Belle Fourche Reservoir Shoreline Stabilization at Gaden's Point.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| R17PS00523.pdf | ||
| FBO_announcement_R17PS00523_-_Gadens_PT_Shoreline_Stabilization.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
R17PS00523
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Billings MT 59107
R60
PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation
R60
Billings MT 59101 2021 4th Ave North Bureau of Reclamation
05/17/2017000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/25/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project Title: Belle Fourche Reservoir Shoreline Stabilization at Gaden's Point
See Page 2 of 2 for changes incorporated with this amendment
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Gerri Voto-Braun
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0001 Solicitation No. R17PS00523
The Final contractor questions from prospective contractors and their respective answers are attached to this amendment and are provided for informational purposes only.
Receipt of Bids: The hour and date for receipt of bids remains unchanged at 3:00 PM on May 26, 2017.
Prospective Contractor Questions Belle Fourche Reservoir Shoreline Stabilization at Gaden’s Point
Solicitation R17PS00523
Q1: What submittal drawings do you want since it is already engineered?
A1: Refer to submittal table in Section 01 33 00 for types of submittals required.
Q2: Why do we need a surveyor?
A2: As indicated in Section 01 71 20, Part 3, surveyor is needed for layout of work and quantity surveys.
Q3: Do slopes need compaction tested since they are going to be rip rapped?
A3: Compact and test as required by Section 31 23 02.
Q4: Required Certified Safety Professional for this job and what is a generic safety program that isn’t acceptable? our safety program was accepted for WAPA slope restoration @ Westfield, IA..
A4: Refer to Section 01 35 20, 1.05 for CSP duties for this project. Refer to Section 01 35 20, 1.03, C. for safety program requirements. The program must be job specific and be prepared as outlined in RSHS Appendix B.
Q5: Who needs 30 OSHA Hour training everyone or just one person?
A5: The Onsite Safety Representative and Safety Professional must have OSHA 30 training within last 5 years.
Q6: Why Storm Water Management Plan for rip rapped slope?
A6: To comply with Federal, State, and Local regulations. Refer to Section 01 57 30, Water Pollution Control.
Q7: Will the alignment station locations be marked before bids are due?
A7: No
Q8: How much excavation will be necessary for revetment construction?
A8: This is not an exact figure, but should be approximately 4000 to 5000 cy.