This document is a Justification and Approval (J&A) for Exception to Fair Opportunity for an emergency maintenance contract with the Department of the Navy's Mid-Atlantic Regional Maintenance Center. The contract (N0024-22-D-4407, Delivery Order N50054-25-FL035) involves repairing ventilation fan SS-29 on the USS San Antonio (LPD 17), which is critical for ensuring safe marine vehicle carbon monoxide operations and deck functionality. The work requires immediate action due to the time-sensitive nature of the ship's current maintenance period, with the repair needing to commence and complete within a condensed timeline to restore full mission capability and well deck operations.
The procurement is being executed as a sole-source acquisition under FAR 16.505(b)(2)(i)(A), with the contracting officer determining the anticipated costs as fair and reasonable based on historical data, Independent Government Estimate, and Project Manager technical knowledge. The emergency nature of the work prevented market research, and future similar acquisitions will be reviewed to promote full and open competition. The contract emphasizes the technical necessity of replacing both the motor and impeller together to prevent potential catastrophic fan failure, which would significantly impact the ship's operational readiness.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J&A Number:
NCH 53.6-2
impeller was not included in the original scope of work. If the motor is replaced and the existing impeller is used any operation of the fan risks catastrophic failure to the newly installed motor as the fan and impeller are balanced together during manufacturing. This degradation prevents USS San Antonio from fully utilizing their vehicle stowage areas to current EMAV, which ends , is the final contracted maintenance period for the ship before they . USS San Antonio It is essential to complete this repair action to restore ventilation fan SS-29 and to allow full mission capability and well deck operations.
6. DETERMINATION OF FAIR AND REASONABLE COSTS
The Contracting Officer has determined that the anticipated cost to the Government for the supplies/ services covered by the J&A will be fair and reasonable. The estimated cost of this work item is based upon (PM) technical knowledge associated with the estimated man hours and material costs to complete this pair labor rate and material burden rate were determined to be fair and reasonable at time of contract and delivery order award. The supported information provided should be sufficient to support the fair and reasonable cost determination of the procurement.
7. ACTIONS TO REMOVE BARRIERS TO COMPETITION
For reasons set forth in paragraph 5 and 6, market research was not conducted. The critical nature of the work requires that it is started immediately. Future acquisitions for similar work will be reviewed by the Contracting Officer on a case by case basis to promote the use of full and open competition in the acquisition process where possible under this multiple delivery-order contract, where possible and practicable in accordance with FAR Subpart 16.5. In addition, a copy of the change(s) covered by this justification will be forwarded to Code 200, Planning and Engineering, and Code 300 Waterfront Operations for consideration of similar work requirements in future solicitations.