About this file
REQUEST FOR BIDS SUMMARY: NORTHGATE VILLAGE REHABILITATION RE-BID
This is a Request for Bids document issued by the City of Victorville, California for the Northgate Village Rehabilitation Re-Bid Project (MS27-053), funded through the Home Investment Partnership Program. The project encompasses roof replacement on various apartment complex buildings located at 17251 Dante Street, Victorville, California, installation of water heaters, and repair of wood-rotted stair landings at the 18-building residential complex constructed in 1991. Specific scope includes roof tear-off and replacement with built-up bituminous roofing on four multifamily buildings (Buildings 1, 15, 16, and 17) with a 15-year manufacturer's warranty, shingle roof replacement on all 18 buildings using 30-year fiberglass-based composition CRRC-rated shingles, and associated flashing, decking repairs, and HVAC system work. The mandatory pre-bid meeting and job walk is scheduled for November 17, 2026, at 9:00 AM at the project site. The question submission deadline is November 25, 2026, at 2:00 PM, with sealed bids due December 8, 2026, at 4:00 PM via the City's eProcurement Portal. Bids will be publicly opened and read aloud immediately following the submission deadline via Zoom livestream. The contract award will be made to the lowest responsive and responsible bidder within 60 calendar days of bid opening, with work to be completed within 60 calendar days of the Notice to Proceed, subject to liquidated damages of $100 per day for delays.
Bidders must submit a bid guaranty in the form of a certified or cashier's check or corporate surety bond equal to 10 percent of the total bid amount, with original guaranties due within 48 hours of the bid submission deadline. Successful bidders must furnish performance and payment bonds equal to 100 percent of the contract amount and maintain comprehensive general liability insurance of $2,000,000 per occurrence and $4,000,000 aggregate, along with workers' compensation insurance and pollution liability coverage. The project is subject to prevailing wage requirements, with the higher of either California State Prevailing Wage or Federal Davis-Bacon wage rates applying to all work. Contractors and subcontractors must be registered with the California Department of Industrial Relations and submit electronic certified payroll records to the Labor Commissioner. Additional requirements include DIR compliance monitoring, Build America, Buy America Act compliance with domestic sourcing mandates for iron, steel, and construction materials, California Air Resources Board vehicle emission compliance certification, valid California Contractor's License Class B, and compliance with California prevailing wage and apprenticeship provisions. Payment will be made monthly upon completion of work, less a 5 percent retention to be released 45 days after Notice of Completion acceptance. The contract includes a one-year warranty guarantee on all work and materials.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR BIDS
MS27-053
NORTHGATE VILLAGE REHABILITATION RE-BID
City of Victorville
14343 Civic Drive
Victorville, CA 92392
RELEASE DATE: November 4, 2026
DEADLINE FOR QUESTIONS: November 25, 2026
RESPONSE DEADLINE: December 8, 2026, 4:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/victorvilleca https://secure.procurenow.com/portal/%7bproject.government.code%7d
City of Victorville
REQUEST FOR BIDS
Northgate Village Rehabilitation Re-Bid
I. INTRODUCTION
II. NOTICE INVITING BIDS
III. INSTRUCTIONS TO BIDDERS
IV. SCOPE OF WORK
V. PRICING PROPOSAL
VI. BID PROPOSAL FORMS
Attachments:
A - SAMPLE_-_CITY-_CONST_AGMT_FEDERAL_PW
B - Davis-Bacon-and-Labor-Standards-Agency-and-Contractor-Guide
C - Davis Bacon Wages 11.03.26
D - HUD 4010 UPDATED 2023
E - 4720
F - WEEKLY_FORMS
G - Updated_WH347 -WEEKLY CERTIFIED PAYROLL FORM
H - Updated_DASForm140-142_6.2024
I - Construction_Demolition_Waste_Recycling_Plan_
J - COV_Payment_Bond_Rev_MS27-053
K - GUARANTY_BOND_-_MS27-053
L - COV_Performance_Bond_Ver_MS27-053
Request for Bids #MS27-053 Title: Northgate Village Rehabilitation Re-Bid
1. INTRODUCTION
1.1. Summary
Northgate Village Rehabilitation Re-Bid, MS27-053
The City of Victorville is requesting bids for the Northgate Village Rehabilitation Re-Bid Project, MS27-053. This will include the roof replacement of various apartment complex buildings, installation of water heaters, and repair of wood rotted stair landings. This is a Home Investment Partnership Program funded project.
1.2. Background
Northgate Village Apartments are located at 17251 Dante Street, Victorville, CA 92394. The complex was built in 1991 and is comprised of 18 residential buildings and an administration building.
1.3. Contact Information
Project Contact:
Liliana Collins
Development Specialist
14343 Civic Dr
Victorville, CA 92392
Email: lcollins@victorvilleca.gov
Phone: (760) 243-6312
Procurement Contact:
Megan Seidler
Finance Specialist
14343 Civic Drive
Victorville, CA 92392
Email: mseidler@victorvilleca.gov
Phone: (760) 955-5082 Ext: 55082
Department:
Economic Development
1.4. Timeline
Release Project Date November 4, 2026
Pre-Proposal Meeting (Mandatory) November 17, 2026, 9:00am
17251 Dante Street, Victorville, CA 92394
Question Submission Deadline November 25, 2026, 2:00pm mailto:lcollins@victorvilleca.gov tel:(760)243-6312 mailto:mseidler@victorvilleca.gov tel:(760)955-5082;ext=55082
Proposal Submission Deadline December 8, 2026, 4:00pm
Bids will be publicly opened and read aloud by the
City Clerk at a virtual meeting, which will be livestreamed via Zoom, "https://victorvilleca-gov.zoom.us/j/87086457815" immediately following the specified bid closing time.
Interested parties may visit Victorville City Hall, Conference Room A, to observe the bid opening via
Zoom.
https://victorvilleca-gov.zoom.us/j/87086457815 https://victorvilleca-gov.zoom.us/j/87086457815
2. NOTICE INVITING BIDS
2.1. PROJECT TITLE AND SUMMARY:
The City of Victorville is requesting quotes for
Northgate Village Rehabilitation Re-Bid, MS27-053
The City of Victorville is requesting bids for the Northgate Village Rehabilitation Re-Bid Project, MS27-053. This will include the roof replacement of various apartment complex buildings, installation of water heaters, and repair of wood rotted stair landings. This is a Home Investment Partnership Program funded project.
2.2. BID SUBMISSION:
The City of Victorville (“City”) will accept sealed bids for the above-referenced Project via the City's eProcurement Portal located at https://procurement.opengov.com/portal/victorvilleca, until 4:00 pm PST on Tuesday, December 8, 2026, at which time the bids will be publicly opened and the bids received will be available for viewing.
Contract Documents pertaining to this Project solicitation are available at the City’s eProcurement Portal.
Only those who download Contract Documents from the portal will be included in a plan holders/followers list and may receive notices such as revisions to the plans or addenda.
2.3. MANDATORY PRE-BID MEETING:
A MANDATORY pre-bid meeting and job walk has been scheduled for all prospective bidders. The meeting will be held on Tuesday, November 17, 2026, at 9:00 am PST, at 17251 Dante Street, Victorville, CA 92394. Mandatory Site Job walk to follow. Prospective bidders are encouraged to address questions, problems, and other issues regarding this project. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
A bid received from a Contractor who is not represented by a duly authorized agent at the pre-bid meeting and job walk shall be considered non-responsive and rejected from further contract award consideration. The participant agrees that they are attending the job walk and assumes responsibility for their safety.
2.4. BID GUARANTY AND BONDS:
Bid Proposal submission must include all the Required Bid Documents and Proposal Forms and be accompanied by a certified or cashier’s check, or by a corporate surety bond (Bidder’s Bond) on the form included therein. Such check or Bidder’s Bond is the Bidder’s guarantee that he/she/it shall, if an award is made in accordance with the terms of his/her/its Bid Proposal, promptly secure the insurance and endorsements, Faithful Performance and Payment Bonds and Guarantee required by the Contract
Documents and execute a Contract for the work on the required forms (see sample Construction
Agreement attached). Said check or bidder’s bond shall accompany and be enclosed in the same envelope with the Bid Proposal. Said Bidder’s Bond shall be in an amount not less than ten percent (10%) of the total amount of the Bid Proposal payable to The City of Victorville (City), as a guarantee that the bidder, https://procurement.opengov.com/portal/victorvilleca if its bid is accepted, will promptly execute the Agreement. The bidder shall guarantee the total bid price from the date of the bid opening.
Please scan and upload a copy of your bid bond/cashier's check as part of your bid submission. In addition, Bidders are required to either HAND DELIVER OR MAIL the original bid guarantee. Bid guarantee must be “POSTMARKED” within (48) forty-eight hours after the bid submission due date.
The bid guarantee must be hand delivered or mailed to the following address:
City of Victorville
14343 Civic Drive
Victorville, CA 92392
Attn: Finance Dept./Purchasing Division
Please have the Bidder Name, Project Number and Title listed clearly on the outside of the envelope.
The Faithful Performance and Payment Bonds shall be for amounts not less than one hundred percent
(100%) of the total amount of the Bid Proposal price named in the Contract. Bonds shall be issued by responsible corporate sureties, licensed, and authorized to issue surety bonds in California. The City reserves the right to reject any bond if, in the opinion of the Department Director, the Surety’s acknowledgement is not in the form included in the Contract Documents or in another form substantially as prescribed by law.
The successful Bidder shall also execute a Guarantee Form to warranty the work done and material provided for the period of one (1) year to ensure the Contractor repairs or replaces any defective or faulty work or materials.
2.5. DIR REGISTRATION;COMPLIANCE MONITORING:
Pursuant to Labor Code Section 1771.1, the City may not accept a Bid Proposal from or enter into a
Contract with any Bidder, without proof that the Bidder and its prospective subcontractors are registered with the DIR to perform public work pursuant to Labor Code Section 1725.5, subject to limited legal exceptions. This project is subject to compliance monitoring and enforcement by the DIR and the submission of electronic certified payroll records to the California Labor Commissioner in the manner set forth in Labor Code Section 1771.4.
Exceptions to the registration requirement:
The contractor registration requirement does not apply to contractors working solely on public works projects awarded prior to April 1, 2015. Some exceptions allow contractors to bid on federally funded projects or submit joint venture bids without first being registered, as long as the contractors that are parties to the joint venture and the joint venture are registered at the time the contract is awarded.
Contractors who work exclusively on small public works projects are not required to register as a public works contractor or file electronic certified payroll reports for those projects. Contractors are still required to maintain certified payroll records on a continuous basis, and provide them to the Labor Commissioner’s
Office upon request. Additionally, awarding agencies are not required to submit the notice of contract award through DIR Public Works website services on projects that fall within the small project exemption.
The small project exemption applies for all public works projects that do not exceed:
• $25,000 for new construction, alteration, installation, demolition or repair
• $15,000 for maintenance
2.6. FEDERAL FUNDING:
This is funded by HOME Community Housing Development Organization (CHDO). The higher of either State
Prevailing Hourly Wages or Federal Wage Determination shall apply to and be paid by all contractors and subcontractors performing work on this Project.
2.7. IN-USE OFF-ROAD DIESEL-FUELED FLEET CERTIFICATE OF REPORTED
COMPLIANCE:
Valid CARB Certificates of Reported Compliance as described in California Code of Regulations, Title 13, Section 2449(n) for fleets of vehicles subject to 13 CCR section 2449 are required for this Project.
3. INSTRUCTIONS TO BIDDERS
3.1. BID SUBMISSION
The City's eProcurement Portal Clock is the official timekeeper for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as a poor internet connection. The City of Victorville strongly recommends completing your response well ahead of the deadline. Bidders take full responsibility for the City's receipt of its bid.
Project Documents pertaining to this Project solicitation are available at the City’s eProcurement Portal, https://procurement.opengov.com/portal/victorvilleca. Only those who download Contract Documents from the portal will be included in a plan holders/followers list and may receive notices such as revisions to the plans or addenda.
3.2. SUBMISSION DOCUMENTS:
All portions of the proposal forms contained in Section 6 Bid Proposal Form - Submission Certification checklist contained in this bid package must be completed to include signed addenda (if any) before the bid is submitted. Failure to do so may result in the bid being rejected as non-responsive.
3.3. CONTRACT DOCUMENTS:
Bidders may download the Contract Documents associated with this Project from the City's eProcurement
Portal. Those registered will be included in a plan holders (followers) list and may receive notices such as delta revisions to the plans or addenda.
3.4. PROJECT QUESTIONS AND ADDENDA:
Bidders shall submit all inquiries regarding this bid via the City’s e-Procurement Portal, located at https://procurement.opengov.com/portal/victorvilleca. Please note the advertised deadline for submitting inquiries is on Wednesday, November 25, 2026, at 2:00 pm PST. All answers to inquiries will be posted on the City’s e-Procurement Portal. As a registered bidder, you will also receive addenda notifications to your email by clicking “Follow” on this project.
Oral explanation or instructions given before the award of a Contract will not be binding. Any information given a prospective Bidder concerning solicitation will be furnished promptly to all prospective Bidders as an addendum to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective Bidders.
PLEASE NOTE: Oral explanation or instructions, or written explanations given by personnel other than purchasing staff are not valid and will not be binding.
3.5. BEGINNING OF WORK AND TIME OF COMPLETION
The Contractor shall begin work by the date specified in the City's Notice to Proceed informing him/her that the contract has been awarded and shall diligently prosecute the work so that all the work shall be completed before the expiration of 60 Days CALENDAR DAYS, including the specified starting date.
3.6. LIQUIDATED DAMAGES
The Contractor shall pay the City the sum of $100.00 per day for each and every calendar day delay in finishing the work as outlined in the Scope in excess of the sixty (60) CALENDAR DAYS specified below as Liquidated
Damages. The City withholds liquidated damages before the accrual date if the anticipated liquidated damages may exceed the value of the remaining work.
3.7. CONTRACTOR'S LICENSE:
The successful bidder and/or specified subcontractor(s) must possess a valid California Contractor’s
License Class B, at the time of the award of this contract, to complete the work as described. The
Contractor and/or subcontractor shall obtain all required permits and licenses prior to commencing work and shall submit the work in progress to periodic inspection by the appropriate Inspector of the City and shall honor all correction notices issued by same. All contacts, regarding inspections, shall be made to the appropriate department within the City.
3.8. PREVAILING WAGE:
Payment of State Wages Required when Higher. Payment of State prevailing wage rates, when higher than Federal Davis-Bacon prevailing rates, are required whenever federally funded or assisted projects are controlled or carried out by California awarding bodies of any sort. The City of Victorville is considered a California awarding body. Therefore, the higher of State Prevailing Wage and Federal
Davis-Bacon Wage rates shall apply to and be paid by all Contractors and subcontractors performing work on this Project.
A. Federal – The general Federal prevailing rate of wages, as determined by the Secretary of
Labor are included as part of the attachments of the Contract Documents (General Federal Wage
Decision); provided, that if there is any difference between the State or Federal wage rate for any given craft or mechanic needed to execute the work, it shall be mandatory upon the Contractor and any subcontractor to pay the higher of the two rates.
The General Federal Wage Decision that is in effect on the date of the bid opening, as long as the Contract is awarded within ninety (90) days of said date, locks in that Federal Wage
Decision for the entire duration of the Project. If the contract is not awarded within such ninety (90) day period, the date of the execution of the Contract would be the date used in determining the applicable Federal Wage Decision.
Revisions to the General Federal Wage Decision, up to fourteen (14) calendar days before bid opening, shall be identified by the issuance of addenda, and the final Contract between the
City of Victorville and the contractor will physically include the applicable General Federal
Wage Decision as revised by addenda, if any such addenda have been issued. Both the prime contractor and all subcontractors are required to pay their laborers and mechanics employed under this contract a wage not less than the highest wage applicable for their work classification, as specified in the Federal General Wage Decision that can be downloaded from https://sam.gov/wage-determinations.
https://sam.gov/wage-determinations
B. State – In accordance with the provisions of California Labor Code Sections 1720, 1770-1776, 1810, 1813, and 1815, as amended, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with the standards set forth in Labor Code Section 1773 for the locality in which the Work is to be performed. It shall be mandatory upon the Contractor to whom the Work is awarded and upon any subcontractor under the Contractor to pay not less than said specified rates to all workers employed by them in the execution of the Work, and shall post a copy of said wage rates at the project site.
AB219 (as applicable) adds Section 1720.9 to the Labor Code the hauling and delivery of ready-mixed concrete to carry out a public works contract, with respect to contracts involving state agency and subdivision of the state Section 1720.9 defines the term “ready-mixed” concrete and specifies that the rate of pay shall be the current prevailing wage “for the geographical area in which the factory or batching plant is located” as determined by the DIR. The statute also requires a written agreement between the party hauling or delivering the ready-mixed concrete and the party that engaged its services.
The delivery company shall provide certified payroll records under Labor Code section 1776(1) to the party that engaged its services and to the general contractor. The time record must be certified by each driver for the performance of job duties.
The contractor and all subcontractors shall comply with all Federal and State laws, regulations, and guidelines required in the performance of the contract. Copies of the updated Wage Determination rates are available to any interested party, by visiting www.wdol.gov for Federal and www.dir.ca.gov for State of California. Additionally, copies of the State prevailing rate of per diem wages and Federal wage determination rates are on file at the City of Victorville Finance Division and shall be made available for review to any interested party on request.
Contractor shall be solely responsible for using the correct wage decision or determination and performing accordingly. An error on the part of any awarding body does not relieve the Contractor from the responsibility for payment of the correct State prevailing wage and compliance with the maintenance and inspection of payroll records, posting of prevailing wage rates at work site, employment of apprentices, and other requirements of California Labor Code (1720-1720.9, et seq;
1770-1776, 1810, 1813, and 1815), California Code of Regulations, Title 8, Section 16000 et seq.; and all other applicable State labor laws. Contractor further acknowledges and agrees that it will be independently responsible for reviewing the applicable laws and regulations and effectuating compliance with those laws. Contractor will require the same of all its subcontractors
NOTE: A CERTIFIED PAYROLL from the Contractor and subcontractors must be submitted weekly to the
City of Victorville and uploaded to DIR website (if using the State Prevailing Wage rate). Payment of invoice(s) may be delayed when certified payrolls are not current.
3.9. ELECTRONIC CERTIFIED PAYROLL REPORTING (eCPR)
Contractors and subcontractors on all public works projects awarded on or after April 1, 2015, must use this system to furnish certified payroll records (CPRs) to the Labor Commissioner. Contractors and subcontractors who have been submitting PDF copies of their CPRs for earlier projects must also begin using the new http://www.wdol.gov/ http://www.dir.ca.gov/ system. For more information, please go to https://services.dir.ca.gov/pw. A copy of proof of payroll submission is required with each invoice to the City of Victorville along with copies of Certified Payrolls.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations
(DIR).
3.10. APPRENTICES ON PUBLIC WORKS
The Contractor shall comply with all applicable provisions of Section 1777.5 and 1777.6 of the California Labor
Code relating to employment of apprentices on public works projects. Prior to commencing work on a contract for public works, contractor shall submit contract award information to an applicable apprenticeship program that can supply apprentices to the site of the public works. Contractor and subcontractor shall provide and keep accurate payroll records and shall be available for inspection by the Labor Standards Enforcement (full texts of these codes are available at http://www.leginfo.legislature.ca.gov/ ).
3.11. EXAMINATION OF THE PROJECT SITE AND CONTRACT DOCUMENTS:
Prior to submitting a Bid, Bidder shall visit the Project Site and analyze the contents of the solicitation and
Contract Documents in their entirety to satisfy itself that it has the abilities and resources to complete the
Work. Prospective bidders are encouraged to address questions, problems, and other issues regarding this Project. The Bidder agrees that if it is awarded the Contract, no claim will be made against the City based on ignorance or misunderstanding of the provisions of the Contract Documents, the nature and amount of the Work, and/or the physical or climatic conditions of the Project Site.
3.12. BID PROPOSAL FORMS:
The Bid Proposal forms are included of this bid package and must be completed in the manner specified therein and signed in blue or black ink before they are sealed and submitted. Bids are required for the entire Work. The costs for any Work shown or required in the Contract Documents, but not specifically identified as a line item in the Bid Schedule included in Section 6 Bid Proposal Forms, are to be included in the cost of the related line item(s) and no additional compensation shall be due to Contractor for the performance of the Work. The amount of the bid for comparison purposes will be the sum of all the subtotals of each of the Pricing Proposal in Section 5 (the “Total Base Bid”). The Bid Proposal Documents must be fully completed without interlineations, alterations, or erasures. Alteration of the proposal forms is prohibited. Any necessary corrections must be clear and legible and must be initialed by the Bidder or its authorized representative. Additional instructions accompany Bid Proposal forms in Section 6. Failure to properly complete the Bid Proposal forms may result in rejection of the Bid as nonresponsive.
3.13. RETURN OF BID GUARANTY:
The Bid Guaranties accompanying the Bid Proposals of the first, second and third lowest responsive and responsible bidders will be retained by the City until a Contract has been fully executed or all bids have been rejected. Thereafter, those Bid Guaranties, except bidder’s bonds and any guaranties which have been forfeited, will be returned to the respective bidders whose bids they accompanied. The Bid
Guaranties submitted by all other unsuccessful bidders will be returned upon the City’s determination of the first, second, and third lowest responsive and responsible bidders.
https://services.dir.ca.gov/pw http://www.leginfo.legislature.ca.gov/
3.14. WITHDRAWAL OF BIDS:
Any Bid may be withdrawn by the Bidder at any time prior to the bid opening date and time specified in the Notice of Inviting Bids, as such may be extended by City-issued addenda. Bids may be withdrawn via the City's eProcurement Portal. A Bid withdrawal does not prejudice the right of the Bidder to resubmit a
Bid prior to the bid opening date and time.
3.15. RELIEF OF BIDDERS:
Pursuant to the provisions of Public Contract Code Sections 5100 to 5110, a Bidder may be relieved of its
Bid by the City for mistake. If the Bidder claims a mistake was made in the bid presented, the Bidder shall give the City written notice within five (5) Business Days after the date of opening of the Bids of the alleged mistake, which notice specifies in detail how the mistake occurred. Should the City determine that a
Bidder mistake occurred, the Bidder shall be relieved from its bid and shall not forfeit its bid security.
Pursuant to Section 5105 of the Public Contract Code, a Bidder who claims a mistake shall be prohibited from participating in further bidding on the Project for which the mistake was claimed.
3.16. SUBCONTRACTING
In accordance with the provisions of Sections 4100 through 4113, inclusive, of the California Public Contract
Code (“Subletting and Subcontracting Fair Practices Act”), each Bidder shall submit with his/her/its Bid
Proposal on the List of Subcontractors form included in Section 6 Bid Proposal Forms of the Project Documents:
the name and location of place of business, and Contractor’s License Number of each proposed subcontractor who will perform work or labor or render service to the principal Contractor in an amount in excess of one-half of one percent (0.5%) of the principal Contractor's bid (or in the case of the construction of streets, highways and bridges, in excess of one-half of one percent (0.5%) or ten thousand dollars ($10,000), whichever is greater); and shall state the portion (type) and percentage of the total contract work which will be done by each such subcontractor. If no subcontractor is listed for a portion of the work, then the Contractor is required to perform that portion with his own forces.
The List of Subcontractors form must be completed in its entirety and submitted as part of Bidder’s Bid
Proposal, together with all other Required Bid Documents and Proposal Forms. If there are no subcontractors, the form shall be submitted with “None” stated thereon.
The Contractor shall perform with its own organization contract work amounting to not less than twenty percent (20%) of the total original contract price. Specialty items may be performed by subcontract and the amount of any such specialty items performed may be deducted from the amount of work required to be performed by the Contractor’s own organization.
1. “Its own organization” shall be construed to include only workers employed and paid directly by the prime contractor and equipment owned or rented by the prime Contractor, with or without operators. Such term does not include employees or equipment of a subcontractor, assignee, or agent of the prime contractor.
2. “Specialty Items” shall be construed to be limited to work that requires highly specialized knowledge, abilities, or equipment not ordinarily available in the type of contracting organizations qualified and expected to bid on the contract as a whole and in general are to be limited to minor components of the overall contract.
3.17. AWARD OF CONTRACT
The City reserves the right to reject any or all Bid Proposals and waive any immaterial irregularities or informalities in any Bid Proposal or in the bidding. The award of a construction contract, if one is to be awarded, shall be made within Sixty (60) calendar days of the date specified for publicly opening Bid Proposals, unless otherwise specified herein. Award of a construction contract, if an award is made, shall be to the lowest responsible bidder whose Bid Proposal conforms to the Contract Documents. For the purposes of evaluating the lowest Bid Proposal price and selecting the lowest bidder, the lowest Bid Proposal price shall be the lowest total of the summation of all individual line items on the Bid Proposal Forms.
The Bidder’s signature on the Bid Proposal Forms shall constitute a commitment on the part of the Bidder to furnish the equipment, materials, supplies, and labor required to perform the contemplated work, for the amount set forth on the Bid Proposal Price Schedules contained therein, and in accordance with all the required provisions of the Contract Documents. The Bidder to whom the contract is awarded shall be notified in writing upon approval of the award by the City Council.
3.18. EXECUTION OF CONTRACT:
A construction Contract shall be signed by the successful Bidder and returned, together with the contract bonds (Faithful Performance and Payment Bond), proof of required insurance coverage and endorsements, and a copy of the Bidder’s City of Victorville Business License within ten (10) Business Days after the Bidder has received the Contract for execution.
3.19. FAILURE TO EXECUTE CONTRACT:
Following award, the failure of the lowest responsive and responsible Bidder, the second lowest responsive and responsible Bidder, or the third lowest responsive and responsible Bidder to timely execute the Contract, and provide the items set forth of these Instructions to Bidders, shall result in the forfeiture of such Bidder’s Bid Proposal guaranty. The successful bidder may file with the City a written notice, signed by the bidder or the bidder’s authorized representative, specifying that the bidder will refuse to execute the Contract if it is presented. The filing of this notice shall have the same force and effect as the failure of the bidder to execute the Contract and furnish acceptable bonds, proof of insurance coverage and endorsements, and a City business license within the time hereinbefore prescribed.
3.20. EVALUATION OF BID PROPOSAL
City reserves the right to reject any or all bids and waive any immaterial irregularities or informalities in any bid or in the bidding. Award of a contract, if any, shall be made to the lowest responsible bidder whose Bid complies with the specified requirements.
3.21. PROHIBITED CONFLICT OF INTEREST
Contractor, its officers, employees, subcontractors, and/or agents may not have, maintain, or acquire a prohibited conflict of interest in relation to the Project or any contract awarded thereunder, in violation of any
City ordinance or requirement, or in violation of any applicable law, including without limitation: California
Government Code Section 1090 et seq.; California Government Code Section 81000 et seq. (the Political Reform
Act); or the regulations of the Fair Political Practices Commission (FPPC) in Division 2 of Title 2 of the California
Code of Regulations.
If Contractor is a “Consultant” as that term is defined in Section 18700.3 of Title 2 of the California Code of
Regulations, or when otherwise directed by the City, Contractor will disclose its financial interests as required by the City’s Conflict of Interest Code by completing and filing a Statement of Economic Interests (FPPC Form
700) with the Victorville City Clerk’s office.
No member, officer, or employee of the City engaged in the selection, award, or administration of a contract for this Project shall have any prohibited conflict of interest, whether real or apparent, in any contract awarded hereunder or in the proceeds thereof.
3.22. AFFIRMATIVE ACTION
The City hereby notifies all bidders that it will affirmatively ensure that, in any Contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration of award.
3.23. INSURANCE
During the term of the Agreement, the Contractor shall procure and maintain, for the duration of the
Agreement, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work here under by the Contractor, their agents, representatives, employees or subcontractors.
COMMERCIAL GENERAL AND AUTOMOBILE LIABILITY INSURANCE
Contractor shall procure and maintain at its own expense, during the term of this Agreement, commercial general liability insurance, of not less than Two Million Dollars ($2,000,000) per occurrence, and Four Million
Dollars ($4,000,000) in the aggregate, for bodily injury, personal injury, death, loss, or damage resulting from the wrongful or negligent acts by the Contractor or its officers, employees, servants, volunteers, and agents and independent contractors.
Contractor shall further procure and maintain, at its own expense, during the Term of this Agreement, commercial vehicle liability insurance covering personal injury and property damage, of not less than One
Million Dollars ($1,000,000) Combined Single Limit, covering any vehicle(s) utilized by Contractor or its officers, employees, servants, volunteers, or agents and independent contractors in performing the services required by this Agreement.
WORKERS' COMPENSATION INSURANCE
Contractor shall procure and maintain, at its own expense, during the Term of this Agreement, workers’ compensation insurance, providing coverage as required by the California State Workers’ Compensation
Law. If any class of employees employed by Contractor is not protected by the California State Workers’
Compensation Law, Contractor shall provide adequate insurance for the protection of such employees to the satisfaction of the City.
In conformance with current statutory requirements of Section 1860 et seq., of the Labor Code of the
State of California, the undersigned confirms the following as their certification: I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions before commencing the performance of the work of this contract.
POLLUTION LIABILITY
Contractors Pollution Liability and/or Asbestos Pollution Liability and/or Errors & Omissions applicable to the work being performed, with a limit no less than $2,000,000 per claim or occurrence and $4,000,000 aggregate per policy period of one year.
INSTALLATION FLOATER
"Installation Floater” coverage with limits sufficient to insure the full replacement value of any property of equipment stored either on or off the project site that provides property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the contract work, including during transit, installation, and testing at the project site. Such coverage shall name the City as a loss payee as its interest may appear.
ADDITIONAL INSURED
Notwithstanding any inconsistent statement in any required insurance policies or any subsequent endorsements attached thereto, the protection offered by all policies, except for Workers' Compensation coverage, shall bear an endorsement whereby it is provided that, the City and its officers, employees, servants, volunteers, and agents and independent contractors, including, without limitation, the City Attorney, are named as Additional Insureds.
WAIVER OF SUBROGATION RIGHTS
Contractor shall require the carriers of all required insurance policies to waive all rights of subrogation against the City and its officers, volunteers, employees, contractors, and subcontractors. Each policy of insurance shall be endorsed to reflect such waiver.
PROOF OF INSURANCE COVERAGE; REQUIRED PRIOR TO COMMENCEMENT OF SERVICES
a. Contractor shall secure from a good and responsible company or companies authorized to do insurance business in the State of California the policies of insurance required by this Agreement and furnish to the City
Clerk certificates of said insurance at least one (1) day prior to the commencement of any services to be performed under this Agreement.
b. The certificates of insurance shall bear an endorsement whereby it is provided that, in the event of cancellation or amendment of any required insurance policy for any reason whatsoever, the City shall be notified by mail, postage prepaid, not less than thirty (30) days before the cancellation or amendment is effective. In the case of non-payment, ten (10) days’ advance written notice shall be given.
c. The certificates of insurance shall bear an endorsement whereby it is provided that the respective insurance policy shall not be terminated or expire without first providing thirty (30) days written notice to the City of such termination or expiration.
d. The certificates of insurance shall indicate that the respective insurance policy will be maintained throughout the Term of this Agreement.
e. The commercial general liability and vehicle liability policies shall be endorsed to contain the following provision: “For any claims related to this contract, the Contractor’s insurance coverage shall be primary and non-contributory and at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it. This requirement shall also apply to any Excess or Umbrella liability policies.”
3.24. CLAIMS AND DISPUTE RESOLUTION
Except for such claims as defined in and covered by California Public Contract Code Section 9204 (“Section
9204”), which are subject to the procedures set out in therein (the full text of Section 9204 is set forth below), any dispute arising out of or relating to the provisions of any construction Contract awarded for this Project, or the breach thereof, shall be settled in the manner set forth in the executed Contract, or if not specified therein, by the following process:
A. Each Party shall designate a senior management or executive level representative to negotiate any dispute.
B. The representatives shall attempt, through good faith negotiations, to resolve the dispute by any means within their authority.
C. If the issue remains unresolved after ten (10) days of good faith negotiations, the Parties shall attempt to resolve the disagreement by negotiation between the legal counsel for each Party. If the above process fails, the Parties may mutually agree to engage in non-binding mediation or arbitration in which the Parties equally share the costs of any mediator or arbitrator, or may proceed with suit or other remedies, subject to the provisions of paragraph (5) below and other applicable provisions and laws.
D. The alternative dispute resolution process set forth herein is a material condition of any Contract entered into for the Project and must be exhausted as an administrative remedy prior to either Party initiating legal action.
E. Compliance with Victorville Municipal Code Section 2.24.020 and the provisions of the Government
Claims Act (Government Code section 810 et seq.) is also required prior to initiating suit against the
City.
California Public Contract Code Section 9204.
(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner.
(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project.
(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project.
(B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled.
(C) Payment of an amount that is disputed by the public entity.
(2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section
7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project.
(3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of
California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency.
(B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department.
(ii) The Department of Transportation as to any project under the jurisdiction of that department.
(iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department.
(iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
(v) The Military Department as to any project under the jurisdiction of that department.
(vi) The Department of General Services as to all other projects.
(vii) The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.
(5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section
7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor.
(d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision.
(B) The claimant shall furnish reasonable documentation to support the claim.
(C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion.
(D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph
(3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.
(4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on their own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section.
(f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that
(1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.
(g) This section applies to contracts entered into on or after January 1, 2017.
(h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.
(i) This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a later enacted statute that is enacted before January 1, 2027, deletes or extends that date.
3.25. INDEMNIFICATION
a. Notwithstanding the limits of any insurance and to the fullest extent permitted by law, Contractor shall indemnify the City, its elected or appointed officials, officers, agents, volunteers and employees against, and will hold and save them and each of them harmless from, any and all actions, suits, claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities, (hereinafter
"Claims or Liabilities") that may be asserted or claimed by any person, firm or entity arising or alleged to arise out of or in connection with the performance of the Work, operations, or activities of Contractor, its agents, employees, Subcontractors, or invitees on the Project, or arising or alleged to arise from the acts or omissions of Contractor hereunder, or arising or alleged to arise from Contractor's performance of or failure to perform any term, provision, covenant or condition of this Contract, but excluding such Claims or Liabilities or portion of such Claims or Liabilities arising or alleged to arise from the active negligence, sole negligence, or willful misconduct of the City, its elected or appointed officials, officers, agents, volunteers, or employees, and in connection therewith:
(1) Contractor will defend any action or actions filed in connection with any of said Claims or
Liabilities and will pay all costs and expenses, including legal costs and attorneys' fees incurred in connection therewith;
(2) Contractor will promptly pay any judgment rendered against the City, its elected or appointed officials, officers, agents, volunteers, or employees for any such claims or liabilities arising or alleged to arise out of or in connection with Contractor's (or its agents', employees', Subcontractors' or invitees') performance of or failure to perform such Work, operations or activities hereunder; and Contractor agrees to save and hold the City, its elected or appointed officials, officers,…
This is the start of the file's text. The full file is on GovTribe.