Att_9_-_Geotechnical_Report_Combined.pdf
PDF 32 MB Posted
- Attached to
- Steinaker Canal Enclosure Reach 1
- Solicitation number
- R15PS00442
About this file
Att 9 - Geotechnical Report Combined
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Geotechnical Study Steinaker Service Canal Enclosure Prepared for Bowen Collins & Associates, Inc.
April 2013
668 East 12225 South, Suite 203 Draper, Utah 84020
801.849.0055
April 24, 2013
Mr. Jordan Oyler Bowen Collins & Associates, Inc.
754 East 14000 South Draper, Utah 84020
Re: Geotechnical Study, Uintah County, Utah.
Dear Jordan:
This letter summarizes the geotechnical study authorized by Bowen Collins & Associates, Inc. (BCA) for the proposed canal enclosure project; based on our proposal dated April 1, 2013.
SCOPE OF SERVICES
The purpose of the study was to characterize subsurface materials at eleven (11) locations along the Steinaker Service Canal alignment between approximate Stations 340+00 and 595+00. To accomplish the scope of services the following tasks were performed:
• Task 1 Field Studies – Eleven (11) test pits were excavated to depths of 4 to 8 feet as directed by Bowen Collins & Associates, Inc. Samples of subsurface materials were collected by hand from the test pits. Subsurface conditions were logged at the time of excavation by a licensed engineer.
• Task 2 Laboratory Testing – Select materials from test pit samples were tested in a geotechnical laboratory.
• Task 3 Analysis and Letter – Results from Tasks 1 and 2 were compiled and summarized in this letter.
Design and construction related recommendations were not included as part of this study.
PROJECT BACKGROUND
We understand the Uintah Water Conservancy District (District) is planning to enclose approximately 5 miles of the lower section of the Steinaker Service Canal.
BCA has been retained to provide design services which we understand will likely included a 42- to 63-inch nominal size HDPE pipe for the enclosure. Preliminary grading suggests cuts on the order of 6 to 8 feet below the existing canal invert will be needed, with the overall objective of minimizing cuts/fills, thus providing an overall mass balance.
FIELD STUDIES
Subsurface soils were studied on April 2, 2013 by excavating eleven (11) test pits located along the Steinaker Service Canal alignment. BCA provided plan and profile figures of the canal alignment with all eleven proposed test pit locations identified by station. The locations of the test pits, as shown on the provided figures, were adjusted in the field as required by District representatives. A Vicinity Map showing the approximate location of the canal enclosure project is included on Figure 1. The approximate locations of the test pits are plotted on Figure 2.
Test pit locations were mapped using a hand held Garmin GPS device; suggesting that the actual locations may vary up to 33 feet, according to the accuracy reported for the device. Test pit data is summarized in Table 1.
Test pits were excavated using a rubber tire John Deere 410J backhoe provided by the District. Test pits were excavated to depths of 4 to 8 feet below the existing ground surface, and were typically 3 to 6 feet in width with a working base of 5 to 11 feet to provide room for logging. At the direction of BCA, all test pits were excavated in the canal invert. Due to limitations on entering the canal (such as embankment side slopes, bridges, pipe crossings, etc.), the backhoe excavated all test pits, except for TP-02, from the access road atop the east canal embankment. Test pit TP-02 was completed with the backhoe located in the canal invert. Given the vertical and horizontal distances between the canal invert and the top of the canal embankment, in conjunction with the maximum reach of the excavator bucket, test pits TP-03, TP- 06, TP-07, TP-08 and TP-10 were limited from reaching the desired 8 foot excavation depth.
Test pits were logged by a licensed engineer during the excavation process. Material descriptions were developed by observing samples collected during the excavation process. Soils were classified following Unified Soil Classification System (USCS) procedures. Laboratory test results were used to supplement field descriptions and adjustments were made to field logs where appropriate. Logs of the test pits are presented in Figures 3 through 13; a legend of soil descriptions is included in Figure 14.
Photo Log
Photographs were taken along the canal alignment at each test pit location. A photo log is included in Figures 18 through 39, with the approximate stationing and description listed for each photograph.
LABORATORY TESTING
Selected samples obtained from test pits were tested in a geotechnical laboratory. In particular, the testing consisted of:
1. ASTM D422 Test Method for Particle-Size Analysis of Soils.
2. ASTM D2216 Test Method for Laboratory Determination of Water (Moisture)
Content of Soil, Rock, and Soil-Aggregate Mixtures
3. ASTM D4318 Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils
Laboratory test results for the test holes are summarized on Table 2 and graphically in Figures 15 and 16. Sensitivity vs. Effective Stress Relationships developed from laboratory data are plotted on Figure 17.
SITE CONDITIONS
The project site is located along the lower section of the Steinaker Service Canal between approximate Stations 340+00 and 595+00. Within project limits, the canal is an earthen lined canal with grassy vegetation located along the entire length of the inboard canal embankment. The canal invert slopes gently downward to the southeast from an elevation of approximately 5438 feet near TP-11 to approximately 5431 feet near TP-01. Freestanding water, to approximate depths of between about 2 to 12 inches, is located at the northern end of the project near test pits TP-10 and TP-11. According to the District, the water is from both infiltration and drainage into the canal. Numerous paved and dirt road crossings, farm bridges, pipe drains, turnouts, check dams and siphons are located along the canal within project limits.
Geology
Near surface geology between TP-01 and TP-04, and for a short segment between TP-09 and TP-10, was mapped by Sprinkel (2007) as Upper Cretaceous-age Mancos Shale consisting of dark gray, soft, slope-forming calcareous shale containing beds of siltstone and bentonitic clay. Near surface geology at TP-04 is adjacent to the boundary between Mancos Shale and Holocene and Pleistocene-age undivided Piedmont and Basin alluvium consisting of variably consolidated, poorly to moderately sorted sand, gravel, cobbles and boulders deposited on near-planar bedrock surfaces. Near surface geology between TP-04 and TP-11, except for the short segment of Mancos Shale between TP-10 and TP-11, was mapped as Holocene-age mixed alluvium and eolian deposits consisting of unconsolidated alluvial mud, silt, and sand mixed with windblown sand and silt.
Some areas of the Mancos shale formation tend to swell/heave when wetted. Plastic limit and liquid limit testing of materials found in the test pits (see Figure 16) show tested materials exhibit low to medium plasticity. Based on results from these index tests and our understanding that the canal enclosure will utilize HDPE (flexible) pipe materials, we believe risks associated with adverse performance related to swelling of the clay materials to be low.
Subsurface Conditions
In general, native materials found during our field studies include clays (CL), silty clays (CL-ML), sandy clays (CL), clayey sands (SC), gravel (GW) and clayey gravel (GC). Except for the sand found in TP-09, granular materials were only found between TP-01 and TP-05. Oversized material, including cobbles and occasional boulders, were found in each of the gravel layers. We interpret portions of clay deposits in TP-06, TP-07, TP-08 and TP-10 to be weathered bedrock due to the blocky structure of the material and breakdown/deterioration observed when exposed. Though the weathered bedrock in TP-10 was more difficult to excavate in relation to the weathered bedrock in other test pits, the backhoe was able to excavate two feet into the weathered bedrock.
Fill material, which we believe resulted from sedimentation in the canal invert, was found in TP-05 and TP-07 through TP-11. Typical sedimentation depths were less than 12 inches, though a sedimentation depth of about 18 inches was found in TP-05 immediately upstream from the siphon under 4000 South, near Station 515+80. Fill material, which consisted of mottled clay with sand, was also found in TP-04 to a depth of about 3 feet. A stream bed crosses the canal near the location of TP-04, and based on discussions with the District, the fill was placed to backfill the stream bed at this location.
Materials with collapse potential were observed in TP-01, TP-02, TP-04, TP-08, TP- 09, TP-10, and TP-11. In general these materials were observed in the upper 2 feet, with the exception of TP-01 where pinhole structure was observed as deep as 4 feet.
These types of materials have the potential to produce surface settlements under additional load with increase in moisture.
General stratigraphy for the site could not be developed due to the large distance between exploration points (approximately ½ mile) and the nature of the depositional environment. Stratification lines shown on the logs represent approximate boundaries between soil types for the particular test pit location, using the field data collected during our study. Therefore, interpolation of subsurface conditions between and beyond the study locations may not be appropriate and/or representative.
Groundwater
Groundwater was found in test pits TP-04, TP-06, TP-08, TP-09 and TP-11 at depths ranging from the 0 to 8 feet at the time of our field studies on April 2, 2013. Test pits
Test Pit
Date
Excavated Long. Lat. Elev. (ft) a
Approx.
Station
Total depth
(ft)
Water depth b
(ft)
Water depth c
(ft) Excavation Method Comments
TP-01 4/2/13 -109.5079 40.3756 5409 594+00 8.0 N/E
d
N/M John Deere 410J Backhoe
TP-02 4/2/13 -109.5081 40.3810 5431 571+00 8.0 N/E N/M John Deere 410J Backhoe
TP-03 4/2/13 -109.5136 40.3868 5435 543+60 7.5 N/E N/M John Deere 410J Backhoe
TP-04 4/2/13 -109.5204 40.3913 5436 515+80 8.0 8.0 6.0 John Deere 410J Backhoe
TP-05 4/2/13 -109.5245 40.3976 5431 487+20 8.0 N/E N/M John Deere 410J Backhoe
TP-06 4/2/13 -109.5296 40.4007 5441 468+60 6.0 5.0 4.0 John Deere 410J Backhoe
TP-07 4/2/13 -109.5344 40.4060 5450 440+00 7.0 N/E N/M John Deere 410J Backhoe
TP-08 4/2/13 -109.5361 40.4120 5458 410+80 7.5 5.0 4.0 John Deere 410J Backhoe
TP-09 4/2/13 -109.5403 40.4179 5454 382+00 5.5 1.0 N/M John Deere 410J Backhoe
TP-10 4/2/13 -109.5447 40.4239 5423 356+20 4.0 N/E N/M John Deere 410J Backhoe
TP-11 4/2/13 -109.5492 40.4254 5438 341+80 4.0 GS N/M John Deere 410J Backhoe
Notes: a: Elevations collected using a hand held Garmin GPS device b: Ground water depth measured at time of excavation on 4/2/13 c: Ground water depth measured on 4/4/13 d: N/E = Not Encountered; N/M = Not Measured; GS = Ground Surface
Table 1 Test Pit Data
Steinaker Service Canal Enclosure (13GCI314)
6 7 8 9 10 11 12 13 7 8 9 10 11 12 13 14 15 16
T e s t H o le
D e p th ft
L L
P L
P I
C o h e s iv e I n d e x C
I
L iq u id it y I n d e x L
I
C O
B B
L E
S
(3
G R
A V
E L
(N o
.4 c o a rs e G
R A
V E
L
(3 /4
-3 fi n e G
R A
V E
L
(N o
.4 -3
/4
S A
N D
(N o
.2
-N o .4 c o a rs e S
A N
D
(N o
.1
-N o
.4 m e d iu m S
A N
D
(N o
.4
-N o
.1 fi n e S
A N
D
(N o
.2
-N o .4
F
IN
E S
N o .2
-i n m m
-i n m m
-i n m m
.5
-i n
.5 m m
/4
-i n m m
/8
-i n
.5 m m
N o
.4
.7 m m
N o
.1 m m
N o
.2
.8 m m
N o
.4
.4 m m
N o
.6
.2 m m
N o
.1
.1 m m
N o
.2
.0 m m
TP-01 1-2 21 40 19 21 1.11 0.1
TP-01 4-5 11 23 18 5 0.28 -1.5
TP-01 6-7 10 23 44 37 7 21 2 3 15 13 100 100 77 59 40 36 33 31 30 28 25 19 13
TP-02 4.5-5.5 6 26 40 25 16 29 7 10 12 5 100 87 74 62 49 40 34 27 21 17 11 8 5
TP-03 3-4 16 26 15 11 0.73 0.1
TP-04 1-2 17 24 16 8 0.5 0.2
TP-04 4.5-5 19 0 0 0 0 25 0 1 24 75 100 100 100 100 100 100 100 99 99 98 95 91 75
TP-04 7-8 12 32 43 34 9 19 4 5 10 7 100 86 68 48 34 29 25 21 19 16 12 9 7
TP-05 0-1 17 30 16 14 0.88 0.1
TP-05 2-3 11 0 0 0 0 65 0 2 63 35 100 100 100 100 100 100 100 100 99 98 84 61 35
TP-05 4.5-5.5 17 23 16 7 0.44 0.2
TP-06 3-4 18 36 18 18 1 0.0
TP-07 4-5 20 42 19 23 1.21 0.0
TP-08 3-4 21 30 20 10 0.5 0.1
TP-08 7-7.5 19 32 18 14 0.78 0.1
TP-09 3-4 23 0 1 0 1 58 0 2 56 42 100 100 100 100 100 100 100 99 99 98 88 69 42
TP-10 3-4 13 33 17 16 0.94 -0.2
TP-11 2-3 25 0 0 0 0 49 0 1 48 51 100 100 100 100 100 100 100 100 100 99 95 80 51
Notes: a: Moisture content performed on minus 3/4 inch material b: LL = Liquid Limit; PL = Plastic Limit; PI = Plasticity Index
Table 2 Summary of Laboratory Test Results
M o is tu re c o n te n t a
Atterberg Limits b
D ry u n it w e ig h t (p c f)
M o is t S a t.
u n it w e ig h t
(p c f)
Grain-Size Analysis (Percent Finer)Grain-Size
Naples
Vernal
Figure 1
0 5,000 10,0002,500
FeetSteinaker Service Canal Enclosure
Vicinity Map
J
P R
O J E
C T
S \2
\1
G
C I3
S te in a k e rS e rv ic e C a n a l\ D ra w in g s \A rc G
IS
\W o rk
\V ic in it y M a p
.m x d
/2
/2
:2
:1
P
M
LEGEND
Steinaker Service Canal
Municipalities
Steinaker Reservoir
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
2500 South
3500 South
4000 South
4500 South
5000 South
H i g h w a y
/ 1
E a s t
H i g h w a y
E a s t
V e rn a l A v e n u e
W e s t
TP-11
TP-10
TP-09
TP-08
TP-07
TP-06
TP-05
TP-04
TP-03
TP-02
TP-01
Figure 2
0 1,200 2,400600
FeetSteinaker Service Canal Enclosure
Test Pit Location Map
J
P R
O J E
C T
S \2
\1
G
C I3
S te in a k e rS e rv ic e C a n a l\ D ra w in g s \A rc G
IS
\W o rk
\T e s t
P it L o c a ti o n M a p
.m x d
/2
/2
:2
:2
P
M
LEGEND
!A Test Pit Locations
Steinaker Service Canal
CLAY, with sand, moist, light reddish brown, with rootlets and pinholes, (CL)
CLAY, silty with sand and gravel, moist, light reddish brown, with rootlets, (CL-ML)
GRAVEL, clayey with sand and cobbles, moist, light reddish brown, sub-rounded, with occasional 12 inch boulders, (GP-GC)
Bottom of Test Pit at 8.0 feet
N u m b e r
S a m p le T y p e
D e p th fe e t
FIELD NOTES
G ra p h ic L o g
MATERIAL DESCRIPTION
E le v a ti o n fe e t
Groundwater Level (feet) N/E
Logged By
Approximate Width (feet) 3
R. Cole
East/West
B. Conder
8.0
Excavation Equipment
4/2/13
John Deere 410J Backhoe
Approximate Length (feet)
Date Measured
Excavation Contractor
Date(s) Excavated
5431.0
Comments
Approximate Depth (feet)
4/2/13 Approximate Surface Elevation (feet)
Approximate Pit TrendUintah Water Conservancy District
Checked By
Figure 3
Log of Test Pit TP-01Project Location: Uintah County
Project: Steinaker Service Canal Enclosure
Project Number: 13GCI314
T E
S T
P
IT
S
T H
O L
E L
O G
S
S T
E
IN
A K
E R
.G
J
G
R H
A R
T .G
D
/2
/1
GRAVEL, clayey with sand, moist, light reddish brown, subrounded, with rootlets, (GC)
GRAVEL, clayey with sand, moist, light reddish brown, cemented, (GC)
GRAVEL, with sand and cobbles, moist, light reddish brown, subrounded, cobbles to 12 inches, (GW)
Bottom of Test Pit at 8.0 feet
N u m b e r
S a m p le T y p e
D e p th fe e t
FIELD NOTES
G ra p h ic L o g
MATERIAL DESCRIPTION
E le v a ti o n fe e t
Groundwater Level (feet) N/E
Logged By
Approximate Width (feet) 3.5
R. Cole
North/South
B. Conder
8.0
Excavation Equipment
4/2/13
John Deere 410J Backhoe
Approximate Length (feet)
Date Measured
Excavation Contractor
Date(s) Excavated
5432.0
Comments
Approximate Depth (feet)
4/2/13 Approximate Surface Elevation (feet)
Approximate Pit TrendUintah Water Conservancy District
Checked By
Figure 4
Log of Test Pit TP-02Project Location: Uintah County
Project: Steinaker Service Canal Enclosure
Project Number: 13GCI314
T E
S T
S
T H
O L
E L
O G
S
S T
E
IN
A K
E R
.G
R H
A R
T .G
- Maximum reach of backhoe
CLAY, with sand, moist, light brown grades to light reddish brown, (CL)
Bottom of Test Pit at 7.5 feet
N u m b e r
S a m p le T y p e
D e p th fe e t
FIELD NOTES
G ra p h ic L o g
MATERIAL DESCRIPTION
E le v a ti o n fe e t
Groundwater Level (feet) N/E
Logged By
Approximate Width (feet) 3
R. Cole
North/South
B. Conder
7.5
Excavation Equipment
4/2/13
John Deere 410J Backhoe
Approximate Length (feet)
Date Measured
Excavation Contractor
Date(s) Excavated
5433.0
Comments
Approximate Depth (feet)
4/2/13 Approximate Surface Elevation (feet)
Approximate Pit TrendUintah Water Conservancy District
Checked By
Figure 5
Log of Test Pit TP-03Project Location: Uintah County
Project: Steinaker Service Canal Enclosure
Project Number: 13GCI314
T E
S T
S
T H
O L
E L
O G
S
S T
E
IN
A K
E R
.G
R H
A R
T .G
CLAY, with sand, moist, mottled light yellow brown to reddish brown, (CL) FILL
CLAY, sandy, moist, dark brown to black, with roots and organics, (CL)
CLAY, with sand, wet, reddish brown, with rootlets, (CL)
GRAVEL, with clay, sand and cobbles, wet, light brown, subrounded, (GW-GC)
Bottom of Test Pit at 8.0 feet
N u m b e r
S a m p le T y p e
D e p th fe e t
FIELD NOTES
G ra p h ic L o g
MATERIAL DESCRIPTION
E le v a ti o n fe e t
Groundwater Level (feet) 6
Logged By
Approximate Width (feet) 3
R. Cole
Northeast/Southwest
B. Conder
8.0
Excavation Equipment
4/2/13
John Deere 410J Backhoe
Approximate Length (feet)
Date Measured
Excavation Contractor
Date(s) Excavated
5434.0
Comments
Approximate Depth (feet)
4/4/13 Approximate Surface Elevation (feet)
Approximate Pit TrendUintah Water Conservancy District
Checked By
Figure 6
Log of Test Pit TP-04Project Location: Uintah County
Project: Steinaker Service Canal Enclosure
Project Number: 13GCI314
T E
S T
S
T H
O L
E L
O G
S
S T
E
IN
A K
E R
.G
R H
A R
T .G
- Fill deposits located upstream from siphon under road
CLAY, with sand, moist, dark grayish brown, (CL) FILL
SAND, clayey, moist, reddish brown, fine grained, (SC)
GRAVEL, clayey with sand, moist, light reddish brown, subrounded, (GC)
CLAY, silty with sand, moist, mottled reddish brown to light reddish brown, (CL-ML)
GRAVEL, clayey with sand and cobbles, moist, reddish brown, subrounded, cobbles to 8 inches, (GC)
Bottom of Test Pit at 8.0 feet
N u m b e r
S a m p le T y p e
D e p th fe e t
FIELD NOTES
G ra p h ic L o g
MATERIAL DESCRIPTION
E le v a ti o n fe e t
Groundwater Level (feet) N/E
Logged By
Approximate Width (feet) 3
R. Cole
Northeast/Southwest
B. Conder
8.0
Excavation Equipment
4/2/13
John Deere 410J Backhoe
Approximate Length (feet)
Date Measured
Excavation Contractor
Date(s) Excavated
5435.0
Comments
Approximate Depth (feet)
4/2/13 Approximate Surface Elevation (feet)
Approximate Pit TrendUintah Water Conservancy District
Checked By
Figure 7
Log of Test Pit TP-05Project Location: Uintah County
Project: Steinaker Service Canal Enclosure
Project Number: 13GCI314
T E
S T
S
T H
O L
E L
O G
S
S T
E
IN
A K
E R
.G
R H
A R
T .G
CLAY, moist to wet, mottled olive gray to olive brown, varved, blocky structure, weathered bedrock, iron oxide staining, (CL)
Bottom of Test Pit at 6.0 feet
N u m b e r
S a m p le T y p e
D e p th fe e t
FIELD NOTES
G ra p h ic L o g
MATERIAL DESCRIPTION
E le v a ti o n fe e t
Groundwater Level (feet) 4
Logged By
Approximate Width (feet) 3
R. Cole
East/West
B. Conder
6.0
Excavation Equipment
4/2/13
John Deere 410J Backhoe
Approximate Length (feet)
Date Measured
Excavation Contractor
Date(s) Excavated
5436.0
Comments
Approximate Depth (feet)
4/4/13 Approximate Surface Elevation (feet)
Approximate Pit TrendUintah Water Conservancy District
Checked By
Figure 8
Log of Test Pit TP-06Project Location: Uintah County
Project: Steinaker Service Canal Enclosure
Project Number: 13GCI314
T E
S T
S
T H
O L
E L
O G
S
S T
E
IN
A K
E R
.G
R H
A R
T .G
CLAY, with sand, moist, dark brown, (CL) FILL
CLAY, moist, olive gray to olive brown, varved, blocky structure, weathered bedrock, iron oxide staining, (CL)
Bottom of Test Pit at 7.0 feet
N u m b e r
S a m p le T y p e
D e p th fe e t
FIELD NOTES
G ra p h ic L o g
MATERIAL DESCRIPTION
E le v a ti o n fe e t
Groundwater Level (feet) N/E
Logged By
Approximate Width (feet) 3
R. Cole
North/South
B. Conder
7.0
Excavation Equipment
4/2/13
John Deere 410J Backhoe
Approximate Length (feet)
Date Measured
Excavation Contractor
Date(s) Excavated
5436.0
Comments
Approximate Depth (feet)
4/2/13 Approximate Surface Elevation (feet)
Approximate Pit TrendUintah Water Conservancy District
Checked By
Figure 9
Log of Test Pit TP-07Project Location: Uintah County
Project: Steinaker Service Canal Enclosure
Project Number: 13GCI314
T E
S T
S
T H
O L
E L
O G
S
S T
E
IN
A K
E R
.G
R H
A R
T .G
CLAY, moist, dark brown, with rootlets, (CL) FILL
CLAY, with sand, moist, olive gray to olive brown, varved, blocky structure, weathered bedrock, (CL)
Bottom of Test Pit at 7.5 feet
N u m b e r
S a m p le T y p e
D e p th fe e t
FIELD NOTES
G ra p h ic L o g
MATERIAL DESCRIPTION
E le v a ti o n fe e t
Groundwater Level (feet) 4
Logged By
Approximate Width (feet) 3
R. Cole
Northeast/Southwest
B. Conder
7.5
Excavation Equipment
4/2/13
John Deere 410J Backhoe
Approximate Length (feet)
Date Measured
Excavation Contractor
Date(s) Excavated
5437.0
Comments
Approximate Depth (feet)
4/4/13 Approximate Surface Elevation (feet)
Approximate Pit TrendUintah Water Conservancy District
Checked By
Figure 10
Log of Test Pit TP-08Project Location: Uintah County
Project: Steinaker Service Canal Enclosure
Project Number: 13GCI314
T E
S T
S
T H
O L
E L
O G
S
S T
E
IN
A K
E R
.G
R H
A R
T .G
- Trench walls collapsed during excavation beginning at 2.0 feet
- Test pit terminated due to collapsing trech walls
CLAY, with sand, wet, dark brown, with rootlets, (CL) FILL
SAND, clayey, wet, reddish brown, fine grained, (SC)
Bottom of Test Pit at 5.5 feet
N u m b e r
S a m p le T y p e
D e p th fe e t
FIELD NOTES
G ra p h ic L o g
MATERIAL DESCRIPTION
E le v a ti o n fe e t
Groundwater Level (feet) 1
Logged By
Approximate Width (feet) 6
R. Cole
East/West
B. Conder
5.5
Excavation Equipment
4/2/13
John Deere 410J Backhoe
Approximate Length (feet)
Date Measured
Excavation Contractor
Date(s) Excavated
5438.0
Comments
Approximate Depth (feet)
4/2/13 Approximate Surface Elevation (feet)
Approximate Pit TrendUintah Water Conservancy District
Checked By
Figure 11
Log of Test Pit TP-09Project Location: Uintah County
Project: Steinaker Service Canal Enclosure
Project Number: 13GCI314
T E
S T
S
T H
O L
E L
O G
S
S T
E
IN
A K
E R
.G
R H
A R
T .G
- 2 to 3 inches of standing water in canal
- Difficult excavation
- Maximum reach of backhoe
CLAY, with sand, wet, dark brown, with rootlets, (CL) FILL
CLAY, moist, olive brown, blocky structure, weathered bedrock, iron oxide staining, (CL)
Bottom of Test Pit at 4.0 feet
N u m b e r
S a m p le T y p e
D e p th fe e t
FIELD NOTES
G ra p h ic L o g
MATERIAL DESCRIPTION
E le v a ti o n fe e t
Groundwater Level (feet) N/E
Logged By
Approximate Width (feet) 3
R. Cole
East/West
B. Conder
4.0
Excavation Equipment
4/2/13
John Deere 410J Backhoe
Approximate Length (feet)
Date Measured
Excavation Contractor
Date(s) Excavated
5438.0
Comments
Approximate Depth (feet)
4/2/13 Approximate Surface Elevation (feet)
Approximate Pit TrendUintah Water Conservancy District
Checked By
Figure 12
Log of Test Pit TP-10Project Location: Uintah County
Project: Steinaker Service Canal Enclosure
Project Number: 13GCI314
T E
S T
S
T H
O L
E L
O G
S
S T
E
IN
A K
E R
.G
R H
A R
T .G
- 12 inches of standing water in canal
- Trench walls collapsed during excavation beginning at 1.0 feet
- Test pit terminated due to collapsing trech walls
CLAY, with sand, wet, dark brown to black, with rootlets, (CL) FILL
CLAY, sandy, wet, brown, (CL)
Bottom of Test Pit at 4.0 feet
N u m b e r
S a m p le T y p e
D e p th fe e t
FIELD NOTES
G ra p h ic L o g
MATERIAL DESCRIPTION
E le v a ti o n fe e t
Groundwater Level (feet) 0
Logged By
Approximate Width (feet) 5
R. Cole
Northeast/Southwest
B. Conder
4.0
Excavation Equipment
4/2/13
John Deere 410J Backhoe
Approximate Length (feet)
Date Measured
Excavation Contractor
Date(s) Excavated
5438.0
Comments
Approximate Depth (feet)
4/2/13 Approximate Surface Elevation (feet)
Approximate Pit TrendUintah Water Conservancy District
Checked By
Figure 13
Log of Test Pit TP-11Project Location: Uintah County
Project: Steinaker Service Canal Enclosure
Project Number: 13GCI314
T E
S T
S
T H
O L
E L
O G
S
S T
E
IN
A K
E R
.G
R H
A R
T .G
Other Material Symbols Sample Types
Boulders / Cobbles COBBLES
BOULDERS
Liquid limit (%)
Plasticity Chart
Criteria 1/16" to 1/2" 1/2" to 12" <= 1 per ft. thickness > 1 per ft. thickness
GW
GP
GM
GC
SW
SP
SM
SC
CL
ML
OL
CH
MH
OH
> 50% (by volume) particles > 3"
Topsoil
Boulders (>12"); Cobbles (>3" and <12")
P la st ic ity in de x
Stratification
SPT
<4
4-10
10-30
30-50
>50 Description
Boulder
Cobble
Coarse Gravel
Fine Gravel
Coarse Sand
Medium Sand
Fine Sand
Criteria
>12" : larger than a basketball
3-12" : larger than a grapefruit
3/4-3" : larger than a grape
No.4-3/4" : larger than a pea
No.10-4 : larger than rock salt grain
No.40-4 : larger than window screen opening
No.200-40 : larger than a sugar grain
Descriptors for Particle Size
Descriptios for Particle Angularity Description Angular Subangular Subrounded Rounded
Criteria Sharp edges, rel. plane sides, unpolished surface Similar to angular, but with rounded edges Nearly plane sides, well-rounded corners & edges Smoothly curved sides and no edges
Abbreviated Soil Classification Symbols (after ASTM D2488 X.5)
Prefix Suffix s = sandy s = with sand g = gravelly g = with gravel c = with cobbles b = with boulders
Abbreviated system for supplementary presentations when complete description is referenced. Examples:
Group Symbol and Full Name Abbreviated Sandy Lean CLAY (CL) s(CL) Poorly Graded SAND with silt and gravel (SP-SM)g Poorly Graded GRAVEL with sand, cobbles, (GP)scb and boulders (GP) Gravelly SILT with sand and cobbles (ML) g(ML)sc
General Notes:
1) Strata graphic lines on the logs represent approximate boundaries.
2) No warranty is provided as to the continuity of soil conditions between points explored and sample locations.
3) Logs represent soil conditions observed at the point of exploration on the date indicated.
4) Visual methods were used to classify the materials in general accordance with the Unified Soils Classification Systems; actual designations based on laboratory methods may vary.
Dr (%)
0-15
15-35
35-65
65-85
85-100
Modifiers Est. (%)
<5
5-12
>12
Description
Trace
Some
With
Figure 14
Asphalt
Auger Cuttings California Sampler
Continuous sampler Rock Core
Grab Sample Modified California Sampler
No Recovery Other (see remarks)
Shelby Tube Piston Sampler (Shelby Tube)
Standard Penetration Test (SPT) Split Spoon
Cont. Sample Vane Shear
Major Soil Divisions
>50% of coarse fraction retained on No. 4 Sieve
SILTS and CLAYS liquid limit < 50
FI
N
E -G
R A
IN
E
D S
O
IL
S >5
0% P as si ng N o.
S ie ve
C O
A R
S E
-G R
A
IN
E D
S O
IL
S
>5 0% re ta in ed on N o.
si ev e
>50% of coarse fraction passing the No. 4 sieve
SILTS and CLAYS liquid limit < 50
1) CF > 30%: + Sandy/Gravelly
2) CF = 15-30% + with sand/gravel
Inorganic
Organic
1) CF > 30%: + Sandy/Gravelly
2) CF = 15-30% + with sand/gravel
Inorganic
Organic
OH & MH
Description Seam Layer Occasional Frequent
MC
<6
6-15
15-42
42-72
>72
Clean GRAVELS (little or no fines)
GRAVELS with fines (appreciable amount of fines)
SANDS with fines (appreciable amount of fines)
Clean SANDS (little or no fines)
Typical Names
GRAVELS
Material Types
SANDS
Group Symbol and Legend
Primarily Organic Matter; Organic Odor PEATPT
Well-Graded GRAVEL, GRAVEL-sand mixtures, few fines
Poorly-Graded GRAVEL, GRAVEL-sand mixtures, few fines
Silty GRAVEL, GRAVEL-sand silt mixtures
Clayey GRAVEL, GRAVEL-sand clay mixtures
Well-Graded SAND, SAND-gravel mixtures, few fines
Poorly-Graded SAND, SAND-gravel mixtures, few fines
Silty SAND, SAND-silt mixtures
Clayey SAND, SAND-clay mixtures
Lean CLAY, Gravelly/Sandy CLAY, low to med. plasticity
SILT, Gravelly/Sandy SILT, no to slight plasticity
Organic CLAY or SILT
Fat CLAY, Gravelly/Sandy Fat CLAY, high plasticity
Elastic SILT, Gravelly/Sandy Elastic SILT, low to high plasticity
Organic CLAY or SILT
Highly orgainc soils
CL
CH
0 10 20 30 40 50 60 70 80 90 100 110 120
Concrete
Fill
Bedrock
"A" LINE
CL-ML
Consistency very soft soft med. stiff stiff very stiff hard
Descriptors for Coarse Grained Soils
Descriptors for Fine Grained Soils
Apparent Density very loose loose med. dense dense very dense
SPT
<2
2-4
4-8
8-15
15-30
>30
MC
<2
2-4
4-10
10-19
19-37
>37
CAL
<2
2-5
5-11
11-22
22-45
>45
SPT - Standard split spoon (SPT): 2" OD, 1.375" ID MC - Modified California: 2.5" OD, 1.875" ID CAL - California: 3" OD, 2.375" ID
CAL
<8
8-20
20-56
56-96
>96
Apparent water level Measured water level
Descriptors for Moisture
Su (psf)
< 250
250-500
500-1000
1000-2000
2000-4000
>4000
Criteria
Absence of moisture, dusty, dry to the touch
Damp but no visible water
Visible free water, usually soil is below water table
Description
Dry
Moist
Wet
Unified Soil Classification System (USCS)
Legend to Soil Descriptions
100 10 1 0.1 Grain size (mm) [40]
P e rc e n t fi n e r b y w e ig h t
[2
12-in 5-in 4-in 3-in 1.5-in 3/4-in 3/8-in No.4 No.10 No.20 No.40 No.60 No.100 No.200
COBBLES
coarse
GRAVEL
fine coarse medium
SAND
fine
FINES
TP-01 at 6-7
TP-02 at 4.5-5.5
TP-04 at 4.5-5
TP-04 at 7-8
TP-05 at 2-3
TP-09 at 3-4
TP-11 at 2-3
Steinaker Service Canal Enclosure (13GCI314) Figure 15
Grain-Size Analysis
0 10 20 30 40 50 60 70 80 90
Liquid limit, LL (%)
P la s ti c it y in d e x P I
Low Plasticity Medium Plasticity High Plasticity Very High Plasticity
CL-ML
CL
ML
CH
MH
10 20 30 40 50 60
PL (%)
P I
CI=0.2
CI=0.4
CI=0.6
CI=0.8
CI=1.0
(SILT)
(slightly clayey SILT)
(clayey SILT)
(very silty CLAY)
(silty CLAY)
(CLAY)
TP-01 at 1-2
TP-01 at 4-5
TP-03 at 3-4
TP-04 at 1-2
TP-05 at 0-1
TP-05 at 4.5-5.5
TP-06 at 3-4
TP-07 at 4-5
TP-08 at 3-4
TP-08 at 7-7.5
TP-10 at 3-4
Steinaker Service Canal Enclosure (13GCI314)
Casagrande's Plasticity Chart (Atterberg Limits)
Figure 16
U Line A Line
100 1000 10000 200 500 2000 5000 20000
Effective stress (psf)
-0.5
0.5
1.5
2.5
L iq u id it y In d e x (w n P L (L L -P L
TP-01 at 1-2
TP-03 at 3-4
TP-04 at 1-2
TP-05 at 4.5-5.5
TP-06 at 3-4
TP-07 at 4-5
TP-08 at 3-4
TP-08 at 7-7.5
TP-10 at 3-4
Steinaker Service Canal Enclosure (13GCI314)
Sensitivity, LI, and Effective Stress Relationships (Mitchell,1993)
Figure 17
Contours of sensitivity
Figure 18: Sta. 594+00, Completed backfill at TP-01.
Figure 19: Sta. 571+00, Excavating TP-02 from canal invert.
Figure 20: Sta. 571+00, Excavating TP-02 from canal invert.
Figure 21: Sta. 571+00, View of trench walls in TP-02.
Figure 22: Sta. 543+60, View of trench walls in TP-03.
Figure 23: Sta. 543+60, Excavating TP-03 from east canal embankment.
Figure 24: Sta. 515+80, View of trench walls in TP-04.
Figure 25: Sta. 515+80, View of canal at TP-04.
Figure 26: Sta. 487+20, Excavating TP-05 from east canal embankment.
Figure 27: Sta. 487+20, View of canal at TP-05.
Figure 28: Sta. 468+60, Excavating TP-06 from east canal embankment.
Figure 29: Sta. 468+60, Groundwater in the bottom of TP-06.
Figure 30: Sta. 440+00, Excavating TP-07 from east canal embankment.
Figure 31: Sta. 440+00, View of trench walls in TP-07.
Figure 32: Sta. 410+80, Excavating TP-08 from east canal embankment.
Figure 33: Sta. 410+80, View of trench walls in TP-08.
Figure 34: Sta. 382+00, View of trench walls in TP-09 which collapsed during excavation.
Figure 35: Sta. 382+00, Excavating TP-09 from east canal embankment.
Figure 36: Sta. 356+20, Excavating TP-10 from east canal embankment.
Figure 37: Sta. 356+20, View of trench walls in TP-10. Note standing water adjacent to test pit.
Figure 38: Sta. 341+80, View of trench walls in TP-11 which collapsed during excavation.
Figure 39: Sta. 341+80, View of canal at TP-11. Note standing water adjacent to test pit.
should be maintained a minimum of 2 feet below the base of excavation while excavation is open. Temporary shoring / trench boxes and/or significantly flatter slopes should be used when dewatering cannot achieve the 2 feet minimum. These areas should be evaluated on a case-by-case basis by a qualified geotechnical engineer during construction.
The contractor should be aware that dewatering will be needed during construction. In order to maintain groundwater levels a minimum of 2 feet below the base of excavation, we anticipate groundwater levels will need to be lowered on the order of 8 to 10 feet.
Dewatering systems should be designed to prevent migration of finer materials, quick conditions, and subgrade softening.
The contractor should rely upon his own methods to determine and maintain safe and stable slopes during construction subject to his particular construction procedures and to those subsurface conditions more fully exposed during construction. All excavations should comply at a minimum with the Occupational Safety and Health Administration’s (OSHA) construction standards for excavations and any other applicable standards. All excavations should be observed by qualified personnel. The Contractor is ultimately responsible for trench and site safety.
COLLAPSIBLE SOILS
Materials with collapse potential were observed in TP-01, TP-02, TP-04, TP-08, TP-09, TP- 10, and TP-11. In general these materials were observed in the upper 2 feet, with the exception of TP-01 where pinhole structure was observed as deep as 4 feet. These types of materials have the potential to produce differential settlements and pose risks to the steel pipe portions of the project. HDPE pipe areas will likely accommodate differential movement and therefore reduce the risk. Materials with collapse potential can typically be identified by their pinhole structure. These materials when found near the pipe alignment should be overexcavated and replaced. We recommend excavations in these areas be observed by a qualified geotechnical engineer during construction.
SUITIBILITY OF BACKFILL
Based on the data collected we believe the onsite materials are suitable for general backfill beyond the import/select backfill areas around the pipe. The medium plasticity materials (liquid limits greater than 35) have the potential to swell and should not be used as structural fill (i.e. beneath footings, pavements, or concrete flatwork). These materials can be used as general fill placed a minimum of 2 feet beyond any pipe works.
Trench backfill placed beneath structures, pavements or concrete flatwork should be compacted to at least 98 percent of the maximum density determined by ASTM D-698 (standard proctor) in accordance with APWA standards, unless more stringent requirements apply as outlined by the city, county or improvement district. Structural fill should be placed in maximum 8-inch loose lifts (prior to compaction). Lift thickness should be decreased to 6-inches in areas were lighter compaction equipment is used.
SOIL CORROSION POTENTIAL
In order to evaluate soil corrosion potential, we recommend that native soil samples be collected at a maximum spacing of 1000 feet from Stations 343+00 to 443+00. The native soil samples should be tested to measure concentrations of soluble chlorides, soluble sulfates, pH, and resistivity.
A recent study by Decker et al. (2008) on several exhumed 34 to 38 year old steel sections suggest critical zones for corrosion include a) the water table fluctuation zone and b) subsurface zones where two adjacent soil zones exhibit large differences in resistivity, pH, moisture, aeration, and cation/anion concentrations. Based on our understanding of the proposed construction, the steel pipe will be located within water table fluctuation zones. As such we recommend the designer address corrosion potential of steel elements in contact with native soils. Furthermore, we recommend the designer address deterioration of concrete elements due to sulfate attack in their design.
CONTROLLED LOW STRENGTH MATERIALS (CLSM)
Controlled Low Strength Material (CLSM) has been successfully used as backfill in pipeline trenches for many years. Traditionally, here in Utah, CLSM has consisted of fine aggregates, cement, and fly ash and has been batched at concrete manufacturing facilities and transported to the site in mixer trucks. Trench-side processes typically involve not only mixing CLSM materials at trench-side, but also using trench-side materials rather than exclusive fine aggregates. Cement and fly ash proportions in these processes are generally elevated, but these costs can often be offset by transportation costs associated with fine aggregates. An evaluation of trench-side processes and CSLM uses were outside our scope, however some general guidelines are summarized below.
• Trench-side CLSM processes and use of trench-side materials is probable; if utilized, native material soil types would need to be adequately defined in addition to a more thorough understanding of groundwater levels.
• Contractor shall submit mix designs which show the proportions and gradations of all materials proposed for use in CLSM. Contractor’s mix designs would need to address the full range of expected native soil types based on samples of the anticipated soils.
Additional site characterization (test pits and sampling) beyond ½ mile spacing would be needed to perform an assessment of trench-side processing.
LIMITATIONS
Recommendations contained in this report are based on a limited field study, and our understanding of the proposed construction plan. If the scope of the proposed construction plan changes from that described in this report, our firm should also be notified.
This report was prepared in accordance with the generally accepted standard of practice at the time the report was written. No warranty, expressed or implied, is made.
It is the Client's responsibility to see that all parties to the project including the Designer, Contractor, Subcontractors, etc. are made aware of this report in its entirety. The use of information contained in this report for bidding purposes should be done at the Contractor's option and risk.
REFERENCES
Decker, J.B., Rollins, K.M., and Ellsworth, J.C. (2008). "Corrosion Rate Evaluation and Prediction for Piles Based on Long-Term Field Performance." J. Geotechnical and Geoenvironmental Engineering. 134 (3).
Gerhart Cole (2013). “Geotechnical Study – Steinaker Service Canal Enclosure,” proposal to Bowen Collins and Associates.
Gerhart Cole (2013). “Geotechnical Study – Steinaker Service Canal Enclosure,” letter prepared for Bowen Collins and Associates
| 13GCI314_LetterReport |
| 13GCI314_SteinakerTM-Recommendations |
File details come from the government source that posted it. Updated .