This is a Solicitation (Request for Proposals) for Region 09 Multiple-Award Indefinite Delivery Indefinite Quantity (IDIQ) Construction Contracts for Zone 2 (Northern California), released by the GSA Public Buildings Service Acquisition Management Division. The solicitation is a total small business set-aside targeting between 10-20 IDIQ construction contracts, with specific socioeconomic set-aside targets including 2 HubZone, 3 Women-Owned Small Business (WOSB), 1 Service-Disabled Veteran Owned Small Business (SDVOSB), and 3 8(a) contracts.
The contract will be for one base year with four one-year option periods, totaling a potential five-year performance period. Proposals will be evaluated on a 200-point technical scale, with 100 points for Past Experience and 100 points for Past Performance. Technical qualifications are weighted significantly more than price, with no trade-off between technical factors and price. Offerors must submit five different project references, with at least one project located in the geographic Zone, and proposals will be evaluated using competitive negotiation procedures. The solicitation requires submission of detailed pricing information including profit, overhead, and bond percentages, with proposals due by 3:00 pm Pacific Standard Time on 11/12/2025.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sol. No. 47PK0125R0005
Construction Contract for: Region 09 Multiple-Award Indefinite Delivery Indefinite Quantity (IDIQ) Contracts for Construction, Zone 2
The Solicitation 09/29/2025
Document: DB201A-SB/2 MAY 2025 (The Solicitation)
Table of Contents
I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Receipt of Offers
II. Proposals
A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal E. Requirements of Joint Venture Offerors
III. General Provisions
A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals G. Contractor Performance Information H. Safeguarding and Dissemination of Controlled Unclassified Information
(CUI) Building Information
IV. FAR/GSAR Solicitation Provisions
FAR 52.216-1 Type Of Contract FAR 52.222-5 Construction Wage Rate Requirements-Secondary Site of Work Buy American Requirements Buy American Exceptions FAR 52.233-2 Service of Protest FAR 52.252-1 Solicitation Provisions Incorporated by Reference GSAR 552.102 Incorporating Provisions and Clauses by Reference GSAR 552.252-5 Authorized Deviations in Provisions (Nov 2021)(DEVIATION
FAR 52.252-5)
GSAR 552.236-77, Government’s Right to Exercise Options (Mar 2019)
V. Instructions to Offerors and Clauses
A. FAR 52.215-1 Instructions to Offerors – Competitive Acquisition
VI. Method Of Award
A. Evaluation of Offers B. Determination of Responsibility C. Price Reasonableness D. Unbalanced Price E. Total Evaluated Price F. Non Price Factors G. Evaluation of Joint Ventures
I. General Information
I.A. The Solicitation and Contract
(1) This Solicitation is set-aside for Small Businesses, in accordance with FAR 19. This Solicitation sets forth requirements for proposals for multiple award IDIQ contracts to construct the Project described in the attached Agreement. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government anticipates awarding contracts to the selected offerors that are the highest technically rated with fair and reasonable pricing, subject to the conditions set forth herein.
(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.
(3) The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Offeror a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.
Notice 1: Clause and provision deviations dated February 2025 do not affect the following:
1. Any FAR subparts that are based on statute or are not covered by E.O.
11246, such as:
a. FAR subparts 22.13, Equal Opportunity for Veterans and its related clauses and provisions; and
b. FAR subpart 22.14, Employment of Workers with Disabilities.
2. Existing U.S. laws on civil rights, nondiscrimination, or any laws that generally apply to a company regardless of whether it is a government contractor.
End of Notice
Notice 2:
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including FAR 52.222-25, Affirmative Action Compliance, 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph (t) of FAR 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services..
GSA will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
End of Notice
NOTICE 3: February 2025 clause or provision deviations are available in class deviations CD-2025-04 (February 15, 2025) and CD-2025-05 with Supplement 1 (March 7, 2025), available at https://www.gsa.gov/policy-regulations/policy/acquisiti2on-policy/acquisition-poli cy-library-and-resources#tab--Class-deviations)
End of Notice
I.B. List of Solicitation Documents The Solicitation Documents are comprised of:
(1) The Solicitation
(2) Offeror Representations and Certifications Form
(3) Standard Form (SF) 1442 – Solicitation Offer and Award (4)The Agreement and Attachments to the Agreement
(5) 2026 Region 9 Construction IDIQ Proposal Submission Google Form
(hereafter referred to as “Google Form”)
I.C. Authorized Representatives
The following individuals are designated as the authorized GSA representatives under this Solicitation:
Authorized Representative Information:
Contracting Officer’s Information
Name: Krista Miller
Telephone: 415-516-8907
Email: krista.miller@gsa.gov https://www.gsa.gov/policy-regulations/policy/acquisition-policy/acquisition-policy-library-and-resources#tab--Class-deviations https://www.gsa.gov/policy-regulations/policy/acquisition-policy/acquisition-policy-library-and-resources#tab--Class-deviations
I.H. Receipt of Offers
(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 3:00 pm Pacific Standard Time on the following date and at the following address.
Date: 11/12/2025 Address: By Google Form only.
II. Proposals
II.A. Proposal Contents
Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:
1. Price Proposal
2. Technical Proposal
3. Representations and Certifications
4. GSA Form 527 – Contractor’s Qualification and Financial Information
II.B. Proposal Format A conforming proposal consists of the completion of all required fields and attachments on the Google Form. ALL Proposal documents will only be accepted via this Google Form. You must use a Google / Gmail email address to use the form and submit a proposal. No proposal documents will be accepted via email, unless explicitly permitted by this Solicitation. Any proposals or proposal documents submitted outside of the Google Form will not be accepted, unless explicitly permitted by this Solicitation. Per the Google Form instructions, all files submitted must include the Offeror name in the file name. Failure to include the Offeror name in the document file name may lead to the Government not giving your proposal credit for the document(s).
II.C. Price Proposal
(1) Contents
Offerors will be required to provide pricing for the following elements:
● Profit % for all task orders and modifications of task orders
● Overhead % for all task orders and modifications of task orders
● Bond % for all task orders and modifications of task orders https://forms.gle/3F5sbfQLiHvYUN7F7 https://forms.gle/2E2d6YnnZ5UboYkE7
If the rates proposed are accepted, they will be incorporated into the base IDIQ contract, and represent the maximum percentages which may be applied to task orders awarded under the base contract. On individual task order competitions, Offerors may choose to propose, and the Government may award, lower rates than those awarded in their base IDIQ contract.
The following ranges are examples of rates historically determined to be fair and reasonable. These are provided as general guidance only, for Offerors’ consideration in pricing their proposals for the current Solicitation. Proposed rates within these ranges will not automatically be determined to be fair and reasonable, and the Government makes no guarantee that Offerors that provide pricing within these ranges will be selected for award. The Contracting Officer will use various factors to determine if specific rates proposed for this Solicitation are fair and reasonable and may include, but are not limited to: historical data; comparison to the Independent Government Estimate;
consideration of the rates proposed by the Offeror pool as a whole; and market conditions.
Markup Zone 1
(AZ/NV)
Zone 2 (Northern
CA)
Zone 3 (Hawaii)
Zone 4 (Southern
CA)
Overhead 8.35–20% 10–20% 10–20% 8.35–20%
Profit 8–10% 8–10% 8–10% 8–10%
Bond 0.95–3.5% 1.08–3.5% 1.08–3% 0.95–3.5%
(2) Qualifications, Exclusions and Conditions
If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.
(4) Additional Proposal Requirements
Offerors will be required to submit separate proposals for each geographic Zone for which they are seeking a contract. An Offeror may receive contracts for multiple Zones, but may only receive one awarded contract per Zone.
II.D. Technical Proposal
A. Factor 1: Past Experience (100 Points)
The following categories of past experience will be evaluated: Mechanical, Electrical, Plumbing, Design-Build, Historic Preservation, Projects Below $350,000 ($350K), $350K–$1 Million ($1M), and Above $1M.
Projects submitted will only be considered for this Factor 1 if the Offeror:
● Was the prime contractor
● Was a member of a joint venture, and the Offeror was the prime contractor, or
● Is submitting a proposal as a joint venture, and one of the members of the joint venture was the prime contractor
Exactly five different projects must be submitted, no more and no fewer. Each project may only be submitted for one category, however offerors are permitted to submit more than one project for a given category. There is no requirement that offerors submit a project for each category.
At least one project must be located within the geographic Zone for which the Offeror is submitting a proposal.
Proposals not conforming to these requirements will not be considered responsive and will not be eligible for award.
Category set-aside contracts may be awarded per Zone for the proposal(s) receiving the highest scores in the following categories:
● Below $350K; maximum of three set-asides
● Design-Build; maximum of three set-asides
● Mechanical; maximum of two set-asides
● Historic Preservation; maximum of two set-asides
Only projects which meet the standard of evaluation in that category will be considered for set-asides. Contracts eligible for either category or socio-economic set-asides must:
● have a minimum technical proposal score in both Factors 1 and 2 of at least 50 points each
● have fair and reasonable pricing
● be compliant with all other proposal requirements
● be found responsible.
Category set-asides will be determined based only on Factor 1: Past Experience, assuming conformance with all other proposal requirements. In the case of a tie in Factor 1: Past Experience for category set-asides which would result in more than the maximum number of set-asides being made, the tie will be broken in favor of the Offeror which has the highest total Technical Score (Factors 1 and 2 combined), as long as all other proposal requirements are met.
For all categories of projects evaluated, if a project meets the standard of evaluation, it will be awarded 10 points, for a maximum of 50 points across all 5 projects. If a submitted project meets the standard of evaluation, it is eligible to receive additional points if it includes certain elements specified for each category, for a total of 10 additional points per project. Each project is eligible to receive up to 20 points total.
For Mechanical Projects, the standard of evaluation is met when a past project is submitted that has been substantially completed within the last seven years from the proposal due date for this Solicitation and includes at least one of the following scope items:
● Installation of HVAC DX packaged/split systems, chilled water and/or hot water fan coils, chillers, condensing and non-condensing and steam boilers, cooling towers, packaged or split AC and Heat Pump systems, small and larger unitary air handling units, refrigerant piping, hydronic chilled water, hot water, condenser water and/or steam piping systems.
● Installation of low and medium pressure supply duct systems and VAV boxes, exhaust and/or make-up air ducting.
● Installation of roof mounted, wall mounted, or inline exhaust fans and supply air fans.
● Installation of hydronic chilled water, condenser water and/or other inline or base mounted pumps.
● Installation of DDC or standalone BAS controls in support of HVAC systems to include providing point and click graphical interfaces, controls wiring/cables and programming.
If a project submitted meets the standard of evaluation, it is eligible to receive up to 2 additional points for each of the following elements, for a total of 10 additional points:
● Crane or helicopter lifting of HVAC equipment to roofs, perimeter mechanical rooms and/or penthouses.
● Project was contracted by GSA.
● Performance of work within a building at least five floors high, if work is performed on multiple floors.
● Completion of more than one of the bulleted scope lines above.
● Performance of work in the occupied portion of a building, which required coordination with tenants, or work performed on building systems that service the occupied portions of a building.
For Electrical Projects, the standard of evaluation is met when a past project is submitted that has been substantially completed within the last seven years from the proposal due date for this Solicitation and includes at least one of the following scope items:
● Installation, replacement, retrofitting, and/or refurbishment of electrical equipment including switchgears, switchboards, distribution boards, panelboards, motor control center and/or transformers.
● Installation and/or replacement of an emergency generator connected to a new and/or existing paralleling switchgear or switchboard, automatic transfer switch with new or existing controls and building automation system.
● Installation of solar photovoltaic system, with inverters and all controls, and connect to new or existing control systems.
● Replacement or retrofit of lighting fixtures with lighting controls.
● Installation of electric vehicle supply equipment with connection to controls.
● Installation, replacement, of disconnection of switches and variable frequency drives, with connection to controls.
● Installation of electrical power outlets, switches, electronic controls, security cameras, door lock security, security control devices, fire alarms, security alarms, intrusion detection system, building automation system, and/or elevator controls.
● Installation, replacement, retrofit or refurbishment of high and/or medium voltage electrical equipment such as switchgears, switchboards, distribution boards, and/or transformers.
If a project submitted meets the standard of evaluation, it is eligible to receive up to 2 additional points for each of the following elements, for a total of 10 additional points:
● Project was contracted by GSA.
● Included change-out of electrical equipment without shutting down power to the facility (which may include providing temporary power source).
● Completion of more than one of the bulleted scope items above.
● Performance of work in the occupied portion of a building, which required coordination with tenants, or work performed on building systems that service the occupied portions of a building.
● Performance of work in a building at least five floors high, if work is performed on multiple floors.
For Plumbing Projects, the standard of evaluation is met when a past project is submitted that has been substantially completed within the last seven years from the proposal due date for this Solicitation and includes the installation of at least one of the following scope items:
● Cold water reduced pressure/backflow preventer headers and/or water meters.
● Domestic hot water, cold water, hot water recirculation systems, domestic water booster pumps, condensate drain, waste and vent, and/or storm water piping systems.
● Roof drains, floor and deck drains, and/or sewage lift pump stations.
● Inline or base mounted domestic water pumps.
● Low and medium pressure natural gas piping, gas regulators and/or gas piping distribution from gas meter to gas burning appliances.
● Below grade piping systems.
If a project submitted meets the standard of evaluation, it is eligible to receive up to 2 additional points for each of the following elements, for a total of 10 additional points:
● Project was contracted by GSA.
● Performance of work was within a public-use (non-residential) building at least five floors high, and if the completed scope included the installation of piping risers on multiple floors.
● Performance of more than one of the bulleted scope items above.
● Performance of work in the occupied portion of a building, which required coordination with tenants, or work performed on building systems that service the occupied portions of a building.
● Installation of plumbing equipment, such as domestic hot water boilers, domestic water house tanks, or irrigation systems.
For Design-Build Projects, the standard of evaluation is met if the Offeror demonstrates that the project submitted was performed as a design-build contract substantially completed within the last seven years from the proposal due date for this Solicitation.
If a project submitted meets the standard of evaluation, it is eligible to receive up to 5 additional points for each of the following elements, for a total of 10 additional points:
● Project was contracted by GSA.
● Performance of work in the occupied portion of a building which required coordination with tenants, or work performed on building systems that service the occupied portions of a building.
For Historic Preservation Projects, the standard of evaluation is met if the project involved work on a historic building (defined as a “qualified historic building” in local or state building codes or historic resource lists), and was substantially completed within the last seven years from the proposal due date for this Solicitation.
If a project submitted meets the standard of evaluation, it is eligible to receive up to 2 additional points for each of the following elements, for a total of 10 additional points:
● Renovation to an existing public-use (non-residential) building.
● Listed in or eligible for listing in the National Register of Historic Places, or a listed National Historic Landmark.
● Project was contracted by GSA.
● Performance of work in the occupied portion of a building, which required coordination with tenants, or work performed on building systems that service the occupied portions of a building.
● Project was in compliance with the Secretary of Interior’s Standards for the Rehabilitation of Historic Properties.
For Below $350K Projects, the standard for evaluation is met if the price of the contract for construction or design-build at award was below $350,000, and was substantially completed within the last seven years from the due date for proposals for this Solicitation.
If a project submitted meets the standard of evaluation, it is eligible to receive up to 5 additional points for each of the following elements, for a total of 10 additional points:
● Project was contracted by GSA.
● Work was performed on a federally-owned building or facility.
For $350K–$1M Projects, the standard for evaluation is met if the price of the contract for construction or design-build at award was for $350,000 to $1,000,000, and was substantially completed within the last seven years from the due date for proposals for this Solicitation.
If a project submitted meets the standard of evaluation, it is eligible to receive up to 5 additional points for each of the following elements, for a total of 10 additional points:
● Project was contracted by GSA.
● Work was performed on a federally-owned building or facility.
For Above $1M Projects, the standard for evaluation is met if the price of the contract for construction or design-build at award was for over $1,000,000, and was substantially completed within the last seven years from the due date for proposals for this Solicitation.
If a project submitted meets the standard of evaluation, it is eligible to receive up to 2 additional points for each of the following elements, for a total of 10 additional points:
● Project was contracted by GSA.
● Contract was awarded for over $3,000,000.
● Work was performed on a federally-owned building or facility.
● Contract involved work by at least four first-tier subcontractors.
● Performance of work in the occupied portion of a building, which required coordination with tenants, or work performed on building systems that service the occupied portions of a building.
B. Factor 2: Past Performance (100 Points)
This factor considers the past performance of the Offeror. The Offeror shall submit references (a person or persons who may be contacted regarding the quality of the Offeror’s past performance) for comparable projects substantially completed within the last seven (7) years from the due date for proposals. The Offeror must provide the name, title, company name, current address, current phone number, and current email address for each reference. The Past Performance Questionnaire (PPQ), will be used to annotate contact and responses to verify information provided in relation to the Offeror’s past performance.
The Offeror must submit up to four (4) PPQs, completed by the applicable client. PPQs submitted must be for construction projects substantially completed in the last seven years from the due date of proposals for this Solicitation. Completed PPQs should be submitted with the proposal, within the Google Form. Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow up with clients/references to ensure timely submission of questionnaires.
If the Offeror is unable to obtain a completed PPQ from a client for a project before the proposal submission closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the project. If the client requests, the client may submit a questionnaire directly to the Government's point of contact, via email at krista.miller@gsa.gov prior to the proposal submission closing date and time. Emails shall be titled, “[Offeror Name - Zone X] PPQ 2026 Construction IDIQ.” Offerors may resubmit questionnaires previously submitted with other proposals or may obtain an updated/new PPQ from a client for any submission. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.
All proposals will initially be assigned 50 points under Factor 2, which is a neutral score.
Any proposals which do not include any record of past performance will retain the score of 50 points.
Each PPQ submitted is worth up to 10 points. If the above submittal requirements are met for a PPQ, all the ratings on the PPQ are at least Satisfactory, and there are no negative performance comments, the standard of evaluation is met for that PPQ and will be scored 5 points.
If a PPQ submitted meets the standard of evaluation, it is eligible to receive 1 additional point for each of the following elements, for a total of 5 additional points:
● Project for which PPQ was submitted is a project that was also submitted under Factor 1: Past Experience.
● Project for which PPQ was submitted was a project contracted by GSA.
● Project for which work was performed on a federally-owned building or facility.
● PPQ includes a majority of ratings above Satisfactory.
● PPQ includes narrative comments which positively reflect on contractor performance.
Offerors must also include up to five (5) performance recognition documents received within the last seven (7) years from the date that proposals are due for this Solicitation, such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition including Contractor Performance Assessment Reporting System (CPARS) reports. In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including CPARS, using all CAGE/UEI numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), previously submitted PPQ information, and any other known sources not provided by the Offeror.
While the Government may elect to consider data from a variety of sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. GSA will not maintain a database of PPQs submitted by Offerors.
Each past performance recognition document submitted will be awarded 2 points.
If an Offeror submits any record of past performance which demonstrates negative past performance, points will be deducted from the neutral score of 50, as follows:
● If a PPQ has between 10% and 50% of ratings that are below Satisfactory:
Deduct 4 points
● If a PPQ has greater than 50% of ratings that are below Satisfactory: Deduct 7 points
● If a PPQ has negative performance comments: Deduct 3 points
● If a performance recognition document has any negative performance ratings and/or comments: Deduct 2 points
II.E. Other Information to Submit with Proposal
(1) Representations and Certifications
Offerors are reminded their SAM registration status must be “Active”, at the time their offer is submitted, to be considered for award (see 52.204-7). Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in SAM, accessed via System for Award Management. Offerors shall also submit with their proposal the Annual Representations and Certifications (FAR 52.204-8), using the attached Offeror’s Representations and Certifications.
(2) Qualifications of Offerors
Offerors submitting a proposal in response to this Solicitation shall submit with their proposal evidence of their financial responsibility and capacity to perform the Contract.
Offerors shall submit this information on GSA Form 527 – Contractor’s Qualifications and Financial Information. Where applicable, point of contact, including names and telephone numbers, are required for all contracts listed.
II.F. Requirements of Joint Venture Offerors
All offers submitted by joint ventures must include a copy of an executed joint venture agreement (with original signatures) which fully discloses the legal identity of each member of the joint venture, the relationship between the members, the form of ownership of each member, and any limitations on liability or authority for each member.
1) An authorized representative of each member of the joint venture must sign the SF-1442 accompanying an offer regardless of any agency relationship established between the members.
2) In the case of corporations that are joint venture members, the corporation secretary must certify that the corporation is authorized to participate in the joint venture, either by so certifying in the joint venture agreement, or by submitting a separate certification to the Government. The joint venture must also provide a certificate that identifies a principal representative of the joint venture with full authority to bind the joint venture.
3) Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.
https://www.sam.gov/
4) For offers from SBA Mentor-Protégé joint ventures: At least one project submitted for Factor 1: Past Experience, has to have been completed by the Protege or the offering Mentor-Protégé Joint Venture.
In the evaluation of responsibility and non-price factors, information submitted for a party to the joint venture will only be evaluated to the extent that the terms of the joint venture agreement do not limit such party's performance or financial obligations as a party to the Contract contemplated by this Solicitation.
III. General Provisions
III.A. Availability of Funds
Issuance of this Solicitation does not warrant that funds are presently available for award of a contract. Award of the contract shall be subject to the availability of appropriated funds, and the Government shall incur no obligation under this Solicitation in advance of such time as funds are made available to the Contracting Officer for the purpose of contract award.
III.B. Requests for Clarification or Interpretation
The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents prior to the date set for receipt of offers, but does not warrant that all such requests will be answered before the proposal due date.
Pre-proposal requests for information must be submitted via the Google Form only. Questions submitted by email or telephone will not be accepted.
Questions must be submitted by 10/14/2025 at 3pm Pacific Daylight Savings Time.
III.C. Notice to Small Business Firms
A program for the purpose of assisting qualified small business concerns in obtaining certain bid, payment, or performance bonds that are otherwise not obtainable is available through the Small Business Administration (SBA) (Small Business Administration). For information concerning SBA's surety bond guarantee assistance, contact your SBA District Office.
III.D. Information Concerning the Disclosure of Solicitation Results
This acquisition is being conducted under the provisions of FAR Part 15 as a negotiated procurement. In accordance with FAR 3.104 and FAR 15.207, after receipt of proposals, no information regarding the identity of those submitting offers, the number of offers http://www.sba.gov/ http://www.sba.gov/ received, or the information contained in such offers will be made available until after award except as provided by FAR 15.503.
III.E. Affirmative Procurement Program
GSA has implemented an Affirmative Procurement Program (APP) intended to maximize the use of recovered materials, environmentally preferable, and bio-based products. Offerors should familiarize themselves with the requirements for using and reporting on the use of such materials in performance as set forth in the Agreement.
III.F. Notice Concerning Preparation of Proposals
Offerors are cautioned to carefully read the entire Solicitation and the Agreement to be included in the Contract contemplated by the Solicitation in order to be fully aware of all requirements and clauses in the contemplated Contract. Verify that all blanks requiring information to be supplied in an Offer have been properly filled out, that all pricing and other numerical data is accurately calculated, and that all copies of the Offer contain the same information.
III.H. Contractor Performance Information
(1)Evaluating Contractor Performance: The General Services Administration is using the Contractor Performance Assessment Reporting System (CPARS) module as the secure, confidential, information management tool to facilitate the performance evaluation process. CPARS enables a comprehensive evaluation by capturing comments from both GSA and the contractor. The website for CPARS is Contractor Performance Assessment
Completed CPARS evaluations may then be used by the Federal acquisition community for use in making source selection decisions. CPARS assists acquisition officials by serving as the single source for contractor past performance data.
(2)CPARS Registration: Each award requiring an evaluation must be registered in CPARS. The contractor will receive several automated emails. Within thirty days of award, the contractor will receive an e-mail that contains user account information, as well as the applicable contract and order number(s) assigned. Contractors will be granted one user account to access all evaluations.
(3)Contractor CPARS Training: Contractors may sign up for CPARS training. A schedule of classes will be posted to the CPARS training site (CPARS Training) and updated as needed.
(4)Contractor Representative (CR) Role: All evaluations will be sent to the Contractor Representative (CR) named on your award. The CR will be able to access CPARS to review and comment on the evaluation. If your CR is not already in the CPARS system, the Contracting Officer will request the name and email address of the person that will be responsible for the CR role on your award.
http://www.cpars.gov/ http://www.cpars.gov/ https://www.cpars.gov/lc.htm
Once an evaluation is ready to be released the CR will receive an email alerting them the evaluation is ready for their review and comment. The email will indicate the time frame the CR has to respond to the evaluation; however, the CR may return the evaluation earlier than this date.
GSA shall provide for review at a level above the Contracting Officer (i.e., contracting director) to consider any disagreement between GSA and the contractor regarding GSA’s evaluation of the contractor. Based on the review, the individual at a level above the Contracting Officer will issue the ultimate conclusion on the performance evaluation.
Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file.
III.I. Safeguarding and Dissemination of Controlled Unclassified Information (CUI) Building Information
Certain information contained in the Solicitation Documents may have been designated as Controlled Unclassified Information (CUI) building information. With respect to such information, Offerors shall agree to the terms for receipt of such information, as set forth in the provision “Administrative Matters” in Section III of the Agreement, as a condition of receipt of such information.
IV. FAR/GSAR Solicitation Provisions
FAR 52.216-1 Type of Contract (APR 84) The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
FAR 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work (MAY 14)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.
Buy American Requirements
FAR 52.225-10 Notice of Buy American Requirement-Construction Materials (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
https://www.acquisition.gov/far/part-52#FAR_52_225_9 https://www.acquisition.gov/far/part-52#FAR_52_225_9 https://www.acquisition.gov/far/part-52#FAR_52_225_9 https://www.gsa.gov/forms-library/solicitation-offer-and-award-construction-alteration-or-repair
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
Buy American Exceptions
For Buy American exceptions, if any, see the applicable Buy American clause in Section IV of the Agreement
FAR 52.233-2 Service of Protest (SEP 06)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the Contracting Officer at the address provided in the provision “Receipt of Offers” in Section I (General Information).
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 98)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address:
Federal Acquisition Regulation
(End of provision) https://www.acquisition.gov/browse/index/far
The following provisions are incorporated by reference:
NUMBER TITLE DATE
52.204-7 System for Award Management NOV 2024
52.204-22 Alternative Line Item Proposal JAN 17
52.214-34 Submission of Offers in the English Language
APR 91
52.215-16 Facilities Capital Cost of Money JUN 03 52.219-6 Notice of Total Small Business
Set-Aside
NOV 2020
52.219-13 Notice of Set-Aside of Orders MAR 2020 52.219-14 Limitations on Subcontracting OCT 2022
GSAR 552.102 Incorporating Provisions and Clauses
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
GSAR 552.252-5 Authorized Deviations in Provisions (Nov 2021) (DEVIATION FAR 52.252-5)
(a) Deviations to FAR provisions. This solicitation identifies any authorized deviation to a Federal Acquisition Regulation (FAR) (48 CFR chapter 1) provision by—
(1) The addition of “(DEVIATION)” after the date of the FAR provision when an authorized deviation to a FAR provision is being used, and
(2) The addition of “(DEVIATION FAR (provision number))” after the date of the GSAR provision when a GSAR provision is being used in lieu of a FAR provision.
(b) Deviations to GSAR provisions. This solicitation identifies any authorized deviation to a General Services Administration Acquisition Regulation (GSAR) (48 CFR chapter 5) provision by the addition of “(DEVIATION)” after the date of the provision.
(c) “Substantially the same as” provisions. Changes in wording of provisions prescribed for use on a “substantially the same as” basis are not considered deviations.
IV.L. Additional Provisions
GSAR Clause 552.236-77, Government’s Right to Exercise Options (Mar 2019)
Government's Right to Exercise Options. (Mar 2019)
(a)The Government may exercise any option in writing in accordance with the terms and conditions of the contract within Enter value:Enter value:_____ [insert the period of time within which the Contracting Officer may exercise the option]. Unless otherwise specified, options may be exercised within 90 calendar days of contract award.
(b)If the Government exercises the option, the contract shall be considered to include this option clause.
(End of clause)
FAR 52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than ____N/A_________ [insert dollar figure or quantity], the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
b) Maximum order. The Contractor is not obligated to honor-
(1) Any order for a single item in excess of $70,000,000
(2) Any order for a combination of items in excess of $70,000,000; or
(3) A series of orders from the same ordering office within __N/A___________ days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within _7____ https://www.acquisition.gov/far/part-52#FAR_52_216_21 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
FAR 52.216-22 INDEFINITE QUANTITY (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued.
The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period;
provided, that the Contractor shall not be required to make any deliveries under this contract after the last date of the period of performance of the base contract.
(End of clause)
FAR 52.216-27 SINGLE OR MULTIPLE AWARDS (OCT 1995)
The Government may elect to award a single delivery order contract or task order contract or to award multiple delivery order contracts or task order contracts for the same or similar supplies or services to two or more sources under this solicitation.
(End of provision)
FAR 52.216-32 Task-Order and Delivery-Order Ombudsman (SEPT 2019)
(a) In accordance with 41 U.S.C. 4106(g), the Agency has designated the following task-order and delivery-order Ombudsman for this contract. The Ombudsman must review complaints from the Contractor concerning all task-order and delivery-order actions for this contract and ensure the Contractor is afforded a fair opportunity for consideration in the award of orders, consistent with the procedures in the contract.
GSAOmbudsman@gsa.gov
(b) Consulting an ombudsman does not alter or postpone the timeline for any other process (e.g., protests).
(c) Before consulting with the Ombudsman, the Contractor is encouraged to first address complaints with the Contracting Officer for resolution. When requested by the Contractor, the Ombudsman may keep the identity of the concerned party or entity confidential, unless prohibited by law or agency procedure.
(End of clause)
FAR 52.216-18 Ordering (AUG 2020)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from notice to proceed to the ending date of the period of performance for the base contract.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) A delivery order or task order is considered "issued" when—
(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;
(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or
(3) If sent electronically, the Government either—
(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4106&num=0&edition=prelim
(ii) Distributes the delivery order or task order via email to the Contractor's email address.
(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.
(End of clause)
V. Instructions and Clauses
V.A. FAR 52.215-1 Instructions to Offerors – Competitive Acquisition (NOV 2021)
(a) Definitions. As used in this provision-
Discussions are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.
In writing, "writing," or "written" means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
Proposal modification is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
Proposal revision is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
Time, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation…