R6 Wraparound BPA SOW Zone 5-6-7 Porta toilets.docx
DOCX document 3 MB Posted
- Attached to
- Porta Toilets BPA
- Solicitation number
- 70FBR623Q00000033
About this file
This statement of work outlines requirements for portable toilet and hand washing station services to support Federal Emergency Management Agency activities in Region Six, which includes Arkansas, Louisiana, Oklahoma, New Mexico, and Texas, in response to natural disasters. The contractor must provide standard and ADA-compliant portable toilets, portable toilets with changing tables, portable hand washing stations, and mobile restroom trailers. Services include daily cleaning, restocking, emptying, maintenance, and fueling. The contractor must respond to setup and delivery requests within 24 hours and provide pickup within 24 hours of notification. The base period of performance is two years. The solicitation seeks contractors to service Zones 5, 6, and 7.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY (DHS)
Federal Emergency Management Agency (FEMA)
STATEMENT OF WORK (SOW) FOR
Incident Support Base and Federal Staging Areas Activation Wraparound Services Region Six
1.0 GENERAL
1.1 BACKGROUND
The Department of Homeland Security (DHS) Federal Emergency Management Agency (FEMA) Region Six, consisting of Arkansas, Louisiana, Oklahoma, New Mexico and Texas, requires surge wraparound support upon activation of one or more incident support bases located in the regional area. FEMA Region 6 historically has had a multitude of natural disasters throughout the year which include but are not limited to hurricanes, winter storms, tornadoes, flooding and pandemics.
This request is to establish a contract that can quickly and efficiently provide the necessary line items to support FEMA personnel activating incident support bases and federal staging areas. These line items include standard portable toilets, ADA compliant portable toilets, portable toilets with changing stations, portable hand washing stations, mobile restroom trailers, services for each to maintain 24-hour support over the period of performance assigned for the disaster.
1.2 SCOPE
The Contractor(s) must be able to provide the requested support upon notification of activation within 24 hours of notification of award to specified location(s) within the states of Arkansas, Louisiana, Oklahoma, New Mexico and Texas. The Contractor(s) must be able to provide these items before and after disaster occurrence with the ability to navigate around and through possible limitations of lines of communications and damage due to the incident. The Contractor(s) will pick up items upon notification from Contracting Officer or Contracting Officer Representative within 24 hours, unless specified in writing for a specific date and time after the 24 hours of notification. This can be awarded per contract line item or state to multiple Contractor(s) if needed to support this BPA.
| Item # |
| Description |
| Service |
| 0001 |
| Standard Port-Toilets |
| COVID Cleaning-Daily with option to decrease as |
Restocking-Daily Emptying-Daily Maintenance-Daily Delivery Pick Up
| 0002 |
| ADA Compliant Port-Toilet |
| COVID Cleaning-Daily |
Restocking-Daily Emptying-Daily Maintenance-Daily Delivery Pick Up
| 0003 |
| Hand Wash Stations |
| COVID Cleaning-Daily |
Restocking-Daily Emptying-Daily Maintenance-Daily Delivery Pick Up
| 0004 |
| Porta Toilet with Changing Table |
| COVID Cleaning-Daily |
Restocking-Daily Emptying-Daily Maintenance-Daily Delivery Pick Up
| 0005 |
| (3) Three Stall restroom (2) Two handwashing station mobile trailer or similar, with power provided, water heating and cooling. |
COVID Cleaning-Daily Restocking-Daily Emptying-Daily Maintenance-Daily Fueling-Daily as Required Water-Daily as Required Delivery Pick Up
1.3 OBJECTIVE
FEMA Region Six has determined a need to deploy resources quickly and efficiently to activated incident support bases and federal staging areas. Establishment of the BPA must include a streamlined process to fund and order required equipment and services from one or more Contractor(s).
1.4 COMPLIANCE DOCUMENTS
1.4.1 The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
· APPENDIX A
1.4.2 Reference Documents The following documents may be helpful to the Contractor in performing the work described in this document:
· APPENDIX A
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 TASK ONE-SAFETY
2.1.1 All line items provided will meet all Local, State and Federal guidelines and regulations for safe handling and operation.
2.2 TASK TWO-COVID CLEANING –
2.2.1 Professional sanitizing services for each identified line item.
· CLIN 0001 Standard Porta Toilets
· CLIN 0002 ADA Porta Toilets
· CLIN 0003 Handwashing stations
· CLIN 0004 Porta toilets with changing station
· CLIN 0005 Mobile Restroom Trailer
2.2.2 Cleaning encompasses disinfecting all surfaces and removal of waste.
2.2.3 Meet current CDC and Federal Guidelines : https://www.cdc.gov/coronavirus/2019-ncov/community/reopen-guidance.html
2.3 TASK THREE-FUELING
2.3.1 Fueling or refueling service for each identified line item that requires power and/or fuel to operate.
2.3.2 Meet current State and Federal EPA Guidelines including spill prevention, control, and countermeasures. Contractor(s) must keep on site spill cleanup materials with instructions for on-site personnel and communicate with the FEMA point of contact of the materials location.
2.4 TASK FOUR-MAINTENANCE
2.4.1 Properly maintain each identified line item in working order to allow consistent operation (up to 24-hours/day for POP) in a disaster environment.
2.4.2 Adhere to manufacture specifications and guidelines for the intended purpose of the equipment. Follow any Local, State or Federal Guidelines, including for disposal of liquids/waste.
2.4.3 If an issue happens outside of normal maintenance schedule and is deemed an essential service or piece of equipment, Contractor(s) must be on site within 2 hours addressing the issue unless other arrangements are made in writing.
2.4.4 All equipment must be set up to prevent leaks or spills onto the ground.
2.4.5 If leaks or spills occur the Contractor(s) must perform State and Federal EPA Guidelines legal clean up services within 24 hours of notification.
2.4.6 If a line item is inoperable it must be fixed or replaced within 24-hours of notification to Contractor(s).
2.5 TASK FIVE-SET UP
2.5.1 Properly set up and anchored to withstand routine severe weather without damage to existing asphalt or concrete. Contractor will be responsible for any damage and/or repairs due to the set-up of the line items.
2.6 TASK SIX-TEAR DOWN
2.6.1 Removal of the equipment without damage to existing asphalt or concrete. Contractor will be responsible for any damage and/or repairs due to the tear down of the line items.
2.7 TASK SEVEN-DELIVERY
2.7.1 Delivered to the specified location within 24 hours of award. Coordination of delivery with COR and FEMA location point of contact.
2.8 TASK EIGHT-PICK UP
2.8.1 Pick up within 24 hours of notification unless specified time and date is provided in writing. Coordination of pick up with COR and FEMA location point of contact.
2.9 TASK NINE-RELOCATION
2.9.1 Move equipment to another area at the same location. Coordination of relocation with COR and FEMA location point of contact.
2.10 TASK TEN-RESTOCKING
2.10.1 Providing necessary commodities to use the equipment as intended for 24-hour operations. To include but not limited to toilet paper, soap, paper towels, and trash bags.
2.11 TASK ELEVEN-DISASTER WEATHER PROCEDURES
2.11.1 -All items should be secured and or removed within 24-hours if notified by FEMA Point of Contact and/or COR of incoming severe weather, and then returned within 24-hours of notification of the all clear from the FEMA Point of Contact and/or COR.
3.0 CONTRACTOR(S) PERSONNEL
It is the responsibility of the Contractor(s) to provide qualified personnel to perform all requirements specified in the SOW.
3.1 QUALIFIED PERSONNEL
The Contractor(s) must provide qualified personnel that meet Federal, State and Local regulations to perform all requirements specified in this SOW.
3.2 CONTINUINTY OF SUPPORT
The Contractor(s) must ensure that the contractually required level of support for this requirement is always maintained.
3.3 CONTRACTOR(S) PERSONNEL SAFETY
3.3.1 Contractor(s) personnel must follow all Local, State and Federal guidelines.
3.3.2 Contractor(s) personnel on site must wear proper safety equipment for their services, as well as a reflective clothing/vest at all times.
3.3.3 Contractor(s) personnel must immediately report to the FEMA POC if any safety incidents occur while performing duties onsite on the day of occurrence before leaving the site.
3.4 KEY PERSONNEL
3.4.1 CONTRACTOR(S) PROJECT MANAGER
Contractor(s) will provide a company representative as a liaison to the onsite FEMA POC upon written request from COR or Contracting Officer to provide guidance and instructions for day to day operations of equipment provided. The FEMA POC’s contact information will be provided to the Contractor(s) by the COR.
3.5 CONTRACTOR(S) EMPLOYEE CONDUCT
3.5.1 Contractor(s) employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms and possession of weapons) when visiting or working at Government facilities. The Contractor(s) must ensure Contractor employees always present a professional appearance and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Contractor(s) Representative must ensure Contractor(s) employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.
3.6 CONTRACTOR(S) EMPLOYEE IDENTIFICATION
3.6.1 Contractor(s) employees visiting Government facilities must wear an identification badge that, at a minimum, displays the Contractor company name, the employee’s photo name, and badge expiration date. Visiting Contractor(s) employees must comply with all Government escort rules and requirements. All Contractor(s) employees must identify themselves as Contractor when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times. All Contractor(s) employees must identify themselves as a Contractor when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times.
3.7 REMOVING CONTRACTOR(S) FOR MISCONDUCT OR SECUIRTY REASONS
The Government may, at its sole discretion (via the Contracting Officer), direct the Contractor(s) to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor(s) of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor(s) with a written explanation to support any request to remove an employee.
4.0 PERIOD OF PERFORMANCE
The period of performance for this contract is a two-year base period.
Base Period September 15, 2023 through September 14, 2025
4.1 PLACE OF PERFORMANCE
Region Six area of responsibility includes the states of Arkansas, Louisiana, Oklahoma, New Mexico and Texas. Pre-identified locations are listed below. Place of performance is not limited to listed locations as future disasters could dictate the need of other locations within the region.
Arkansas ISB/FSA Locations
| Loc # |
| Name - Address |
| City |
| Zip |
| 1 |
| Camp Robinson-Building 9501 Camp Joseph Robinson |
| North Little Rock |
| 72118 |
| 2 |
| Conway Expo Center- 2505 East Oak Street Conway AR 72032 |
| Conway |
| 72032 |
| 3 |
| Fayetteville Springdale Weigh Station-I-49 DOT Scales |
| Springdale |
| 72762 |
| 4 |
| FedEx Freight East Little Rock – 5701 Lindsey Road |
| Little Rock |
| 72206 |
| 5 |
| Jonesboro-Old City Shop-2605 Dan Ave. |
| Jonesboro |
| 72401 |
| 6 |
| Newport Extension Center-Northeast of AR 14 and Jackson Road 917 Intersection |
| Newport |
| 72112 |
| 7 |
| Old Blytheville AFB-Arkansas Aeroplex-2901 Casper St. |
| Blytheville |
| 72316 |
| 8 |
| Pine Bluff Arsenal-10020 Kabrich Circle |
| White Hall |
| 71602 |
| 9 |
| Red River Army Depot-Texarkana-100 Armory Drive |
| Texarkana |
| 75507 |
| 10 |
| Stuttgart Municipal Airport- 2000 W Airport Road (State HWY 980) |
| Stuttgart |
| 72160 |
Texas ISB/FSA Locations
| Loc # |
| Name - Address |
| City |
| Zip |
| 1 |
| RSA Ford Park -5515 I-10 South |
| Beaumont |
| 77705 |
| 2 |
| Chase Industrial Complex - 472 Constellation Dr |
| Beeville |
| 78102 |
| 3 |
| NAS Corpus Christi- 10800 D Street |
| Corpus Christi |
| 78419 |
| 4 |
| Ellington AFB |
| Houston |
| 77034 |
| 5 |
| FedEx Freight East Dallas/FXF- 301 Clay Road |
| Sunnyvale |
| 75182 |
| 6 |
| FedEx Freight Fort Worth- 1909 Great Southwest Pkwy |
| Fort Worth |
| 76106 |
| 7 |
| FedEx Freight Tyler- 3471 Pointe North Dr. |
| Tyler |
| 75702 |
| 8 |
| FedEx Freight IAH- 9010 Jackrabbit Rd. |
| Houston |
| 77095 |
| 9 |
| FedEx Freight IAH- 6905 East Orem Dr. |
| Houston |
| 77095 |
| 10 |
| FedEx Freight- Laredo- 13145 S. Unitec Dr. |
| Laredo |
| 78045 |
| 11 |
| FedEx Freight- Round Rock- 2500 Chisolm Trail Rd |
| Round Rock |
| 78681 |
| 12 |
| FedEx Freight STX- 7012 FM 3009 |
| Schertz |
| 78154 |
| 13 |
| FedEx Freight- Wichita Falls- 1301 Hatton Rd. |
| Wichita Falls |
| 76302 |
| 14 |
| Joint Base SA-Fort Sam Houston-1210 Stanley Rd |
| San Antonio |
| 78234 |
| 15 |
| Ft. Bliss- 2 Sheridan Rd. |
| El Paso |
| 79906 |
| 16 |
| NAS Kingsville- 554 McCain St., Ste 210A |
| Kingsville |
| 78363 |
| 17 |
| Joint Base SA-Lackland- Galaxy Road Lackland AFB |
| San Antonio |
| 78236 |
| 18 |
| Joint Base SA- Medina- 1210 Stanley Rd |
| San Antonio |
| 78234 |
| 19 |
| Moore Field Base-22675 N. Moorefield Rd |
| Edinburg |
| 78541 |
| 20 |
| Joint Base SA- Randolph AFB- 10712 Lower Seguin Road (truck gate) |
| Schertz |
| 78154 |
| 21 |
| Randolph Air Force Base Auxillary-1055 Aux Airport Rd. |
| Seguin |
| 78155 |
Louisiana ISB/FSA Locations
| Loc # |
| Name - Address |
| City |
| Zip |
| 1 |
| Camp Beauregard- 7615 Esler Field Road |
| Pineville |
| 71360 |
| 2 |
| Camp Minden-100 Louisiana Blvd |
| Minden |
| 71055 |
| 3 |
| FedEx Freight St. Rose (New Orleans)- 311 James Drive East |
| St. Rose |
| 70087 |
| 4 |
| FedEx Freight - 11855 N. Harrells Ferry Road |
| Baton Rouge |
| 70816 |
| 5 |
| FedEx (Lafayette)- 1840 W. Willow Street |
| Scott |
| 70583 |
| 6 |
| FedEx Freight – Shreveport- 7104 Brooks RD |
| Shreveport |
| 71129 |
| 7 |
| Fort Polk-Leesville |
| Vernon Parish |
| 71459 |
| 8 |
| Lamar Dixon Expo Center- 9039 South St Landry Ave. |
| Gonzales |
| 70737 |
| 9 |
| MSY Airport TSA Screening Facility- 11 Middle Access Rd. |
| Kenner |
| 70062 |
| 10 |
| NAS JRB New Orleans - 400 Russell Drive, Hangar 4 |
| New Orleans |
| 70143 |
| 11 |
| LakeFront-5801 Walter Beech St |
| New Orleans |
| 70126 |
| 12 |
| Roseland RSA- 61658 Highway 51 |
| Roseland |
| 70456 |
Oklahoma ISB/FSA Locations
| Loc # |
| Name - Address |
| City |
| Zip |
| 1 |
| Altus Air Force Base- Challenger Blvd |
| Altus |
| 73521 |
| 2 |
| FedEx Freight OKC- 8100 S Bryant Ave |
| Oklahoma City |
| 73149 |
| 3 |
| FedEx Freight TUL/OK- 6882 W. 76th Street |
| Tulsa |
| 74131 |
| 4 |
| Fort Sill 7303 Apache Gate Road |
| Elgin |
| 73538 |
| 5 |
| McAlester Ammunition Depot-1 C-Tree Rd. |
| McAlester |
| 74501 |
| 6 |
| Muskogee-Davis Regional Airport-1200 Sabre |
| Muskogee |
| 74403 |
| 7 |
| Tinker AFB- 7300 S Air Depot Blvd |
| Oklahoma City |
| 73135 |
New Mexico ISB/FSA Locations
| Loc # |
| Name - Address |
| City |
| Zip |
| 1 |
| Belen Regional Airport- 4900 Camino del Llano |
| Belen |
| 87002 |
| 2 |
| Cannon AFB- 110 E. Sexant St. Cannon Air Force Base |
| Cannon |
| 88103 |
| 3 |
| Double Eagle II Airport- 7401 Atrisco Vista Blvd NW 6 |
| Albuquerque |
| 87120 |
| 4 |
| Fedex Freight Albuquerque NM- 1 Shamrock Way NW |
| Albuquerque |
| 87120 |
| 5 |
| FLETC Artesia NM- 1300 W. Richey Ave |
| Artesia |
| 88210 |
| 6 |
| Holloman AFB Alamogordo NM- 550 Tabosa St |
| Alamogordo |
| 88330 |
| 7 |
| Kirtland AFB-Sandia Military Reservation- 2200 Sunport Blvd SE |
| Albuquerque |
| 87106 |
| 8 |
| Roswell Int’l Air Center- #1 Jerry Smith Circle |
| Roswell |
| 88203 |
| 9 |
| San Juan Fairgrounds 41 Road 5568 |
| Farmington |
| 87401 |
| 10 |
| Stallion AAF- Hwy 380 & 525 (WSMR P Rte 7) |
| San Antonio |
| 87832 |
4.2 ADDITIONAL CONTRACT INFORMATION
Region Six will be separated into seven (7) geographic zones with awarded Contractor(s) operating within their zones. If a Contractor(s) cannot support all requests within their zone, awarded Contractor(s) from other zones can be called upon to help fulfill requests for that zone. Contractor(s) can be awarded multiple zones. **This contract is for Zones 5, 6, and 7 only, Contracts for zones 1, 2, 3, and 4 will be awarded by the end on 2022
Contract support is divided into (seven) geographical Zones:
**Zone 1
**Zone 2
**Zone 3
**Zone 4
Zone 5
Zone 6
Zone 7
**This contract is for Zones 5, 6, and 7 only, Contracts for zones 1, 2, 3, and 4 will be awarded by the end on 2022.
4.3 GENERAL REPORT REQUIREMENTS
The Contractor(s) must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows 10 and Microsoft Office Applications).
Contractor(s) must adhere to delivery of all operation reports specified in task items Section 2. Contractor(s) must provide an initiation report to include the schedule of delivery upon notification of order to include point of origin and estimated timeline of delivery of all line items. Upon set up of all line items on the site, Contractor(s) will provide reports indicated in the specified task items within Section 2 of the SOW.
If a line item will be delayed past the 24-hour requirement of delivery, upon 1-hour of discovery, the Contractor(s) must notify the CO and COR in writing of the line item delayed and estimated time of delivery. Contractor(s) will be required to update the CO and COR every 8 hours in writing until the line item has met delivery requirements.
Contractor(s) must provide written acknowledgement to the CO and COR upon notification of site termination and to provide a detailed schedule of tearing down and picking up line items. Upon removal of all line items from the site, Contractor(s) will provide reports indicated in the specified task items within Section 2 of the SOW.
If a line item will be delayed past the 24-hour requirement of pickup, upon 1-hour of discovery, the Contractor(s) must notify the CO and COR in writing of the line item delayed and estimated time of pickup. Contractor(s) will be required to update the CO and COR every 8 hours in writing until the line item has met pickup requirements.
5.0 GOVERNMENT TERMS & DEFINITIONS
| Term |
| Definition |
| COR |
| Contracting Officer’s Representative |
| CO |
| Contracting Officer |
| DHS |
| Department of Homeland Security |
| FEMA |
| Federal Emergency Management Agency |
| EPA |
| Environmental Protection Agency |
| CDC |
| Centers for Disease Control and Prevention |
| SOW |
| Statement of Work |
| BPA |
| Blank Purchase Agreement |
| POP |
| Period of Performance |
| ADA |
| Americans with Disabilities Act |
| FEMA Region 6 |
| States consisting of Oklahoma, Texas, Louisiana, New Mexico and Arkansas. |
| Surge |
| Period before and immediately after a disaster, during which FEMA activates its personnel and response. |
| Wraparound Support |
| Comprehensive and full-service planning, delivery, maintenance and removal of services and equipment. |
| ISB |
| Incident Support Base-FEMA operational support and staging area set up near disaster impacted areas. |
| COVID |
| Coronavirus Disease |
| FEMA Point of Contact |
| Approved FEMA personnel, usually on site, that handles the day to day interaction, and in most circumstances does not define the Contracting Officer or have contract decision making powers. |
| FSA |
| Federal Staging Area-FEMA operational support and staging area set up near disaster impacted areas. |
6.0 GOVERNMENT FURNISHED RESOURCE
The Government will not furnish any resources to the Contractor(s) in support of this contract.
7.0 CONTRACTOR(S) FURNISHED PROPERTY
The Contractor(s) must furnish all materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in SOW 6.0.
8.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review deliverables, supplies, services prior to acceptance and provide the Contractor(s) with an e-mail that provides documented reasons for non-acceptance. If the deliverable, supply and/or service is acceptable, the COR will send an e-mail to the Contractor(s) notifying it that the deliverable, supply and/or service has been accepted.
8.1 The CO will have the right to reject or require correction of any deficiencies found in the deliverable, supply and/or service that are contrary to the information contained in the Contractor(s)’s accepted proposal. In the event of a rejected deliverable, supply and/or service, the Contractor(s) will be notified in writing by the CO of the specific reasons for rejection. The Contractor(s) may have an opportunity to correct the rejected deliverable, supply and/or service and return it per delivery instructions.
8.2 The CO will have 48 hours to review deliverable, supply and/or service and make comments. The Contractor(s) must have 24 hours to make corrections and redeliver.
9.0 DELIVERABLES
9.1 DAILY CLEANING REPORT
9.1.1. Contractor(s) must provide a daily cleaning report to the FEMA point of contact at the site which includes summary of item/unit cleaned, personnel that accomplished the cleaning, with time and date.
9.2 DAILY FUEL REPORT
9.2.1. Provide FEMA Point of contact at the site a daily fueling log which provides item number, amount of fuel added and what kind of fuel.
9.3 DAILY MAINTENANCE REPORT
9.3.1. Provide FEMA point of contact at the site with a daily report and log which provides item number, actions taken, any issues and solutions. A report must be submitted every day even if to confirm there are no issues.
9.3.2. The status of repair or replacement must be provided in the maintenance daily report.
9.4 SET UP REPORT
9.4.1. Contractor(s) will provide written confirmation with pictures of each set up site for each line item, prior to set up and after set up, to be reviewed and signed by the Contractor(s), FEMA POC on site and COR
9.5 TEAR DOWN REPORT
9.5.1. Contractor(s) will provide written confirmation with pictures of each tear down site for each line item, prior to tear down and after tear down, to be reviewed and signed by the Contractor(s), FEMA POC on site and COR
9.6 DELIVERY REPORT
9.6.1. . Contractor(s) will provide written confirmation of delivery signed by the Contractor(s) and FEMA POC on site
9.7 PICK UP REPORT
9.7.1. Contractor(s) will provide written confirmation of pick up signed by the Contractor(s) and FEMA POC on site.
Appendix A: State and Federal Guidance
1. COVID CLEANING
a. Cleaning and Disinfecting: Best Practices During the COVID-19 Pandemic | Coronavirus (COVID-19) | US EPA
b. Disinfectants for Coronavirus (COVID-19) | Coronavirus (COVID-19) | US EPA
c. COVID Cleaning-Cleaning and Disinfecting Your Facility | CDC
d. OSHA 1910.1200 - Hazard Communication. 1910.1200 - Hazard Communication. | Occupational Safety and Health Administration (osha.gov)
e. PPE 1910.132 - General requirements. | Occupational Safety and Health Administration (osha.gov)
f. Cleaning and Disinfection for Non-emergency Transport Vehicles | CDC
2. FUEL
a. Arkansas Spill Reporting Hazardous Waste Enforcement | DEQ (state.ar.us)
b. Louisiana Spill Reporting File A Complaint / Report an Incident | Louisiana Department of Environmental Quality
c. New Mexico Spill Reporting New Mexico Environment Department General
d. Oklahoma Spill Reporting Spill Reporting - Oklahoma Department of Environmental Quality
e. Texas Spill Reporting Spills, Discharges, and Releases - Texas Commission on Environmental Quality - www.tceq.texas.gov
f. When are You Required to Report an Oil Spill and Hazardous Substance Release? | Emergency Response | US EPA
g. Diesel Fuel Standards | US EPA
h. Berm Example image1.jpeg image2.jpeg image3.emf image4.jpeg image5.emf image6.jpeg image7.emf image8.jpeg image9.emf image10.jpg image11.png image12.jpeg image13.emf image14.jpeg image15.emf