Range 10 Replacement Trailers - SOW-Clean.pdf
PDF 789 KB Posted
- Attached to
- Replacement Trailers for Range 10
- Solicitation number
- 1223replacementtrailors
About this file
This draft Statement of Work (SOW) details the United States Secret Service's requirement for two new prefabricated modular structures at the James J. Rowley Training Center's Range 10 location in Ft. Meade, MD. The project involves providing and installing two air-conditioned modular trailers: a 24'X56' structure with two offices, a 12-person classroom, two restrooms, a kitchenette, and associated utilities; and a 12'X56' structure for weapon cleaning and storage. Key specifications include wall-to-wall vinyl flooring, LED lighting, CGFI power outlets, a 25-gallon electric hot water heater, freshwater and sanitary sewer storage tanks, and complete transportation, delivery, and installation services.
The SOW requires the contractor to be a U.S. citizen, submit detailed design schematics with pricing, obtain necessary permits, and provide a firm fixed-price proposal covering all labor, materials, and administrative costs. All contractor personnel must pass a police background investigation. The structures will be installed in place of existing trailers, with careful attention to leveling, anchoring, and utility hookups. Acceptance will be based on a walk-through evaluation by the Contracting Officer's Representative (COR) to ensure the structures meet all specified requirements. The delivery date is currently to be determined (TBD).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GSA RFI Questions - Range 10 Replacement Trailers.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USSS - Standard Sensitive Info
DRAFT
STATEMENT OF WORK
Range 10 Replacement Trailers
December 22, 2025
United States Secret Service James J. Rowley Training Center
GENERAL INFORMATION
1.0 INTRODUCTION:
1.1 Background: The purpose of this solicitation is to provide, set, install and secure two (2) new prefabricated modular structures, hereinafter referred to as the Structures, for Range 10 at Ft.
Meade, MD.
1.2 Security Concerns: This project is unclassified; however, the contractor and affiliates shall not be permitted to advertise, or make endorsement claims of any kind relating to this procurement and the project on any website or media.
2.0 SCOPE OF WORK
2.1 The Contractor shall provide all necessary labor, supervision, equipment, materials, parts, and supplies required for providing and installing one (1) 24'X56' modular structure that will contain two office spaces, a classroom that will seat 12 students and 2 restrooms capable of being serviced by a sanitary service company and a kitchenette area. The Contractor shall also provide the same for a separate 12'X56' modular structure that will be used to clean weapons and provide storage space. The installation shall include block and leveling, anchoring and hitch removal.
2.2 One (1) 24'X56' air-conditioned modular Structure that will contain:
i. Two office spaces each with power, telephone and network outlets.
ii. A classroom that will seat a minimum of 12 students (furniture and furnishings not included)
iii. A storage closet.
iv. Two (2) restrooms, each with a water closet, a lavatory sinks with cold and hot water, a soap, toilet paper and paper towel dispensers, and an exhaust air inlet.
v. A kitchenette with base and wall mounted cabinets, a sink with gooseneck faucet with cold and hot water, and garbage disposer, a dishwasher and a refrigerator.
vi. Air conditioning system(s) sized to maintain indoor air conditions at 72 degrees
Fahrenheit in the summer and 68 degrees Fahrenheit in the winter.
vii. An exhaust fan system consisting of two fans (one primary and one backup), each sized for continuous operation to exhaust both restrooms simultaneously.
viii. A twenty-five (25) gallon electric hot water heater.
ix. A freshwater storage tank sized to provide domestic water needs for no less than two (2) weeks between fillings.
x. A sanitary sewer storage tank sized for no less of two weeks between pump outs.
b. One (1) 12'X56' air-conditioned modular Structure that will be used to clean weapons.
That will contain:
i. A large storage closet
c. The installation shall include:
i. The design, fabrication, manufacture, transport and delivery of both structures.
ii. Assembling and setting the Structures, each in its final location, including blocking, leveling, anchoring and hitch removal.
iii. Installation of stairs, landings and railings for access to both Structures.
iv. Hooking up to existing power.
v. Hookups to Contractor provided water and sewer tanks.
d. Flooring requirements:
i. Wall to wall continuous vinyl flooring
ii. Provide 4” vinyl baseboard around the perimeter of all interior walls.
e. Ceiling Requirements:
i. All ceilings shall be 24”x24” lay-in acoustical ceiling tiles.
ii. In the Kitchenette and restrooms, the ceilings tiles shall be vinyl covered or similar moisture resistant material.
f. Lighting Requirements:
i. All interior light fixtures shall be LED.
ii. Light fixtures in office areas and kitchenette shall be 24”x24” ceiling mounted.
iii. Light fixtures in the classroom area shall be dimmable LED, 24”x24” ceiling mounted.
iv. Light fixtures in restrooms shall be wall mounted located above vanity mirrors.
v. Outdoor light fixtures shall be LED flood lights.
g. Receptacle and Power Requirements:
i. All Receptacles shall be dual outlet standard 3 prong (Live, Neutral and Ground).
ii. Office areas: provide outlets as required by codes and standards.
iii. Kitchenette: Provide CGFI where required by codes and standards. Provide additional outlets for a dishwasher, a garbage disposer, a refrigerator, two microwave ovens, a toaster and a coffee maker.
iv. Restrooms: Provide CGFI power outlets near vanities.
v. Classroom Area: Provide outlets on perimeter walls as required by codes and
vi. standards. Provide an additional Outlet for a wall mounted TV.
vii. Gun Cleaning Trailer: Provide power outlets on perimeter walls as required by codes and standards. Provide additional receptacles at 40” AFF for gun cleaning tools.
viii. Provide one (1) weatherproof outdoor receptacle per trailer.
ix. All wiring and panels shall be in accordance with applicable codes and standards.
h. TRANSPORTATION, DELIVERY AND ASSEMBLY:
i. The Contractor shall be responsible for all aspects of transporting the two modular structures, all accessories, components and parts from their place of origin to their final destination.
ii. The Contractor’s responsibilities include provide all lifting and transportation equipment and all lifting, loading, unloading, assembling, setting, anchoring, securing and hookup of utilities as described herein.
iii. Trailers will be installed in place of existing trailers.
2.3 Contractor shall provide cement footers substantial enough to support the structures - Concrete Masonry
Units (CMU) -- for trailer leveling purposes. The trailers will be securely fastened/attached to the ground.
2.4 All structures shall be capable of providing lighting, electricity, air conditioning & heating. Lease to include trailer, stairs, skirting, leveling, installation and removal.
2.5 The Contractor shall provide both modular structures of new material suitable for the application. All work shall be done in accordance with the latest building codes. The Contractor shall obtain all permits to move and dispose the modular trailers.
2.6 All modular trailers will have a serial number associated with the project easily visible on all 4 sides of the trailer.
2.7 Any damage done to existing surfaces not impacted by the installation, as a result of work performed under this specification, shall be repaired by the contractor, at no additional cost to the Government. All such repairs shall be brought up to a condition equal in appearance to that at the start of this contract and shall be approved by the Government.
3.0 FEDERAL REFERENCES
3.1 All services covered by these specifications shall conform to the latest applicable standards of the following:
a. Code of Federal Regulations (CFR)
4.0 SUBMITTALS
4.1 Contractor shall submit a detailed design schematic of the modular structures along with pricing data.
4.2 The Contractor shall coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements before submission to the Contracting Officer's Representative
(COR}.
4.3 Contractor shall provide and maintain a list of employees who are authorized to perform work under this contract. All such employees must provide valid state and/or federal government identification.
5.0 INSPECTIONS
5.1 Acceptance of the modular structures shall be based on a walk-thru and evaluation by the COR ensuring the structures, at minimum, meet the required specifications, with no defects and/or abnormalities.
5.2 Government inspections are for the sole benefit of the Government, and do not relieve the Contractor from contractual obligations and adequate quality control measures.
6.0 SPECIAL PROVISIONS
6.1 Any innovative practices or specialized procedures incorporated by the Offeror which will provide added value to the Government must be detailed in the Offeror’s proposal.
6.2 The contractor shall propose a firm, fixed price to accomplish this project. This price shall include all labor, supervision, common equipment, materials, supplies, permits and shall include all considerations for administration, overhead, and profit.
6.3 All contractor personnel proposed to work under this contract must be U.S. Citizens. They will be subject to, and must successfully pass, a police background investigation prior to being admitted into the facility.
Upon contract award the contractor will be provided with U.S. Secret Service Contractor Personnel Access forms.
7.0 DELIVERY: TBD
File details come from the government source that posted it. Updated .