject to California Labor Code prevailing wage compliance monitoring and enforcement by DIR.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
FOR
RECYCLED WATER PRESSURE TANK REPLACEMENT
PROJECT
CITY PROJECT NO. RW01
CITY OF SOLEDAD
248 Main Street
Soledad, CA 93960
July 24, 2026
MEMBERS OF THE CITY COUNCIL
Anna Velazquez Mayor Fernando Cabrera Mayor Pro Tem Fernando Ansaldo-Sánchez Councilmember Evarista Bañuelos Councilmember Ben Caldera Councilmember
Megan Hunter - City Manager
Michael Rodriguez – City Attorney Donald Wilcox, P.E. - Director of Public Works
Juan Daniel Huerta – Assistant Engineer
For use in conjunction with DESIGN STANDARDS AND STANDARD
SPECIFICATIONS, City of Soledad, Department of Public Works, 2007.
LOCATION MAP
City of Soledad i
TABLE OF CONTENTS
Notice Inviting Bids ........................................................................... Error! Bookmark not defined.
Instructions to Bidders ..................................................................... Error! Bookmark not defined.
Bid Proposal ....................................................................................... Error! Bookmark not defined.
Bid Schedule Subcontractor List ............................................................................. Error! Bookmark not defined.
Noncollusion Declaration ................................................................. Error! Bookmark not defined.
Bid Bond ............................................................................................. Error! Bookmark not defined.
Bidder’s Questionnaire ..................................................................... Error! Bookmark not defined.
Contract .............................................................................................. Error! Bookmark not defined.
Payment Bond .................................................................................... Error! Bookmark not defined.
Performance Bond ............................................................................ Error! Bookmark not defined.
General Conditions ........................................................................... Error! Bookmark not defined.
Article 1 - Definitions ......................................................................... Error! Bookmark not defined.
Definitions .................................................................................... Error! Bookmark not defined.
Article 2 - Roles and Responsibilities ............................................. Error! Bookmark not defined.
2.1 City .................................................................................. Error! Bookmark not defined.
2.2 Contractor ........................................................................ Error! Bookmark not defined.
2.3 Subcontractors ................................................................ Error! Bookmark not defined.
2.4 Coordination of Work ....................................................... Error! Bookmark not defined.
2.5 Submittals ........................................................................ Error! Bookmark not defined.
2.6 Shop Drawings ................................................................ Error! Bookmark not defined.
Article 3 - Contract Documents ........................................................ Error! Bookmark not defined.
3.1 Interpretation of Contract Documents ............................. Error! Bookmark not defined.
3.2 Order of Precedence ....................................................... Error! Bookmark not defined.
3.3 Caltrans Standard Specifications .................................... Error! Bookmark not defined.
3.4 For Reference Only ......................................................... Error! Bookmark not defined.
3.5 Current Versions ............................................................. Error! Bookmark not defined.
3.6 Conformed Copies .......................................................... Error! Bookmark not defined.
Article 4 - Bonds, Indemnity, and Insurance .................................. Error! Bookmark not defined.
4.1 Payment and Performance Bonds .................................. Error! Bookmark not defined.
4.2 Indemnity ......................................................................... Error! Bookmark not defined.
4.3 Insurance ......................................................................... Error! Bookmark not defined.
Article 5 - Contract Time ................................................................... Error! Bookmark not defined.
5.1 Time is of the Essence .................................................... Error! Bookmark not defined.
5.2 Schedule Requirements .................................................. Error! Bookmark not defined.
5.3 Delay and Extensions of Contract Time .......................... Error! Bookmark not defined.
5.4 Liquidated Damages ....................................................... Error! Bookmark not defined.
Article 6 - Contract Modification ...................................................... Error! Bookmark not defined.
6.1 Contract Modification. ...................................................... Error! Bookmark not defined.
6.2 Contractor Change Order Requests ............................... Error! Bookmark not defined.
6.3 Adjustments to Contract Price ......................................... Error! Bookmark not defined.
6.4 Unilateral Change Order ................................................. Error! Bookmark not defined.
6.5 Non-Compliance Deemed Waiver ................................... Error! Bookmark not defined.
6.6 Post-Bid Cost Increases
Article 7 - General Construction Provisions ................................... Error! Bookmark not defined.
7.1 Permits, Fees, Business License, and Taxes ................. Error! Bookmark not defined.
7.2 Temporary Facilities ........................................................ Error! Bookmark not defined.
7.3 Noninterference and Site Management .......................... Error! Bookmark not defined.
7.4 Signs ................................................................................ Error! Bookmark not defined.
7.5 Project Site and Nearby Property Protections. ............... Error! Bookmark not defined.
7.6 Materials and Equipment................................................. Error! Bookmark not defined.
7.7 Substitutions .................................................................... Error! Bookmark not defined.
ii
7.8 Testing and Inspection .................................................... Error! Bookmark not defined.
7.9 Project Site Conditions and Maintenance ....................... Error! Bookmark not defined.
7.10 Instructions and Manuals ................................................ Error! Bookmark not defined.
7.11 As-built Drawings ............................................................ Error! Bookmark not defined.
7.12 Existing Utilities ............................................................... Error! Bookmark not defined.
7.13 Notice of Excavation ........................................................ Error! Bookmark not defined.
7.14 Trenching and Excavations of Four Feet or More ........... Error! Bookmark not defined.
7.15 Trenching of Five Feet or More ....................................... Error! Bookmark not defined.
7.16 New Utility Connections .................................................. Error! Bookmark not defined.
7.17 Lines and Grades. ........................................................... Error! Bookmark not defined.
7.18 Historic or Archeological Items ........................................ Error! Bookmark not defined.
7.19 Environmental Control ..................................................... Error! Bookmark not defined.
7.20 Noise Control. .................................................................. Error! Bookmark not defined.
7.21 Mined Materials. .............................................................. Error! Bookmark not defined.
Article 8 - Payment ............................................................................ Error! Bookmark not defined.
8.1 Schedule of Values ......................................................... Error! Bookmark not defined.
8.2 Progress Payments ......................................................... Error! Bookmark not defined.
8.3 Adjustment of Payment Application ................................ Error! Bookmark not defined.
8.4 Early Occupancy. ............................................................ Error! Bookmark not defined.
8.5 Retention ......................................................................... Error! Bookmark not defined.
8.6 Payment to Subcontractors and Suppliers ...................... Error! Bookmark not defined.
8.7 Final Payment ................................................................. Error! Bookmark not defined.
8.8 Release of Claims ........................................................... Error! Bookmark not defined.
8.9 Warranty of Title .............................................................. Error! Bookmark not defined.
Article 9 - Labor Provisions .............................................................. Error! Bookmark not defined.
9.1 Discrimination Prohibited................................................. Error! Bookmark not defined.
9.2 Labor Code Requirements .............................................. Error! Bookmark not defined.
9.3 Prevailing Wages ............................................................ Error! Bookmark not defined.
9.4 Payroll Records ............................................................... Error! Bookmark not defined.
9.5 Labor Compliance ........................................................... Error! Bookmark not defined.
Article 10 - Safety Provisions ........................................................... Error! Bookmark not defined.
10.1 Safety Precautions and Programs .................................. Error! Bookmark not defined.
10.2 Hazardous Materials ....................................................... Error! Bookmark not defined.
10.3 Material Safety ................................................................ Error! Bookmark not defined.
10.4 Hazardous Condition ....................................................... Error! Bookmark not defined.
10.5 Emergencies ................................................................... Error! Bookmark not defined.
Article 11 - Completion and Warranty Provisions .......................... Error! Bookmark not defined.
11.1 Final Completion ............................................................. Error! Bookmark not defined.
11.2 Warranty .......................................................................... Error! Bookmark not defined.
11.3 Use Prior to Final Completion ......................................... Error! Bookmark not defined.
11.4 Substantial Completion ................................................... Error! Bookmark not defined.
Article 12 - Dispute Resolution ........................................................ Error! Bookmark not defined.
12.1 Claims.............................................................................. Error! Bookmark not defined.
12.2 Claims Submission .......................................................... Error! Bookmark not defined.
12.3 City’s Response .............................................................. Error! Bookmark not defined.
12.4 Meet and Confer .............................................................. Error! Bookmark not defined.
12.5 Mediation and Government Code Claims ....................... Error! Bookmark not defined.
12.6 Tort Claims ...................................................................... Error! Bookmark not defined.
12.7 Arbitration ........................................................................ Error! Bookmark not defined.
12.8 Burden of Proof and Limitations ...................................... Error! Bookmark not defined.
12.9 Legal Proceedings ........................................................... Error! Bookmark not defined.
12.10 Other Disputes ................................................................ Error! Bookmark not defined.
Article 13 - Suspension and Termination ........................................ Error! Bookmark not defined.
13.1 Suspension for Cause ..................................................... Error! Bookmark not defined.
13.2 Suspension for Convenience .......................................... Error! Bookmark not defined.
13.3 Termination for Default .................................................... Error! Bookmark not defined.
iii
13.4 Termination for Convenience .......................................... Error! Bookmark not defined.
13.5 Actions Upon Termination for Default or Convenience ... Error! Bookmark not defined.
Article 14 - Miscellaneous Provisions ............................................. Error! Bookmark not defined.
14.1 Assignment of Unfair Business Practice Claims ............. Error! Bookmark not defined.
14.2 Provisions Deemed Inserted ........................................... Error! Bookmark not defined.
14.3 Waiver ............................................................................. Error! Bookmark not defined.
14.4 Titles, Headings, and Groupings ..................................... Error! Bookmark not defined.
14.5 Statutory and Regulatory References ............................. Error! Bookmark not defined.
14.6 Survival. ........................................................................... Error! Bookmark not defined.
Special Conditions ............................................................................ Error! Bookmark not defined.
Attachment A – Caltrans Bidding Requirements ........................... Error! Bookmark not defined.
Attachment B – Caltrans Contract Requirements .......................... Error! Bookmark not defined.
Notice Inviting Bids
1. Bid Submission. City of Soledad (“City”) will accept sealed bids for its Recycled Water
Pressure Tank Replacement Project (“Project”), by or before August 21, 2026 , at 2:00 p.m., via PlanetBids, a third-party service managing our RFQ, RFP, and Bid Process. Bids will be opened and results posted on PlanetBids immediately thereafter. The City reserves the right to reject any and all bids and to waive any non-substantive irregularities.
2. Project Information.
2.1 Location and Description. The Project is located at 34520 Morisoli Rd,Soledad CA,93960, and is described as follows: Provide field verification; furnish new ASME pressure; remove/dispose of existing tank; install new tank; reconnect piping;
furnish valves/fittings/anchors as required; perform startup, pressure testing, leak testing, and commissioning; provide O&M manuals, warranties, and training. The intention is to replace the current ASME tank with an equivalent ASME tank that matches all the current tank's specifications in its configuration.
2.2 Time for Final Completion. The Project must be fully completed within 60 calendar days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about October 1,2026, but the anticipated start date is provided solely for convenience and is neither certain nor binding.
3. License and Registration Requirements.
3.1 License. This Project requires a valid California contractor’s license for the following classification(s): C-36 Plumbing Contractors License
3.2 DIR Registration. City may not accept a Bid Proposal from or enter into the
Contract with a bidder, without proof that the bidder is registered with the California Department of Industrial Relations (“DIR”) to perform public work pursuant to Labor Code § 1725.5, subject to limited legal exceptions.
4. Contract Documents. The plans, specifications, bid forms and contract documents for the
Project, and any addenda thereto (“Contract Documents”) may be downloaded from City’s website located at: https://www.cityofsoledad.com/rfqs-rfps-bids/. A printed copy of the Contract Documents is not available.
5. Bidder’s Conference. A bidders’ conference will be held on August 11, 2026 at 1:30p.m., at the City of Soledad Wastewater Treatment Plant at the following location: 34520 Morisoli Rd, Soledad, CA 93960 to acquaint all prospective bidders with the Contract Documents and the Worksite. The bidders’ conference is not mandatory but highly recommended. A bidder who fails to attend a mandatory bidders’ conference may be disqualified from bidding.
6. Bid Security. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier’s or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that within ten days after City issues the Notice of Potential Award, the successful bidder will execute the Contract and submit the payment and performance bonds, insurance certificates and endorsements, valid Certificates of Reported Compliance as required under the California Air Resources Board’s In-Use Off-Road Diesel-Fueled Fleets Regulation (13
CCR § 2449 et seq.) (“Off-Road Regulation”), if applicable, and any other submittals required by the Contract Documents and as specified in the Notice of Potential Award.
7. Prevailing Wage Requirements.
7.1 General. Pursuant to California Labor Code § 1720 et seq., this Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes.
7.2 Rates. The prevailing rates are on file with the City and are available online at http://www.dir.ca.gov/DLSR. Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight hours. The rate for holiday and overtime work must be at least time and one-half.
7.3 Compliance. The Contract will be subject to compliance monitoring and enforcement by the DIR, under Labor Code § 1771.4.
8. Performance and Payment Bonds. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents.
9. Substitution of Securities. Substitution of appropriate securities in lieu of retention amounts from progress payments is permitted under Public Contract Code § 22300.
10. Subcontractor List. Each Subcontractor must be registered with the DIR to perform work on public projects. Each bidder must submit a completed Subcontractor List form with its Bid Proposal, including the name, location of the place of business, California contractor license number, DIR registration number, and portion of the Work to be performed for each Subcontractor that will perform Work or service, or fabricate and install Work, for the prime contractor in excess of one-half of 1% of the total bid price, using the Subcontractor List form included with the Contract Documents.
11. Instructions to Bidders. All bidders should carefully review the Instructions to Bidders for more detailed information before submitting a Bid Proposal. The definitions provided in Article 1 of the General Conditions apply to all of the Contract Documents, as defined therein, including this Notice Inviting Bids.
12. Estimated Cost. The estimated construction cost is $55,000.
By: ___________________________________ Date: ________________
<_________________________,> City Clerk
Publication Date: <___________________>
END OF NOTICE INVITING BIDS
Instructions to Bidders
Each Bid Proposal submitted to the City of Soledad (“City”) for its Recycled Water Tank Replacement Project (“Project”) must be submitted in accordance with the following instructions and requirements:
1. Bid Submission.
1.1 General. Each Bid Proposal must be completed, using the form provided in the Contract Documents, signed, and submitted to City electronically via Planetbids.com, with all required forms and attachments, by or before the date and time set forth in Section 1 of the Notice Inviting Bids, or as amended by subsequent addendum. Faxed, mailed or emailed Bid Proposals will not be accepted, unless otherwise specified. Late submissions will be returned unopened. City reserves the right to postpone the date or time for receiving or opening bids. Each bidder is solely responsible for all of its costs to prepare and submit its bid and by submitting a bid waives any right to recover those costs from City. The bid price(s) must include all costs to perform the Work as specified, including all labor, materials, supplies, and equipment and all other direct or indirect costs such as applicable taxes, insurance and overhead.
1.2 DIR Registration. Subject to limited legal exceptions for joint venture bids and federally-funded projects, City may not accept a Bid Proposal from a bidder without proof that the bidder is registered with the DIR to perform public work under Labor Code § 1725.5. If City is unable to confirm that the bidder is currently registered with the DIR, City may disqualify the bidder and return its bid unopened. (Labor Code §§ 1725.5 and 1771.1(a).)
2. Bid Proposal Form and Enclosures. Each Bid Proposal must be completed in ink using the Bid Proposal form included with the Contract Documents. The Bid Proposal form must be fully completed without interlineations, alterations, or erasures. Any necessary corrections must be clear and legible, and must be initialed by the bidder’s authorized representative. A Bid Proposal submitted with exceptions or terms such as “negotiable,” “will negotiate,” or similar, will be considered nonresponsive. Each Bid Proposal must be accompanied by bid security, as set forth in Section 4 below, and by a completed Subcontractor List and Noncollusion Declaration using the forms included with the Contract Documents, and any other required enclosures, as applicable.
3. Authorization and Execution. Each Bid Proposal must be signed by the bidder’s authorized representative. A Bid Proposal submitted by a partnership must be signed in the partnership name by a general partner with authority to bind the partnership. A Bid Proposal submitted by a corporation must be signed with the legal name of the corporation, followed by the signature and title of two officers of the corporation with full authority to bind the corporation to the terms of the Bid Proposal, under California Corporations Code § 313.
4. Bid Security. Each Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier’s check or certified check, made payable to the City, or bid bond using the form included in the Contract Documents and executed by a surety licensed to do business in the State of California. A copy of the cashier’s or certified check must be uploaded to the PlanetBids procurement site as well as delivered to the City of Soledad on or before the bid due date. The bid security must guarantee that, within ten days after issuance of the Notice of Potential Award, the bidder will: execute and submit the enclosed Contract for the bid price; submit payment and performance bonds for 100% of the maximum Contract Price; submit the insurance certificates and endorsements;
and submit valid Certificates of Reported Compliance as required by the Off-Road
Regulation, if applicable, and any other submittals, if any, required by the Contract Documents or the Notice of Potential Award. A Bid Proposal may not be withdrawn for a period of 60 days after the bid opening without forfeiture of the bid security, except as authorized for material error under Public Contract Code § 5100 et seq.
5. Requests for Information. Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing via PlanetBids under the Q&A section no later than 2 p.m. on August 14, 2026. Oral responses are not authorized and are not binding on the City. Bidders should submit any such written inquiries at least five Working Days before the scheduled bid opening. Questions received any later might not be addressed before the bid deadline. An interpretation or clarification by City in response to a written inquiry will be issued in an addendum. The RFI format is as follows:
5.1 RFIs shall be numbered sequentially
5.2 Each RFI shall be limited to one subject
5.3 An RFI should be submitted if any one of the following occur:
Bidder discovers an apparent conflict or discrepancy between portions of the Bids Documents
Bidder discovers what appears to be an omission from the Bid Documents
6. Pre-Bid Investigation.
6.1 General. Each bidder is solely responsible at its sole expense for diligent and thorough review of the Contract Documents, examination of the Project site, and reasonable and prudent inquiry concerning known and potential site and area conditions prior to submitting a Bid Proposal. Each bidder is responsible for knowledge of conditions and requirements which reasonable review and investigation would have disclosed. However, except for any areas that are open to the public at large, bidders may not enter property owned or leased by the City or the Project site without prior written authorization from City.
6.2 Document Review. Each bidder is responsible for review of the Contract
Documents and any informational documents provided “For Reference Only,” e.g., as-builts, technical reports, test data, and the like. A bidder is responsible for notifying City of any errors, omissions, inconsistencies, or conflicts it discovers in the Contract Documents, acting solely in its capacity as a contractor and subject to the limitations of Public Contract Code § 1104. Notification of any such errors, omissions, inconsistencies, or conflicts must be submitted in writing to the City no later than five Working Days before the scheduled bid opening. (See Section 5, above.) City expressly disclaims responsibility for assumptions a bidder might draw from the presence or absence of information provided by City.
6.3 Project Site. Questions regarding the availability of soil test data, water table elevations, and the like should be submitted to the City in writing, as specified in Section 5, above. Any subsurface exploration at the Project site must be done at the bidder’s expense, but only with prior written authorization from City. All soil data and analyses available for inspection or provided in the Contract Documents apply only to the test hole locations. Any water table elevation indicated by a soil test report existed on the date the test hole was drilled. The bidder is responsible for determining and allowing for any differing soil or water table conditions during construction. Because groundwater levels may fluctuate, difference(s) in elevation between ground water shown in soil boring logs and ground water actually encountered during construction will not be considered changed Project site conditions. Actual locations and depths must be determined by bidder’s field investigation. The bidder may request access to underlying or background information on the Project site in City’s possession that is necessary for the bidder to form its own conclusions, including, if available, record drawings or other documents indicating the location of subsurface lines, utilities, or other structures.
6.4 Utility Company Standards. The Project must be completed in a manner that satisfies the standards and requirements of any affected utility companies or agencies (collectively, “utility owners”). The successful bidder may be required by the third party utility owners to provide detailed plans prepared by a California registered civil engineer showing the necessary temporary support of the utilities during coordinated construction work. Bidders are directed to contact the affected third party utility owners about their requirements before submitting a Bid Proposal.
7. Bidders Interested in More Than One Bid. No person, firm, or corporation may submit or be a party to more than one Bid Proposal unless alternate bids are specifically called for.
However, a person, firm, or corporation that has submitted a subcontract proposal or quote to a bidder may submit subcontract proposals or quotes to other bidders.
8. Addenda. Subject to the limitations of Public Contract Code § 4104.5, City reserves the right to issue addenda prior to bid time. Any addenda issued prior to the bid opening are part of the Contract Documents. Each bidder is solely responsible for ensuring it has received and reviewed all addenda prior to submitting its bid. Bidders should check City’s website periodically for any addenda or updates on the Project at:
https://www.cityofsoledad.com/rfqs-rfps-bids/.
9. Brand Designations and “Or Equal” Substitutions. Any specification designating a material, product, thing, or service by specific brand or trade name, followed by the words “or equal,” is intended only to indicate quality and type of item desired, and bidders may request use of any equal material, product, thing, or service. All data substantiating the proposed substitute as an equal item must be submitted with the written request for substitution. A request for substitution must be submitted within 35 days after Notice of Potential Award unless otherwise provided in the Contract Documents. This provision does not apply to materials, products, things, or services that may lawfully be designated by a specific brand or trade name under Public Contract Code § 3400(c).
10. Bid Protest. Any bid protest against another bidder must be submitted in writing and received by City at City Hall, 248 Main Street, Soledad, California 93960 or sent via email at dwilcox@cityofsoledad.com before 5:00 p.m. no later than two Working Days following bid opening (“Bid Protest Deadline”) and must comply with the following requirements:
10.1 General. Only a bidder who has actually submitted a Bid Proposal is eligible to submit a bid protest against another bidder. Subcontractors are not eligible to submit bid protests. A bidder may not rely on the bid protest submitted by another bidder, but must timely pursue its own protest. For purposes of this Section 10, a “Working Day” means a day that City is open for normal business, and excludes weekends and holidays observed by City. Pursuant to Public Contract Code § 4104, inadvertent omission of a Subcontractor’s DIR registration number on the Subcontractor List form is not grounds for a bid protest, provided it is corrected within 24 hours of the bid opening or as otherwise provided under Labor Code § 1771.1(b).
10.2 Protest Contents. The bid protest must contain a complete statement of the basis for the protest and must include all supporting documentation. Material submitted after the Bid Protest Deadline will not be considered. The protest must refer to the specific portion or portions of the Contract Documents upon which the protest is based. The protest must include the name, address, email address, and telephone number of the protesting bidder and any person submitting the protest on behalf of or as an authorized representative of the protesting bidder.
10.3 Copy to Protested Bidder. Upon submission of its bid protest to City, the protesting bidder must also concurrently transmit the protest and all supporting documents to the protested bidder, and to any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest, by email or hand delivery to ensure delivery before the Bid Protest Deadline.
10.4 Response to Protest. The protested bidder may submit a written response to the protest, provided the response is received by City before 5:00 p.m., within two Working Days after the Bid Protest Deadline or after actual receipt of the bid protest, whichever is sooner (the “Response Deadline”). The response must attach all supporting documentation. Material submitted after the Response Deadline will not be considered. The response must include the name, address, email address, and telephone number of the person responding on behalf of or representing the protested bidder if different from the protested bidder.
10.5 Copy to Protesting Bidder. Upon submission of its response to the bid protest to the City, the protested bidder must also concurrently transmit by email or hand delivery, by or before the Response Deadline, a copy of its response and all supporting documents to the protesting bidder and to any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest.
10.6 Exclusive Remedy. The procedure and time limits set forth in this Section are mandatory and are the bidder’s sole and exclusive remedy in the event of a bid protest. A bidder’s failure to comply with these procedures will constitute a waiver of any right to further pursue a bid protest, including filing a Government Code Claim or initiation of legal proceedings.
10.7 Right to Award. City reserves the right, acting in its sole discretion, to reject any bid protest that it determines lacks merit, to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest responsive bid, and to issue a Notice to Proceed with the Work notwithstanding any pending or continuing challenge to its determination.
11. Reservation of Rights. City reserves the unfettered right, acting in its sole discretion, to waive or to decline to waive any immaterial bid irregularities; to accept or reject any or all bids; to cancel or reschedule the bid; to postpone or abandon the Project entirely; or to perform all or part of the Work with its own forces. The Contract will be awarded, if at all, within 60 days after opening of bids or as otherwise specified in the Special Conditions, to the responsible bidder that submitted the lowest responsive bid. Any planned start date for the Project represents the City’s expectations at the time the Notice Inviting Bids was first issued. City is not bound to issue a Notice to Proceed by or before such planned start date, and it reserves the right to issue the Notice to Proceed when the City determines, in its sole discretion, the appropriate time for commencing the Work. The City expressly disclaims responsibility for any assumptions a bidder might draw from the presence or absence of information provided by the City in any form. Each bidder is solely responsible for its costs to prepare and submit a bid, including site investigation costs.
12. Bonds. Within ten calendar days following City’s issuance of the Notice of Potential Award to the successful bidder, the bidder must submit payment and performance bonds to City as specified in the Contract Documents using the bond forms included in the Contract Documents. All required bonds must be calculated on the maximum total Contract Price as awarded, including additive alternates, if applicable.
13. License(s). The successful bidder and its Subcontractor(s) must possess the California contractor’s license(s) in the classification(s) required by law to perform the Work. The successful bidder must also obtain a City business license within 10 days following City’s issuance of the Notice of Potential Award. Subcontractors must also obtain a City business license before performing any Work.
14. Ineligible Subcontractor. Any Subcontractor who is ineligible to perform work on a public works project under Labor Code §§ 1777.1 or 1777.7 is prohibited from performing work on the Project.
15. Safety Orders. If the Project includes construction of a pipeline, sewer, sewage disposal system, boring and jacking pits, or similar trenches or open excavations, which are five feet or deeper, each bid must include a bid item for adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life or limb, which comply with safety orders as required by Labor Code § 6707.
16. In-Use Off-Road Diesel-Fueled Fleets. If the Project involves the use of vehicles subject to the California Air Resources Board’s In-Use Off-Road Diesel-Fueled Fleets Regulation (13 CCR § 2449 et seq.) (“Off-Road Regulation”), then within ten calendar days following City’s issuance of the Notice of Potential Award to the successful bidder, the bidder must submit to City valid Certificates of Reported Compliance for its fleet and its listed Subcontractors, if applicable, in accordance with the Off-Road Regulation, unless exempt under the Off-Road Regulation.
17. Subcontractor Work Limits. The prime contractor must perform at least 30% of the Work on the Project, calculated as a percentage of the base bid price, with its own forces, except for any Work identified as “Specialty Work” in the Contract Documents. The total bid amount for any such Specialty Work, as shown on the Bid Schedule, may be deducted from the base bid price before computing the 30% self-performance requirement. The remaining Work may be performed by qualified Subcontractor(s).
18. Bid Schedule. Each bidder must complete the Bid Schedule form with unit prices as indicated, and submit the completed Bid Schedule with its Bid Proposal.
18.1 Incorrect Totals. In the event a computational error for any bid item (base bid or alternate) results in an incorrect extended total for that item, the submitted base bid or bid alternate total will be adjusted to reflect the corrected amount as the product of the estimated quantity and the unit cost. In the event of a discrepancy between the actual total of the itemized or unit prices shown on the Bid Schedule for the base bid, and the amount entered as the base bid on the Bid Proposal form, the actual total of the itemized or unit prices shown on the Bid Schedule for the base bid will be deemed the base bid price. Likewise, in the event of a discrepancy between the actual total of the itemized or unit prices shown on the Bid Schedule for any bid alternate, and the amount entered for the alternate on the Bid Proposal form, the actual total of the itemized prices shown on the Bid Schedule for that alternate will be deemed the alternate price. Nothing in this provision is intended to prevent a bidder from requesting to withdraw its bid for material error under Public Contract Code § 5100 et seq.
18.2 Estimated Quantities. Unless identified as a “Final Pay Quantity,” the quantities shown on the Bid Schedule are estimated and the actual quantities required to perform the Work may be greater or less than the estimated amount. The Contract Price will be adjusted to reflect the actual quantities required for the Work based on the itemized or unit prices provided in the Bid Schedule, with no allowance for anticipated profit for quantities that are deleted or decreased, and no increase in the unit price, and without regard to the percentage increase or decrease of the estimated quantity and the actual quantity.
19. Bidder’s Questionnaire. A completed, signed Bidder’s Questionnaire using the form provided with the Contract Documents and including all required attachments must be submitted within 48 hours following a request by City. A bid that does not fully comply with this requirement may be rejected as nonresponsive. A bidder who submits a Bidder’s Questionnaire which is subsequently determined to contain false or misleading information, or material omissions, may be disqualified as non-responsible.
20. Bidder’s References. A completed Reference Form, using the form provided with the
Contract Documents must be submitted with the Bid Forms in order to be considered. A bid that does not fully comply with this requirement may be rejected as nonresponsive. A bidder who submits a Reference Form which is subsequently determined to contain false or misleading information, or material omissions, may be disqualified as non-responsible.
END OF INSTRUCTIONS TO BIDDERS
Bid Proposal Recycled Water Tank Replacement Project
______________________________________________________ (“Bidder”) hereby submits this Bid Proposal to the City of Soledad (“City”) for the above-referenced project (“Project”) in response to the Notice Inviting Bids and in accordance with the Contract Documents referenced in the Notice.
1. Base Bid. Bidder proposes to perform and fully complete the Work for the Project as specified in the Contract Documents, within the time required for full completion of the Work, including all labor, materials, supplies, and equipment and all other direct or indirect costs including, but not limited to, taxes, insurance and all overhead, for the following price (“Base Bid”): $_______________________________________________________.
2. Bidder’s State Registration Number with Department of Industrial Relations: Bidder provide State Registration number. Bids will not be considered if the registration number is missing.
3. Addenda. Bidder agrees that it has confirmed receipt of or access to, and reviewed, all addenda issued for this bid. Bidder waives any claims it might have against the City based on its failure to receive, access, or review any addenda for any reason. Bidder specifically acknowledges receipt of the following addenda:
Addendum: Date Received: Addendum: Date Received:
#01 _____________ #05 _____________
#02 _____________ #06 _____________ #03 _____________ #07 _____________ #04 _____________ #08 _____________
4. Bidder’s Certifications and Warranties. By signing and submitting this Bid Proposal, Bidder certifies and warrants the following:
4.1 Examination of Contract Documents. Bidder has thoroughly examined the
Contract Documents and represents that, to the best of Bidder’s knowledge, there are no errors, omissions, or discrepancies in the Contract Documents, subject to the limitations of Public Contract Code § 1104.
4.2 Examination of Worksite. Bidder has had the opportunity to examine the Worksite and local conditions at the Project location.
4.3 Bidder Responsibility. Bidder is a responsible bidder, with the necessary ability, capacity, experience, skill, qualifications, workforce, equipment, and resources to perform or cause the Work to be performed in accordance with the Contract Documents and within the Contract Time.
4.4 Responsibility for Bid. Bidder has carefully reviewed this Bid Proposal and is solely responsible for any errors or omissions contained in its completed bid. All statements and information provided in this Bid Proposal and enclosures are true and correct to the best of Bidder’s knowledge.
4.5 Nondiscrimination. In preparing this bid, the Bidder has not engaged in discrimination against any prospective or present employee or Subcontractor on grounds of race, color, ancestry, national origin, ethnicity, religion, sex, sexual orientation, age, disability, or marital status.
4.6 Iran Contracting Act. If the Contract Price exceeds $1,000,000, Bidder is not identified on a list created under the Iran Contracting Act, Public Contract Code § 2200 et seq. (the “Act”), as a person engaging in investment activities in Iran, as defined in the Act, or is otherwise expressly exempt under the Act.
5. Award of Contract. By signing and submitting this Bid Proposal, Bidder agrees that, if City issues the Notice of Potential Award to Bidder, then within ten days following issuance of the Notice of Potential Award to Bidder, Bidder will do all of the following:
5.1 Execute Contract. Enter into the Contract with City in accordance with the terms of this Bid Proposal, by signing and submitting to City the Contract prepared by City using the form included with the Contract Documents;
5.2 Submit Required Bonds. Submit to City a payment bond and a performance bond, each for 100% of the Contract Price, using the bond forms provided and in accordance with the requirements of the Contract Documents;
5.3 Insurance Requirements. Submit to City the insurance certificate(s) and endorsement(s) as required by the Contract Documents; and
5.4 Certificates of Reported Compliance. Submit to City valid Certificates of Reported
Compliance for its fleet and its listed Subcontractors, if applicable, if the Project involves the use of vehicles subject to the Off-Road Regulation. (See Section 16 of the Instructions to Bidders.)
6. Bid Security. As a guarantee that, if awarded the Contract, Bidder will perform its obligations under Section 5 above, Bidder is enclosing bid security in the amount of ten percent of its maximum bid amount in one of the following forms (check one):
____ A cashier’s check or certified check payable to City and issued by
_______________________________ [Bank name] in the amount of
____ A bid bond, using the Bid Bond form included with the Contract Documents, payable to City and executed by a surety licensed to do business in the State of California.
This Bid Proposal is hereby submitted on _________________________, 20__.
s/ ___________________________________
Name and Title s/ ___________________________________ [See Section 3 of Instructions to Bidders] Name and Title
Company Name License #, Expiration Date, and Classification
Address DIR Registration #
City, State, Zip Phone
Contact Name Contact Email
END OF BID PROPOSAL
Bid Schedule
BIDDER NAME:
This Bid Schedule must be completed in ink and included with the sealed Bid Proposal. Pricing must be provided for each item as indicated. Items marked “(SW)” are Specialty Work that must be performed by a qualified Subcontractor. The lump sum or unit cost for each item must be inclusive of all costs, whether direct or indirect, including profit and overhead.
AL = Allowance CF = Cubic Feet CY = Cubic Yard EA = Each LB = Pounds LF = Linear Foot LS = Lump Sum SF = Square Feet TON = Ton (2000 lbs)
BASE BID
BID
ITEM
NO.
ITEM DESCRIPTION EST. QTY. UNIT
UNIT
COST
EXTENDED TOTAL
AMOUNT
Removal of Existing Pressure Tank 1 LS
2 Furnish New Pressure Tank 1 LS $ $
Installation of Piping Modifications 1 LS
Startup, Testing, and Commissioning 1 LS
* Final Pay Quantity
TOTAL BASE BID: Items 1 through _____ inclusive:
Note: The amount entered as the “Total Base Bid” should be identical to the Base Bid amount entered in Section 1 of the Bid Proposal form.
END OF BID SCHEDULE
Subcontractor List
For each Subcontractor that will perform Work in an amount in excess of one-half of 1% of the Bidder’s total Base Bid,1 the bidder must list a description of the Work, the name of the Subcontractor, its California contractor license number, the location of its place of business, and its DIR registration number. If the Instructions to Bidders include a provision on “Subcontractor Work Limits,” the bidder must also list the percentage of Work to be performed by the Subcontractor (based on a percentage of the Base Bid price) in the “Percent of Work” column.
DESCRIPTION
OF WORK
SUBCONTRACTOR
NAME
CALIFORNIA
CONTRACTOR
LICENSE NO.
LOCATION OF
BUSINESS
DIR REG. NO. PERCENT
OF
WORK
END OF SUBCONTRACTOR LIST
1 For street or highway construction, this requirement applies to any subcontract of $10,000 or more.
2026 Form NONCOLLUSION DECLARATION
Noncollusion Declaration
TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
The undersigned declares:
I am the __________________________ [title] of _____________________________________ [business name], the party making the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham.
The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
This declaration is intended to comply with California Public Contract Code § 7106 and Title 23 U.S.C § 112.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on _______________ [date], at __________________________________ [city], _______ [state].
s/________________________________________
Name [print]
END OF NONCOLLUSION DECLARATION
2026 Form BID BOND
Bid Bond
________________________________________________________ (“Bidder”) has submitted a bid, dated ___________________________, 20______ (“Bid”), to City of Soledad (“City”) for work on the Recycled Water Tank Replacement Project (“Project”). Under this duly executed bid bond (“Bid Bond”), Bidder as Principal and ______________________________, its surety (“Surety”), are bound to City as obligee in the penal sum of ten percent of the maximum amount of the Bid (the “Bond Sum”). Bidder and Surety bind themselves and their respective heirs, executors, administrators, successors and assigns, jointly and severally, as follows:
1. General. If Bidder is awarded the Contract for the Project, Bidder will enter into the
Contract with City in accordance with the terms of the Bid.
2. Submittals. Within ten days following issuance of the Notice of…