Rainbow Lake Improvement Plans 04-19-24.pdf
PDF 6 MB Posted
- Attached to
- Rainbow Lake Parking Lot Construction
- Solicitation number
- BPM044025
- Issued by
- Frederick County, Elkridge CDP, Maryland
About this file
This document contains the improvement plans for the Rainbow Lake Parking Lot construction project in Emmitsburg, Maryland. The Town of Emmitsburg is requesting sealed bids from qualified contractors for the construction of a 10-space parking lot at Rainbow Lake. The scope of work includes mobilization, maintenance of traffic, construction stakeout, sediment and erosion control, construction of the 10-space parking lot with a stormwater management bioretention facility, asphalt paving, site restoration, landscaping, and other related items. The bid packet provides more detailed information about the project requirements.
The improvement plans detail the site layout, grading, stormwater management, sediment and erosion control, and landscaping for the parking lot construction. The project is located along Hampton Valley Road in the Town of Emmitsburg, Frederick County, Maryland. The plans include a legend, notes, paving plan, and detailed engineering drawings to guide the construction activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Rainbow Lake RFP_Bid Packet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET INDEX
SHEET No. DESCRIPTION
1 COVERSHEET
2 LEGEND AND NOTES
3 PAVING PLAN
4 GRADING, SWM, SEDIMENT AND EROSION CONTROL PLAN
5 SWM FACILITY DETAILS AND LANDSCAPE PLAN
6 SWM NOTES AND DETAILS
7 SITE DETAILS
8 SEDIMENT & EROSION CONTROL NOTES AND DETAILS
9 SEDIMENT & EROSION CONTROL NOTES AND DETAILS
10 STORMWATER MANAGEMENT DRAINAGE AREA MAP
SIGNATURE OWNER / DEVELOPER DATE
OWNERS / DEVELOPERS CERTIFICATION
I/WE HEREBY CERTIFY THAT ANY CLEARING, GRADING, CONSTRUCTION AND/OR
DEVELOPMENT WILL BE DONE PURSUANT TO THIS PLAN AND THAT ANY RESPONSIBLE
PERSONNEL INVOLVED IN THE CONSTRUCTION PROJECT WILL HAVE A CERTIFICATE OF
ATTENDANCE AT A DEPARTMENT OF THE ENVIRONMENT APPROVED TRAINING PROGRAM
FOR THE CONTROL OF SEDIMENT AND EROSION BEFORE BEGINNING THE PROJECT. I/WE
ALSO CERTIFY THAT THE SITE WILL BE INSPECTED AT THE END OF EACH WORKING DAY,
AND THAT ANY NEEDED MAINTENANCE WILL BE COMPLETED SO AS TO ENSURE THAT ALL
SEDIMENT CONTROL PRACTICES ARE LEFT IN OPERATIONAL CONDITION. I/WE AUTHORIZE
THE RIGHT OF ENTRY FOR PERIODIC ONSITE EVALUATION BY THE FREDERICK COUNTY
SOIL CONSERVATION DISTRICT BOARD OF THEIR AUTHORIZED AGENTS.
PRINT NAME DATE
By:
Date:
PLAN IS VALID FOR TWO YEARS FROM DATE OF APPROVAL
FREDERICK COUNTY SOIL CONSERVATION DISTRICT
EROSION AND SEDIMENT CONTROL PLAN APPROVAL
SCD APPROVAL FOR SEDIMENT AND EROSION CONTROL IS IN ACCORDANCE WITH THE 2011
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL AND
IS CONTINGENT UPON ISSUANCE OF ALL APPLICABLE REGULATORY PERMITS.
DISTRICT MANAGER OR DESIGNEE
Due Date :
A / P # : PW276146
File : SP2208
CDD - Dev. Review
FREDERICK COUNTY, MARYLAND
VICINITY MAP SCALE: 1" = 1000'TAX MAP 007 PARCEL 043
SITE
TAX ID. 05-174104
FIRE & RESCUE NOTES:
1. FIRE DEPARTMENT ACCESS ROADS SHALL BE ACCESSIBLE
DURING ALL TYPES OF WEATHER AND AT ALL TIMES.
2. FIRE DEPARTMENT ACCESS ROADS SHALL BE CAPABLE OF
SUPPORTING FIRE APPARATUS AT ALL TIMES AND BE A MINIMUM
OF 18 FEET WIDE.
3. FIRE DEPARTMENT ACCESS SHALL BE PROVIDED AND MAINTAINED
TO ALL STRUCTURES UNDERGOING CONSTRUCTION, ALTERATION
OR DEMOLITION.
4. THE ACCESS ROADWAYS SHALL PROVIDE A MINIMUM TURNING
RADIUS OF 40 TO 45 FEET.
5. STREETS AND FIRE HYDRANTS/WATER MAINS ARE REQUIRED TO
BE CONSTRUCTED AND IN SERVICE PRIOR TO THE START OF ANY
VERTICAL BUILDING CONSTRUCTION.
6. FIRE LANES/STREETS PROVIDING ACCESS TO THE BUILDINGS
WHILE UNDER CONSTRUCTION SHALL BE PROVIDED PRIOR TO
THE START OF VERTICAL CONSTRUCTION OF THE BUILDINGS
(NFPA 1, SECTION 16.1.4).
7. ON-SITE FIRE HYDRANTS SHALL BE INSTALLED AND IN SERVICE
PRIOR TO THE START OF VERTICAL CONSTRUCTION OF THE
BUILDINGS (NFPA 1, 16.4.3.1.3).
PROJECT DESCRIPTION
PROJECT INCLUDES CONSTRUCTION OF A PARKING LOT
AND ASSOCIATED STORMWATER MANAGEMENT FACILITY
SOILS HYDRAULIC SOILS GROUP
BdB Bagtown cobbly loam, 15 to 25 percent slopes, rubbly C UdC Udorthents, smooth, 8 to 15 percent slopes C WeE Weverton-Hazel complex, 25 to 45 percent slopes, very stony B
SHEET OF
23-31990 D - 3607
DECEMBER 2023
JHCCHECKED BY:
DRAWN BY:
DATE:
DRAWING NO.
PROJECT NO.
CJC
PREPARED BY
FAX:
PHONE: (301)695-0880
(301)293-6009
SUITE 'G'
82 WORMANS MILL COURT
FREDERICK, MD. 21701
FAX:
or (301)416-7250
(301)733-1853
981 MT. AETNA ROAD
HAGERSTOWN, MD. 21740
PHONE: (301)733-8503
ENGINEERS SURVEYORS PLANNERS
FOX & ASSOCIATES, INC.
WWW.FOXASSOCIATESINC.COM Email: FOXFREDERICK@FOXASSOCIATESINC.COM DATE REVISIONLICENSE No.: EXP. DATE:
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND THAT
I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MARYLAND.
IMPROVEMENT PLANS
TOWN OF EMMITSBURG
RAINBOW LAKE PARKING LOT
OWNER / DEVELOPER
TOWN OF EMMITSBURG, MARYLAND
300A SOUTH SETON AVE.
EMMITSBURG, MD 21727
CRYSTAL FOUNTAIN ROAD
HAMPTON
VALLEY
ROAD
RAINBOW
LAKE
THERE IS NO 100 YEAR FLOODPLAIN WITHIN THE
PROJECT LIMITS AS DETERMINED PER FEMA FLOOD
INSURANCE RATE MAP NO. 24021C-0034E, DATED
AUGUST 1, 2023.
THERE ARE NO WETLANDS ON SITE PER THE NATIONAL
WETLANDS INVENTORY MAP FREDERICK, MARYLAND
QUADRANGLE.
17 1,272
25,993 0.62
ENGINEER'S DESIGN CERTIFICATION
I HEREBY CERTIFY THIS PLAN FOR SOIL EROSION AND SEDIMENT CONTROL HAS BEEN
DESIGNED IN ACCORDANCE WITH LOCAL ORDINANCES, COMAR 26.17.01 AND THE 2011
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL.
IF APPLICABLE, THIS PLAN IS ALSO DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS
CONTAINED WITHIN USDA, NRCS "STANDARDS AND SPECIFICATIONS FOR PONDS MD-378"
AND THE POLICIES AND PROCEDURES OF THE MARYLAND DEPARTMENT OF THE
ENVIRONMENT DAM SAFETY PROGRAM.
30709
ENGINEERS SIGNATURE P.E. NO.
JOSEPH H. CECI
PRINT NAME DATE
ENGINEER"S SIGNATURE P.E. NO.
DISTURBED AREA QUANTITY
I HEREBY CERTIFY THAT THE ESTIMATED TOTAL AMOUNT OF AREA TO BE
DISTURBED SHOWN ON THESE PLANS HAS BEEN COMPUTED TO BE
C.Y. OF EXCAVATION, C.Y. OF FILL AND
THE TOTAL AREA TO BE DISTURBED ON THESE PLANS HAS BEEN
DETERMINED TO BE SQ. FT. OR ACRES.
* THESE QUANTITIES ARE APPROXIMATE AND SHALL NOT BE USED BY THE
CONTRACTOR FOR BIDDING PURPOSES.
JOSEPH H. CECI, P.E.
PRINT NAME DATE
JOSEPH H. CECI 04/12/24
04/12/24
30709
04/12/24
BID SET 04/25/2024
H C a rl so n
P ro je ct s\ \3
E m m it sb ur g
R a in bo w L a ke
P a rk in g\
W D -0
1.
dw g, /1 /2
:5
:5
P
M jc ec i, 1:
HAMPTON VALLEY RD
(501)
(500)
(502)
HAMPTON VALLEY RD
SIGHT DISTANCE = 190'
SIGHT DISTANCE = 448'
GENERAL NOTES
1. OWNER: TOWN OF EMMITSBURG MARYLAND
300A SOUTH SETON AVE
EMMITSBURG, MD 21727
2. TOPOGRAPHY: THE TOPOGRAPHIC SURVEY IS FIELD RUN BY FOX & ASSOCIATES,
INC. DATED JUNE 2023. VERTICAL DATUM IS BASED ON NAVD88. HORIZONTAL
DATUM IS BASED ON MARYLAND STATE PLANE COORDINATE SYSTEM NAD 83/91.
3. FLOODPLAIN: THE 100 YEAR FLOODPLAIN IS SHOWN PER THE FREDERICK COUNTY,
MARYLAND FLOOD INSURANCE RATE MAP COMMUNITY PANEL #24021C0034E.
EFFECTIVE DATE AUGUST 1. 2023.
4. WETLANDS: THERE ARE NO WETLANDS ON THE PROJECT SITE PER THE NATIONAL
WETLAND INVENTORY MAP.
5. SUBSURFACE: FOX & ASSOCIATES, INC. HAS PERFORMED NO SUBSURFACE
INVESTIGATION TO DETERMINE LOCATIONS OF ROCK, SOIL TYPES, WATER TABLE,
UTILITIES, ETC.
6. ALL CONSTRUCTION METHODS AND MATERIALS SHALL BE IN STRICT ACCORDANCE
WITH THE TOWN OF EMMITSBURG, AND THE MDOT SHA 2023 STANDARD
SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS.
7. CONTRACTOR SHALL NOTIFY MISS UTILITY AT 1-800-257-7777, FREDERICK COUNTY
ENVIRONMENTAL COMPLIANCE SECTION (301-600-3507), TOWN OF EMMITSBURG
DPW AT (301) 600-6300, AND MDOT SHA DISTRICT 7 (301) 624-8225, SEVENTY-TWO (72)
HOURS PRIOR TO START OF CONSTRUCTION.
8. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS BEFORE BEGINNING
CONSTRUCTION.
9. ALL CONSTRUCTION STATIONING IS APPROXIMATE AND MAY BE ADJUSTED IN
ORDER TO MEET FIELD CONDITIONS. CONTACT THE TOWN OF EMMITSBURG
INSPECTOR, FOX & ASSOCIATES, INC. AT 301-695-0880.
10. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE UTILIZATION OF MEN,
MATERIALS, EQUIPMENT OR SAFETY MEASURES IN THE PERFORMANCE OF ANY
WORK ON THIS PROJECT. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY AND
LIABILITY FOR PERFORMING THE WORK CORRECTLY AND IN CONFORMANCE WITH
ALL APPLICABLE CODES AND REGULATIONS.
11. ALL MATERIALS EXCAVATED WHICH ARE UNSUITABLE FOR BACKFILL SHALL BE
DISPOSED OF AT AN APPROVED LOCATION THAT HAS AN ACTIVE PERMIT FOR
DISPOSAL OF EACH CATEGORY OF MATERIAL BEING DISPOSED OF.
12. PLACEMENT OF ANY CONCRETE WORK SUCH AS
CURB/GUTTER/SIDEWALKS/DRIVEWAY APRONS/ETC. SHALL BE COMMENCED ONLY
AFTER THE RELOCATIONS AND/OR INSTALLATION OF ALL UTILITIES INCLUDING GAS
LINES/ELECTRICAL LINES/ STREET LIGHTING CONDUITS/CONDUITS/TELEVISION
CABLE/WATER AND SEWER LINES/ETC. ARE IN PLACE.
13. JOB SITE SAFETY SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
14. ANY BLASTING REQUIRED FOR SITE CONSTRUCTION SHALL REQUIRE THE
CONTRACTOR TO OBTAIN PROPER PERMITS AND PERFORM BLASTING OPERATIONS
IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS.
15. SOILS INFORMATION TAKEN FROM "SOILS SURVEY OF FREDERICK COUNTY", 2023
EDITION.
16. INFORMATION CONCERNING UNDERGROUND UTILITIES ARE SHOWN FROM BEST
AVAILABLE RECORDS. THE CONTRACTOR SHALL TEST PIT IN THE AREA OF KNOWN
UTILITIES TO VERIFY SIZE, ELEVATION, LOCATION AND TYPE PRIOR TO PERFORMING
ANY WORK. ANY UTILITY, WHETHER SHOWN OR NOT, THAT IS DAMAGED BY THE
CONTRACTOR SHALL BE REPAIRED IMMEDIATELY AT NO EXPENSE TO THE OWNER.
SHOULD THE CONTRACTOR DISCOVER DISCREPANCIES BETWEEN THE PLANS AND
FIELD CONDITIONS, THE OWNER IS TO BE NOTIFIED IMMEDIATELY. SHOULD THE
CONTRACTOR MAKE FIELD CORRECTIONS OR ADJUSTMENTS WITHOUT THE
AUTHORIZATION OF THE OWNER, THEN THE CONTRACTOR ASSUMES THE
RESPONSIBILITY FOR SAID CORRECTIONS OR ADJUSTMENTS.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING SILT AND DEBRIS OUT OF
THE STORM DRAINAGE SYSTEM FOR THE DURATION OF THE CONTRACT.
18. CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF TRAFFIC ON EXISTING
ROADWAYS IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL
DEVICES (MUTCD) AND AS NOTED IN SECTION 104, THE TEMPORARY TRAFFIC
CONTROL SECTION, OF THE MARYLAND STATE HIGHWAY ADMINISTRATION'S BOOK
OF STANDARDS, LATEST EDITIONS.
19. ALL BENCHMARKS SHALL BE MAINTAINED FOR THE DURATION OF THE
CONSTRUCTION UNTIL TOWN HAS GRANTED FINAL APPROVAL TO THE PROJECT.
20. CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING DUST, DIRT, DEBRIS AND
MUD FROM ENTERING ALL ROADWAYS. IF DUST, DIRT, DEBRIS AND MUD HAPPEN TO
OVERRIDE PREVENTION MEASURES AND ENTER THE ROADWAY, THE CONTRACTOR
SHALL BE REQUIRED TO CLEAN THE ROADWAY AS SOON AS POSSIBLE, AT HIS/HER
EXPENSE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ELIMINATION OF
DUST IN THE AIR BY THE REQUIRED WATERING OF THE GROUND AS NEEDED.
21. THE CONTRACTOR SHALL NOT (1) STAGE WORK, (2) STORE MATERIALS OR (3)
PERMIT PARKING OF EQUIPMENT AND/OR CONSTRUCTION-RELATED VEHICLES IN
THE PUBLIC RIGHTS-OF-WAY OR PUBLICLY-OWNED PROPERTY WITHOUT PRIOR
APPROVAL OF THE TOWN OF EMMITSBURG. WHERE PRACTICAL AND TO THE
DEGREE POSSIBLE, THE ENGINEER SHALL DESIGNATE ON THESE PLANS
APPROPRIATE SPACE THAT CAN BE UTILIZED FOR THE ABOVE PURPOSES. IT IS THE
CONTRACTOR'S ULTIMATE RESPONSIBILITY TO ENSURE THAT PROPER AND
APPROPRIATE AREAS ARE SECURED FOR THESE USES FOR THE DURATION OF THE
PROJECT.
22. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS RELATED TO TEMPORARY AND
PERMANENT TRAFFIC CONTROL (PAVEMENT MARKINGS, SIGNAGE, SIGNALIZATION,
TRAFFIC BARRIERS, FLAGGERS, ETC.).
23. THE SITE SHALL COMPLY WITH ALL APPLICABLE PROVISIONS OF THE MARYLAND
ACCESSIBILITY CODE (MAC), THE AMERICAN DISABILITIES ACT 2010 (ADA), AND
ANSI A117.1. IF THERE ARE CONFLICTING REQUIREMENTS, THE MOST STRINGENT
SHALL APPLY.
24. IF ROAD OR ANY PART OF ROAD IS TO BE CLOSED, A DETAILED DETOUR AND/OR
CLOSURE PLAN SHALL BE SUBMITTED TO FREDERICK COUNTY, FOR APPROVAL.
25. ALL CONTRACTORS MUST COMPLY WITH ALL APPLICABLE TOWN, STATE AND
FEDERAL LABOR AND INDUSTRY REGULATIONS TO INCLUDE TOWN SAFETY &
HEALTH POLICY, MOSHA, OSHA, ETC.
26. THESE DRAWINGS REPRESENT THE FINISHED PRODUCT, THEY DO NOT INDICATE
THE METHOD OF CONSTRUCTION. CONTRACTOR SHALL BE SOLELY RESPONSIBLE
FOR, AND HAVE CONTROL OVER, CONSTRUCTION MEANS, METHODS, TECHNIQUES,
SEQUENCES AND PROCEDURES AS WELL AS ANY ASSOCIATED SAFETY
PRECAUTIONS AND PROGRAMS, AND ALL INCIDENTAL OR TEMPORARY DEVICES
REQUIRED TO CONSTRUCT THE PROJECT. CONTRACTOR SHALL BE RESPONSIBLE
FOR COORDINATING ALL PORTIONS OF THE WORK.
27. STORMWATER MANAGEMENT FOR THIS SITE WILL BE IN ACCORDANCE WITH THE
MARYLAND 2007 STORMWATER MANAGEMENT ACT AND THE FREDERICK STORMWATER
MANAGEMENT ORDINANCE. RE
VI
SI
ON
DA
TE
CHECKED BY:
DRAWN BY:
DATE:
DRAWING NO.
PROJECT NO.
SHEET OF
SCALE:
DR
AW
N
BY
EN
G
IN
EE
R S
S U
R
VE
YO
R
S P
LA
N
N
ER
S
FO
X
A
SS
O
C
IA
TE
S, I N
C
W W
W .F
O
XA
SS
O
C
IA
TE
SI
N C
.C O
M
Em ai l:
FO
XF
R
ED
ER
IC
K
FO
XA
SS
O C
IA
TE
SI
N
C .C
O M
PH
O
N E:
(3
)7
-8
H
A G
ER
ST
O W
N , M
D . 2
M T.
A
ET
N A
R O
A D
(3
)7
-1 o r (
1)
6-
FA
X:
FR
ED
ER
IC
K , M
D . 2
W
O R
M A
N S
M
IL
L C
O U
R T
SU
IT
E 'G
' (3
)2
-6
PH
O N
E:
(3
)6
-0
FA
X:
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND THAT
I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MARYLAND.
PROFESSIONAL CERTIFICATION
LICENSE No.: EXP. DATE:
PROPOSED STORM DRAIN
PROPOSED WATERLINE
PROPOSED FIRE HYDRANT
SOILS LINE
CITY/COUNTY CORPORATE LIMITS
PROP. CONTOUR (10' INTERVAL)
PROP. CONTOUR (2' INTERVAL)
EX. CONTOUR (10' INTERVAL)
EX. CONTOUR (2' INTERVAL)658
LEGEND
BENCHMARK - HORIZONTAL
FULL DEPTH ASPHALT PAVEMENT
TRENCH REPAIR & OVERLAY
EXISTING GUARD RAIL
EXIST. WATER
PROP. GAS
PROP, SEWER
EXIST. SEWER
RIGHT-OF-WAY LINE
TEST PIT
STATION / CENTERLINE
GAS GAS GAS
& VERTICAL CONTROL POINTSTREAM
EXIST. BUILDING
TREE LINE
EXIST UTILITY POLE
EXIST. SIGNS
SINGLE TREE
CURB & GUTTER
PROPERTY LINE
SILT FENCE
SUPER SILT FENCE
INLET PROTECTION
SF
SSF
ABBREVIATIONS
EXIST. EASEMENT
PROP. EASEMENT
LIMITS OF DISTURBANCE
/// /// /// DEMOLITION LINE
COMPOST FILTER LOGFL-12
BM
LOD LOD
UGE UGE UGE
UGFO UGFO
UNDERGROUND ELECTRIC
UNDERCROUND FIBER OPTIC
OWNER / DEVELOPER
TOWN OF EMMITSBURG, MARYLAND
300A SOUTH SETON AVE.
EMMITSBURG, MD 21727 2 10
AS NOTED
23-31990 D - 3607
DECEMBER 2023
CJC
JHC
LE
GE
ND
A
ND
N
OT
ES
TO
W
N O
F
EM
M
IT
SB
U
R G
SI
TU
AT
ED
A
LO
NG
H
AM
PT
ON
V
AL
LE
Y R
OA
D
TO
W
N
OF
E
MM
IT
SB
UR
G
E
LE
CT
IO
N D
IS
TR
IC
T
No . 5
FR
ED
ER
IC
K C
OU
NT
Y , M
AR
YL
AN
D
By:
Date:
PLAN IS VALID FOR TWO YEARS FROM DATE OF APPROVAL
FREDERICK COUNTY SOIL CONSERVATION DISTRICT
EROSION AND SEDIMENT CONTROL PLAN APPROVAL
SCD APPROVAL FOR SEDIMENT AND EROSION CONTROL IS IN ACCORDANCE WITH THE 2011
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL AND
IS CONTINGENT UPON ISSUANCE OF ALL APPLICABLE REGULATORY PERMITS.
DISTRICT MANAGER OR DESIGNEE
TP
GAS GAS GAS EXIST. GAS
OHE OHE OHE OVERHEAD ELECTRIC
WATER VALVELEGEND
BENCHMARKS
PT. NO. DESCRIPTION COORDINATES ELEVATION
500 REBAR & CAP N:739272.3807 E:1203148.0903 869.87
501 MAG NAIL N:739225.4552 E:1203038.2298 868.50
502 NAIL N:739134.3294 E:1203110.2839 859.36
100-YR FLOODPLAIN
100-YR FLOODWAY
SIGHT DISTANCE
BID SET 04/25/2024
H C a rl so n
P ro je ct s\ \3
E m m it sb ur g
R a in bo w L a ke
P a rk in g\
W D -0
1.
dw g, /1 /2
:5
:2
P
M jc ec i, RAINBOW LAKE
EX. SIGN TO BE
REMOVED &
RELOCATED
EX. SIGN
REMOVE & RESET TO
MATCH NEW GRADE
REMOVE EX. WIRE FENCE
AND POSTSS.C
.E.
(B) (A)
ACCESSIBLE SIGN W/
VAN ACCESSIBLE (TYP.)
CONC. WHEEL
STOP (TYP.)
10'
28'
18'
3'R
10'R
3'R
3'R
10'R
10'R
68'R
40'R
68'R
10'R 10 'R
52'R
5' R
24" WHITE
PAINTED STOP
BAR (TYP.)
STOP SIGN R1-1 W/
DO NOT ENTER R5-1
STOP SIGN
R1-1 W/ RIGHT
TURN ONLY
EX. TREE TO BE REMOVED
CONC. CURB
AND GUTTER
REMOVE ±94LF EX.
CHAIN LINK FENCE
FROM FIRST FENCE
POST
ONE WAY
R6-1R (R)
RELOCATED
RAINBOW LAKE SIGN
12'x8' CONC.
DUMPSTER PAD
SEE DETAIL
NOSE DOWN
CURB
NOSE DOWN
CURB
24'
4" WHITE PAINTED
PARKING LINE
(TYP.)
EX. SIGN TO BE
REMOVED & RELOCATED
PROP. 5FT. CHAIN LINK
FENCE W/ 6 FT.
OPENING ±98 LF (TYP.)
RELOCATED RULES OF
THE TRAIL SIGN
NO PARKING SIGN
R7-1(I)
NO PARKING SIGN
R7-1(I)
NOSE DOWN
CURB (TYP.)
RE
VI
SI
ON
DA
TE
CHECKED BY:
DRAWN BY:
DATE:
DRAWING NO.
PROJECT NO.
SHEET OF
SCALE:
DR
AW
N
BY
EN
G
IN
EE
R S
S U
R
VE
YO
R
S P
LA
N
N
ER
S
FO
X
A
SS
O
C
IA
TE
S, I N
C
W W
W .F
O
XA
SS
O
C
IA
TE
SI
N C
.C l:
FO
XF
R
ED
ER
IC
K
FO
XA
SS
O C
IA
TE
SI
N
C .C
O M
PH
O
N E:
(3
)7
-8
H
A G
ER
ST
O W
N , M
D . 2
M T.
A
ET
N A
R O
A D
(3
)7
-1
1)
6-
ER
IC
K , M
D . 2
W
O R
M A
N S
M
IL
L C
O U
R T
SU
IT
E 'G
' (3
)2
-6
PH
O N
E:
(3
)6
-0
FA
X:
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND THAT
I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MARYLAND.
PROFESSIONAL CERTIFICATION
LICENSE No.: EXP. DATE:
OWNER / DEVELOPER
TOWN OF EMMITSBURG, MARYLAND
300A SOUTH SETON AVE.
EMMITSBURG, MD 21727 3 10
1" = 20'
23-31990 D - 3607
DECEMBER 2023
CJC
JHC
PA
VI
NG
P
LA
N
TO
W
N O
F
EM
M
IT
SB
U
R G
SI
TU
AT
ED
A
LO
NG
H
AM
PT
ON
V
AL
LE
Y R
OA
D
TO
W
N
OF
E
MM
IT
SB
UR
G
E
LE
CT
IO
N D
IS
TR
IC
T
No . 5
FR
ED
ER
IC
K C
OU
NT
Y , M
AR
YL
AN
D
COMBINATION CURB AND GUTTER
NOTES:
1. CONCRETE SHALL BE MSHA MIX NO. 3.
2. CONCRETE SHALL BE SPRAYED WITH LIQUID
CURING COMPOUND AS SOON AS FREE
WATER HAS DISAPPEARED FROM THE
SURFACE. CURING COMPOUND REQUIRED AS
PER SPECIFICATION 32-16-13
3. FORMS SHALL BE STEEL FORMS WITH THE
EXCEPTION OF APPROVED FLEXIBLE FORMS
FOR RADIAL FORMATION.
4. ALL CURB SHALL BE A MINIMUM OF 5' IN
LENGTH.
5. IF HAND FORMED USE MAGNESIUM OR WOOD
TROWEL WITH BRUSHED FINISH. IF CURB IS
EXTRUDED BRUSH FINISH.
N.T.S.
6"12" 18"
1/2"
1/4": 1'R = 3/8" R = 1"
R = 3/8"
4" MINIMUM GAB
8" 6"
1/4":1'
6" MIN. GAB EXTENDED
BEYOND BACK OF CURB
BENCHMARKS
(501)
(500)
(502)
MAG NAIL N:739225.4552 E:1203038.2298
REBAR & CAP N:739272.3807 E:1203148.0903
EX. NAIL N:739134.3294 E:1203110.2839
SIGNS
(B)
(A)
NO PARKING SIGN IN ACCESS AISLE R8-1(2)
VAN ACCESSIBLE PARKING SIGN R7-8, R7-8A, R7-8(2), R8-1(2)
NOTE:
CONTRACTOR TO VERIFY IF SIGN POST CAN
BE REUSED. IF REPLACEMENT IS REQUIRED
SEE DETAIL ON SHEET 7.
BID SET 04/25/2024
H C a rl so n
P ro je ct s\ \3
E m m it sb ur g
R a in bo w L a ke
P a rk in g\
W D -0
1.
dw g, /1 /2
:4 :0
P
M jc ec i, TURKEY CREEK
Ud C
Bd D
U dC
W
UdC
WeE
WeE
BdD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LODLODLODLODLODLODLODLODLODLOD
LOD
SS
F
SS
F
SS
F
SS
F
SSF SSF SSF SSF SSF
SSF
SSF
SSF
SSF
SSF
SSF
SSF SSF SSF
SSF
SSF
SSF
SSF
SSF
SSF
A
A
8 L.F. CL I
RIP-RAP
d50 = 9.5"
DEPTH = 19"
WIDTH = 9.5'
UNDERLINE
W/ TYPE 'SE'
FILTER FABRIC
6" PERFORATED PVC.
UNDERDRAIN (TYP.)
CLEANOUT (TYP.)
OBSERVATION WELL
LINE EMBANKMENT W/ SOD
LINE SWALE W/ CURLEX
MATTING OR EQ. (TYP.)
LINE SLOPE W/
CURLEX I MATTING
OR EQ. (TYP.)
LINE SWALE W/ LANDLOK TRM 450
MATTING OR EQ. (TYP.)
SF SF SF SF SF SF
SF
SF
SF
TEMPORARY TOPSOIL
STOCKPILE
MAX. HT. = 20FT
EX. 100 YEAR
FLOOD PLAIN
FLOODWAY
15" HDPE
S.C .E.
STABILIZED
CONSTRUCTION
ENTRANCE
SIP (TYP.)
EX. TOE OF SLOPE
60" HT. CHAIN LINK FENCE
5FT. GATE
RE
VI
SI
ON
DA
TE
CHECKED BY:
DRAWN BY:
DATE:
DRAWING NO.
PROJECT NO.
SHEET OF
SCALE:
DR
AW
N
BY
EN
G
IN
EE
R S
S U
R
VE
YO
R
S P
LA
N
N
ER
S
FO
X
A
SS
O
C
IA
TE
S, I N
C
W W
W .F
O
XA
SS
O
C
IA
TE
SI
N C
.C l:
FO
XF
R
ED
ER
IC
K
FO
XA
SS
O C
IA
TE
SI
N
C .C
O M
PH
O
N E:
(3
)7
-8
H
A G
ER
ST
O W
N , M
D . 2
M T.
A
ET
N A
R O
A D
(3
)7
-1
1)
6-
ER
IC
K , M
D . 2
W
O R
M A
N S
M
IL
L C
O U
R T
SU
IT
E 'G
' (3
)2
-6
PH
O N
E:
(3
)6
-0
FA
X:
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND THAT
I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MARYLAND.
PROFESSIONAL CERTIFICATION
LICENSE No.: EXP. DATE:
OWNER / DEVELOPER
TOWN OF EMMITSBURG, MARYLAND
300A SOUTH SETON AVE.
EMMITSBURG, MD 21727 4 10
1" = 20'
23-31990 D - 3607
DECEMBER 2023
CJC
JHC
GR
AD
IN
G, S W
M, S
ED
IM
EN
T
AN
D
ER
OS
IO
N
CO
NT
RO
L P
LA
N
TO
W
N O
F
EM
M
IT
SB
U
R G
SI
TU
AT
ED
A
LO
NG
H
AM
PT
ON
V
AL
LE
Y R
OA
D
TO
W
N
OF
E
MM
IT
SB
UR
G
E
LE
CT
IO
N D
IS
TR
IC
T
No . 5
FR
ED
ER
IC
K C
OU
NT
Y , M
AR
YL
AN
D
By:
Date:
PLAN IS VALID FOR TWO YEARS FROM DATE OF APPROVAL
FREDERICK COUNTY SOIL CONSERVATION DISTRICT
EROSION AND SEDIMENT CONTROL PLAN APPROVAL
SCD APPROVAL FOR SEDIMENT AND EROSION CONTROL IS IN ACCORDANCE WITH THE 2011
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL AND
IS CONTINGENT UPON ISSUANCE OF ALL APPLICABLE REGULATORY PERMITS.
DISTRICT MANAGER OR DESIGNEESOILS HYDRAULIC SOILS GROUP
BdB Bagtown cobbly loam, 15 to 25 percent slopes, rubbly C UdC Udorthents, smooth, 8 to 15 percent slopes C WeE Weverton-Hazel complex, 25 to 45 percent slopes, very stony B
ENGINEER'S DESIGN CERTIFICATION
I HEREBY CERTIFY THIS PLAN FOR SOIL EROSION AND SEDIMENT CONTROL HAS BEEN
DESIGNED IN ACCORDANCE WITH LOCAL ORDINANCES, COMAR 26.17.01 AND THE 2011
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL.
IF APPLICABLE, THIS PLAN IS ALSO DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS
CONTAINED WITHIN USDA, NRCS "STANDARDS AND SPECIFICATIONS FOR PONDS MD-378"
AND THE POLICIES AND PROCEDURES OF THE MARYLAND DEPARTMENT OF THE
ENVIRONMENT DAM SAFETY PROGRAM.
30709
ENGINEERS SIGNATURE P.E. NO.
JOSEPH H. CECI
PRINT NAME DATE
4/12/24
LANDLOK TRM 450
CURLEX MATTING
BID SET
04/25/2024
H C a rl so n
P ro je ct s\ \3
E m m it sb ur g
R a in bo w L a ke
P a rk in g\
W D -0
1.
dw g, /1 /2
:5
:3
P
M jc ec i, 0+00 0+30 0+60 0+90 1+20 1+50
S.W.M. SECTION A - A
22 L.F. 15" HDPEP
TYPE ' S ' @ 3.28%
EN
D
S
EC
TI
O
N
IN
V
7.
SI
N
G
LE
W R
IN
LE
T G
R A
TE
.6
HAMPTON VALLEY RD
RAINBOW LAKE
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LODLODLODLODLODLODLODLODLODLOD
LOD
3 SA
3 IV
5 CS
AR
LT
LT
LINE EMBANKMENT
WITH SOD
HARDWOOD
MULCH
EX. TOE OF SLOPE
4 IG
2 IG
6 JP
3 CA
RE
VI
SI
ON
DA
TE
CHECKED BY:
DRAWN BY:
DATE:
DRAWING NO.
PROJECT NO.
SHEET OF
SCALE:
DR
AW
N
BY
EN
G
IN
EE
R S
S U
R
VE
YO
R
S P
LA
N
N
ER
S
FO
X
A
SS
O
C
IA
TE
S, I N
C
W W
W .F
O
XA
SS
O
C
IA
TE
SI
N C
.C l:
FO
XF
R
ED
ER
IC
K
FO
XA
SS
O C
IA
TE
SI
N
C .C
O M
PH
O
N E:
(3
)7
-8
H
A G
ER
ST
O W
N , M
D . 2
M T.
A
ET
N A
R O
A D
(3
)7
-1
1)
6-
ER
IC
K , M
D . 2
W
O R
M A
N S
M
IL
L C
O U
R T
SU
IT
E 'G
' (3
)2
-6
PH
O N
E:
(3
)6
-0
FA
X:
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND THAT
I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MARYLAND.
PROFESSIONAL CERTIFICATION
LICENSE No.: EXP. DATE:
OWNER / DEVELOPER
TOWN OF EMMITSBURG, MARYLAND
300A SOUTH SETON AVE.
EMMITSBURG, MD 21727 5 10
1" = 20'
23-31990 D - 3607
DECEMBER 2023
CJC
JHC
SW
M
FA
CI
LIT
Y
DE
TA
ILS
A
ND
LA
ND
SC
AP
IN
G
PL
AN
TO
W
N O
F
EM
M
IT
SB
U
R G
SI
TU
AT
ED
A
LO
NG
H
AM
PT
ON
V
AL
LE
Y R
OA
D
TO
W
N
OF
E
MM
IT
SB
UR
G
E
LE
CT
IO
N D
IS
TR
IC
T
No . 5
FR
ED
ER
IC
K C
OU
NT
Y , M
AR
YL
AN
D
By:
Date:
PLAN IS VALID FOR TWO YEARS FROM DATE OF APPROVAL
FREDERICK COUNTY SOIL CONSERVATION DISTRICT
EROSION AND SEDIMENT CONTROL PLAN APPROVAL
SCD APPROVAL FOR SEDIMENT AND EROSION CONTROL IS IN ACCORDANCE WITH THE 2011
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL AND
IS CONTINGENT UPON ISSUANCE OF ALL APPLICABLE REGULATORY PERMITS.
DISTRICT MANAGER OR DESIGNEE
OBSERVATION WELL WITH
REMOVABLE WATERTIGHT
CAP 6" ABOVE GRADE
6" PVC SOLID
PIPE ABOVE
STONE LAYERS
6" PERFORATED PVC
18"x18"x1/2" STEEL PLATE OR
TYPE 1, GRADE 1 PVC PLATE
6" PVC TYPE 1,
GRADE 1 FLANGE
OBSERVATION WELL DETAIL
NOT TO SCALE
NOTES:
1. ALL PVC TO BE SCHEDULE 40. PERFORATIONS SHALL BE 3/8" DIA.
@ 4" O/C 90° ALL AROUND PIPE.
2. INSTALL REMOVABLE WATERTIGHT PVC CAP ON TOP OF 6" PVC.
3. BOTTOM EXCAVATION IS TO BE IN NATURAL UNCOMPACTED
EARTH.
4. THREE HOLES SHOULD BE DRILLED INTO THE BOTTOM PLATE TO
ALLOW WATER TO DRAIN FROM THE OBSERVATION WELL.
5. REFER TO BMP PROFILE FOR SPECIFIC STONE AND PLANTING
MEDIA DEPTHS AND ELEVATIONS.
6. PVC PIPE SHALL BE ATTACHED TO THE FLANGE WITH SOLVENT
CEMENT PER THE MANUFACTURER'S SPECIFICATIONS.
SIZE LENGTHTYPE CLASS
PIPE SCHEDULE
6" 49 L.F.PERF. PVC SCH. 40
HDPEP15" 22 L.F.TYPE 'S'
QUANTITIES ARE APPROXIMATE AND SHALL NOT BE
USED BY THE CONTRACTOR FOR BIDDING
STRUCTURE SCHEDULE
1 15" ALCMP END SECTION N 739292.86 E 1203144.12 INV. = 857.00 MSHA STD. MD - 370.01
2 N 739276.25 E 1203158.61 GRATE = 861.67 MSHA STD. MD - 374.06TYPE 'WR' INLET
8" PONDING
MAXIMUM
WQv
NOTES:
1. ALL DRAINAGE AREAS TO A BIORETENTION FACILITY ARE TO BE
STABILIZED PRIOR TO INSTALLATION OF AMENDED SOILS, MULCH
OR PLANTINGS.
2. UNDERDRAIN CLEANOUTS SHOULD EXTEND A MIN. OF 6" ABOVE TOP
SURFACE OF MULCH LAYER. CLEANOUTS MAY BE FLUSH WITH TOP
OF SURFACE TO ALLOW DRAWDOWN.
TYPICAL BIORETENTION #1 CROSS - SECTION
NOT TO SCALE
6" DIAMETER PERFORATED
PVC UNDERDRAIN PIPE.
INV. = 609.75
3" HARDWOOD
MULCH LAYER
VARIES
BIORETENTION PLANTING SOIL
HARDWOOD MULCH
NO. 57 OR NO. 6 AGGREGATE (38"-3
4")
NO.8 PEA GRAVEL DIAPHRAGM
3"
24"
4" 12"
LINE INTERIOR SIDE
SLOPES WITH SOD
SEE LANDSCAPE PLAN FOR
PLANTING SCHEDULE
OBSERVATION WELL
SOLID WALL
PVC
1'x1'x6" CONC. PAD
(POURED IN PLACE)
861.00 860.75
858.75 858.42
857.42
861.67
6"
857.92
SHRUB PLANTING DETAIL
LANDSCAPE NOTES
LANDSCAPE PLAN
SCALE: 1"=20'
TREE PLANTING DETAIL
ENGINEER'S DESIGN CERTIFICATION
I HEREBY CERTIFY THIS PLAN FOR SOIL EROSION AND SEDIMENT CONTROL HAS BEEN
DESIGNED IN ACCORDANCE WITH LOCAL ORDINANCES, COMAR 26.17.01 AND THE 2011
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL.
IF APPLICABLE, THIS PLAN IS ALSO DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS
CONTAINED WITHIN USDA, NRCS "STANDARDS AND SPECIFICATIONS FOR PONDS MD-378"
AND THE POLICIES AND PROCEDURES OF THE MARYLAND DEPARTMENT OF THE
ENVIRONMENT DAM SAFETY PROGRAM.
30709
ENGINEERS SIGNATURE P.E. NO.
JOSEPH H. CECI
PRINT NAME DATE
4/12/24
BID SET 04/25/2024
H C a rl so n
P ro je ct s\ \3
E m m it sb ur g
R a in bo w L a ke
P a rk in g\
W D -0
1.
dw g, /1 /2
:5
:5
P
M jc ec i, RE
VI
SI
ON
DA
TE
CHECKED BY:
DRAWN BY:
DATE:
DRAWING NO.
PROJECT NO.
SHEET OF
SCALE:
DR
AW
N
BY
EN
G
IN
EE
R S
S U
R
VE
YO
R
S P
LA
N
N
ER
S
FO
X
A
SS
O
C
IA
TE
S, I N
C
W W
W .F
O
XA
SS
O
C
IA
TE
SI
N C
.C l:
FO
XF
R
ED
ER
IC
K
FO
XA
SS
O C
IA
TE
SI
N
C .C
O M
PH
O
N E:
(3
)7
-8
H
A G
ER
ST
O W
N , M
D . 2
M T.
A
ET
N A
R O
A D
(3
)7
-1
1)
6-
ER
IC
K , M
D . 2
W
O R
M A
N S
M
IL
L C
O U
R T
SU
IT
E 'G
' (3
)2
-6
PH
O N
E:
(3
)6
-0
FA
X:
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND THAT
I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MARYLAND.
PROFESSIONAL CERTIFICATION
LICENSE No.: EXP. DATE:
OWNER / DEVELOPER
TOWN OF EMMITSBURG, MARYLAND
300A SOUTH SETON AVE.
EMMITSBURG, MD 21727 6 10
AS NOTED
23-31990 D - 3607
DECEMBER 2023
CJC
JHC
SW
M
N
OT
ES
A
ND
D
ET
AI
LS
TO
W
N O
F
EM
M
IT
SB
U
R G
SI
TU
AT
ED
A
LO
NG
H
AM
PT
ON
V
AL
LE
Y R
OA
D
TO
W
N
OF
E
MM
IT
SB
UR
G
E
LE
CT
IO
N D
IS
TR
IC
T
No . 5
FR
ED
ER
IC
K C
OU
NT
Y , M
AR
YL
AN
D
TABLE B.4.1 MATERIAL SPECIFICATIONS FOR MICRO-BIORETENTION, RAIN GARDENS & LANDSCAPE INFILTRATION
MATERIAL SPECIFICATION SIZE NOTES
PLANTINGS SEE APPENDIX A, TABLE A.4 N/A PLANTINGS ARE SITE SPECIFIC
PLANTING SOIL
[2'-4' DEEP]
LOAMY SAND (60-65%) &
COMPOST (35-40%)
OR
SANDY LOAM (30%)
COARSE SAND (30%)
COMPOST (40%)
N/A USDA SOIL TYPES LOAMY SAND OR SANDY LOAM; CLAY CONTENT <5%
ORGANIC CONTENT MIN. 10% BY DRY WEIGHT (ASTM
D2974)
MULCH SHREDDED HARDWOOD AGED 6 MONTHS, MINIMUM, NO PINE OR WOOD CHIPS
PEA GRAVEL
DIAPHRAGM
PEA GRAVEL: (ASTM D-448) NO. 8 OR NO. 9
(1/8" TO 3/8")
CURTAIN DRAIN ORNAMENTAL STONE: WASHED
COBBLES
STONE: 2” TO 5”
GEOTEXTILE N/A PE TYPE I NONWOVEN
GRAVEL
(UNDERDRAINS AND
INFILTRATION
BERMS)
AASHTO M-43 NO. 57 OR NO. 6
AGGREGATE
(38"-3 4")
UNDERDRAIN PIPING F758, TYPE PS 28 OR AASHTO
M-278
4" TO 6" RIGID
SCHEDULE 40
PVC OR SDR-35
SLOTTED OR PERFORATED PIPE; 38" PERF. @6" ON CENTER, 4 HOLES PER ROW; MINIMUM
3" OF GRAVEL OVER PIPES; NOT NECESSARY UNDERNEATH PIPES. PERFORATED PIPE
SHALL BE WRAPPED WITH 14" GALVANIZED HARDWARE CLOTH.
POURED IN PLACE
CONCRETE (IF
REQUIRED)
MSHA MIX NO. 3 f'c=3500 PSI @ 28
DAYS, NORMAL WEIGHT,
AIR-ENTRAINED, REINFORCING TO
MEET ASTM-615-60
N/A ON-SITE TESTING OF POURED-IN-PLACE CONCRETE REQUIRED: 28 DAY
STRENGTH AND SLUMP TEST; ALL CONCRETE DESIGN (CAST-IN-PLACE OR
PRECAST) NOT USING PREVIOUSLY APPROVED STATE OR LOCAL STANDARDS
REQUIRES DESIGN DRAWINGS SEALED AND APPROVED BY A PROFESSIONAL
STRUCTURAL ENGINEER LICENSED IN THE STATE OF MARYLAND - DESIGN TO
INCLUDE MEETING ACI CODE 350.R/89; VERTICAL LOADING [H-10 OR H-20];
ALLOWABLE HORIZONTAL LOAD (BASED ON SOIL PRESSURES); AND ANALYSIS
OF POTENTIAL CRACKING
SAND AASHTO-M-6 OR ASTM-C-33 0.02" TO 0.04" SAND SUBSTITUTIONS SUCH AS DIABASE AND GRAYSTONE (AASHTO) #10 ARE NOT
ACCEPTABLE. NO CALCIUM CARBONATED OR DOLOMITIC SAND SUBSTITUTIONS ARE
ACCEPTABLE. NO "ROCK DUST" CAN BE USED FOR SAND.
MAINTENANCE SCHEDULE FOR BIORETENTION AREAS
DESCRIPTION METHOD FREQUENCY TIME OF YEAR
SOIL
INSPECT AND REPAIR
EROSION
VISUAL MONTHLY MONTHLY
ORGANIC LAYER
REMULCH ANY VOID AREAS BYHAND WHENEVER NEEDED WHENEVER NEEDED
REMOVE PREVIOUS MULCH
LAYER BEFORE APPLYING
NEW LAYER (OPTIONAL)
BY HAND ONCE EVERY TWO TO
THREE YEARS
SPRING
ANY ADDITIONAL MULCH
ADDED (OPTIONAL)
BY HAND ONCE A YEAR SPRING
PLANTS
REMOVAL AND REPLACEMENT
OF ALL DEAD AND DISEASED
VEGITATION CONSIDERED
BEYOND TREATMENT
SEE PLANTING
SPECIFICATIONS
TWICE A YEAR 3/15 TO 4/30 AND 10/1 TO
11/30
TREAT ALL DISEASED TREES
AND SHRUBS
MECHANICAL OR BY HAND N/A VARIES, DEPENDS ON
INSECT OR DISEASE
INFESTATION
WATERING OF PLANTS SHALL
TAKE PLACE AT THE END OF
EACH DAY FOR FOURTEEN
CONSECUTIVE DAYS AFTER
PLANTING HAS COMPLETED
BY HAND IMMEDIATELY AFTER
COMPLETION OF PROJECT
N/A
REPLACE STAKES AFTER ONE
YEAR
BY HAND ONCE A YEAR ONLY REMOVE STAKES IN
THE SPRING
REPLACE ANY DEFICIENT
STAKES OR WIRES
BY HAND N/A WHENEVER NEEDED
@ 45° AROUND PIPE
3/8"Ø HOLES @ 6" O/C
PERFORATED PIPE DETAIL
SCH. 40 OR SDR-35 PVC
NTS
CANADIAN BLUEGRASS
PENNLAWN RED FESCUE
KENTUCKY BLUE GRASS
LOW MAINTENANCE SEED MIXTURE
10 LBS./ACRE
10 LBS./ACRE
REDTOP GRASS SEED
BIRDSFOOT TREFOIL
10 LBS./ACRE
20 LBS./ACRE
5 LBS./ACRE
NOTES:
1. PIPE SHALL BE 6” DIAMETER, PERFORATED
RIGID PLASTIC PIPE (ASTMF 758, TYPE PS 28,
OR AASHTO-M-278).
2. PERFORATIONS SHALL BE ⅜” DIAMETER
LOCATED 6” ON CENTER WITH A MINIMUM OF
FOUR HOLES PER ROW.
3. PIPE SHALL BE WRAPPED WITH A ¼” (NO. 4 OR
4X4) GALVANIZED HARDWARE CLOTH.
6" or 8" X 6" PVC Wye (Gasketed)
Two-6"-1/16 (221 2°) Street Els
6"
S. W. M. UNDERDRAIN CLEANOUT DETAIL
6" SDR 35 OR SCH
40 PVC UNDERDRAIN
FlowLow End Upstream
12"
6" X 6" PVC Wye (Gasketed)
Two-6"-1/16 (221 2°) Street Els
6"
Flow
1'
12"
6" Cemented Cap
6" SDR 35 OR SCH
40 PVC UNDERDRAIN
(SOLIDWALL OR PERFORATED)
S. W. M. TERMINAL END UNDERDRAIN CLEANOUT DETAIL
NOT TO SCALE
- PVC RISER SHALL BE SOLID WALL
SDR-35 OR SCH 40
- ALL RISER JOINTS TO BE WATERTIGHT
- THIS DETAIL TO BE USED FOR SWM
PURPOSES ONLY
NOTES:
- PVC RISER SHALL BE SOLID WALL
SDR-35 OR SCH 40
- ALL RISER JOINTS TO BE WATERTIGHT
- THIS DETAIL TO BE USED FOR SWM
PURPOSES ONLY
NOTES:
NOT TO SCALE
(SOLIDWALL OR PERFORATED)
CLEANOUT W/
REMOVABLE 6"
INVERTED MIPT CAP
CLEANOUT W/
REMOVABLE 6"
INVERTED MIPT CAP
B.3.B SPECIFICATIONS FOR BIORETENTION
1. MATERIAL SPECIFICATIONS
THE ALLOWABLE MATERIALS TO BE USED IN BIORETENTION AREA ARE DETAILED IN TABLE B.4.1
2. PLANTING SOIL
THE SOIL SHALL BE A UNIFORM MIX, FREE OF STONES, STUMPS, ROOTS OR OTHER SIMILAR OBJECTS LARGER THAN
TWO INCHES. NO OTHER MATERIALS OR SUBSTANCES SHALL BE MIXED OR DUMPED WITHIN THE
MICRO-BIORETENTION PRACTICE THAT MAY BE HARMFUL TO PLANT GROWTH, OR PROVE A HINDRANCE TO THE PLANTING OR MAINTENANCE OPERATIONS. THE PLANTING SOIL SHALL BE FREE OF BERMUDA GRASS, QUACKGRASS, JOHNSON GRASS, OR OTHER NOXIOUS WEEDS AS SPECIFIED UNDER COMAR 15.08.01.05.
THE PLANTING SOIL SHALL BE TESTED AND SHALL MEET THE FOLLOWING CRITERIA:
• SOIL COMPONENT - LOAMY SAND OR SANDY LOAM (USDA SOIL TEXTURAL CLASSIFICATION)
• ORGANIC CONTENT - MINIMUM 10% BY DRY WEIGHT (ASTM D 2974). IN GENERAL, THIS CAN BE MET WITH A
MIXTURE OF LOAMY SAND (60%-65%) AND COMPOST (35% TO 40%) OR SANDY LOAM (30%), COARSE SAND
(30%), AND COMPOST (40%).
• CLAY CONTENT - MEDIA SHALL HAVE A CLAY CONTENT OF LESS THAN 5%.
• pH RANGE – SHOULD BE BETWEEN 5.5 - 7.0. AMENDMENTS (E.G., LIME, IRON SULFATE PLUS SULFUR) MAY BE
MIXED INTO THE SOIL TO INCREASE OR DECREASE pH.
THERE SHALL BE AT LEAST ONE SOIL TEST PER PROJECT. EACH TEST SHALL CONSIST OF BOTH THE STANDARD SOIL TEST FOR PH, AND ADDITIONAL TESTS OF ORGANIC MATTER, AND SOLUBLE SALTS. A TEXTURAL ANALYSIS IS REQUIRED FROM THE SITE STOCKPILED TOPSOIL. IF TOPSOIL IS IMPORTED, THEN A TEXTURE ANALYSIS SHALL BE
PERFORMED FOR EACH LOCATION WHERE THE TOPSOIL WAS EXCAVATED.
SINCE DIFFERENT LABS CALIBRATE THEIR TESTING EQUIPMENT DIFFERENTLY, ALL TESTING RESULTS SHALL COME
FROM THE SAME TESTING FACILITY.
SHOULD THE PH FALL OUT OF THE ACCEPTABLE RANGE, IT MAY BE MODIFIED (HIGHER) WITH LIME OR (LOWER) WITH
IRON SULFATE PLUS SULFUR.
3. COMPACTION
IT IS VERY IMPORTANT TO MINIMIZE COMPACTION OF BOTH THE BASE OF THE BIORETENTION AREA AND THE REQUIRED BACKFILL. WHEN POSSIBLE, USE EXCAVATION HOES TO REMOVE ORIGINAL SOIL. IF BIORETENTION AREAS ARE EXCAVATED USING A LOADER, THE CONTRACTOR SHOULD USE WIDE TRACK OR MARSH TRACK EQUIPMENT, OR LIGHT EQUIPMENT WITH TURF TYPE TIRES. USE OF EQUIPMENT WITH NARROW TRACKS OR NARROW TIRES, RUBBER TIRES WITH LARGE LUGS, OR HIGH PRESSURE TIRES WILL CAUSE EXCESSIVE COMPACTION RESULTING IN REDUCED INFILTRATION RATES AND IS NOT ACCEPTABLE. COMPACTION WILL SIGNIFICANTLY
CONTRIBUTE TO DESIGN FAILURE.
COMPACTION CAN BE ALLEVIATED AT THE BASE OF THE BIORETENTION FACILITY BY USING A PRIMARY TILLING OPERATION SUCH AS A CHISEL PLOW, RIPPER, OR SUBSOILER. THESE TILLING OPERATIONS ARE TO REFRACTURE THE SOIL PROFILE THROUGH THE 12 INCH COMPACTION ZONE. SUBSTITUTE METHODS MUST BE APPROVED BY THE ENGINEER. ROTOTILLERS TYPICALLY DO NOT TILL DEEP ENOUGH TO REDUCE THE EFFECTS OF COMPACTION FROM
HEAVY EQUIPMENT.
ROTOTILL 2 TO 3 INCHES OF SAND INTO THE BASE OF THE BIORETENTION FACILITY BEFORE BACKFILLING THE
OPTIONAL SAND LAYER. PUMP ANY PONDED WATER BEFORE PREPARING (ROTOTILLING) BASE.
WHEN BACKFILLING THE TOPSOIL OVER THE SAND LAYER, FIRST PLACE 3 TO 4 INCHES OF TOPSOIL OVER THE SAND, THEN ROTOTILL THE SAND/TOPSOIL TO CREATE A GRADATION ZONE. BACKFILL THE REMAINDER OF THE TOPSOIL TO
FINAL GRADE.
WHEN BACKFILLING THE BIORETENTION FACILITY, PLACE SOIL IN LIFTS 12” TO 18”. DO NOT USE HEAVY EQUIPMENT WITHIN THE BIORETENTION BASIN. HEAVY EQUIPMENT CAN BE USED AROUND THE PERIMETER OF THE BASIN TO SUPPLY SOILS AND SAND. GRADE BIORETENTION MATERIALS WITH LIGHT EQUIPMENT SUCH AS A
COMPACT LOADER OR A DOZER/LOADER WITH MARSH TRACKS.
4. PLANT MATERIAL
PLANT MATERIAL FOR BIORETENTION AREAS CAN BE FOUND ON THE SITE SPECIFIC LANDSCAPE PLAN.
5. PLANT INSTALLATION
MULCH SHOULD BE PLACED TO A UNIFORM THICKNESS OF 2” TO 3”. SHREDDED OR CHIPPED HARDWOOD MULCH IS THE ONLY ACCEPTED MULCH. PINE MULCH AND WOOD CHIPS ARE NOT ACCEPTABLE. SHREDDED MULCH MUST BE
WELL AGED (6 TO 12 MONTHS) FOR ACCEPTANCE.
ROOT STOCK OF THE PLANT MATERIAL SHALL BE KEPT MOIST DURING TRANSPORT AND ON-SITE STORAGE. THE PLANT ROOT BALL SHOULD BE PLANTED SO 1/8TH OF THE BALL IS ABOVE FINAL GRADE SURFACE. THE DIAMETER OF THE PLANTING PIT SHALL BE AT LEAST SIX INCHES LARGER THAN THE DIAMETER OF THE PLANTING BALL. SET AND MAINTAIN THE PLANT STRAIGHT DURING THE ENTIRE PLANTING PROCESS. THOROUGHLY WATER GROUND BED
COVER AFTER INSTALLATION.
TREES SHALL BE BRACED USING 2” BY 2” STAKES ONLY AS NECESSARY AND FOR THE FIRST GROWING SEASON
ONLY. STAKES ARE TO BE EQUALLY SPACED ON THE OUTSIDE OF THE TREE BALL.
GRASSES AND LEGUME SEED SHOULD BE DRILLED INTO THE SOIL TO A DEPTH OF AT LEAST ONE INCH. GRASS AND LEGUME PLUGS SHALL BE PLANTED FOLLOWING THE NON-GRASS GROUND COVER PLANTING SPECIFICATIONS.
THE TOPSOIL SPECIFICATIONS PROVIDE ENOUGH ORGANIC MATERIAL TO ADEQUATELY SUPPLY NUTRIENTS FROM NATURAL CYCLING. THE PRIMARY FUNCTION OF THE BIORETENTION STRUCTURE IS TO IMPROVE WATER QUALITY.
ADDING FERTILIZERS DEFEATS, OR AT A MINIMUM, IMPEDES THIS GOAL. ONLY ADD FERTILIZER IF WOOD CHIPS OR MULCH ARE USED TO AMEND THE SOIL. ROTOTILL UREA FERTILIZER AT A RATE OF 2 POUNDS PER 1000 SQUARE
FEET.
6. UNDERDRAINS
UNDERDRAINS ARE TO BE PLACED ON A 3'-0” WIDE SECTION OF FILTER CLOTH. PIPE IS PLACED NEXT, FOLLOWED BY THE GRAVEL BEDDING. THE ENDS OF UNDERDRAIN PIPES NOT TERMINATING IN AN OBSERVATION WELL SHALL BE
CAPPED.
THE MAIN COLLECTOR PIPE FOR UNDERDRAIN SYSTEMS SHALL BE CONSTRUCTED PER PLAN.
OBSERVATION WELLS AND/OR CLEAN-OUT PIPES MUST BE PROVIDED (ONE MINIMUM PER EVERY 1000 SQUARE FEET
OF SURFACE AREA).
7. MISCELLANEOUS
THE BIORETENTION FACILITY MAY NOT BE CONSTRUCTED UNTIL ALL CONTRIBUTING DRAINAGE AREA HAS BEEN
STABILIZED.
PLANTING NON-GRASS GROUND COVER
- THE GROUND COVER PLANTING HOLES SHALL BE DUG THROUGH THE
MULCH WITH ONE OF THE FOLLOWING: HAND TROWEL, SHOVEL, BULB
PLANTER, OR HOE (THIS DOES NOT APPLY TO GRASSES OR LEGUMES).
- BEFORE PLANTING BIODEGRADABLE POTS SHALL BE SPLIT, AND
NON-BIODEGRADABLE POTS SHALL BE REMOVED. ROOT SYSTEMS OF
ALL POTTED PLANTS SHALL BE SPLIT OR CRUMBLED.
- THE GROUND COVER SHALL BE PLANTED SO THAT THE ROOTS ARE
SURROUNDED BY THE SOIL BELOW THE MULCH. POTTED PLANTS SHALL
BE SET SO THAT THE TOP OF THE POT IS EVEN WITH THE EXISTING
GRADE. THE ROOTS OF BARE ROOT PLANTS SHALL BE COVERED TO THE
CROWN.
- THE MULCHED AND PLANTED GROUND COVER BED WITH A
PRE-EMERGENT HERBICIDE.
- THE ENTIRE GROUND COVER BED SHALL BE THOROUGHLY WATERED.
PLANTING GRASS GROUND COVER
- GRASSES AND LEGUME SEED SHALL BE TILLED INTO THE SOIL TO A
DEPTH OF AT LEAST 2 INCHES BY EITHER HARROWING OR DISCING.
FERTILIZER SHALL BE APPLIED AT THE SAME RATE AND UTILIZING THE
SAME PROCESS FOR NON-GRASS GROUND COVER. GRASS AND LEGUME
PLUGS SHALL BE PLANTED FOLLOWING THE NON-GRASS GROUND
COVER PLANTING TECHNIQUES.
FERTILIZER
- ALL GROUND COVERS SHALL BE FERTILIZED WITH A 10-6-4 ANALYSIS
FERTILIZER AS A WET APPLICATION AT THE RATE OF 3 LBS. PER 100
SQUARE FEET OF THE BIORETENTION AREA PRIOR TO PLANTING
NON-GRASS GROUND COVER OR AS PART OF THE GRASS SEED GROUND
COVER.
STORMWATER MANAGEMENT FACILITY
OPERATIONS AND MAINTENANCE SCHEDULE
ROUTINE MAINTENANCE:
1 THE FACILITY SHALL BE INSPECTED BIANNUALLY AND AFTER MAJOR STORMS.
INSPECTIONS SHOULD BE PERFORMED DURING WET WEATHER TO DETERMINE
IF AND INSIDE SLOPE SHALL BE MOWED A MINIMUM OF TWICE A YEAR, ONCE IN
LATE POND IS FUNCTIONING PROPERLY.
2 THE EMBANKMENT OF THE POND CONSISTING OF THE OUTSIDE SLOPE, THE TOP,
JUNE AND ONCE IN SEPTEMBER. OTHER SIDE SLOPES, POND BOTTOM, AND
MAINTENANCE ACCESS ARE TO BE MOWED AS NEEDED.
3 DEBRIS, TRASH AND LITTER SHALL BE REMOVED DURING REGULAR MOWING
OPERATIONS OR AS DEEMED NECESSARY.
4 NO WOODY VEGETATION ALLOWED WITHIN 50 FOOT RADIUS OF THE POND
PRINCIPLE SPILLWAY (INFLOW OR OUTFLOW AREAS) OR ANYWHERE ON THE
MANMADE EMBANKMENT.
5 BURROWING ANIMALS ARE TO BE REMOVED FROM THE MANMADE
EMBANKMENT AREA AND THE BURROWS BACKFILLED.
6 VISIBLE SIGNS OF EROSION ALONG THE INFLOW CHANNELS, WITHIN THE POND,
AND AT THE OUTFALL SHALL BE REPAIRED IMMEDIATELY.
7. REPLACE MULCH ANNUALLY.
8. IF PONDING OCCURS THE TOP 3" OF PLANTING SOIL SHALL BE REPLACED.
NON-ROUTINE MAINTENANCE:
1 STRUCTURAL COMPONENTS OF THE POND SUCH AS THE EMBANKMENT, RISER,
BARREL, WEIR, ETC. SHALL BE REPAIRED IMMEDIATELY UPON DETECTION OF A
PROBLEM.
2 PERIODIC CLEANING, RECOATING, WELDING, ETC. OF THE POND TRASH RACK,
RISER, BARREL, LOW FLOW DEWATERING DEVICE, ETC. IMMEDIATELY UPON
DETECTION OF A PROBLEM.
ENGINEER'S DESIGN CERTIFICATION
I HEREBY CERTIFY THIS PLAN FOR SOIL EROSION AND SEDIMENT CONTROL HAS BEEN
DESIGNED IN ACCORDANCE WITH LOCAL ORDINANCES, COMAR 26.17.01 AND THE 2011
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL.
IF APPLICABLE, THIS PLAN IS ALSO DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS
CONTAINED WITHIN USDA, NRCS "STANDARDS AND SPECIFICATIONS FOR PONDS MD-378"
AND THE POLICIES AND PROCEDURES OF THE MARYLAND DEPARTMENT OF THE
ENVIRONMENT DAM SAFETY PROGRAM.
30709
ENGINEERS SIGNATURE P.E. NO.
JOSEPH H. CECI
PRINT NAME DATE
4/12/24
BID SET 04/25/2024
H C a rl so n
P ro je ct s\ \3
E m m it sb ur g
R a in bo w L a ke
P a rk in g\
W D -0
1.
dw g, /1 /2
:5
8:
P
M jc ec i, SI
ON
DA
TE
CHECKED BY:
DRAWN BY:
DATE:
DRAWING NO.
PROJECT NO.
SHEET OF
SCALE:
DR
AW
N
BY
EN
G
IN
EE
R S
S U
R
VE
YO
R
S P
LA
N
N
ER
S
FO
X
A
SS
O
C
IA
TE
S, I N
C
W W
W .F
O
XA
SS
O
C
IA
TE
SI
N C
.C l:
FO
XF
R
ED
ER
IC
K
FO
XA
SS
O C
IA
TE
SI
N
C .C
O M
PH
O
N E:
(3
)7
-8
H
A G
ER
ST
O W
N , M
D . 2
M T.
A
ET
N A
R O
A D
(3
)7
-1
1)
6-
ER
IC
K , M
D . 2
W
O R
M A
N S
M
IL
L C
O U
R T
SU
IT
E 'G
' (3
)2
-6
PH
O N
E:
(3
)6
-0
FA
X:
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND THAT
I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MARYLAND.
PROFESSIONAL CERTIFICATION
LICENSE No.: EXP. DATE:
OWNER / DEVELOPER
TOWN OF EMMITSBURG, MARYLAND
300A SOUTH SETON AVE.
EMMITSBURG, MD 21727 7 10
AS NOTED
23-31990 D - 3607
DECEMBER 2023
CJC
JHC
SI
TE
D
ET
AI
LS
TO
W
N O
F
EM
M
IT
SB
U
R G
SI
TU
AT
ED
A
LO
NG
H
AM
PT
ON
V
AL
LE
Y R
OA
D
TO
W
N
OF
E
MM
IT
SB
UR
G
E
LE
CT
IO
N D
IS
TR
IC
T
No . 5
FR
ED
ER
IC
K C
OU
NT
Y , M
AR
YL
AN
D
SIGN POST SETTING DETAIL
6"
SECTION
7' -0
M
IN
6" 6"
2' -0
NO
PARKING
IN
ACCESS
AISLE
ACCESS AISLE SIGN R8-1(2)
A B C D E F G H J K L
STANDARD 1 34 2 12 1 2 1 12 12 18 6 18 14 1 12
2 1/2" ARROWHEAD MAXIMUM
FINE $500
VAN
ACCESSIBLE
N.T.S.
* REDUCE SPACING 50 PERCENT
COLORS
LEGEND AND BORDER - GREEN
WHITE SYMBOL ON BLUE BACKGROUND
BACKROUND - WHITE
ARROW MAY BE REMOVED IF NECESSARY
Reference: State of Maryland Standard Highway Signs Booklet MdMUTCD SECTION - 2B.39, 2B.40, 2B.41, 7B.14
RESERVED PARKING R7-8
VAN ACCESSIBLE R7-8A
N.T.S.
MAXIMUM FINE R7-8(2)
NOTES:
1. METAL POST TO BE GALVANIZED. ALL BOLTS, NUTS, WASHERS
AND SCREWS MUST BE RUSTPROOF.
2. CONCRETE FOR SIGN FOOTING SHALL BE PORTLAND CEMENT
AND HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3,000 P.S.I.
3. SIGNS WILL BE FABRICATED BY USING REFLECTING COATING IN
THE SYMBOL, MESSAGE AND BORDER APPLIED TO A SHEET
ALUMINUM BACKING (.080) IN THICKNESS.
4. THE SYMBOL IS COMPOSED OF TWO ELEMENTS, A WHITE
WHEELCHAIR FIGURE (WHICH SHOULD ALWAYS FACE RIGHT) ON
A SQUARE BACKGROUND, INTERNATIONAL BLUE IN COLOR (FED.
STD. 595A, COLOR #15180).
5. SIGN POST SHALL BE MIN. 2'-0" CLEAR FROM FACE OF CURB OR
BACK OF SIDEWALK.
6. WHERE A SINGLE (NON-VAN) ACCESSIBLE PARKING SPACE IS
PROVIDED, THE LOADING AND UNLOADING ACCESS AISLE SHALL
BE ON THE PASSENGER SIDE OF THE VEHICLE AS THE VEHICLE
IS GOING FORWARD INTO THE PARKING SPACE.
7. SURFACE SLOPES OF ACCESSIBLE OFF-STREET PARKING
STALLS SHALL BE THE MINIMUM POSSIBLE AND SHALL NOT
EXCEED 2 PERCENT IN ANY DIRECTION.
GALVANIZED NUTS
AND BOLTS(TYP.)
SIGN PLATE,
(TYP.)
STANDARD
U-CHANNEL
WITH PLASTIC
SLEEVE
2 - PIECE
SIGN POST
FINISHED
GRADE
12" DIA.
CONC.
FOOTING
COMPACTED
SUBGRADE
45°
5"
3"
HOLES 12" FROM EITHER END.
NOTE: CURB STOP SHALL BE 6'-0" IN LENGTH W/(2) 5/8" DIA.
CEMENT
PORTLAND
3500 PSI
5/8" DIA. HOLE
PRECAST CONCRETE WHEEL STOP
N.T.S.
8 12"
COMPACTED DENSE GRADED AGGREGATE
SUBBASE (M.S.H.A. GA BASE)
MIRAFI 600X OR EQUAL
BY THE GEOTECHNICAL ENGINEER
N.T.S.
* NOTE: FINAL PAVEMENT SECTION IS SUBJECT TO MODIFICATION
PAVING DETAIL
STABILIZATION FABRIC
SUBGRADE PREPARATION
A. FILL AREAS TO BE PAVED SHALL HAVE SOIL PLACED IN 8 INCH LIFTS AND COMPACTED
TO 92 PERCENT OF MAXIMUM DENSITY. THE LAST TWO LIFTS SHALL BE COMPACTED TO
95 PERCENT OF MAXIMUM DENSITY. MAXIMUM DENSITY SHALL BE DETERMINED IN
ACCORDANCE WITH ASSHTO T-180 METHOD C. CERTIFICATION BY A GEOTECHNICAL
ENGINEER LICENSED BY THE STATE OF MARYLAND MAY BE REQUIRED.
B. MAXIMUM DENNSITY SHALL BE DETERMINED IN ACCORDANCE WITH ASTM D-698
STANDARD PROCTOR.
C. AFTER THE SUBGRADE IN CUTS AND FILLS HAS BEEN FINALLY SHAPED TO THE SPECIFIC
CROSS SECTION, IT SHALL BE CAREFULLY AND THOROUGHLY PROOF ROLLED WITH A 20
TON ROLLER OR EQUIVALENT TO DETERMINE SOFT OR UNSUITABLE AREAS. PRIOR TO
PAVING SOFT OR SUITABLE MATERIAL TO THE REQUIREMENTS OF ITEM "A" ABOVE.
D. NO PAVEMENT SHALL BE PLACED ON FROZEN SUBGRADES NOR ON SUBGRADES THAT
WILL NOT ADEQUATELY SUPPORT THE PAVEMENT.
E. IF ROCK IS ENCOUNTERED IN THE SUBGRADE, REMOVE AN ADDITIONAL 6 INCHES
BELOW SUBGRADE AND BACKFILL WITH SUITABLE MATERIAL TO THE REQUIREMENTS OF
ITEM "A".
9.5mm SUPERPAVE HMA SURFACE
25.0mm SUPERPAVE HMA BASE
STOP
R1-1
30"X30"
TRAFFIC WHITE
1'-0"
34"
4" STROKE
(TYPICAL)
ONE WAY
R6-1R 36"x12"
R5-1 30"x30"
CONCRETE PAVING DETAIL
DUMPSTER PAD PORTLAND CEMENT
4000 PSI
CONCRETE PAVEMENT
SUBBASE (M.S.H.A. G.A. BASE)
PORTLAND CEMENT
8" 6"
COMPACTED DENSE GRADED AGGREGATE
2 LAYERS WWF 6X6 W6XW6
2" 2"
24"
N.T.S.
SUSUBGRADE PREPARATION:
1 FILL AREAS TO BE PAVED SHALL HAVE SOIL PLACED IN 8 INCH LIFTS AND COMPACTED TO 95 PERCENT OF
MAXIMUM DENSITY. MAXIMUM DENNSITY SHALL BE DETERMINED IN ACCORDANCE WITH ASTM D-698 STANDARD
PROCTOR.
2 AFTER THE SUBGRADE IN CUTS AND FILLS HAS BEEN FINALLY SHAPED TO THE SPECIFIED CROSS SECTION, IT SHALL BE CAREFULLY AND THOROUGHLY PROOF ROLLED WITH A 20 TON ROLLER OR EQUIVALENT TO DETERMINE SOFT OR UNSUITABLE AREAS. PRIOR TO PAVING, SOFT OR UNSUITABLE ARES SHALL BE REMOVED AND BACKFILLED WITH SUITABLE MATERIAL TO THE REQUIREMENTS OF No. 1 ABOVE.
3 NO PAVEMENT SHALL BE PLACED ON FROZEN OR FROSTED SUBGRADES THAT WILL NOT ADEQUATELY SUPPORT
THE PAVEMENT.
4 IF ROCK IN ENCOUNTERED IN THE SUBGRADE, REMOVE AN ADDITIONAL 6 INCHES BELOW SUBGRADE AND BACKFILL WITH SUITABLE MATERIAL TO THE REQUIREMENTS OF No. 1 ABOVE.
*NOTE: FINAL PAVEMENT SECTION IS SUBJECT TO MODIFICATION BY THE GEOTECHNICAL ENGINEER
PORTLAND CEMENT CONCRETE PAVEMENT
PER MSHA SECTION 520. MIX NUMBER 2, 3
OR EQUIVALENT
1. POSTS TO BE PRESSURE TREATED SOUTHERN YELLOW
4"
PINE FREE OF LARGE KNOTS, WANES & CHECKS.
CONTRACTOR TO VERIFY IF
EXISTING POST CAN BE
REUSED. ANY REPLACEMENT
POST SHALL BE PRESSURE
TREATED PINE
2"
3,000 PSI MIX
CONCRETE @28
DAYS
14" DIA. HOLE FOR 4" x 4" & 4" x 6" 18" DIA. HOLE FOR 6" x 6" & 6' x 8"
SIGN BOARD POST DETAIL
N.T.S.
VA
R
IE
S
7' -8
"4' -8
/8
5'- 0"
8'- 0"
10'-0" MAX SPACING
TENSION BAR
TURNBUCKLE
TYPICAL HIGH FENCE
ROUND END POSTS, WITH TOP RAIL
TRUSS ROD
ADJUSTABLE
CORNER POST
POST TOP
ROUND END &
HOG RING
1.66" [42.2MM] (1 5/8") OD
KNUCKLED
BOTTOM SELVAGE
BRACE RAIL
TOP RAIL
1.66" [42.2MM] (1 5/8") OD
LINE POST
(ROUND OR "C")
LINE POST TIE
(OPTIONAL)
WIRE
TENSION
LINE POST
LOOP CAP
NOT TO SCALE
GALVANIZED CHAIN
LINK FABRIC, (TOP
SELVAGE OPTION)
TYPICAL SINGLE SWING GATE
BA
R
LE
NG
TH
(V
AR
IE
S)
5' 0"
LATCH POST
2 1/4" 2 1/2"
5' 0"
4'
4' 8 1
/2"
FRAME
LATCH
BLACK PVC
COATED CHAIN
LINK
CONCRETE FOOTING
GATE POST
Ø2.875" (73MM)
HINGE
3'-
6" COMPACTED
GRANULAR BASE
FRAME
LATCH POST
HINGE LATCH
NOT TO SCALE
GRADE
TENSION WIRE
3'- 6"
10"
3,500PSI
CONCRETE 10"
3,500PSI
CONCRETE
NO PARKING
R7-1 (I)
12"X18"
RIGHT TURN ONLY
12"X18"
RIGHT
TURN
ONLY
BID SET 04/25/2024
H C a rl so n
P ro je ct s\ \3
E m m it sb ur g
R a in bo w L a ke
P a rk in g\
W D -0
1.
dw g, /1 /2
:5
8:
P M jc ec i, SI
ON
DA
TE
CHECKED BY:
DRAWN BY:
DATE:
DRAWING NO.
PROJECT NO.
SHEET OF
SCALE:
DR
AW
N
BY
EN
G
IN
EE
R S
S U
R
VE
YO
R
S P
LA
N
N
ER
S
FO
X
A
SS
O
C
IA
TE
S, I N
C
W W
W .F
O
XA
SS
O
C
IA
TE
SI
N C
.C l:
FO
XF
R
ED
ER
IC
K
FO
XA
SS
O C
IA
TE
SI
N
C .C
O M
PH
O
N E:
(3
)7
-8
H
A G
ER
ST
O W
N , M
D . 2
M T.
A
ET
N A
R O
A D
(3
)7
-1
1)
6-
ER
IC
K , M
D . 2
W
O R
M A
N S
M
IL
L C
O U
R T
SU
IT
E 'G
' (3
)2
-6
PH
O N
E:
(3
)6
-0
FA
X:
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND THAT
I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MARYLAND.
PROFESSIONAL CERTIFICATION
LICENSE No.: EXP. DATE:
OWNER / DEVELOPER
TOWN OF EMMITSBURG, MARYLAND
300A SOUTH SETON AVE.
EMMITSBURG, MD 21727 8 10
AS NOTED
23-31990 D - 3607
DECEMBER 2023
CJC
JHC
SE
DI
ME
NT
A
ND
E
RO
SI
ON
C
ON
TR
OL
N
OT
ES
A
ND
D
ET
AI
LS
TO
W
N O
F
EM
M
IT
SB
U
R G
SI
TU
AT
ED
A
LO
NG
H
AM
PT
ON
V
AL
LE
Y R
OA
D
TO
W
N
OF
E
MM
IT
SB
UR
G
E
LE
CT
IO
N D
IS
TR
IC
T
No . 5
FR
ED
ER
IC
K C
OU
NT
Y , M
AR
YL
AN
D
By:
Date:
PLAN IS VALID FOR TWO YEARS FROM DATE OF APPROVAL
FREDERICK COUNTY SOIL CONSERVATION DISTRICT
EROSION AND SEDIMENT CONTROL PLAN APPROVAL
SCD APPROVAL FOR SEDIMENT AND EROSION CONTROL IS IN ACCORDANCE WITH THE 2011
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL AND
IS CONTINGENT UPON ISSUANCE OF ALL APPLICABLE REGULATORY PERMITS.
DISTRICT MANAGER OR DESIGNEE
DETAIL B-1 STABILIZED CONSTRUCTION
ENTRANCE
DETAIL E-3 SUPER SILT FENCE
DETAIL E-1 SILT FENCEDETAIL E-1 SILT FENCE
DETAIL H-6 ONSITE CONCRETE
WASHOUT STRUCTURE
DETAIL H-6 ONSITE CONCRETE
WASHOUT STRUCTURE
DETAIL B-4-6-C PERMANENT SOIL
STABILIZATION MATTING
CHANNEL APPLICATION
DETAIL E- 9-1 STANDARD INLET PROTECTION DETAIL E- 9-1 STANDARD INLET PROTECTION
ENGINEER'S DESIGN CERTIFICATION
I HEREBY CERTIFY THIS PLAN FOR SOIL EROSION AND SEDIMENT CONTROL HAS BEEN
DESIGNED IN ACCORDANCE WITH LOCAL ORDINANCES, COMAR 26.17.01 AND THE 2011
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL.
IF APPLICABLE, THIS PLAN IS ALSO DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS
CONTAINED WITHIN USDA, NRCS "STANDARDS AND SPECIFICATIONS FOR PONDS MD-378"
AND THE POLICIES AND PROCEDURES OF THE MARYLAND DEPARTMENT OF THE
ENVIRONMENT DAM SAFETY PROGRAM.
30709
ENGINEERS SIGNATURE P.E. NO.
JOSEPH H. CECI
PRINT NAME DATE
4/12/24
SEQUENCE OF CONSTRUCTION
1. OBTAIN ALL REQUIRED PERMITS AND APPROVALS FROM THE APPROPRIATE AGENCIES.
CONTACT FREDERICK COUNTY ENVIRONMENTAL COMPLIANCE SECTION AND THE TOWN
OF EMMITSBURG TO SET UP A PRE-CONSTRUCTION MEETING WITH THE SEDIMENT AND
EROSION CONTROL INSPECTOR AT (301-600-3507, 48 HOURS PRIOR TO BEGINNING
CONSTRUCTION. ADDITIONAL SEDIMENT CONTROL MEASURES MAY BE REQUIRED AS A
RESULT OF THE PRE-CONSTRUCTION MEETING.
2. INSTALL STABILIZED CONSTRUCTION ENTRANCE.
3. CLEAR AND GRUB ONLY THAT AREA REQUIRED TO INSTALL SEDIMENT CONTROL
DEVICES INCLUDING SILT FENCE AND SUPER SILT FENCE.
4. CONTRACTOR SHALL PROVIDE TEMPORARY STABILIZATION OF ALL DISTURBED AREAS
IN ACCORDANCE WITH THE STANDARD SEDIMENT AND EROSION CONTROL NOTES NOs.
4 & 5 SHOWN ON THIS SHEET.
5. CONTACT SEDIMENT CONTROL INSPECTOR BEFORE PROCEEDING.
6. CLEAR AND GRUB REMAINDER OF THE SITE.
7. BEGIN GRADING OPERATION. STRIP AND STOCKPILE/REMOVE TOPSOIL AS NECESSARY.
8. ALL SOIL THAT IS NOT NEEDED FOR FILL MATERIAL MUST BE REMOVED FROM THE SITE
AND DELIVERED TO AN APPROVED SITE.
9. EXCAVATE AND CONSTRUCT FILLS.
10. CONSTRUCT THE SWM BIORETENTION FACILITY. DO NOT INSTALL FILTER MATERIAL
UNTIL ALL UPSTREAM AREAS ARE STABILIZED.
11. CONSTRUCT UNDERGROUND UTILITIES INCLUDING STORM DRAIN.
12. WITH UTILITY CONSTRUCTION COMPLETE FINE GRADE THE PARKING LOT, INSTALL
CURB & GUTTER, AND COMMENCE PAVING OPERATIONS.
13. STABILIZE ALL DISTURBED AREAS.
14. PRIOR TO CONVERTING SWM FACILITIES, FLUSH STORM DRAIN SYSTEM OF
ACCUMULATED SEDIMENT.
15. ONCE ALL UPSTREAM AREAS DRAINING TO THE SWM FACILITIES ARE PERMANENTLY
STABILIZED AND UPON APPROVAL FROM THE SEDIMENT CONTROL INSPECTOR,
RESHAPE THE SWM FACILITIES TO THEIR ORIGINAL DESIGN SPECIFICATIONS AND
INSTALL THE UNDERDRAIN, PERMEABLE SOIL AND STONE WITHIN THE BIORETENTION
AREAS. STABILIZE ANY REMAINING DISTURBED AREAS.
16. WHEN SITE IS STABILIZED, CONTACT THE SEDIMENT CONTROL INSPECTOR FOR
PERMISSION TO REMOVE THE SEDIMENT CONTROL DEVICES.
17. REMOVE SEDIMENT CONTROL DEVICES, STABILIZE AREAS DISTURBED BY THEIR
REMOVAL.
NOTE:
DEPENDING ON THE SITE CONDITIONS, PHASING OR CONSTRUCTION SEQUENCING, AND
STABILIZATION METHODS, ADDITIONAL SEDIMENT CONTROLS (OTHER THAN AS SHOWN
HERE ON) MAY BE REQUIRED BY THE INSPECTOR.
BID SET
04/25/2024
H C a rl so n
P ro je ct s\ \3
E m m it sb ur g
R a in bo w L a ke
P a rk in g\
W D -0
1.
dw g, /1 /2
:5
8:
P
M jc ec i, SI
ON
DA
TE
CHECKED BY:
DRAWN BY:
DATE:
DRAWING NO.
PROJECT NO.
SHEET OF
SCALE:
DR
AW
N
BY
EN
G
IN
EE
R S
S U
R
VE
YO
R
S P
LA
N
N
ER
S
FO
X
A
SS
O
C
IA
TE
S, I N
C
W W
W .F
O
XA
SS
O
C
IA
TE
SI
N C
.C l:
FO
XF
R
ED
ER
IC
K
FO
XA
SS
O C
IA
TE
SI
N
C .C
O M
PH
O
N E:
(3
)7
-8
H
A G
ER
ST
O W
N , M
D . 2
M T.
A
ET
N A
R O
A D
(3
)7
-1
1)
6-
ER
IC
K , M
D . 2
W
O R
M A
N S
M
IL
L C
O U
R T
SU
IT
E 'G
' (3
)2
-6
PH
O N
E:
(3
)6
-0
FA
X:
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND THAT
I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MARYLAND.
PROFESSIONAL CERTIFICATION
LICENSE No.: EXP. DATE:
OWNER / DEVELOPER
TOWN OF EMMITSBURG, MARYLAND
300A SOUTH SETON AVE.
EMMITSBURG, MD 21727 9 10
AS NOTED
23-31990 D - 3607
DECEMBER 2023
CJC
JHC
SE
DI
ME
NT
A
ND
E
RO
SI
ON
C
ON
TR
OL
N
OT
ES
A
ND
D
ET
AI
LS
TO
W
N O
F
EM
M
IT
SB
U
R G
SI
TU
AT
ED
A
LO
NG
H
AM
PT
ON
V
AL
LE
Y R
OA
D
TO
W
N
OF
E
MM
IT
SB
UR
G
E
LE
CT
IO
N D
IS
TR
IC
T
No . 5
FR
ED
ER
IC
K C
OU
NT
Y , M
AR
YL
AN
D
By:
Date:
PLAN IS VALID FOR TWO YEARS FROM DATE OF APPROVAL
FREDERICK COUNTY SOIL CONSERVATION DISTRICT
EROSION AND SEDIMENT CONTROL PLAN APPROVAL
SCD APPROVAL FOR SEDIMENT AND EROSION CONTROL IS IN ACCORDANCE WITH THE 2011
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL AND
IS CONTINGENT UPON ISSUANCE OF ALL APPLICABLE REGULATORY PERMITS.
DISTRICT MANAGER OR DESIGNEE
SOIL EROSION AND SEDIMENT CONTROL."
1. ALL DISTURBED AREAS SHALL BE SEEDED, SODDED AND/OR MULCHED IN
ACCORDANCE WITH "2011 MARYLAND STANDARDS AND SPECIFICATIONS FOR
2. SEEDING SHALL BE PERFORMED IN ACCORDANCE WITH THE ABOVE MENTIONED
STANDARDS. REFER TO SELECTION G, VEGETATIVE PRACTICES, AND FOR
SEEDING, MULCHING AND SODDING SPECIFICATIONS, RESPECTIVELY.
3. DIKE SEEDING AND PERMANENT SITE SEEDING SHALL BE PERFORMED IN
ACCORDANCE WITH THE ABOVE MENTIONED STANDARDS.
4. IF SITE IS READY TO RECEIVE FINAL COVER DURING THE NON-PLANTING
SEASON, THEN IT SHALL BE PROTECTED BY MULCHING. REFER TO THE
ABOVE "STANDARDS AND SPECIFICATIONS." THE MULCH WILL REMAIN UNTIL
THE NEXT PLANTING SEASON AS DEFINED BY THE STANDARDS.
5. ALL DISTURBED AREAS NOT COVERED BY BUILDING AND PAVING SHALL BE
STABILIZED AS SOON AS POSSIBLE BY PERMANENT SEEDING AND MULCHING
AS PER "STANDARDS AND SPECIFICATIONS", SECTION G.
SUBGRADE PREPARATION
SEEDING, SODDING AND / OR MULCHING NOTES
SEDIMENT & EROSION CONTROL NOTES
FOR SITES 1.0 ACRE OR MORE, THE FOLLOWING ARE REQUIRED:
FREDERICK COUNTY CODES.
YOU…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .