This request for solicitation seeks landscape services for the USDA Forest Service Region 5 Regional Office building located in Vallejo, California. The services include removal of trees and shrubs, planting of ground covers, shrubs, and trees, tree pruning, mulching, fertilizing, and removal and replacement of the irrigation system. The contractor must provide all materials, labor, and supervision to renew the landscape areas outlined in the appendix from April 1, 2024 through June 28, 2024. In addition to meeting minimum landscaping requirements, the contractor must install a new drip irrigation system, plant drought resistant native plants, remove dead vegetation, and apply slow-release fertilizer and mulch.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Region 5 Regional Office Landscape Renewal February 7, 2024
US Forest Service Landscape Renewal Region 5 Regional Office 1323 Club Drive Vallejo, CA 94592
Statement of Work for Agreement to Perform Landscape Services Region 5 Regional Office Building
To: By:
US Forest Service Region 5 Regional Office Building Company Name 1323 Club Drive Address Vallejo, CA 94592 City State Zip
This Statement of Work (SOW) is issued pursuant to the Consultant Services Master Agreement between Region 5 Pacific Southwest US Forest Service (Client) and Company Name (Contractor) effective Date (the Agreement). This SOW is subject to the terms and conditions contained in the Agreement between the parties and is made a part thereof. Any term not otherwise defined herein shall have the meaning specified in the Agreement. In the event of any conflict or inconsistency between the terms of this SOW and the terms of this Agreement, the terms of this SOW shall govern and prevail.
This SOW Dated is entered into by and between Contractor and Client and is subject to the terms and conditions specified below. The Exhibit(s) to this SOW if any shall be deemed to be a part hereof. In the event of any inconsistencies between the terms of the body of this SOW and the terms of the Exhibit(s) hereto, the terms of the body of this SOW shall prevail.
Landscape Renewal Page 1 February 7, 2024
Table of Contents
Project Scope
Project Location
Project Site
Period of Performance
Project Team
Scope of Work
Communication
Fee Schedule
Signatures
Landscape Renewal Page 2 February 7, 2024
Project Scope
The Region 5 Regional Office landscape renewal requires removal of trees and shrubs, planting of ground covers, shrubs, and trees, tree pruning, mulching, fertilizing, and removal and replacement of irrigation system.
Project Location
The Regional Office is located on Mare Island at 1323 Club Drive, Vallejo, CA 94592.
Landscape Renewal Page 3 February 7, 2024
Project Site
Project site is at the southern end of Mare Island, 1323 Club Drive, Vallejo, CA 94592. .
Landscape Renewal Page 4 February 7, 2024
Period of Performance
The Services shall commence on April 1, 2024 and shall continue through June 28, 2024.
Project Team
Name Title Email Phone
Leonard Job Director of Engineering Leonard.Job@USDA.GOV 707-562-8841
Rachael Thurston Regional Facilities Engineer
Rachael.Thurston@USDA.GOV 707-572-8419
Denise Hopkins
Regional Architect/COR
Denise.Hopkins@USDA.GOV
707-562-8879
Travis Marsden Facility Operations Specialist
Russell.Marsden@USDA.GOV 707-562-8811
I have reviewed and agree with this Statement of Work.
Print Name Signature Date mailto:Rachael.Thurston@USDA.GOV mailto:Denise.Hopkins@USDA.GOV
Landscape Renewal Page 5 February 7, 2024
Scope of Work
Contractor shall provide the Services and Deliverable(s) as follows:
1. Contractor shall provide all materials, labor, and supervision to renew landscape areas outlined in Appendix A.
2. The Contractor’s landscaping shall at a minimum meet the following requirements.
3. Existing Conditions: Protect existing site and plants not to be removed or replaced.
4. Damages created and not repaired to original conditions will be repaired and separately expensed to the contractor.
5. All materials removed shall be appropriately disposed of off-site by the contractor.
6. Areas, larger than 1 foot in diameter, where water pools shall be identified and brought to elevation high enough to drain properly.
7. IRRIGATION
a. Installers: Entity that employs a Certified Irrigation Designer qualified by the Irrigation Association or Professional Technical Class member of the American Society of Irrigation Consultants.
b. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
c. Remove existing irrigation drip lines throughout site.
d. Evaluate existing irrigation water supply equipment for repair, removal, or replacement.
e. Provide detailed line item costs to repair or replace existing water supply equipment to irrigate existing and new irrigation areas.
f. All removed components shall be properly disposed of at proper off-site disposal centers.
g. Design 100 percent coverage drip irrigation system including new and existing trees and shrubs and back of building areas where no irrigation currently exists.
h. Install drip tube system and all necessary items for a fully functional irrigation system.
i. Do not interrupt existing water service to facilities.
j. Provide Irrigation Zone Control: Automatic operation with controller and automatic control.
k. Submit irrigation plan, water flow data, manufacturer cut sheets, and shop drawings for all irrigation components and irrigation system to COR for review and approval.
l. Irrigation system shall minimize power and water use.
m. Components shall be of recycled materials and/or able to be recycled.
n. Irrigation system shall use BAA (Buy American Act) product approvals.
8. PLANT MATERIALS
a. Remove all dead, dying, or diseased vegetation in existing landscape beds identified in Appendix A.
b. Remove or grind all existing stumps and protruding roots flush with soil level to prevent trip hazards.
c. Grind or remove all roots from newly removed shrubs and trees.
d. Design and plant new landscape areas at significant points around facility including but not limited to (reference planting areas as noted in Appendix A).
i. Employee entrance drive both sides.
ii. Front visitor entrance both sides including concrete planter bed. Design planting so that front entrance is visible, inviting, and attractive.
iii. Back of building full length of north building and around equipment building. Utilize ground cover with plantings at employee entrances.
iv. North employee entrance near employee entrance drive.
v. Delivery entrance and around equipment by delivery entrance.
vi. Employee picnic area on back side of building.
vii. Instead of mulch, provide and plant native ground covers along sloped areas that cannot hold mulch.
e. Landscape areas shall be planted with drought resistant perennial shrubs and ground covers and provide a uniform and healthy appearance throughout the USFS Campus.
f. Plant material shall be drought resistant, non-invasive, nonpoisonous to animals or humans, and native to the local ecosystem.
Landscape Renewal Page 6 February 7, 2024
g. Plant material shall be sized with full consideration for mature height and width.
h. Overall plant palette shall be limited in type of plant material for ease of maintenance and cohesive design around facility.
i. Plant material shall be that without fruit, messy seed pods, and frequent shedding of branches.
j. Select trees with few or no insect and disease problems.
k. Plants with thorns or prickly burrs are not to be used.
l. Provide healthy plants from a commercial nursery.
m. Provide a limited variety of trees and shrubs:
i. Evergreen and deciduous
ii. Columnar, oval, round
iii. Loose open structure
iv. Textural variety from fine to coarse
n. Provide planting plan showing shrub and tree (see notes below) locations, plant key, species and variety, quantities, container size, botanical names, and common names for review and approval.
9. TREES
a. Existing trees to be removed as noted in Appendix A, approximately 3 trees, including one large tree and two 6-8 feet trees for reuse. Number to be verified on site.
b. Remove or grind protruding stumps and tree roots from all removed trees and shrubs, including those remaining from earlier removal.
c. All remaining trees to be pruned by an arborist currently credentialed by International Society of Arborists.
Trained employees of this ISA credentialed arborist may perform the work under the close supervision of this arborist.
d. Trees are to be pruned in accordance with the current ISA Best Management Practices and guidelines.
e. Trees to be pruned to promote their health, remove suckers, crossing branches, and weak branches.
f. No pollarding of trees is allowed.
g. Trees are not to be topped or deliberately cut back to reduce their central leaders and height.
h. Include new trees in planting plan as noted above in Plant Material for review and approval.
10. COMPOST
a. Use compost as needed for infill at low areas, drainage, etc.
b. Prepare planting holes with compost.
c. Compost shall be a well decomposed, stable, weed free organic matter derived from food waste, yard trimmings, manure, bio-solids, and other recovered organic materials.
d. The product shall contain no substances toxic to plants and shall be reasonably free (1% by dry weight) of man-made foreign matter.
e. The compost will possess no objectionable odors and shall not resemble the raw material from which it was derived.
f. The product shall be certified through the U. S. Composting Council’s (USCC) Seal of Testing Assurance (STA)
Program.
11. FERTILIZER
a. Apply slow-release fertilizer to all new and existing plants and trees.
b. Fertilizers shall be made from recovered organic materials such as alfalfa meal, blood meal, cottonseed meal, fish meal, seaweed, meat and bone meal, poultry manure.
c. It shall contain the highest percentage of recovered materials practical while maintaining a satisfactory cost and level of competition.
d. Submit recommended fertilizer data for review and approval.
12. MULCH
a. Install mulch in all landscape beds on regional office grounds.
i. Mulch shall be applied uniformly around the regional office grounds.
ii. Mulch shall be natural, undyed large wood nuggets.
iii. Mulched areas shall be at an even minimum depth of 3” with a uniform appearance.
iv. Mulch shall be organic in nature. No synthetic mulch shall be used.
Landscape Renewal Page 7 February 7, 2024
v. Mulch must be free from deleterious materials and suitable as a top dressing for trees and shrubs.
vi. Mulch must consist of shredded hardwood.
vii. There is mulch on site, approximately 80 yards, that should be used by the contractor. This mulch can be used as a base or in remote areas where visibility is low. Coordinate locations with COR. This on-site mulch will not be replenished. Contractor shall be responsible for providing all additional mulch once this on-site mulch is exhausted.
b. Install continuous and uniform mulch containment borders around the entire perimeter of all landscape beds on the regional office grounds.
i. Borders shall be at a height no less than 4 inches above finished grade and width no less than 3/32” to contain mulch in designated areas and out of pathways, parking areas, and sidewalks.
ii. Borders shall contour with existing sidewalks, walkways or traffic ways and not impede foot or vehicle traffic or create an unsafe condition for pedestrians or vehicles traffic.
iii. Borders shall be properly anchored into existing ground cover to prevent movement and not impede irrigation system components.
iv. Wood material or wooden landscape timbers shall not be used as border material.
v. Submit border material sample at least 8” in length for review and approval.
13. SITE
a. Access to the campus and parking will be provided to crew and for up to three vehicles to all areas required to perform the work.
b. The Contractor may request permission to store equipment, tools, and materials on site at the Regional Office
Building parking area. Any on-site storage must be reviewed and approved by the COR. Items left on USFS property are solely the responsibility of the contractor.
c. The Contractor shall be provided Visitor Access badges while performing the work under this contract.
d. The Contractor shall meet the Forest Service COR or facilities operation specialist for Visitor Access badges.
e. Visitor Access badges shall be returned to the COR or facilities operation specialist at the end of each business day.
f. The work will be conducted at the Pacific Southwest Region, Region 5, Regional Office Building, located at 1323
Club Drive, Vallejo, California 94592.
g. The work will be conducted during the business day, Monday through Friday between the hours of 7:30am and
4:30pm and shall exclude all Federal Holidays.
Meetings
Within one week after receiving notice to proceed, meet on site with USFS Contracting Officer Representative (COR) and Facility Operations Specialist to review work scope.
Communication
All communications for the project must occur through the project’s Contracting Officer’s Representative. Address for all submittals shall be:
Region 5 Regional Office 1323 Club Drive Vallejo, CA 94592 Attn: Denise Hopkins, Regional Architect and COR Email: Denise.Hopkins@USDA.GOV:
Phone: 707-562-8879
Landscape Renewal Page 8 February 7, 2024
Completion Criteria: Work is considered complete when accepted in writing by the Client as sufficiently complete in accordance with this SOW and contract documents.
Fee Schedule
This engagement will be conducted on a fixed sum contract.
Payment will be made upon full completion of project and acceptance by the Client.
Signatures
We, the parties hereto have caused this SOW to be effective as of the day, month and year first written above.
Region 5 Pacific Southwest Regional Office Company Name
Signature Signature
Print Name Print Name
Title Title
Appendix A
Landscape Renewal Page 1
Region 5
Pacific Southwest
Regional Office Landscape Renewal
Site Plan
LANDSCAPE RENEWAL AREA
Landscape Renewal Page 2
Region 5
Pacific Southwest
Regional Office Landscape Renewal
Site Plan
PLANTING AREA
X
X
X
X X
X
X X
X
X
Landscape Renewal Page 3
Remove shrubs. Remove shrubs.
x x
Remove shrubs.
x x x
Region 5
Pacific Southwest
Regional Office Landscape Renewal x
Remove tree. Leave 7 feet tall stump for future carving.
Landscape Renewal Page 4
Region 5
Pacific Southwest
Regional Office Landscape Renewal
Remove all shrubs in the area, excluding tallest one. Remove shrubs along wall. Ground cover to remain.
x
Remove group of shrubs.
Remove all this type of shrub immediately adjacent to inside of upper wall.
x x x x x x x x
Front of Regional Office.
Landscape Renewal Page 5 x x
Remove shrubs.
Region 5
Pacific Southwest
Regional Office Landscape Renewal
Remove shrub.
Remove shrub.
Remove shrubs.
x x x x x x
South wing of building front.
Landscape Renewal Page 6 x
Remove group of shrubs.
Region 5
Pacific Southwest
Regional Office Landscape Renewal
Remove all shrubs.
Ground cover to remain. Remove shrubs.
x x x x x x ? x
South wing of building front.
Remove X marked shrubs.
Landscape Renewal Page 7 x x x
Remove groups of shrubs in front of low wall on left side of main entrance.
Region 5
Pacific Southwest
Regional Office Landscape Renewal
Remove X-marked shrubs.
Remove all shrubs.
Remove all shrubs in this condition in sloped bed along sidewalk.
x x x x x x x x x
Building front along street.
Landscape Renewal Page 8 x x x x x x x x
Remove shrub.
Region 5
Pacific Southwest
Regional Office Landscape Renewal
Remove shrubs, save for replanting.
Remove shrub.
Remove shrubs.
x x x x x x x x x x x x x x
North wing front.
Landscape Renewal Page 9 x x x x x x
Remove shrubs.
Region 5
Pacific Southwest
Regional Office Landscape Renewal
Remove shrubs.
Remove shrubs and saplings.
Remove shrubs.
x x x x x x x x x x x x x
Along Club Drive.
Landscape Renewal Page 10 x x x x x
Remove shrubs.
Region 5
Pacific Southwest
Regional Office Landscape Renewal
Remove shrubs and saplings.
x x x x x x x x x
Remove shrubs immediately adjacent to building.
Building front along street.
Back side by central entrance.
Remove dying plants, refresh with additional plants or remove and replace. Recommend replacement plant type for review and approval.
Landscape Renewal Page 11 x
Remove shrub.
Region 5
Pacific Southwest
Regional Office Landscape Renewal
Remove small tree.
Remove shrub.
Remove all shrubs in this area on parking lot side of fence.
x x x x x
North wing by employee entrance drive and parking lot.
Landscape Renewal Page 12 x x
Remove shrub.
Region 5
Pacific Southwest
Regional Office Landscape Renewal
Remove all shrubs.
Remove all shrubs on building side of fence.
Remove all shrubs including that by piping and tree (in background) touching solar panels.
Building back by parking lot.
Landscape Renewal Page 13 x
Remove two trees and save for replanting.
Region 5
Pacific Southwest
Regional Office Landscape Renewal
Front side of building near guest parking
| R5RO-SOW-Landscape Renewal.pdf |
| Project Scope |
| Project Location |
| Project Site |
| Period of Performance |
| Project Team |
| Scope of Work |
| Meetings |
| Communication |
| Fee Schedule |
| Signatures |