Radio System Evaluation.pdf
PDF 172 KB Posted
- Attached to
- Radio System Evaluation
- Solicitation number
- BD-27-2233-SCTM-SCTM-135580
- Issued by
- Bristol County, New Bedford City, Massachusetts
About this file
This memorandum is a scope of work issued by South Coast Transit Management, Inc. (SCTM), a Transdev sub-corporation operating under contract with Southeastern Regional Transit Authority (SRTA), for a radio system evaluation project. The contractor shall evaluate SRTA's existing radio communications system to assess equipment condition, system reliability, radio coverage, and voice communication quality throughout the service area encompassing New Bedford, Fall River, Acushnet, Dartmouth, Fairhaven, Freetown, Mattapoisett, Somerset, Swansea, Westport, and parts of Wareham. The evaluation includes inspection of system infrastructure (repeater equipment, antenna systems, feedlines, and cabling), technical performance testing, RF coverage mapping, DHAAT analysis, adjacent channel and interstitial interference analysis, and on-vehicle testing under normal operating conditions. The contractor may perform minor system adjustments, programming changes, and corrective maintenance without procuring additional equipment. The submittal package is due Friday, December 18, 2026, with an estimated award date of Friday, January 29, 2027. The contract includes a ninety-day warranty period following SRTA's acceptance of work, during which the contractor shall correct defects or deficiencies at no additional cost.
Upon completion, the contractor shall provide a written PDF report summarizing findings, identifying system deficiencies, and recommending corrective actions. For each recommended action, the contractor shall provide itemized cost estimates including labor, materials, equipment, and associated costs for planning purposes only. The radio infrastructure consists of Motorola SLR8000 repeaters, Laird UHF Technologies FG4505W antennas, and Motorola XPR-5550e on-vehicle radios, with two tower locations at the Water Tower in New Bedford and Cardinal Medeiros Tower in Fall River. SCTM is exempt from Massachusetts sales tax, and proposals should not include such taxes. In compliance with Federal Transit Administration procurement guidelines, vendors must demonstrate responsiveness and responsibility and sign applicable Federal Clauses, including debarment certification. Submissions should include a standard company quotation form, work plan, FTA clauses, and debarment certification, directed to Casey Cabral at ccabral@srtabus.com with subject line "SRTA Radio System Evaluation."
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Memorandum
TO: Prospective Bidders FROM: South Coast Transit Management, Inc. (SCTM) DATE: November 18, 2026 RE: Radio System Evaluation
Background:
South Coast Transit Management, Inc. (SCTM) is a sub-corporation of Transdev operating under a management contract with Southeastern Regional Transit Authority (SRTA), providing fixed route and demand response transportation in the greater New Bedford area, which is both Federal and state funded.
Scope of Work:
The Contractor shall evaluate the SRTA's existing radio communications system to assess equipment condition, system reliability, radio coverage, and voice communication quality throughout the service area.
The evaluation shall include an inspection of system infrastructure, technical performance testing, coverage and interference analyses, and operational field testing to identify deficiencies and recommend improvements. The Contractor may perform minor system adjustments, programming changes, equipment reconfigurations, and corrective maintenance activities necessary to support testing and restore proper system performance, provided such work does not require the procurement of additional equipment or exceed the authorized amount.
The Contractor shall inspect radio system infrastructure, including repeater equipment, antenna systems, feedlines, cabling, and related components, and identify any deficiencies that could affect system performance.
The Contractor shall perform testing and analysis to evaluate system performance and identify coverage gaps, interference, or reliability issues. Testing shall include, at a minimum, an RF coverage map based on the existing tower sites and licensed frequencies, a DHAAT (Differential Height Above Average Terrain) analysis, and an adjacent channel / interstitial interference analysis.
The Contractor shall conduct on-vehicle testing under normal operating conditions throughout the SRTA service area to assess radio performance, coverage, call quality, and transition effects between the two tower sites.
Upon completion of the evaluation, the Contractor shall provide a written report in PDF format summarizing findings, identifying any system deficiencies, and recommending corrective actions, repairs, upgrades, or equipment replacements. The report shall include all supporting coverage maps, test results, and technical analyses produced as part of the evaluation.
For each recommended corrective action, repair, upgrade, or equipment replacement identified in the written report, the Contractor shall provide an itemized cost estimate that includes, as applicable, labor, materials, equipment, and any other associated costs. Such estimates are for planning purposes and shall not authorize the Contractor to proceed with additional work without prior written approval from the
SRTA.
The Contractor shall warrant all adjustments, programming changes, equipment reconfigurations, corrective maintenance, and other work performed under this scope for a period of ninety (90) calendar days following the SRTA's acceptance of the applicable work. During the warranty period, the Contractor shall, at no additional cost to the SRTA, promptly correct any defect, deficiency, or performance issue attributable to the Contractor's workmanship or the changes or adjustments it made.
Radio Infrastructure:
• Repeater: Motorola SLR8000
• Antenna: Laird UHF Technologies FG4505W
• On Vehicle: Motorola XPR-5550e
Radio Channels:
• New Bedford o Channel 1: 457.725 452.725 (TX-DPL631 RX-DPL371) o Channel 2: 457.725 452.725 Tone 218.1
• Fall River o Channel 1: 464.2625 469.2625 (TX & RX DPL371) o Channel 2: 464.2625 469.2625 (TX & RX DPL631)
Radio Infrastructure Locations:
City of New Bedford – Water Tower Cardinal Medeiros Tower
616 Hathaway Road 1197 Robeson Street
New Bedford, MA 02740 Fall River, MA 02720
Note: The SRTA service area includes Acushnet, Dartmouth, Fairhaven, Fall River, Freetown, Mattapoisett, New Bedford, Somerset, Swansea, Westport, and parts of Wareham. Please see the SRTA website for more information. The SRTA will work with the successful Contractor to determine and, if necessary, refine the geographic area and specific locations for radio system testing.
Submission Criteria:
Completed submissions should be submitted via email to Casey Cabral at ccabral@srtabus.com and should include or denote the following:
• Subject Line (Email Line or Cover Letter) o SRTA Radio System Evaluation
• Submittal Package o Standard Company Quotation Form o Work Plan o FTA Clauses mailto:ccabral@srtabus.com o Debarment Certification
Key Action Dates:
The dates in the following table are provided to illustrate the current expectations for the timing of actions related to this project and the resultant award:
Key Action Date
Release Friday, November 20, 2026
Submittal Package Due Friday, December 18, 2026
Award (No Later Than Date- Estimated) Friday, January 29, 2027
Additional Information:
SCTM is an agent/operator for SRTA who is exempt from Massachusetts sales tax, do not include such taxes in the proposal figure. SCTM will furnish the successful bidder with tax exemption certificates upon request.
In compliance with the procurement guidelines set forth by the Federal Transit Administration (FTA), any Vendor looking to conduct business with South Coast Transit Management, Inc. (SCTM) are required to demonstrate responsiveness, responsibility, and must sign off on applicable Federal Clauses.
Note: The relevant Federal Clauses and responsibility determination information will be forwarded to the selected Vendor, however, this information is available upon request.
File details come from the government source that posted it. Updated .