RAM-5 Cart - SOW_v2 RAM Transportation Cart.docx
DOCX document 19 KB Posted
- Attached to
- RAM 5 Transportation Carts Federal contract opportunity
- Solicitation number
- N0017421Q0032
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RAM-5 Cart - CDRL_A002- REV 1 Final eSigned.pdf | ||
| RAM-5 Cart - CDRL_A001- REV 1 Final eSigned.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MANUFACTURING OF RAM-5 TRANSPORTATION CARTS
PERFORMANCE-BASED STATEMENT OF WORK
1.0 Scope of Work
The requirements in this document contain the information necessary to manufacture transportation carts for the RAM-5 Project at Naval Surface Warfare Center Indian Head Division.
2.0 Applicable Documents
2.1 General Specifications
Contract Data Requirement Lists as in the attached Form 1423s:
| DI-QCIC-81356 |
| Certificate of Compliance |
| DI-MISC-80678 |
| Certification / Data Report |
Technical Drawings for Deliverables:
| 2015-Y-057 |
| RAM-5 Mixing Vessel Transportation Cart |
2.2 Conflicting Document Requirements
If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.
3.0 Requirements
3.1 Welding
All welds shall be Dye Penatrant inspected per ASTM E1417 Type II, Method C, or equivalent. Discontinuities exceeding the maximum size permitted by MIL-STD-1907, Grade A, Table III, or equivalent, are unacceptable. The Contractor shall submit a Certificate of Compliance (CDRL A001) as identified on the Form 16 for each drawing.
3.2 Material and Test Certification
The Contractor shall submit a Certificate of Compliance (CDRL A001) and/or a Certificate of Analysis (CDRL A002) as identified on the Form 16 for each drawing.
4.0 Deliverables
The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified in each individual Delivery Order.
4.1 Documentation
4.1.1 Certificates
All certificates shall include the signature of the Contractor’s representative authorized to make such certification. The Government reserves the right to reject defective hardware submitted if the hardware or documentation does not successfully pass Government inspection or testing. The Contractor shall in such event promptly replace, correct, or repair the rejected hardware at the Contractor’s expense.
| CDRL |
| Spec |
| Section |
| Title |
| A001 |
| DI-QCIC-81356 |
| 3.1 / 3.2 |
| Certificate of Compliance |
| A002 |
| DI-MISC-80678 |
| 3.2 |
| Certificate of Analysis |
4.2 Hardware Delivery
The Contractor shall notify the Contracting Officer 30 business days in advance if the Contractor cannot meet the contract delivery schedule.
The Contractor shall be responsible for coordinating and shipping all the units to the required destination. Delivery address provided below:
Naval Surface Warfare Center Indian Head Division 4522 McMahon Road Bldg. 116, Suite 100 Indian Head, MD 20640
File details come from the government source that posted it. Updated .