Radome Requirements Document.pdf
PDF 107 KB Posted
- Solicitation number
- PANRSA-24-P-0000-006146
About this file
This document is a Pre-Solicitation for a federal contract opportunity to manufacture and deliver three (3) ground-based Radomes to Fort Carson, CO for the U.S. Army. The key details are:
The Radomes must meet specific technical requirements outlined in the attached Radome Requirements Document, including size, construction materials, and design features. This is a 100% set-aside for Economically Disadvantaged Women Owned Small Businesses under NAICS code 334290. Proposals are due by a specified date, and the contract will be awarded as a firm-fixed-price based on the most advantageous offer considering technical acceptability, socioeconomic status, delivery date, and price. The Required Delivery Date to Fort Carson, CO is September 30, 2024. Offerors must provide pricing for the Radomes, including delivery, as well as details on their proposed design, delivery plan, and small business status. Failure to submit all required information may render a proposal non-responsive.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RADOME SKETCH_UPDATED.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item # Description Manufacturer Model/Part # QTY Unit of Issue Ship-to-Address
1 Suitable sized Radome constructed with RF Transparent material (installed with riser wall, personnel and trailer access vestibule, fall arrest points, and APEX maintenance point).
TBD TBD 3 Each
1.a.
Radome size to be contractor designed and defined to adequately house trailer mounted antenna with deployed dimensions shown in the outline drawing attachment. (250 inch height minimum)
TBD TBD 3 Each
1.b. Radome construction shall be of fire retardant materials (per ASTM D6413‐99 and ASTM E84‐18).
TBD TBD 3 Each
1.c. Radome material shall have <2.0 dB transmit loss at UHF through Ka‐bands (0.3 to 40 GHz). TBD TBD 3 Each
1.d. Radome structure must have wind rating of at least 60 mph sustained and gusting to 90 mph.
TBD TBD 3 Each
1.e. Radome material shall have an operational temperature range of ‐30° C through +50° C. TBD TBD 3 Each
1.f. Radome structure shall be capable of Solar load of 300 BTUs per square foot. TBD TBD 3 Each
1.g. Radome structure shall be capable of Ice and snow load of at least 10 pounds per square foot.
TBD TBD 3 Each
1.h Radome structure shall provide a fixed input and exhaust port suitable for contractor provided HVAC unit flexible duct.
TBD TBD 3 Each
Radome structure shall provide a personnel and trailer access vestibule with minimum of 12'h X 12'w X 5'd. The vestibule shall be located on the North side of the Radome and does not need to be RF transparent.
TBD TBD 3 Each
2.a. The vestibule shall provide 1 roll‐up type stowed trailer access door of a minimum 11' X 11' on front face of vestibule.
TBD TBD 3 Each
2.b. The vestibule shall provide 1 personnel access door of a minimum 36" X 80" located on one side of vestibule.
TBD TBD 3 Each
2.c. The vestibule shall provide 1 cable access run/port at ground level of approximately 24" wide and 8" tall.
TBD TBD 3 Each
3 The contractor shall provide a minimum of four (4) Spare Panels ‐ For the RF Transparent Radome structure.
TBD TBD 3 Each
4 The contractor shall provide FAA/ICAO Low Intensity Obstruction Warning Light ‐ LED (NVG/NVIS: Compatible).
TBD TBD 3 Each
5 The contractor shall provide a Lightning Protection System ‐ with a Single air terminal, 36" minimum.
TBD TBD 3 Each
6 The contractor shall provide an LED Interior Lighting System. TBD TBD 3 Each
7 The contractor shall provide an HVAC Unit (skid‐mounted w/flexible ducting from HVAC) operating range 0° to 40°C.
TBD TBD 3 Each
8 The contractor shall provide the Instruction Manual for Installation and Deinstallation of the radome.
TBD TBD 3 Each
9 The contractor shall provide the Operation and Maintenance Manual for the radome. TBD TBD 3 Each
Requirements Document
Organization: 1st Space Brigade
1st Space Brigade S‐4 Attn: Mike Moore or Nelson Alequin
6410 Magrath Ave Bldg 1959 Fort Carson CO 80913
Radome Requirements Document
10 The contractor shall provide the Operation and Maintenance Manual for the HVAC unit. TBD TBD 3 Each
11 The contractor shall provide a list for a Basic Tool kit for operator repairs. TBD TBD 3 Each
12 The contractor shall provide a mounting point and standard 5 lb, Type C fire extinguisher for use inside the radome.
TBD TBD 3 Each
13 The radome shall include a mounting point for; and standard battery powered smoke detector.
TBD TBD 3 Each
14 Total cost/bid of the radome must include shipping. TBD TBD 3 Each
15 The contractor shall ensure radomes are packed in manner for onward overseas shipment (i.e. skidded, crated, boxed, and be able to be easily handed with MHE).
TBD TBD 3 Each
Radome Requirements Document
File details come from the government source that posted it. Updated .