RC Concrete SOW.pdf

PDF 2 MB Posted

Attached to
Remove and Replace Areas of Concrete, Federal Building, Rapid City, SD
Solicitation number
47PJ0024R0043
Issued by

About this file

This document summarizes a statement of work for a federal contract opportunity to remove and replace concrete at a federal building in Rapid City, South Dakota. The solicitation number is 47PJ0024R0043 issued by the General Services Administration Public Buildings Service Region 8. Work includes removing approximately 190 square feet of concrete, including an accessible ramp, sidewalk, and a section of curb and gutter. Bidders should provide labor, materials, equipment and supervision necessary to complete the project as detailed in the attached solicitation. The statement of work does not specify pricing terms, response dates, or other administrative details.

View the file

Other files

File Type Posted
C301 Reps Certs 47PJ0024R0043.pdf PDF
C101 Agreement 47PJ0024R0043.pdf PDF
SF 1442 47PJ0024R0043.pdf PDF
C201 Solicitation 47PJ0024R0043.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | Page

CONSTRUCTION SCOPE OF WORK

U.S. GENERAL SERVICES ADMINISTRATION, ROCKY MOUNTAIN REGION 8

Date: 2/13/2024 Revision:

Section 1: Project Title Remove and replace accessible concrete ramp, Andrew W. Bogue Federal Building, Rapid City, South Dakota

Section 2: Project Location, Building Name, & Building Number Andrew W. Bogue Federal Building & Courthouse 515 9th St Rapid City, South Dakota Building Number: SD0035ZZ

Section 3: Contact List Contracting Officer (CO) Name: Kristen Feickert Email: Kristen.feickert@gsa.gov Address: 115 4th Ave SE, Aberdeen, SD 57401 Phone (O): 605-252-3355 Phone (C): 605-877-1200

Building Manager Name: Justin Weyer Email: Justin.weyer@gsa.gov Address: 515 9th Street, Rapid City, SD 57701 Phone (C): 605-222-0998

Project Manager/COR Name: John Riker Email: john.riker@gsa.gov Address: 515 9th Street, Rapid City, SD 57701 Phone (C): 605-381-8294

Section 4: Project Background & Project Description The General Services Administration, Region 8, is initiating a project to remove and replace approximately 190 square feet of concrete, to include an accessible ramp, sidewalk, and a section of curb and gutter. The new ramp includes a detectable warning surface. The 190 square foot project area includes approximately 15 linear feet of curb and gutter. The project also includes approximately 152 linear feet of concrete grinding to repair vertically displaced sidewalk panels. The project is located at the Andrew W. Bogue Federal Building in Rapid City, South Dakota.

Section 5: Project Objectives The contractor shall provide labor, materials, equipment and supervision necessary to perform:

1) Locate Utilities in the work area

2) Pedestrian Control:

a. Furnish and deploy pedestrian control measures to allow safe, continuous access to the building entrance.

2 | Page

3) Contractor shall coordinate sequencing and control measures with the Project Manager and the Property Manager.

a. Contractor shall provide barricades to prevent access of the public into the work areas;

and shall protect the public at all times.

4) General requirements:

a. Concrete to have compressive strength of 4,000 psi or greater, as specified below.

b. Concrete Mix Design by Contractor shall be suitable for the job conditions.

c. Reinforcements - Bars, fabrics, connectors, and chairs shall be suitable for the job conditions.

5) Remove concrete to be replaced.

a. See attachments for repair boundaries.

b. Saw repair boundaries to the full depth of concrete.

c. Remove existing concrete so as to not spall or crack adjacent concrete.

i. All old concrete and materials to be removed completely from the site.

d. Recycle all demolished concrete if possible, and provide recycling or disposal manifests.

6) Construct steel reinforced concrete ramp and sidewalk, to a depth of not less than 4”; surface area is approximately 150 square feet, as shown in the attachments and in compliance with

ABAAS 406.

a. Use sidewalk forms that are of a height equal to the full depth of the finished sidewalk.

b. Use curb and gutter outside forms that have a height equal to the full depth of the curb or gutter

c. Provide dry, compacted gravel subgrade suitable for a sidewalk; 98% proctor test required prior to placing concrete

d. Form sidewalk and tool all joints to match the pattern, appearance, and dimensions of the existing sidewalk; the existing sections are approximately 60” wide.

i. Round all joint edges with an edger having a 1/8" radius

1. Note: ABAAS requirements apply to this project.

e. Hammer drill and set ½”, #4 re-bar tie-bars, 24” o.c in the ends of slab. Re-bar tie bars shall be 18” long, with minimum 6” of embedment into the existing concrete. New tie bars shall be anchored in adhesive epoxy.

f. Provide 10ga 6” x 6” wire mesh at mid-depth of the concrete; support as needed to keep mesh in the center of the slab.

g. Contractor shall place minimum 4,000 P.S.I at 28 day concrete, GSA approved equivalent mix.

i. Concrete features, to include slump and entrained air requirements:

1. The slump at time of placement shall be maintained between 1 (25 mm) and 4 inches.

2. High range water reducer may be used to achieve slump/strength ratio.

The water cement ratio shall be kept as low as possible.

3. The entrained air content for this cast in place concrete shall be 4-1/2%-

7-1/2%.

4. Batch mix shall have minimum 480-495 pounds of type I,II,III or V cement material per cubic yard, with 105-120 pounds of fly ash; total cement and fly ash shall be 600 pounds.

a. No calcium chloride shall be used if admixtures are added to batch mix to enhance temperatures for curing purposes. Non-chloride accelerator can be used in its place.

ii. Curb and gutter features:

1. Curb and gutter shall be placed in a single lift

2. Use hard-pressed fiberboard contraction joint filler for curb and gutter

h. Install detectable warning system in accordance with the US Access Board’s Public Right-of-Way Guidelines (PROWAG), ANSI A117.1 Section 705, and by manufacturers’

3 | Page installation instructions

i. Yellow, truncated dome tile

ii. Full width of ramp excluding flares

iii. 24″ minimum in the direction of travel

i. Contractor shall provide a light broom finish after floating and troweling, as soon as concrete will not tear. Broom grooves shall have a depth of 1/16.

j. Temperature at placement shall be minimum 40 degrees and rising.

k. Contractor shall cover the concrete with curing blankets if temperatures will drop below

45 degrees F. in the first 48 hours of cure time.

l. Concrete shall be maintained above 32 F (0 C) until it has attained a compressive strength of 1500 psi (11 MPa)

m. Protect concrete from damage until accepted by GSA

n. Contractor shall provide and apply a low/no VOC, water based white concrete curing compound to all fresh concrete placed during hot or windy conditions.

o. Contractor shall pour concrete cylinders to be broken in a destructive strength test.

i. One cylinder shall be broken at 72 hours after placement, one at 7 days, and one at 28 days after placement.

ii. The sidewalk shall not be reopened until the new concrete has achieved minimum 3,500 PSI.

iii. Contractor shall submit break test results as soon as they get them, so that GSA can reopen the sidewalk as soon as possible.

p. Apply joint sealants to all expansion joints

7) Concrete grinding

a. Concrete grinding, or horizontal saw cutting, is a method typically used to remove “stub toes” that are 1 inch (1”) high or less

b. Prior to performing work, secure any necessary permits from the City of Rapid City for work in a public right of way.

c. The finished result shall have a smooth uniform appearance and texture and leave zero point of differential between slabs of crack to both sides of the sidewalk to eliminate trip hazards the full width of the sidewalk.

d. Repairs shall be performed so that the sidewalk surface has essentially the same or slightly rougher texture as the undamaged portion on either side of the joint or score lines. Repaired surface shall not be smooth or polished and shall have a non-slip surface. Coefficient of friction (ASTM C-1028 standard COF of .5 or above).

e. Repairs shall be performed in such a manner as to produce a neat perimeter with no stray marks. Temporary repairs shall not mar or otherwise deface adjacent concrete.

f. Saw cuts shall have a slope not to exceed 1:12.

g. Remove and replace any sealants damaged as a result of the work performed.

h. Refer to attached drawing for approximate locations and quantities of work.

4 | Page

8) Replace and/or repair any damage caused as a result of this project to pre-construction condition; this includes, but is not limited to other driveway sections, curbs, fencing, and sidewalks.

Section 6: Proposal Pricing & Site Walk

1) Pre-proposal Site Visit Meeting: As scheduled with the Project Manager

a) The site visit shall consist of a meeting to review construction requirements followed by a walk-thru of the project site. The meeting shall be attended by the contractor and GSA project personnel, and appropriate sub-contractors.

b) Review existing conditions of the project area including any field verification.

c) Review the solicitation/evaluation requirements.

2) Cost Proposal Requirements:

a) When submitting a proposal, provide a cost breakdown for each task into the following categories: Materials, equipment, labor hours, subcontractor's quotes, overhead, profit, and bond. Pricing shall be broken down by Construction Specification Institute (CSI) divisions.

Section 7: Period of Performance Once notice to proceed has been issued, the contractor has 14 calendar days to complete the project.

The contractor must also promptly begin the badging process at the time of award. Please allow a minimum of 30 days to complete the badging process. Extensions will be granted for unforeseen conditions and other factors outside of the contractor’s control at the Contracting Officer’s discretion.

Section 8: Universal Scope Requirements

● ALL of the requirements in this section are MANDATORY

● See the attached Universal Scope Requirements document for the full details outlining each item

● Failure to comply with any and all of the requirements will result in the project not being accepted as complete

SAFETY & HEALTH

A. Safety and Health Program E. Accessibility (ABAAS)

ENERGY, SUSTAINABILITY & ENVIRONMENTAL

G. Sustainable Purchasing H. Construction Waste Diversion I. Site Work (Stormwater/Erosion, Soil Disturbance, and Utility Locates)

Section 9: Submittals

1) Contractor shall submit a Method of Procedures (MOP) to the GSA Delivery Project Manager (PM) for approval prior to commencement of work. At a minimum, the MOP shall include:

a) Project schedule (to include critical path, major milestones, long lead time items, mob & de-mob, inspection dates, substantial completion, and occupancy dates)

b) Service/Utility Outages (if necessary)

c) Phasing schedule (if necessary)

2) Manufacturer's specifications, instructions and material specification sheets in original form

3) Submittal register/ log for all products specified to establish a standard of quality to include.

5 | Page

Submittal register response by the government shall be (14) calendar days or less.

a) For pricing purposed please assume 1 electronic copies to be sent to the project manager. Physical samples are only required for color selection and shall be mailed to GSA’s project manager. Distribution list including final quantities will be finalized after receipt of the submittal log/ register by GSA project manager.

4) If product samples are not submitted in a timely fashion, any delays caused by the contractor will not warrant a time extension. After completion of all work, the Contractor shall submit to the project manager the manufacturer's specifications, instructions and material specification sheets in original form. Additionally, the Contractor shall submit all inventory changes (removals, additions, upgrades, etc., and new condition codes) to the COR.

5) Submittal response by the government shall be (14) calendar days or less.

SUBMITTAL DUE DATE

1. Performance/Experience References With Proposal

2. Alternative payment protection Within 14 calendar days after Award

3. Insurance Certificate Within 14 calendar days after Award

4. Security Clearances Forms Within 14 calendar days after Award

5. Standard Form(s) 1413 Within 14 calendar days after Award

6. Method of Procedures (MOP) Within 14 calendar days after Award

7. Waste Management Plan (see USR) Within 14 calendar days after Award

8. Safety and Health Program (see USR) Within 28 calendar days after Award

9. Payrolls Weekly after construction start date

MATERIAL SUBMITTALS:

10. Concrete Mix Design & Curing Plan Within 14 calendar days after Award

11. Steel Reinforcing Cut Sheets Within 14 calendar days after Award

12. Concrete Break Test Results Within 72 hours of test

13. Proctor test results Within 72 hours of test

14. Joint Sealant Cut Sheets Within 14 calendar days after Award

15. Detectable Warning System Within 14 calendar days after Award

Section 10: General Requirements

1) Contractor Use of the Premises During the period of the project, the contractor will have access to the site during all hours. The contractor will need to coordinate with the Contracting Officer to arrange access to the parking lot. The contractor shall make every effort to cause a minimum of damage to parking lots, any other paved areas, any items that need to be moved during the course of the project, and any areas not included in this scope of work. Any damage caused will be repaired at the contractor’s expense.

2) Progress Meetings Progress meetings are not required for this project. The project manager and building team representative shall make periodic inspections of the work progress.

3) Equipment The contractor shall provide all equipment associated with the entire project, operate in a safe manner and adhere to all OSHA and GSA standards.

4) Equipment and Material Storage The contractor shall provide and store all equipment, the materials specified above, and any other materials required completing the project. The materials are required to be kept clean and dry throughout the duration of the project. Contractor to coordinate with building manager for location of storage sheds.

6 | Page

5) Sanitary Facilities Provide and maintain temporary toilet facilities in accordance with State Health Department and GSA requirements.

6) Electricity, Water, and Gas GSA will pay for electricity, water, and gas during the course of this project. The contractor is responsible for making connections to the existing systems. Temporary electrical work shall meet the requirements of NFPA 70-1996 (NEC), Article 305. When temporary connections are removed, restore existing utility services to their original condition.

7) Contractor’s Field Office The contractor may provide an office for their own use. Size, location, and construction shall be subject to approval.

8) Fire Watch Contractor shall be responsible for providing fire watch if required per attached GSA fire watch guidelines.

9) Fire Alarm Impairment and Hot Work When a fire suppression or alarm system impairment is required, contractor shall provide written outage request to GSA for approval in advance of impairing any systems. Contractor shall be responsible for having a GSA approved NICET certified fire alarm contractor perform all system impairments. During fire alarm/suppression impairments or hot work procedures, contractor shall provide a fire watch per the GSA Regional Fire Watch Guidelines.

10) Protection of Public The building site will continue to be used by tenants. The contractor shall fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry. The contractor shall illuminate barricades and obstructions at night and maintain safe building access and egress for tenants.

11) Housekeeping The project site shall be kept in a neat, orderly, and safe condition at all times. The contractor shall provide enough containers for collecting construction debris and construction materials to be recycled. The contractor shall wet down dry materials and rubbish to prevent blowing dust and keep volatile wastes in covered containers.

12) Transportation and Deliveries The contractor shall arrange deliveries of materials in accordance with construction schedules; coordinate with COR to avoid conflict with other tenants and other work conditions at the site. Contractor must make GSA PM & CO aware of any lead times that may affect the project schedule.

13) Cleaning Before scheduling the final inspection, the Contractor shall accomplish six items: (1) Remove all tools, equipment, surplus material, and rubbish; (2) Restore or refinish, to original condition, surfaces that are damaged due to the work of this contract; (3) Remove grease, dirt, stains, foreign materials, and labels from finished surfaces; (4) Thoroughly clean building interiors; (5) Pickup all construction debris from the site; and (6) At time of final inspection, project shall be thoroughly cleaned and ready for use.

14) Disruptive Work All painting, staining, or other activity which may cause noxious or undesirable fumes and/ or any noisy work that may be disruptive to the tenants/ public must be performed after normal working hours. The use of paint or stain that does not generate odors is preferred and may be required if the space will be occupied the following day with prior written approval from GSA.

Section 11: Badging & Security

1) Contractor is responsible to follow GSA’s security and badging requirements as detailed in the Badging & Security Requirements (Vendor Fitness Determination Training Manual).

7 | Page

2) US Access shared enrollment centers can be found at fedidcard.gov. Travel distances to the nearest center should be accounted for during the badging process.

Section 12: Payments

1) Information regarding payment requests and payment is in the solicitation/ contract. Please contact the CO if you have any questions regarding payments.

Section 13: Substantial Completion & Final Inspection

1) When project, or designated portion of project is complete, request a final inspection. Upon receipt of request that project is substantially complete, the Contracting Officer will proceed with the inspection within ten days of receipt of request or will advise the contractor of items that prevent the project from being designated substantially complete.

2) Red-lined drawings and CAD and/or BIM as-built drawings, and field training for Operations and Maintenance (O&M) personnel shall be provided at completion of project if applicable. Maintain one complete set of contract drawings. Clearly mark changes, deletions, and additions using GSA CAD Standards to show actual construction conditions. Show additions in red, deletions in green, and special instructions in blue print. Provide to GSA within timeframe negotiated at time of award.

3) The contractor shall provide O&M manuals if applicable. The O&M manuals shall contain the following:

o Executed Warranties (at project completion) o Maintenance and operation manuals

Section 14: Attachments

1) Universal Scope requirements

2) Design Intent Drawings http://fedidcard.gov/

Universal Scope Requirements V3.9 – 11.13.2023

(Mandatory Requirements that accompany all Scope of Work Templates) Note: The PBS-P100 remains the paramount guidance document.

This document clarifies and expands upon certain requirements within the P100.

Safety & Health 1

Section A – Safety and Health Program 1 Section E – Accessibility (ABAAS) 5

Energy, Sustainability, & Environmental 6 Section G – Sustainable Purchasing 6 Section H – Construction Waste Diversion 7 Section I – Site Work (Stormwater/Erosion, Soil Disturbance and Utility Locates) 8

REFERENCES 19

V3.8 – 6.30.2022

Safety & Health

Section A – Safety and Health Program

● Contact: Robert Smith, Regional Industrial Hygienist 720.275.7459 robertv.smith@gsa.gov

● Contractor Responsibility: The Contractor shall assume full responsibility and liability for compliance with applicable codes, standards and regulations during execution of the Work, and shall hold the Government harmless for any action on the Contractor's part, or that of the Contractor's employees or subcontractors, that results in illness, injury or death.

● References: In addition to publications referenced in the Construction Contract Clauses, the following Code of Federal Regulations (CFR), publications apply to work conduct. State and local safety and health regulations that apply are not cited herein.

Current editions at the date of the contract apply. The more stringent requirements apply.

○ 29 CFR Part 1910: Occupational Safety and Health Administration (OSHA) General Industry and Health Standards

○ 29 CFR Part 1926: OSHA "Safety and Health Regulations for Construction"

○ National Fire Protection Association (NFPA) 70E Electrical Safety Requirements for

Workplace Safety.

● The Contractor shall submit for approval a site-specific written Project Safety and

Health Program, including but not limited to the following:

1. Occupational Noise Exposure

2. Fall Protection

3. Personal Protective Equipment

4. Control of Hazardous Energy

5. Electrical Safety Related Work

Practices

6. Lead

7. Asbestos

8. Polychlorinated Biphenyls (PCBs)

9. Respiratory Protection

10. Confined spaces

11. Hazard Communication.

12. Respirable Crystalline Silica

● Contractor shall additionally submit firm's General Safety Plan at the pre-construction conference listing emergency procedures and contact persons including home addresses and telephone numbers.

Section E – Accessibility (ABAAS)

● Contact: Verna McCain, Designer 303.918.1991 verna.mccain@gsa.gov

● The Architectural Barriers Act Accessibility Standard (ABAAS) is mandatory for all GSA projects. Found at http://www.access-board.gov/ada-aba/final.cfm

● If local accessibility standards exist, the A/E must follow the more stringent requirements between the local standards and ABAAS.

● Accessibility in Federal Courthouses: Comply with Chapter 8, Design Standards for U.S. Court

Facilities, Section 8.2, Planning for Accessibility, and Table 8.1, Accessibility Requirements.

Energy, Sustainability, & Environmental

Section G – Sustainable Purchasing

● Contact: Christie-Anne Edie, Sustainability Specialist 303.335.7254 christie.edie@gsa.gov

● Key Sustainable Products (KSPs)

○ Any of the five materials listed below that are purchased and/or installed as part of this project must comply with their respective sustainability standards.

mailto:robertv.smith@gsa.gov mailto:verna.mccain@gsa.gov http://www.access-board.gov/ada-aba/final.cfm mailto:christie.edie@gsa.gov

V3.8 – 6.30.2022

○ Contractor shall submit the required submittal for each material used demonstrating compliance with the standard prior to install.

Product Sustainability Standard Required Submittal

Nylon carpet NSF 140 Gold certification AND ≥ 10% post-consumer recovered content

Product literature showing NSF Gold logo AND

Certification of recovered content by reputable 3rd party

Interior latex paint

≤ 50 grams per liter (g/L) VOCs post-tint (SCAQMD Rule 1113 standard)

Material Safety Data Sheet (MSDS) Technical Data Sheet (TDS)

Gypsum board

Greenguard Gold certification OR 0 g/L VOCs

Product sheet Material Safety Data Sheet (MSDS) Technical Data Sheet (TDS)

Acoustical ceiling tiles

Meets ALL of the following:

California Section 01350 standard for low-

VOC materials Total recycled content ≥ 20% Recyclable in a closed loop process USDA Certified BioPreferred

Environmental Product Declaration

(EPD) AND

Product sheet for USDA Certified BioPreferred

Concrete (ready-mix and site-mix)

≥ 15% fly ash OR

≥ 25% ground granulated blast-furnace (GGBF) slag

Letter from the supplier

● Non-Key Sustainable Products

○ In addition to the KSPs, all other interior finishes must meet the baseline environmental requirements specified in the most current GSA P100 facilities standards, Chapter 3, Architecture and Interior Design.

○ Sustainability requirements for specific interior finishes and construction materials may also be found at www.sftool.gov

○ Contractor shall submit product data for each finish material used demonstrating compliance.

● Water-Efficient Products (Plumbing Fixtures)

○ Purchase/install only water-conserving products, such as WaterSense and FEMP-designated products.

● Energy Efficient Products & Appliances (if applicable)

○ Any appliances (refrigerators, dishwashers, etc.) purchased by GSA and/or under GSA-operational control must be energy-efficient, meeting standards such as:

■ Environmental Protection Agency’s (EPA) Energy Star-labeled

■ Federal Energy Management Program (FEMP) designated

■ Other similar energy-efficient certifications.

○ Contractor must provide proof of compliance (standard construction submittal) for applicable products, equipment replacements, and installations.

● Refrigerants Phase Out (if applicable)

○ If any equipment/components are being replaced that contain ozone-depleting

HCFC and HFC compounds and/or high GWP chemicals, these must be replaced with equipment containing non-HCFC and/or non-HFC refrigerants and/or SNAP-approved substitutes.

http://www.sftool.gov/

V3.8 – 6.30.2022

○ Accordingly, contractors shall comply with the Title VI of the Federal Clean Air Act AND 40 CFR Part 82.

Section H – Construction Waste Diversion

● Contact: Lauren Pittenger (lauren.pittenger@gsa.gov) or Amy Gutirrez (amy.gutirrez@gsa.gov).

● NOTE: Only required for projects $50,000 and above.

● Construction and Demolition (C&D) Waste Protocol

○ C&D waste is defined as non-hazardous waste generated by construction or demolition activities (such as furniture, appliances, carpet, sheetrock, fixtures, etc.)

○ Unless otherwise specified, all C&D waste material becomes the property of the contractor and shall be disposed of outside Government facilities and land.

○ Contractor shall provide dumpsters as necessary to handle all C&D waste - location of these dumpsters will need to be coordinated with GSA at the start of the project.

Contractor is responsible for transportation of waste material to a landfill as well as any disposal costs. Contractor shall not stockpile demolition debris for more than 48 hours (outside a dumpster).

○ Contractor shall dispose of C&D waste at least monthly, in a legal manner, at a public or private dumping area.

○ Contractor must document disposal as outlined below.

● Minimum C&D Waste Diversion requirement is 50 percent

○ Diversion is defined as diverting materials from landfills and incinerators via methods such as recycling, reuse, repurposing, scrap, or donation.

○ Contractor shall use all reasonable means to divert as much C&D waste as possible and is encouraged to exceed the minimum.

○ Diversion rates are calculated at end-of-project by weight of total non-hazardous waste generated by the project.

○ Further, the contractor shall employ processes to ensure the project generates as little waste as possible due to over-packaging, error, poor planning/layout, breakage, contamination, damage from weather, etc.

● Required Submittals and Reporting Requirements

○ Waste Management Plan: To demonstrate compliance, contractor shall submit a

Waste Management Plan within 14 days of Notice to Proceed including:

■ List of the recycling facilities, reuse facilities, municipal waste landfills and other disposal area(s) to be used

■ Name, location, and phone number of each facility listed

■ A copy of permit or license for each facility listed

■ Identify materials that cannot be recycled or reused. Provide explanation or justification why they may not.

■ Plan may require revision and resubmission per GSA review and comment

■ Approval of Contractor’s Plan does not relieve the Contractor of responsibility for compliance with applicable environmental regulations

○ Waste and Diversion Reporting and Records

■ Recycling and Processing Facility Records: Indicate receipt and acceptance of recyclable waste by facilities licensed to accept them.

■ Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them.

■ At substantial completion provide manifests, weight tickets, receipts, and invoices.

mailto:lauren.pittenger@gsa.gov mailto:amy.gutirrez@gsa.gov

V3.8 – 6.30.2022

■ After Substantial Completion, submit actual end-of-project rates for salvage, recycling, and disposal as a percentage of total waste generated.

Section I – Site Work (Stormwater/Erosion, Soil Disturbance and Utility Locates)

● Stormwater and Erosion Control

○ Contact: William Fieselman, Stormwater Manager 303.356.5669 william.fieselman@gsa.gov or John Kleinschmidt, Regional Environmental Program Manager 303.868.0795 john.kleinschmidt@gsa.gov

○ For any project with potential to impact stormwater or the storm sewer system, follow all local codes/regulations.

○ An Erosion Control/Stormwater Management Plan will be a required as well as a dewatering permit as applicable. Standard Operating Procedures will be provided.

○ For projects involving ≥5,000 SF exterior site redevelopment, contact the Office of Facilities Management Environmental Programs Group for guidance on procedure and required forms.

● Safe Digging

○ Contractor shall follow all local codes/regulations for safe digging and construction dewatering. Contact the local municipality for applicable requirements.

● Soil Disturbance Permit

○ Contact: Fritz Heneman 720.518.9112 frederick.heneman@gsa.gov

○ Projects on the Denver Federal Center (DFC): Contractor shall obtain a Soil

Disturbance Permit prior to performing any excavation or soil-disturbing work.

Permits are issued by GSA’s Environmental Protection Group (EPG), will reference any soil contamination in the area, and may require a health and safety plan.

● Utility Locates

○ Contractor shall be responsible for obtaining public and private utility locates prior to performing any excavation activities. Payment of fees associated with utility locates are the responsibility of the contractor and must be included in proposal submission.

○ Projects on the DFC

■ DFC pre-approved locate contractors must be used for private utility locates.

■ All utility locate information shall be provided to GSA. Any change to existing, addition of new, and/or discovery of known or previously unknown or abandoned utilities will require as-builts and geomapping of said utility.

Standard Operating Procedures will be provided.

REFERENCES

● PBS-P100, Facilities Standards for the Public Buildings Service, current at the time of the award, including all applicable standards, criteria, and guides listed therein.

○ Design Stage submissions shall comply with PSB-P100 Appendix A unless otherwise indicated in this Statement of Work. (www.gsa.gov/p100)

● PBS P-120, Project Estimating Requirements for the Public Buildings Service

● PBS PQ-251, Value Engineering Program Guide for Design and Construction, Volume 2, Contracting Officers and Professional Services Contractors mailto:william.fieselman@gsa.gov mailto:john.kleinschmidt@gsa.gov mailto:frederick.heneman@gsa.gov http://www.gsa.gov/p100

JohnRiker Image

JohnRiker Polygon

JohnRiker Text Box

CONCRETE TO BE REMOVED,

APPROXIMATELY 12'-6" X 15'-0"

Image

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Polygon

JohnRiker Arrow

JohnRiker Arrow

JohnRiker PolyLine

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker PolyLine

JohnRiker Text Box 1:12

JohnRiker Text Box

1:10 MAX

JohnRiker Polygon

JohnRiker Arrow

JohnRiker Text Box 5'

JohnRiker Arrow

JohnRiker Arrow

JohnRiker Text Box 5'

JohnRiker Arrow

JohnRiker Arrow

JohnRiker Polygon

JohnRiker Text Box

1:10 MAX

JohnRiker Text Box 5'

JohnRiker Arrow

JohnRiker Arrow

JohnRiker Line

JohnRiker Line

JohnRiker Text Box

8', VIF

JohnRiker Arrow

JohnRiker Arrow

JohnRiker PolyLine

JohnRiker Arrow

JohnRiker Arrow

JohnRiker Text Box 1:48

MAX

JohnRiker Callout Install to prevent the accumulation of water.

JohnRiker Callout Locate new work to create 60" min. X 60" (width of ramp) landing at the top of the ramp. Max. 1:48 slope.

JohnRiker Callout Locate new work to create 60" min. X 60" (width of ramp) landing at the top of the ramp. Max. 1:48 slope.

JohnRiker PolyLine

JohnRiker Arrow

JohnRiker Arrow

JohnRiker Text Box

1:48 MAX

JohnRiker Line

JohnRiker Text Box

CROSS SLOPE

1:48 MAX

Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

JohnRiker Line

Line

The General Services Administration, Region 8, is initiating a project to remove and replace approximately 190 square feet of concrete, to include an accessible ramp, sidewalk, and a section of curb and gutter. The new ramp includes a detectable warni...
SAFETY & HEALTH
1) Contractor Use of the Premises
During the period of the project, the contractor will have access to the site during all hours. The contractor will need to coordinate with the Contracting Officer to arrange access to the parking lot. The contractor shall make every effort to cause a...
2) Progress Meetings
3) Equipment
4) Equipment and Material Storage
5) Sanitary Facilities
6) Electricity, Water, and Gas
7) Contractor’s Field Office
8) Fire Watch
10) Protection of Public
11) Housekeeping
12) Transportation and Deliveries
13) Cleaning
14) Disruptive Work
RC Concrete Drawings.pdf
Page 2
USR.pdf
Safety & Health
Section A – Safety and Health Program
Section E – Accessibility (ABAAS)
Energy, Sustainability, & Environmental
Section G – Sustainable Purchasing
Section H – Construction Waste Diversion
Section I – Site Work (Stormwater/Erosion, Soil Disturbance and Utility Locates)

REFERENCES

File details come from the government source that posted it. Updated .