ATTACHMENT 1
PERFORMANCE WORK STATEMENT
SOLICITATION NO. RA-133W-16-RP-0071 NWS NEXRAD WSR-88D RADAR TOWER
MAINT.
1. PERFORMANCE WORK STATEMENT
2. INTRODUCTION
The Contractor shall furnish the necessary personnel, material, equipment, and facilities (except as otherwise specified) to perform the following Performance Work Statement. The Government requires Contractor technical evaluation and support for life-cycle maintenance and catastrophic recovery of the existing radar towers in its weather radar network.
3. BACKGROUND
The Next Generation Weather Radar (NEXRAD) program is a tri-agency joint effort of the Department of Commerce (DOC), the Department of Defense (DOD), and the Department of Transportation (DOT). The operational user agencies involved are: DOC; National Weather Service (NWS), DOD; United States Air Force (USAF) and Naval Meteorological and Oceanography Command (NMOC), and DOT; Federal Aviation Administration (FAA). The NEXRAD Program has deployed 160 operational and 2 non-operational (training, test, and repair) towers supporting the Weather Surveillance Radar - 1988 Doppler (WSR-88D) weather radar systems throughout the United States and various overseas locations. Currently only NEXRAD radar sites operated by the DOC and DOD are participating in this tower restoration contract. DOT has an internal depot team conducting tower maintenance on their towers.
The WSR-88D Radar Operations Center (ROC) has support management responsibility for these radars for the tri-agency NEXRAD program. Part of the support management responsibility associated with these radars is the maintenance of the tower structure in a fully operational condition to ensure the mission of the tri-agency radar network can be continuously met. Timeliness of tower repairs, both routine as well as catastrophic failure recovery, is critical to the successful completion of the NEXRAD mission.
Since the WSR-88D tower is a rigid structure which supports the critical transmit and receive equipment, the structural integrity of the tower must be maintained to ensure the availability of weather radar data under all circumstances. Factors such as corrosion, loose fasteners, damaged structural components or tower foundations, and others can contribute to the weakening of the tower system and may result in failure of the system to perform its lifesaving function. It is necessary to periodically inspect the soundness of the tower at all WSR-88D sites, which are constantly exposed to the environmental extremes. It may be necessary to conduct impromptu inspections of radar towers, which have been damaged or suspected to have been damaged by a catastrophic event.
Additionally, some towers are located at remote mountainous sites with severe weather environments where the wind and ice loading are excessive. These sites are only accessible at certain times of the year for a limited period of time and require frequent maintenance. Timeliness of inspection and subsequent repair are critical in these situations to restore the WSR-88D tower to its original operational condition. WSR-88D radars must be 96% operationally available in order to meet the diverse meteorological missions of the NEXRAD tri-agency partners.
The Government does not own complete data rights associated with the WSR- 88D Tower. The design and engineering data for the WSR-88D Towers are the proprietary property of Valmont- Microflect (CAGE: 29189). The Government does have data rights to the unique as-built drawings for each tower and detailed bills of material for each tower configuration. The Government has available, a set of installation drawings and detailed bills of material to reconstitute any tower height contained within the WSR-88D network for both the Limited Phase Production and Full Scale Production configurations. These drawings contain references to all Valmont- Microflect part numbers and parts/quantities required to install any tower configuration in the NEXRAD network. All necessary data and drawings currently available to the government will be provided following contract award.
The list of all 160 WSR-88D sites and their locations is provided Attachment “2”.
4. SCOPE
This Performance Work Statement provides for initial WSR-88D tower inspection and engineering evaluation. Based on the results of these evaluation services, this work statement provides for the WSR-88D tower repair services for timely restoration of the inspected tower to a like new condition.
Restoration may include, but is not limited to, replacement of structural components, replacement of fasteners, repair/replacement of lightning protection system components, corrosion removal, cleaning, painting, and repair/replacement of galvanic coatings, and tower foundation replacement/repair.
Preventative measures to protect the tower from other issues besides weather related ones may also be required, e.g., bird proofing and power washing chloride deposits. Although the government does not require the use of OEM parts, the contractor must specify any proposed replacement components which are not OEM parts, and demonstrate to the government’s satisfaction that the substitute part is interchangeable and of the same quality of the like OEM part. Finally, this work statement provides for the delivery of WSR-88D Tower Engineering Data and Engineering Change Proposals resulting from any modifications to the documented tower configuration.
5. WSR-88D TOWER INSPECTION AND ENGINEERING EVALUATION CONTRACT LINE
ITEM NUMBER (CLIN) 0001 (Option Periods – 1001, 2001, 3001, 4001)
Upon receipt of a task order (marked ROUTINE or URGENT) for a specific WSR-88D Tower site or sites, the Contractor shall provide WSR-88D Tower inspection and engineering evaluation for the individual tower(s) and provide a written report in Contractor format in accordance with Contract Data Requirements List (CDRL) A001, (Attachment 5) of the original installation and current condition of each inspected WSR-88D Tower and associated hardware including foundations, waveguides, supports, ladders, conduits, power and control circuits/conductors, lightning arrest system, and fasteners.
An urgent task order may be initiated in response to a catastrophic event, a suspected corrective maintenance requirement, or a Government engineering concern requiring Contractor engineering evaluation. For an urgent task order inspection and Engineering Evaluation requires the Contractor on site for inspection within a 48 hour period for sites within the Continental United States and 96 hours for sites outside the Continental United States.
As part of the inspection process, the Contractor shall perform galvanic coating thickness, structural member thickness measurements, ground resistance measurements, and provide an overview of the tower electrical conduits, electrical boxes, tower base perimeter fence, stair treads, stairwell lights-assemblies, and concrete foundation condition as part of its corrosion evaluation. Inspections shall be based on the engineering data as specified by the original equipment manufacturer (OEM) Valmont- Microflect for the specific towers under evaluation.
Inspection results shall reflect requirements for correction, if any, of the existing tower condition to restore it to a serviceable, operational and like new condition. Evaluations of corrosion must include a statement addressing the extent of the corrosion and its affect, if any, on the structural integrity of the tower or component(s) under evaluation. The contractor must also provide photographs, which illustrate the severity and extent (i.e. widespread, localized, etc.) of the tower corrosion if corrosion is present. The contractor must address the extent and method of corrosion removal required, tower encapsulation requirements, and other environmental issues related to the proposed repair. The contractor must also select the proposed method(s) of galvanic coating restoration from the methods described in American Society for Testing and Materials (ASTM) A-780, A Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings@ dated 4/10/01. Since these towers are highly visible symbols of the National Weather Service, the aesthetic appeal of the completed repair must be considered in addition to the effectiveness of the recommended technique. This CLIN addresses repair or replacement of components regardless of the cause of the damage (severe weather, earthquake, flood, wildfire, corrosion, material failure/fatigue, etc.)
The specific tower installation and repair can range from the replacement of a complete tower to the replacement/repair of any combination of tower components.
The contractor shall indicate in its written report all parts (repairable, consumables, expendables), tools and test equipment, personnel, technical procedures and data, repair time, lead time for parts availability and a detailed pricing proposal to restore the tower to a like new condition.
The report shall also indicate the urgency of the proposed corrective action. All estimates provided by the contractor shall be based on the contractor performing all of the maintenance required and providing of all materials and parts required. The Contractor's safety plan as well as copies of OSHA certifications for personnel and equipment shall be submitted with the task order proposal.
The Government will provide a Point of Contact (POC) for Tower site coordination at the time of a CLIN 0001 (1001, 2001, 3001 & 4001) task order issuance. Government assistance to the Contractor will include directions to and admittance to the Tower site and turning the WSR-88D Radar system off and on as required.
6. WSR-88D TOWER STRUCTURAL REPAIR, REPLACEMENT and
RESTORATION OF GALVANIC COATING CLIN 0002 (Option Periods - 1002, 2002, 3002, and 4002)
Upon receipt of a task order, the Contractor shall provide WSR-88D Tower Structural Repair and Replacement for a specific WSR-88D Tower site or site(s) as indicated in the order including restoration of the galvanic coatings on WSR-88D Tower components.
The Contractor shall provide all labor, materials, equipment, and supplies required to dismantle, remove, install, replace, or repair damaged components of the WSR-88D Tower including restoration of the galvanic coatings. All required installation and repair parts and materials shall be provided by the Contractor.
The order shall be based on the results provided by the Tower Inspection and Engineering Evaluation in CLIN 0001 (1001, 2001, 3001 & 4001) described in paragraph C.5.1.
The method of restoration of the galvanic coating must be selected from those methods meeting the ASTM A-780 standard practices which include the application of paints containing at least 65% zinc dust, application of zinc solder, and/or metalizing of zinc deficient areas.
The Contractor shall deliver all parts and materials required in a new, unused condition, to the WSR-88D tower site specified in the task order. Although the government does not require the use of OEM parts, the contractor must specify any proposed replacement components, which are not OEM parts, and provide sufficient engineering documentation to fully specify each part and support comparison between the two. It is the contractor’s responsibility to demonstrate to the Government’s satisfaction that the recommended part is interchangeable, and of the same quality of the like OEM part. The complete list of WSR-88D sites is provided in Attachment “1” to this solicitation/contract.
The Government currently has in storage a complete tower in kit form, which is set aside for reconstitution of a tower in the event of catastrophic loss. In the event that an urgent tower repair or replacement is required, the Government will provide to the Contractor, the components necessary to support the performance of CLIN 0002 (1002, 2002, 3002, & 4002) in order to minimize the delay in acquisition of required materials if necessary. In this case, the Contractor shall replenish the exact parts and quantities of Government Furnished Material utilized for the performance of CLIN 0002 (1002, 2002, 3002, & 4002). The Contractor shall replenish the Government Furnished Material with identical new and unused material within
120 calendar days of completion of an urgent repair task order. The Contractor shall provide an acceptance document (similar to the Department of Defense Form DD250 acceptance document) to the Government when the material is available and ready for transition to the Government’s designated storage facility.
7. WSR-88D TOWER ENGINEERING DATA AND ENGINEERING CHANGE
PROPOSALS CLIN (0003) (Option Periods - 1003, 2003, 3003 AND 4003)
Upon receipt of a task order, the Contractor shall provide the Government WSR-88D Tower Engineering Data and/or Engineering Change Proposals reflecting modification or proposed modification of the current configuration of a given WSR-88D Tower. The specific documentation that may be requested under this CLIN is described in Attachment “5” to this solicitation/contract, and includes:
CDRL A003 - Engineering Change Proposal CDRL A004 - Specification Change Notice CDRL A005 - Notice of Revision CDRL A006 - Product Drawings and Associated Lists CDRL A007 - Configuration Status Accounting Information
If modification must be made to a documented tower configuration as a result of the contractor’s election to use other than OEM parts, the contractor shall be responsible to generate all associated technical documentation changes (CDRL A003 - CDRL A007) at no expense to the government.
8. COORDINATION OF ON-SITE INSPECTION AND REPAIR ACTIVITIES
Tower maintenance and repair should be planned to minimize downtime of the radar as long as the safety of personnel and property is not compromised. The maximum downtime for the WSR- 88D system shall be indicated in the task order and must not exceed 30 calendar days for total tower replacement unless the tower foundation and base plate require replacement. In the event that the tower base plate and foundation require replacement, the downtime of the WSR-88D must not exceed 45 days. Other repairs are anticipated to take considerably less time. Certain weather events may require the work to be delayed by the site’s Meteorologist in Charge. If this situation occurs, the Contractor shall immediately contact the Contracting Officer’s Representative (COR). The Contractor is responsible for complete site clean-up and restoration including removal and disposal of used tower components and materials, restoration of anything (i.e fencing) that was dismantled to gain access to the tower, and landscaping following any excavation work.
The Contractor shall provide seven (7) calendar days advance notice to the COR prior to the date of arrival of work crews at a WSR-88D site, unless an urgent situation exists under C.5.1. The Government will provide a Point of Contact (POC) for tower site coordination at or prior to the contractor’s arrival on site. Government assistance to the Contractor will include directions to and admittance to the Tower site and turning the WSR-88D Radar system off and on during the performance of the contract.
9. CONTRACTOR’S PERSONNEL REQUIREMENTS
All Contractor personnel that are proposed to climb WSR-88D towers in the accomplishment of this Performance work statement shall be certified by OSHA and shall use OSHA certified equipment. The Contractor’s safety plan as well as copies of OSHA certifications for personnel and equipment shall be submitted to the Government’s Contracting Officer and COR with the Contractor’s proposal.
10. CERTIFICATION OF SATISFACTORY REPAIR ACTIVITY COMPLETION
During execution of CLIN 0002 (Option Periods - 1002, 2002, 3002, & 4002), the Contractor shall have quality control procedures in place to ensure tower repair and restoration services are consistently and correctly performed, and that the tower is restored to a like new condition.
Within 30 days of work completion of each Task order, the Contractor shall submit a Repair Services Completion Report in accordance with the requirements of Contract Data Requirements List (CDRL A002) provided in Attachment 5 of this solicitation/contract. This report must be certified by a professionally registered structural engineer and must state that the installation/repair services completed have restored the WSR-88D Tower to a serviceable, operational and like new condition.
In addition to this report the Contractor will conduct a quality assurance site completion checklist with the local Government Official. At a minimum the checklist will indicate that all the tasks and replacement parts that were identified in the task order were accomplished, a soluble salt test was conducted, the site was cleaned up and all residue is properly disposed of including hazardous materials. This check list shall be submitted with the work certification report (CDRL A002) with signatures from the Contractor and the on-site Government Official. A copy of all documentation shall be submitted to the COR.
11. PERFORMANCE REQUIREMENTS SUMMARY
PERFORMANCE REQUIREMENTS SUMMARY
Reference Performance
Objective Performance Indicator
Acceptable Quality
Surveillance Method
Incentive/ Disincentive
1. C.5.1 Inspection and Engineering Evaluation
Prepare and submit report in accordance with CDRL A001 as required 30 days after completion of inspection.
Timely Submittal.
High quality report information and reasonable representat ive photos that identify all needed repairs.
Submitted timely with Government clarifications or corrections responded to in 3 business days. Less than 2 errors per report.
100% COR
inspection and acceptance.
Past Performance Reports, Exercise of Options, and Contractual remedies
FAR 52.246-4
2. C.5.2 Installation and Repair
Health and Safety Plan (HASP) submitted annually at the exercise of each option period.
Timely submittal within 10 days of exercise of option.
Report quality of less than 2 corrections.
Timely submittal of HASPs 99% of the time. Less than 2 corrections per report.
100% COR
inspection, acceptance.
Past Performance Reports, Exercise of Options, and Contractual remedies
FAR 52.246-4
3. C.5.2 Installation and Repair
High quality, timely completion of installation and repairs. Written certification of restoration.
Report submitted per A002.
Installation and repairs completed timely with no defects. Identified problems corrected as agreed upon with COR.
Timely submittal of quality reports.
No defects 95% of the time.
Defects corrected as agreed upon with COR.
Less than 2 corrections per report.
100% inspection and acceptance by COR.
Past Performance Reports, Exercise of Options, and Contractual
4. C.5.2 Supplies materials
Supply proper materials and subsequent reports timely
(CDRL A001).
Correct materials are provided.
Quality reports are submitted timely.
Correct materials provided 98% of the time.
Quality report provided -corrections responded to in 3 business days. Less than 2 errors per report.
100% inspection and acceptance by COR.
Past Performance Reports, Exercise of Options, and Contractual
FAR 52.246-4.
5. C.5.5 Engineering Data and Engineering Change Proposals
Prepare and submit report CDRL A003, A004, A005, A006 and A007 as required per Tower conditions.
Timely Submittal, Quality Report
Report submitted as agreed upon with the
COR.
100% COR
review.
Past Performance Reports, Exercise of Options, and Contractual