This document is a Request for Proposals (RFP) issued by Jonesville Community Schools for contractor services to construct two press boxes and complete other improvements at the schools' sports facilities located at 401 East Chicago Street, Jonesville, Michigan.
The project consists of constructing a 10'x20' press box behind the baseball field's home plate and a 10'x16' press box behind the softball field's home plate, both with a lower storage level and upper-level counter space. Additional work includes removing and replacing the roofs on all dugouts, regrading the floor of one softball dugout, and constructing a 15'x70' concrete batting and pitching cage. The RFP outlines the scope of services, proposal submission requirements, schedule, evaluation criteria, and contract terms. Proposals are due by April 4, 2024, and the District intends to award the contract by April 22, 2024, with work commencing on June 5, 2024.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JONESVILLE COMMUNITY SCHOOLS
CONTRACTOR SERVICES
REQUEST FOR PROPOSALS (“RFP”)
March 15th, 2024
Page
Jonesville Community Schools
REQUEST FOR PROPOSALS FOR
CONTRACTOR SERVICES
PART 1 – GENERAL INSTRUCTIONS
A. Instructions
Qualified firms are invited to submit proposals to Jonesville Community Schools (the “District”) for the construction of two press boxes (the “Project”). One will be 10’x20’ which will be constructed behind the baseball home plate and the other will be 10’x16’ which will be located behind home plate on the softball field. The press boxes will be two stories with storage space in the lower level with a door leading to it. The upper level will be accessed through enclosed stairs leading to it and the upper floor will have counter space. Each press box will rest on 18’x18’ concrete footings. The roof will be made of steel. The front elevation will contain three windows and each side of the press box will also have a window.
There will also be removal and replacement of the roofs on all dugouts. In one of the softball dugouts there will need to be regrading of the floor to address water pooling. Additionally, there will be construction of a 15’x70’ concrete pad in between the fields to be used as a batting and pitching cage.
This will also include grading and removal of existing dirt as needed. The Project will take place at the location(s) below: 401 East Chicago Street, Jonesville, Mi.
The Project consists of approximately 1,410 square feet and all work will be done at 401 East Chicago st. Jonesville, Mi.
For the purpose of this RFP, the terms “proposal” and “bid” shall be treated as one and the same.
The District reserves the right to reject any or all proposals and to make any award that it considers to be in the best interest of the District.
B. Proposal Submission
To be considered by the District, seven (7) copies of the complete proposal must be received no later than April 4th, 2024, by 3:00 p.m.. Proposals should be addressed to:
Jonesville Community Schools c/o Erik Weatherwax 115 East Street Jonesville, MI 49250 Telephone: (517) 849-9075
The lower left corner of the submittal envelope should be marked: PROPOSAL FOR
CONTRACTOR SERVICES.
Pursuant to Michigan law, MCL 380.1267, proposals must include security (cashier’s check or bond) in an amount not less than 1/20 (5%) of the amount of the bid conditioned to secure the District from loss or damage by reason of the withdrawal of the bid or by the failure of the bidder to enter a contract for performance, if the bid is accepted by the District’s Board of Education. Any firm(s) not awarded will be refunded this security if submitted in the form of a cashier’s check.
Submitted proposals become the property of the District and will not be returned.
C. Late Proposals
Any proposal received by the District after the time specified above will not be considered. The party submitting a proposal shall bear full and total responsibility for ensuring timely receipt of that proposal.
D. Withdrawal of Proposals
Proposals may be withdrawn by written notice received at any time prior to the submission deadline.
Proposals may be withdrawn in person, provided that the firm's representative signs a receipt for the proposal prior to the submission deadline.
E. Questions Concerning this RFP
Inquiries may be made to Erik Weatherwax, Superintendent, at the address and telephone number above. Information about the District is available during business hours (8:00 a.m. to 4:00 p.m.).
F. Economy of Preparation
Proposals should be prepared simply, providing a concise description of the firm’s ability to meet the requirements of this RFP. Please limit your proposal to the information requested in Part 3 - Proposal Details and Part 4 - Proposal Summary. Part 4 - Proposal Summary, must be signed by the person responsible for the decision as to services and costs being offered.
G. Site Visit
Bidders are encouraged to schedule an appointment with Erik Weatherwax, Superintendent, during business hours to personally inspect the site before bid submission to become familiar with the space.
The District will not accept responsibility for a bidder’s failure to inspect the facilities/sites.
H. Prime Responsibilities
The firm selected will be required to assume responsibility for all services offered in the proposal, regardless of who actually provides such services and whether the selected firm utilizes separate consultants. The selected firm shall be the sole point of contact with regard to contractual matters, including payment of any and all charges resulting from the contract.
A general scope of services is described below in this Part 1 under Section M.
I. Proposal Preparation Costs
All costs incurred for proposal preparation presentation, or contract negotiation are the responsibility of the firm. The District will not be responsible for, and will not pay, the cost for any information solicited or received.
J. Acceptance of Proposal Contents
The contents of the proposal of the selected firm will become contractual obligations when a contract is issued, except with regard to particular contents that are rejected by the District. Failure of the successful firm to abide by such obligations will result in cancellation of the award.
K. Proposed Project Schedule
The bid is expected to be awarded around April 22nd, 2024. The Project is expected to commence around June 5th, 2024. The District and all bidders recognize that this schedule is subject to change.
L. Collusive Bidding and Relationship Disclosure
The Proposer certifies that their Proposal is made without any previous understanding, agreement or connection with any person, firm, or company making a Proposal for the same project and is in all respects fair and without outside control, collusion, fraud, or other illegal action.
The Proposer shall submit a Familial Relationship Disclosure in substantially the form attached hereto as Attachment “A”.
The Proposer shall submit an Iran Economic Sanctions Act Certification in substantially the form attached hereto as Attachment “B”.
M. Scope of Services
It is assumed that any proposal submitted will include, but shall not necessarily be limited to, the performance of all of the activities listed below. The District will consider alternate proposals;
however, the proposal must clearly indicate any activities that have been deleted and/or added from the requested scope of services.
1. Construction Phase Services
a. Prepare for and commence construction, construction draw, and occupancy schedules.
b. Propose change order requests, subject to District approvals.
c. Review shop drawings and expedite the review process.
d. Review payment and cost control procedures, including the following:
i. Subcontractors’ Schedule of Values, if applicable
ii. Subcontractors’ Payment Application and
Certification, if applicable
iii. Subcontractors’ Sworn Statements and
Waivers of Lien, if applicable
iv. Purchase Order and disbursement Summaries
v. Change Order Listings
vi. Budget Cost Summary Reports
e. Participate in progress meetings and provide progress reports of same.
i. As needed, meet with the District’s Project Representative to discuss any activities which may affect operations.
ii. Weekly meeting with District representative and trade contractors.
iii. Monthly meetings for planning, coordination, and payments with District administrators which will include status reports on the Project, budget, change orders, and allowances for reimbursable expenses.
f. Prepare as-built drawings and record and review operating and maintenance manuals, warranties, guarantees, and Project directories.
g. Ensure that all construction is completed as specified by the construction documents and meets all codes and regulations of agencies having jurisdiction.
h. Provide review and coordinate Project commissioning.
i. Prepare and complete punch lists, coordinate final inspections, and recommend District acceptance and occupancy.
2. Post-construction Phase Services
a. Assist in conducting training sessions for appropriate employees regarding the operation and maintenance of technical equipment.
Videotape a training session for the District's future use.
b. Provide staff readily available during three-month adjustment period as staff and students become accustomed to new surroundings.
c. Provide follow-up for the duration of the longest warranty period covered by the Project.
N. Insurance Coverage
Before beginning work, the selected firm will be required to provide a copy of insurance certificates for the following insurance types and amounts:
1. Commercial General Liability with policy limits of not less than $1,000,000 for each occurrence and $3,000,000 in the aggregate providing coverage for claims including damages because of bodily injury, sickness or disease, including occupational sickness or disease, and death of any person; personal injury; damages because of injury to or destruction of tangible property; bodily injury or property damage arising out of completed operations; and contractual liability applicable to the Contractor’s obligations.
2. Comprehensive Automobile Liability, which includes coverage for any auto, hired autos, and non-owned autos with a combined single limit of $1,000,000.
3. Workers compensation of $1,000,0000.
4. Agree to indemnify and hold the district and its officers, employees, agents, volunteers, and board members harmless against any and all liabilities, claims, losses, actions, causes of action, costs, expenses, and attorney fees, of any kind, whether relating to property of district or any third party, or for personal injury or death, or for compensatory or economic damages, arising out of or in any way attributable to the acts or failure to act of contractor or its officers, agents, employees, and independent contractors.
Any subcontractor of the Contractor shall provide insurance coverages at least equal to that provided by the Contractor, and those subcontractors shall provide insurance certificates for general and professional liability coverages.
O. Payment of Fees
The District will make payments to the Contractor in accordance with the awarded bid. Payments may be subject to 10% retainage. The specific day of the month on which invoices are to be received and checks released will be determined during contract negotiations with the selected firm.
P. Indemnification
If the acts or omissions of the Contractor or its employees, agents or officers cause injury to District person or property, the Contractor shall defend, indemnify and save harmless the District, its agents, officials, and employees against all claims, judgments, losses, damages, demands, and payments of any kind to persons or property to the extent occasioned from any claim or demand arising therefrom, to the extent allowed by law.
REQUEST FOR PROPOSAL FOR
CONTRACTOR SERVICES
PART 2 – PROPOSAL REVIEW AND SELECTION PROCESS
A. Time Frame for Contractor Selection
It is the intent of the District to select a Contractor according to the following schedule:
March 15th, 2024 RFP is released.
March 21st at 9:00 a.m at the fields Optional pre-proposal review meeting with Owner located at 401 East Chicago St, Jonesville Mi.
April 4th, 2024 at 3:00 p.m. Proposals are due.
April 8th, 2024, at 6:00 p.m. Optional Bidder interviews with the Board of
Education.
April 22nd, 2024 Board of Education selects a Contractor and authorizes the Superintendent to finalize a contract.
June 5th, 2024 Contractor begins work.
The District may modify or eliminate any of the above schedule in its sole discretion.
B. Review and Selection Process
The District reserves the right to reject any or all proposals that are determined not to be in the best interests of the District. The District will not necessarily select the lowest cost proposal.
C. Contractor Interviews
It is possible that the District will invite firms to participate in interviews with the Board of Education (and/or, if applicable, any Selection Committee) and to answer any questions that may exist about their proposal.
D. Evaluation Criteria
The District will evaluate proposals considering all of the information provided in response to this RFP, including but not necessarily limited to the following:
Adherence to RFP: To merit evaluation, submittals must conform, in both content and presentation, to the parameters established in this request.
Relevant Experience: Relevant experience of the firm with construction and renovation of K-12 public school facilities, particularly those of comparable size and complexity.
Qualifications: Qualifications and experience of the key staff to be assigned to these projects.
Timeliness: Ability of the firm to complete work tasks specified in this RFP in a timely fashion.
Responsiveness: The ability to meet quickly with District officials, contractors, etc. when necessary.
Team Compatibility: The ability of the firm to work with students, District employees, parents, community members, and governmental officials based on references and interviews.
Fee Proposal: The total fees for Contractor services.
E. Awarding of the Contract
All proposals received shall be subject to evaluation by Administration for the purpose of recommending a firm or firms with whom a contract will be signed. Authorization for execution of a contract will be approved by the District’s Board of Education after it has had an opportunity to review the recommendations of the Administration.
The form of Contract shall be based on a modified version of the Standard Form of Agreement between Owner and Contractor (e.g., AIA Document A132-2019 or AIA Document A101-2017), or similar agreement.
Notwithstanding anything herein to the contrary, the District shall have the ability, in its sole discretion, to negotiate any term of the Contract. The award of a Contract shall be contingent upon the successful negotiation of same.
F. Anticipated Project Schedule
The District desires that construction for the Project begin no later than June 5th, 2024 and that Substantial Completion be achieved by not later than August 15th, 2024. Please identify any concerns or reservations your firm may have with these general parameters and describe any negative impacts on the Project foreseen as a result of such parameters.
G. Cost Proposal
The cost proposal shall be stated as a lump sum as set forth below. If you believe any other information or clarification may be helpful to the District in determining your cost for services, please include that information in your proposal.
REQUEST FOR PROPOSAL FOR
CONTRACTOR SERVICES
PART 4 – PROPOSAL SUMMARY
All materials necessary to complete the Project shall be the responsibility of the Contractor.
Single Prime (All Trades) Contract: The undersigned Bidder, having carefully examined the Bidding and Contract Requirements, Conditions of the Contract, and all subsequent Addenda, as issued by the Owner, hereby agrees to furnish all material, labor, equipment, and services as described in the above documents, without exception, including all scheduled allowances and permits, if any, necessary to complete the Project, to the sum of:
This proposal has been prepared to provide the District with all the information requested in Part 3 - Proposal Details of the RFP regarding Contractor services. The undersigned certifies that the proposal contained herein meets or exceeds the scope of services as outlined in this RFP, and that any items that have been deleted from and/or added to the requested scope of services (including, but not limited to, the proposed contract language) are clearly noted as follows or separately attached:
Signed this ____ day of ______________, 2024.
Firm Name: __________________________________________________________________
Address: __________________________________________________________________
Phone Number: __________________________ Fax Number: ________________________
By: __________________________________________________________________ Signature and Title
ATTACHMENT “A”
FAMILIAL DISCLOSURE STATEMENT
AFFIDAVIT OF ______________________________
(insert name of affiant)
STATE OF MICHIGAN )
)ss
COUNTY OF _________________ )
___________________________________ makes this Affidavit under oath and states as follows:
(insert name of affiant)
1. I am a/the:
□ President
□ Vice-President
□ Chief Executive Officer
□ Member
□ Partner
□ Owner
□ Other (please specify) ________________________ of ___________________________________ [insert name of contractor], a bidder for contractor services for Jonesville Community Schools.
2. I have personal knowledge and/or I have personally verified that the following are all of the familial relationships existing between the owner(s) and the employee(s) of the aforementioned contractor and the school district’s superintendent and/or board members:
3. I have authority to bind the aforementioned contractor with the representations contained herein, and I am fully aware that the school district will rely on my representations in evaluating bids for contractor services.
4. I declare the above information to be true to the best of my knowledge, information and belief. I could completely and accurately testify regarding the information contained in this affidavit if requested to do so.
(signature of affiant)
Dated: ________________
Subscribed and sworn before me in _________________ County, Michigan, on the ___ day of _________________, 202__ ____________________________________________(signature) _____________________________________________ (printed) Notary public, State of Michigan, County of ________________ My Commission expires on _____________________________ Acting in the County of ________________________________
ATTACHMENT “B”
IRAN ECONOMIC SANCTIONS ACT CERTIFICATION
I am the _______________ of ____________________________, or I am bidding in my individual capacity (“Bidder”), with authority to submit a binding bid for the provision of contractor services to Jonesville Community Schools. I have personal knowledge of the matters described in this Certification, and I am familiar with the Iran Economic Sanctions Act, MCL 129.311, et seq. (“Act”). I am fully aware that the school district will rely on my representations in evaluating bids.
I certify that Bidder is not an Iran-linked business, as that term is defined in the Act. I understand that submission of a false certification may result in contract termination, ineligibility to bid for three (3) years, and a civil penalty of $250,000 or twice the bid amount, whichever is greater, plus related investigation and legal costs.
(signature)
(printed)
(date)
File details come from the government source that posted it. Updated .