U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HUD)
OFFICE OF THE CHIEF INFORMATION OFFICER (OCIO)
Enterprise Project and Portfolio Management (EPPM) Process/ HUD’s Portfolio and Project Lifecycle Utilization Solution (HUD PLUS) Support Services Task Order Statement of Work
1. BACKGROUND
In fiscal year 2010, the U.S. Department of Housing and Urban Development (HUD) was given new authority by Congress to conduct a transformation initiative in four areas:
1. Research, evaluation, and program metrics
1. Program demonstrations
1. Technical assistance and capacity building
1. Information technology
To better carry out HUD’s mission and meet these challenges, the agency has developed an organizational “Transformation Initiative” (TI) to deal with the broad range of persistent management, programmatic, operational and human capital challenges. One of the five strategic goals for the Department is to transform the way HUD does business. As part of the Transformation Initiative, the Office of the Chief Information Officer (OCIO) implemented the Information Technology Management (ITM) governance controls in FY 2011 to account for the usage of IT funding. To continue to support the department’s transformation initiative the OCIO is expanding its governance to uniformly control the project and portfolio management for IT through the implementation of an Enterprise Project and Portfolio Management (EPPM) process.
In September 2013, HUD’s Office of the Chief Information Officer (OCIO) engaged the consulting services of the Microsoft Gold Certified Partner, UMT Consulting Group, under contract DU-100F-13-C-05, to support the strengthening of the ITM Framework and improve the strategic implementation of the ITM processes and controls. HUD’s goal was to provide an integrated and cohesive information management process to collect, organize, and manage the financial, operational, program and project data needed to operate HUD’s business, improve portfolio-investment selection and support the ITM Framework.
The HUD ITM Framework is the foundation of establishing greater transparency and accountability throughout the investment life cycle in compliance with OMB, GAO and the President’s vision to change the way business is done in government. The ITM Framework (Figure 1) integrates a variety of related IT management methodologies, mandates, and practices into a full investment management lifecycle approach. The essential components of the ITM Framework are defined through a suite of supporting policies, processes, standards, guidelines, roles and responsibilities.
Figure 1: HUD Information Technology Management Framework The implementation methodology used by HUD EPPM process team focused in two key disciplines:
1) Portfolio Management
2) Project Management Through a series of workshops involving stakeholders from both OCIO and the HUD business areas, the team defined and documented the needs to improve both discipline areas. The HUD EPPM process team collected and prioritized requirements that were derived based on a capability-based approach that focused on 5 key tenants: governance, behavior, process, data and technology. The EPPM process platform included Microsoft SharePoint Server 2010, Microsoft Project Server 2010, and the Gartner recognized UMT software called UMT360 Financials©. The EPPM process solution was branded as HUD’s Portfolio and Project Lifecycle Utilization Solution (HUD PLUS).
The Portfolio Management portion of HUD PLUS was piloted in Quarter 2 (Q2) and Quarter 3 (Q3) of fiscal year (FY) 2014 with the Information Technology Investment Management (ITIM) team in support of the budget formulation process for FY15.
HUD PLUS enabled a repeatable process, seen below in Figure 2 for portfolio selection based on the methodologies and procedures defined based on vendor best practices and supported by the enabling technology.
Figure2: HUD Repeatable Strategic Portfolio Prioritization and Optimization Process These repeatable processes will be the standard for investment scoring, prioritization, optimization and selection for HUD. The establishment of these processes and the centralization of portfolio have enabled HUD to begin showing evidence against some of the GAO audit findings and recommendations (see Figure 3 below) HUD is beginning to address.
Figure 3: GAO Audits that will be addressed by the adoption and maturity of HUD PLUS As HUD matures, adopts and adjusts its’ culture to the new processes that HUD PLUS supports these audit findings will be settled.
The HUD PLUS is an enterprise solution for HUD and it is transformational initiatives in that it provides unprecedented transparency, accountability, and governance of IT investment management framework. It also provides better visibility, line of sight and report capability due to the centralized data structure and standardized templates.
The HUD PLUS will enable a framework to provide HUD leadership with the line of sight from strategy to capability, from capability to system/service, from system to investment and from investment to project.
2. OVERALL OBJECTIVE OR SCOPE OF EFFORT
The initial operating capability of the HUD PLUS solution was utilized in May 2015. The purpose of this Statement of Work (SOW) is to continue to adopt and grow HUD PLUS as a core integrated enterprise portfolio management solution that is used by HUD OCIO for Innovation Management, Portfolio Management, Project Management, and System/Service Development Methodology Management in support of the complete lifecycle of the ITM Framework.
The HUD PLUS will continue to capture a defined set of metadata for IT related projects. In addition HUD PLUS will continue to unify project and portfolio management into a single methodology and process thereby helping the organization to align resources and investments with strategic priorities more effectively, gain control across all types of work, and visualize performance by using effective and efficient dashboards.
The HUD PLUS solution can support the end-to-end process, at various levels of the HUD hierarchy, of the ITM Framework throughout the Architect, Invest and Implement phases and encompasses a methodology that can capture and support decision making at all levels. The framework addresses all areas of the ITM framework and provides a construct by which OCIO can clearly link strategy to execution and decision making.
The primary goal of the HUD PLUS solution is to collect, organize, process and manage the financial, operational, program and project data required to operate HUD’s business and improve investment selection and service delivery for customers.
| EPPM Process Area |
| Operations Support |
| Maintenance Support |
| Project Management |
| · Change Control Board (CCB) for EPPM/HUD PLUS |
· Training/Desk-Side Support
· Organizational Change Management Support
· User Onboarding (~1 Segment Per Month)
· Continuous Improvement of Processes
· Business Intelligence Reporting Support
· Data Health Checks (Integrity Reporting) Support
· Project Management Maturity Assessment Support
· Project Health Assessment Refinement Support
· Project Status Reporting Improvements Support
· Data Call Support
· Project Tailoring Agreement Reporting Support
| Project Management |
| · Change Control Board (CCB) for EPPM/HUD PLUS |
· Training/Desk-Side Support
· Organizational Change Management Support
· User Onboarding (~1 Segment Per Month)
· Continuous Improvement of Processes
· Business Intelligence Reporting Support
· Data Health Checks (Integrity Reporting) Support
· Project Management Maturity Assessment Support
· Project Health Assessment Refinement Support
· Project Status Reporting Improvements Support
· Data Call Support
· Project Tailoring Agreement Reporting Support
| Portfolio Management |
| · Change Control Board (CCB) for EPPM/HUD PLUS |
· Training/Desk-Side Support
· Organizational Change Management Support
· User Onboarding
· Continuous Improvement of Processes
· Business Intelligence Reporting Support
· Data Health Checks (Integrity Reporting) Support
· Scenario Development & Portfolio Optimization Support
· Annual Budget Formulation Support
· Budget Hearing Preparation Support
· Annual Budget Submission Ex 53/300 Support
| Capability Area |
| Critical New Capability |
| Project Management |
| · Financial Management – Budget, Expenditures, Forecasts |
· Financial Integration/Interfaces
· Change Request Management
· Trend Analysis
· Resource Management – Generic, Named
· Resource Integration/Interfaces
· Task Status Collection
· Earned Value Management
| Portfolio Management |
| · Business Driver Integration |
· Governance Board Process Integration and Management (TRC, IRB, ARB)
· Total Lifecycle Cost Maturity
· Resource Capacity Planning
· Operational Analysis/Management/ROI
· Ensure alignment to help investments and investment managers report data more efficiently
| Application Portfolio Management |
| · Application Lifecycle Management |
· Business Capability Alignment (FEA)
· Enterprise Architecture Alignment
· Operations & Support Planning
· Application & Platform Strategy
· Application Portfolio Optimization
· Vendor Management
· Software + License Management
· Insights and Reporting
· Financial Management
· Transformation Roadmap
· Decision Tracking
The HUD PLUS will capture a defined set of metadata for IT related projects. In addition, HUD PLUS will unify project and portfolio management into a single methodology and process thereby helping the organization to align resources and investments with strategic priorities more effectively, gain control across all types of work, and visualize performance by using effective and efficient dashboards.
Current State Description
The HUD ITM Framework is currently being support by multiple silos and does not operate in an integrated manner. This has led to disjointed processes, duplicative efforts and mis-utilized resources.
The HUD PLUS supports the integrated Enterprise Governance Lifecycle (EGL) that will provide the underlying processes and governance layers to support the ITM framework. The EGL provides a framework to integrate various processes throughout HUD (ex. CPIC processes, Project Portfolio Management 2.0 processes and Software/System Development Methodologies (SDM).
Figure 5: Target State HUD Integrated Enterprise Governance Lifecycle (EGL) As of May 2015, HUD PLUS supports two major discipline areas: Project Management and Portfolio Management. Those disciplines are shown below in Figure 6.
Portfolio Management (PfM)
· Business Need Capture
· Budget Request/Value-Driven Business Case Capture
· Portfolio Analysis/Selection to support Budget Formulation
· Operational Performance Project Management (PM)
· Centralized Schedule Repository
· Standardized Schedule Templates
· Project Health Assessment (initial metrics are a subset only)
· Action, Decision, Risk, and Issue Management
· Document Management
Figure 6: Initial HUD PLUS Support for Project Management and Portfolio Management Disciplines The May 2015 disciplines referenced above are in the very early stages of adoption and change from the standpoint of maturity within the HUD organization and the wider user community will just be starting to utilize HUD PLUS in the April/May 2015 timeframe. The table below indicates the maturity level of the current HUD PLUS.
| HUD PLUS Capability |
| Current Status |
| Maturity Level Self-Assessment |
Portfolio Management Discipline
| PfM: Business Need Capture |
| This is a new discipline for HUD and it will take change in culture and behavior for HUD to achieve the most value from this capability. Additionally, as this is a new process it will need to be improved and reviewed based on user feedback and demonstrated results. |
| 1.5 out of 5 |
| PfM: Budget Request/Business Case Capture |
| HUD will eliminate the need for hundreds of excel spreadsheets/emails and thousands of hours of labor used to consolidate and report on the budget request information. |
| 1.5 out of 5 |
| PfM: Portfolio Analysis/Selection to support Budget Formulation |
| Again this year, provide a repeatable mechanism for the OCIO and CCC to score, prioritized and optimize the investment portfolio based on more objective criteria. This will allow for strategic based data driven decisions to be made. |
| 2 out of 5 |
| PfM: Operational Performance |
| Previously, during the Excel-based budget request capture process operational performance goals and metrics were provided in narrative. This was impossible to track and monitor. EPPM process is providing a simple to use and relatively basic model for starting the process of planning for operational metrics and then tracking against them in an operational analysis framework. |
| 1 out of 5 |
Project Management Capabilities
| PM: Centralized Schedule Library |
| HUD currently has no centralized schedule repository and items are managed separately and differently on all projects. The EPPM process discipline for Project Management will allow several early adopter projects to use the centralized HUD PLUS solution that supports the process as that repository |
| 1 out of 5 |
| PM: Standardized Schedule Templates |
| While the PPM 2.0 defines several schedule templates, early assessment has shown than many groups either don’t have project schedules in the sense of a Microsoft Project schedule (.mpp) and /or are not using the templates provided and defined in the PPM 2.0. The EPPM process will enforce the use of the schedule templates and over time all new projects will be created using the templates while some previously existing projects eventually come to an end or are they will be migrated to the new template. |
| 1 out of 5 |
| PM: Project Health Assessment |
| The Project Health Assessment (PHA) is a very new process to HUD and in turn many of the project/programs that are participating in the assessments are not prepared and don’t have the correct artifacts or processes in place to report out to the PHA. The EPPM process that supports the HUD PLUS solution will identify some of the foundational elements that HUD can build on regarding the PHA. |
| 1 out of 5 |
| PM: Action, Decision, Risk, and Issue Management |
| In order to improve and standardize collaboration, ensure compliance with PPM 2.0 standards and shorten training time when resources move between projects HUD PLUS will be automating and standardizing the collection and management of Actions, Decisions, Risks and Issues. |
| 1 out of 5 |
| PM: Document Management |
| Leveraging the SharePoint based collaboration capabilities deployed in the solution users will be able to centralize and store their project documentation in one standard place. |
| 1 out of 5 |
Maturity Level Key 1 = HUD is “Aware” of the existence of the capability 2 = HUD is “Educated” on the capability and understands the need for the solution 3 = HUD is “Trained” on the capability, understands its’ impact and the need for change 4 = HUD is “Adopting” the capability and shifting behaviors to adopt it 5 = HUD is “Sustaining” the capability as an institution
III. PROJECT REQUIREMENTS/SPECIFIC OBJECTIVES
Maintaining the HUD PLUS continues to have needs related to the following specific objectives:
· Provide operations and maintenance support of the HUD PLUS initial operating capability in the areas of Portfolio Management and Project Management.
· Provide support for organizational change management to promote HUD PLUS adoption in the areas of Portfolio Management and Project Management.
· Provide services to help with the consolidation and elimination of the existing budget planning, tracking and forecast data stores, processes, spreadsheets and applications in order to provide a more streamlined budget formulation and budget execution solution for HUD.
· Provide HUD with common and standardized processes for project management, forecasting resource demand and reporting in a consistent and uniform manner such that Project Health Assessments may be conducted using HUD PLUS.
· Provide enterprise information, data, and status suitable for the decision making and planning processes of the Portfolio Executives.
· Provide a repeatable solution for HUD portfolio capture, calibration, prioritization and optimization allowing for what-if scenarios based on various constraints.
IV. TASKS/DELIVERABLES
The major tasks and products outlined below are required by the SOW to maintain the HUD PLUS solution. The details of specific activities and deliverables will be provided in a Project Schedule.
A. Kick-Off Meeting
A kick-off meeting will be held within two weeks of contract award. The kick-off meeting will be used to clarify specific tasks and deliverables required and begin the development of planning and management documents. Follow-up meetings will be identified to review and approve plans, deliverables, schedules, and reporting details.
B. Monthly Progress Reports
The Contractor shall provide monthly progress/status reports after the issuance of this contract, which will be due no later than the fifteenth workday of each month. The status report will show actual progress against the Project Schedule. The status reports will: (1) provide a brief, factual summary description of technical progress made and costs incurred for each task (or group of tasks) during the reporting period; (2) identify significant problems and their impacts, causes, proposed corrective action, and the effect that such corrective actions will have on satisfying contract requirements and achieving contract objectives; (3) the schedule status or degree of completion of tasks/activities by time intervals; and (4) cost status or actual cost of work performed.
C. Project Schedule
The Contractor shall provide a project schedule of milestones and work activities in the MS Project format. The project schedule must be used to track and report progress of activities, resource allocation and costs. The project schedule will be uploaded and baseline in HUD PLUS no later than ten (10) days after the contract kick-off meeting. The project schedule will be updated as necessary after the project schedule is baseline in HUD PLUS.
Task 1: HUD PLUS Operations and Maintenance
The Contractor shall provide operations and maintenance services. The operations and maintenance areas that need to be supported are methodology administration, documentation and training, and change management. The requirements/deliverables related to these items are called out below.
| # |
| Deliverable/Requirement |
| Type |
| Due Date |
| 1-1 |
| Provide data import where required and necessary. This may include such things as: the addition of new data attributes in HUD PLUS and the initial population of that data attribute OR a one-time mass updates to existing data fields based on an enterprise level change OR the import of data into a specific financial dimension based on an enterprise decision. |
| PM and PfM |
| In accordance with baseline project schedule |
| 1-2 |
| Provide support in the area of backup and recovery to be sure that HUD is covered from a disaster recovery planning perspective. This will involve interaction with the IT Operations Team and the current IT service provider. |
| PM and PfM |
| In accordance with baseline project schedule |
| 1-3 |
| Provide basic O&M support to deploying cumulative updates (CUs) and Service Packs (SPs) to Project Server and UMT360 Financials. |
| General |
| In accordance with baseline project schedule |
| 1-4 |
| Provide performance troubleshooting assistance. |
| General |
| In accordance with baseline project schedule |
| 1-5 |
| Provide support in the migration from Project Server 2010 platform to the Project Server 2013 Platform. |
| General |
| In accordance with baseline project schedule |
| 1-6 |
| Provide support in migration from UMT360 Financials to UMT360 Portfolios. |
| General |
| In accordance with baseline project schedule |
| 1-7 |
| Provide annual Software Assurance and Premium Support for UMT360 Financials or UMT360 Portfolios, depending on the current deployed version. |
| General |
| In accordance with baseline project schedule |
Task 2: Organizational and Capability Maturity
The Contractor shall provide HUD PLUS Organizational and Capability Maturity (O&CM) supports change management, communications, detailed training, desk-side support, and maturing the use of the solution and processes enabled by HUD PLUS. The requirements/deliverables related to these items are called out below.
| # |
| Deliverable/Requirement |
| Type |
| Due Date |
| 2-1 |
| Provide classroom instructor led user training for new users and users needing refresher training on HUD PLUS to include specifics on navigation and usage of the solution and the supporting platforms (SharePoint, Project Server, and UMT360). This will include training support for both Portfolio Management and Project Management capabilities in HUD PLUS. |
| General |
| In accordance with baseline project schedule |
| 2-2 |
| Provide content and support for the maintenance of the HUD PLUS front facing web page on HUD@work to be used for internal marketing and as a landing page for new or interested users. This includes keeping collateral up to date, updating training schedules, new user applications, and more. |
| General |
| In accordance with baseline project schedule |
| 2-3 |
| Provide a monthly newsletter, including but not limited to, highlighting a summary of system changes, upcoming milestones, new capabilities, and user/segment spotlight. |
| General |
| In accordance with baseline project schedule |
| 2-4 |
| Provide job-aids as needed based on frequently asked questions, user feedback and team identified challenge areas. |
| General |
| In accordance with baseline project schedule |
| 2-5 |
| Provide solution branding support, including but not limited to; poster/flyers, business cards, banners and brief videos showcasing HUD PLUS personas and value propositions for roles such as Executive, Project Manager, CRC, Program Manager, or Team Member. |
| General |
| In accordance with baseline project schedule |
| 2-6 |
| Provide 1-on-1 onboarding sessions and desk-side support for users to help with the creation/modification of their budget planning records. |
| PfM |
| In accordance with baseline project schedule |
| 2-7 |
| Provide support for portfolio prioritization and optimization process by preparing scenarios, facilitating discussions and creating exports from the solution for use for budget hearings, and CCC/Deputy Secretary decision making. Scenarios will support the budget planning and formulation process and may be used to address multiple budget scenarios or organization strategy. |
| PfM |
| In accordance with baseline project schedule |
| 2-8 |
| Provide support for the portfolio prioritization and optimization in the area of implementing weighted criteria based on organization strategy and enterprise guidance. |
| PfM |
| In accordance with baseline project schedule |
| 2-9 |
| Provide support for the initial operating capability around the operational analysis and evaluation of operations and maintenance records. |
| PfM |
| In accordance with baseline project schedule |
| 2-10 |
| Provide 1-on-1 onboarding sessions and desk-side support for users to help with the import and update of their projects, schedules, risks, issues, documents. |
| PM |
| In accordance with baseline project schedule |
| 2-11 |
| Provide the necessary project schedule template upgrades based on revisions to the PPM. This will include the replacement of existing templates with new templates and adjustments to the onboarding process. |
| PM |
| In accordance with baseline project schedule |
| 2-12 |
| Provide 1-on-1 onboarding sessions for users to help with the creation/modification of their UMT360 relationships/associations to support the data aggregation and reporting on dependencies between entities in the solution. |
| PM and PfM |
| In accordance with baseline project schedule |
| 2-13 |
| Provide training as requested to HUD designated employee in the administration of the HUD PLUS solution to start the process of transition of administration duties to HUD. This will include training on the administration of Project Server and UMT360. |
| PM and PfM |
| In accordance with baseline project schedule |
| 2-14 |
| Provide administrative support for, but not limited to, the following areas based on approval by the HUD PLUS CCB: user creation, security groups, security categories, security roles, portfolio center views, enterprise custom fields, UMT360 mapped custom fields, UMT360 cost structures, UMT360 enterprise financial types, governance workflows, fiscal calendar administration, UMT360 snapshot, and UMT360 change requests. |
| PM and PfM |
| In accordance with baseline project schedule |
| 2-15 |
| Provide support in knowledge transfer and the transitioning administration of the HUD PLUS solution to a Government FTE. This will come in the form of training, mentoring and on-the-job (OJT) learning while participating in the administrative functions. This transition will be done in a shadowing capacity as well as during a set aside time each week to conduct reviews of what has been done in the system and answer question. This weekly set aside time will be no more than two hours. The shadowing, mentoring and OJT will be key to making this transition work. |
| PM and PfM |
| In accordance with baseline project schedule |
| 2-16 |
| Provide minor changes to layouts, filtering, and export capability of existing reports. |
| PM and PfM |
| In accordance with baseline project schedule |
| 2-17 |
| Provide updated and consolidated list of frequently asked questions to be stored on the HUD PLUS Help Center Page. These can be used as reference and first line of user self-help. |
| PM and PfM |
| In accordance with baseline project schedule |
| 2-18 |
| Provide documentation updates to training materials, services user guides, and other PPM 2.0 required documents as needed and agreed upon by the HUD PLUS Project Manager. |
| PM and PfM |
| In accordance with baseline project schedule |
| 2-19 |
| Provide a weekly status report, from the HUD PLUS PM module, that includes the status of the schedule, risks, issues, action items. Also included will be metrics on support provided to include but not limited to things such as; number of desk-side support session conducted, number of new users in a week, number of active users in the week, number of emails received in HUD PLUS email account for support, etc… |
| PM and PfM |
| In accordance with baseline project schedule |
Task 3: Critical New Capability
The Contractor shall identify HUD PLUS critical new capabilities that will be implemented under the SOW work effort. The Contractor shall identify, prioritize and add to the enterprise roadmap any remaining new capabilities not implemented as part of the SOW work effort. The requirements/deliverables related to these items are called out below.
| # |
| Deliverable/Requirement |
| Type |
| Due Date |
| 3-1 |
| Provide report design, creation, testing and deployment to support EPMO reporting needs. This will include queries against the Project Server and UMT360 databases to aggregate/compare financial data based on UMT360 aggregation settings. |
| General |
| In accordance with baseline project schedule |
| 3-2 |
| Provide an automated mechanism (report) for the export of the portfolio scenarios developed during the portfolio prioritization and optimization sessions that are conducted. This will save time and make it easier for the HUD employees to export the results of scenarios out of the system in a well formatted and consumable fashion. |
| PfM and PM |
| In accordance with baseline project schedule |
| 3-3 |
| Provide support in defining, and integrating the HUD strategic drivers with the portfolio prioritization and optimization process. |
| PfM |
| In accordance with baseline project schedule |
| 3-4 |
| Provide support for advanced financial management capability to track actual expenses and forecasts using the UMT360 Financials capabilities. |
| PM |
| In accordance with baseline project schedule |
Task 4: New Capability: Application Portfolio Management (APM Initial Operating Capability - Part 1)
The Contractor shall deploy the HUD PLUS Application Portfolio Management (APM) capability as part of the enterprise OCRPM vision. The APM module is critical to completing the vision enabling HUD to get the maximum value out of the HUD PLUS investment in the form of application rationalization, reduction in duplicate efforts and elimination fragmentation in the portfolio.
A parallel effort will be started to deploy the capability so that they can converge in the future. The new APM capability and the existing HUD PLUS PM/PFM capability will be dependent on one another and will operate separately leveraging different primary user groups. Hence, the efforts to deploy APM will happen in parallel and roadmap to converge the solutions developed. The requirements/deliverables related to these items are called out below.
| # |
| Deliverable/Requirement |
| Type |
| Due Date |
| 4-1 |
| Provide support to migrate from UMT360 Financials to UMT360 Portfolios software to support the Application Portfolio Management capability. |
Note: This will require the additional purchase or upsell (true-up) to the UMT360 Portfolios software.
Note: In addition to UMT360 Portfolios, HUD should consider the acquisition of the UMT360 Portfolios APM Content Pack of Reports which includes dozens of pre-configured reports that can be used immediately once data is populated. Reports would be owned by HUD and can be modified, edited, and updated as business needs change.
| Initial Operating Capability (IOC) – Part 1 |
| In accordance with baseline project schedule |
| 4-2 |
| Provide the ability to create an Application entity in HUD PLUS. |
| IOC– Part 1 |
| In accordance with baseline project schedule |
| 4-3 |
| Provide the ability to capture and manage attributes related to an Application. |
| IOC– Part 1 |
| In accordance with baseline project schedule |
| 4-4 |
| Provide the ability to create UMT360 relationships between Applications and other entities in the HUD PLUS solution for the purpose of financial aggregation. |
| IOC– Part 1 |
| In accordance with baseline project schedule |
| 4-5 |
| Provide the ability to create relationships to other Applications. |
| IOC– Part 1 |
| In accordance with baseline project schedule |
| 4-6 |
| Provide the ability to create a hierarchy of Business Capability entity in HUD PLUS. |
| IOC– Part 1 |
| In accordance with baseline project schedule |
| 4-7 |
| Provide the ability to capture and manage attributes related to those entities creation to support the Business Capability hierarchy. |
| IOC– Part 1 |
| In accordance with baseline project schedule |
| 4-8 |
| Provide the ability to create UMT360 relationships between Business Capabilities and other entities in the HUD PLUS solution for the purpose of financial aggregation and reporting. |
| IOC– Part 1 |
| In accordance with baseline project schedule |
| 4-9 |
| Provide the ability to create UMT360 relationships to other Business Capabilities. |
| IOC– Part 1 |
| In accordance with baseline project schedule |
V. TRAVEL
All local travel will be reimbursed at the rates in effect at the time of the travel. Local travel is defined as travel within the greater Washington Metropolitan area. Long distance travel will be performed on an as needed basis and coordinated with the GTM for this project. Every effort will be made to obtain economic airfares and per diem will be reimbursed at government-approved rates in effect at the time of travel.
VI. GOVERNMENT FURNISHED MATERIALS
Government furnished property (e.g., materials, equipment, and/or information) will be provided in conjunction with required performance under this Task as determined by mutual agreement between the government and the Contractor purchase of hardware or software tools, unless approved as part of the Task Order for this SOW, must be pre-approved by the GTM.
At the written request of the government, the Contractor shall immediately return any property provided by the government for the Contractor’s use to complete the assigned subtasks under this Task. If not requested, the Contractor shall continue to abide by FAR Part 45 until completion of the contract.
The government will arrange for Contractor access to HUD contractor/subcontractor data, works in progress, deliverables, and other materials essential to perform independent assessments or other activities in support of this SOW.
Government workspace will be provided to Contractor personnel when they are working at a HUD facility at government request. Individual contractor personnel will be provided access to the HUD information network, as necessary, and in accordance with HUD’s network security requirements, to accomplish this SOW.
VII. PLACE OF PERFORMANCE
It is anticipated that the majority of work may be performed at Department of Housing and Urban Development facilities. The coordination of work to be performed at a government site must be done through the GTR and GTM.
VIII. PERFORMANCE MEASUREMENTS
Performance Standards - The following provides the Performance standards for this Statement of Work:
| PERFORMANCE REQUIREMENT |
| PERFORMANCE STANDARD |
| PERFORMANCE MEASUREMENT |
| PERFORMANCE DISINCENTIVE(S) |
Customer Satisfaction Quality of Products and Services – Excellent Rating
· Compliance with SOW requirements
· Accurate reporting
· Use of appropriate personnel
· Technical excellence
· Minimal errors requiring rework
On a quarterly basis, the Contracting Officer may assess a 1% disincentive of the applicable CLIN price if any one of the performance standards is rated less than Excellent; 2% if two of the performance standards are rated less than Excellent; 4% if three of the performance standards are rated less than Excellent; and 5% if all four performance standards are rated less than Excellent. The total disincentive that may be applied will not exceed 5% of the applicable CLIN price. Any disincentives shall be applied to all of the tasks completed and accepted during the calendar quarter evaluated.
Timeliness of Performance – Excellent Rating
· Performance milestones and delivery schedules met
· Timely completion, including wrap-up & contract administration
Business Relations –
· Effective management
· Business-like communications
· Prompt notification of problems
· Reasonable, cooperative, flexible, proactive
Customer Satisfaction –
· Service/products meet customer needs as expressed in meetings/interviews, etc.
· Responsive to SOW requirements
· Effective contractor-generated solutions
IX. PERIOD OF PERFORMANCE
The Period of Performance will be twelve (12) months from Task Order award.
X. TECHICAL CONTACTS
Government Technical Representative: Danita Gordon image1.png image2.png image3.png image4.png