Sol_R15PS00272.pdf
PDF 1 MB Posted
- Solicitation number
- R15PS00272
About this file
R15PS00272
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_R15PS00272_Amd_000006.pdf | ||
| Sol_R15PS00272_Amd_000005.pdf | ||
| Sol_R15PS00272_Amd_000004.pdf | ||
| Sol_R15PS00272_Amd_000003.pdf | ||
| Sol_R15PS00272_Amd_000002.pdf | ||
| Sol_R15PS00272_Amd_000001.pdf | ||
| Sol_Attach_6.pdf | ||
| Sol_Attach_9.pdf | ||
| Sol_Attach_3.pdf | ||
| Sol_Attach_4.pdf | ||
| Sol_Attach_7.pdf | ||
| R15PS00272_Attachment_J-1_SOW.pdf | ||
| Sol_Attach_8.pdf | ||
| Sol_Attach_5.pdf | ||
| Sol_Attach_2.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040192243
Bureau of Reclamation
Upper Colorado Region
See Administered By Office 84138
R41
Bureau of Reclamation, Upper Colorado Region
Attn. UC-841 (Richard Beeman) 125 South State Street, Room 8100 Salt Lake City, UT 84138
Richard Beeman
1x 01/29/2015
R15PS00272
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Replacement of the main step up transformers and associated equipment at Glen Canyon
Power Plant. The construction component is expexted to exceed $10 million.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
30 1825 calendar days and complete it within ________________ ________________ calendar days after receiving
Clause F-2
03/12/2015
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Carolyn A. Smith
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 149
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
R15PS00272
FOB: Destination
00010 Replace Main Step Up Transformer & ISO Phase Bus
(Price Schedule A)
Delivery: 11/01/2016
Delivery Location Code: 0009910010
Bureau of Reclamation-UC-GCFD
Glen Canyon Field Division
Page AZ 86040-1477 US
00020 Replace Main Step Up Transformer & ISO Phase Bus
(Price Schedule B)
Delivery: 06/01/2016
Delivery Location Code: 0009910010
Bureau of Reclamation-UC-GCFD
Glen Canyon Field Division
805 Bureau St, PO Box 1477
Page AZ 86040-1477 US
00030 Replace main Step Up Transformers & ISO Phase Bus
(Price Schedule C)
Delivery: 11/01/2016
Delivery Location Code: 0009910010
Bureau of Reclamation-UC-GCFD
Glen Canyon Field Division
805 Bureau St, PO Box 1477
Page AZ 86040-1477 US
00040 Replace main Step Up Transformers & ISO Phase Bus
(Price Schedule D)
Delivery: 06/01/2017
Delivery Location Code: 0009910010
Bureau of Reclamation-UC-GCFD
Glen Canyon Field Division
805 Bureau St, PO Box 1477
Page AZ 86040-1477 US
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 149
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
R15PS00272
00050 Replace main Step Up Transformers & ISO Phase Bus
(Price Schedule E)
Delivery: 11/01/2017
Delivery Location Code: 0009910010
Bureau of Reclamation-UC-GCFD
Glen Canyon Field Division
805 Bureau St, PO Box 1477
Page AZ 86040-1477 US
00060 Replace main Step Up Transformers & ISO Phase Bus
(Price Schedule F)
Delivery: 06/01/2018
Delivery Location Code: 0009910010
Bureau of Reclamation-UC-GCFD
Glen Canyon Field Division
805 Bureau St, PO Box 1477
Page AZ 86040-1477 US
00070 Replace main Step Up Transformers & ISO Phase Bus
(Price Schedule G)
Delivery: 11/01/2018
Delivery Location Code: 0009910010
Bureau of Reclamation-UC-GCFD
Glen Canyon Field Division
805 Bureau St, PO Box 1477
Page AZ 86040-1477 US
00080 Replace main Step Up Transformers & ISO Phase Bus
(Price Schedule H)
Delivery: 06/03/2019
Delivery Location Code: 0009910010
Bureau of Reclamation-UC-GCFD
Glen Canyon Field Division
805 Bureau St, PO Box 1477
Page AZ 86040-1477 US
00090 Replace main Step Up Transformers & ISO Phase Bus
(Price Schedule H)
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
5 149
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
R15PS00272
(Option Line Item)
1 Days After Award
Delivery: 06/03/2019
Delivery Location Code: 0009910010
Bureau of Reclamation-UC-GCFD
Glen Canyon Field Division
805 Bureau St, PO Box 1477
Page AZ 86040-1477 US
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
SOLICITATION NO. R15PS00272
GSU Transformers and Associated Equipment Replacements
Glen Canyon Power Plant Middle River Division – Glen Canyon Unit – Arizona – Utah
Colorado River Storage Project
GSU Transformers and Associated Equipment Replacements Glen Canyon Power Plant
Middle River Division – Glen Canyon Unit – Arizona – Utah Colorado River Storage Project
FOREWORD
Work is located approximately 3 miles northwest of Page, Arizona in Coconino County.
Principal components of work include removing and disposing of existing GSU power transformers, furnishing, testing, and installing new GSU power transformers; removing and disposing existing isolated phase bus and bushing connecting GSU power transformers to generator synchronizing breakers, furnishing, testing and installing new isolated phase bus and bushing connecting GSU power transformers to generator synchronizing breakers; removing and disposing existing isolated phase bus between the generator synchronizing breakers and the generators, furnishing, testing and installing new isolated phase bus between the generator synchronizing breakers and the generators; removing and disposing existing potential transformers, generator surge protectors and associated cubicles attached to existing isolated phase bus, furnishing, testing and installing new potential transformers, generator surge protectors and associated cubicles; removing and disposing existing generator output bushings, furnishing, testing and installing new generator output bushings; constructing new cast-in-place concrete fire walls; furnishing and installing new transformer seismic anchorage systems;
removing and disposing of existing oil-spill containment systems; and furnishing and installing new oil-spill containment systems.
PRE-BID SITE VISIT: A PREBID SITE VISIT WILL BE HELD ON February 18, 2015, FROM THE CARL HAYDEN VISITOR’S CENTER AT GLEN CANYON DAM, PAGE, AZ, BEGINNING AT 9:00 AM MOUNTAIN STANDARD TIME. PARTIES PLANNING
TO ATTEND THE SITE VISIT MUST SEND THE COMPANY NAME, AND NAME OF
ATTENDEES, IN WRITING, TO:
MATT JACKSON, GC-200
GLEN CANYON FIELD DIVISION
P.O. BOX 1477
PAGE, ARIZONA, 86040-1477
EMAIL: MBJACKSON@USBR.GOV
AT LEAST THREE DAYS BEFORE THE DATE OF THE SITE VISIT.
FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S PUBLICATION
"RECLAMATION SAFETY AND HEALTH STANDARDS" (2009 EDITION) WHICH IS
APPLICABLE TO WORK UNDER THIS CONTRACT, SEE CLAUSE AT "WBR
1452.223-81 SAFETY AND HEALTH."
mailto:MBJACKSON@usbr.gov
Contents
SECTION B - Supplies Or Services And Prices
SECTION C – Description / Specifications / Statement of work
SECTION D – Packaging and Marking
SECTION E -- Inspection and Acceptance
E.1 52.246-02 Inspection Of Supplies--Fixed Price August 1996
E.2 52.246-16 Responsibility For Supplies April 1984
E-3 52.246-12 Inspection of Construction August 1996
SECTION F -- Deliveries or Performance
F.1 52.247-34 F.O.B. Destination November 1991
F.2 52.252-02 Clauses Incorporated By Reference
F.3 52.211-10 Commencement, Prosecution, and Completion of Work April 1984
F.4 52.211-12 Liquidated Damages—Construction September 2000
F.5 52.211-13 Time Extensions September 2000
F.6 52.211-18 Variation in Estimated Quantity April 1984
F.7 52.252-02 Clauses Incorporated By Reference
SECTION G -- Contract Administration Data
G.1 1452.201-70 Authorities and Delegations September 2011
G.2 DIAPR 2011-04 Electronic Invoicing and Payment Requirements-Internet Payment Platform (IPP)
G.3 WBR 1452.242-80 Postaward Conference--Bureau of Reclamation July 1993
SECTION H -- Special Contract Requirements
H.1 DIAPR 2010-14 Contractor Performance Assessment Reporting System July 2010
SECTION I -- Contract Clauses
I.1 52.252-02 Clauses Incorporated By Reference
I.2 52.232-01 Payments April 1984
I.3 52.232-09 Limitation on Witholding of Payment April 1984
I.4 52.232-11 Extras April 1984
I.5 52.232-25 Prompt Payment July 2013
I.6 52.246-18 Warranty Of Supplies Of A Complex Nature May 2001
I.7 WBR 1452.246-81, Alt Vi Failure To Meet Performance Warranties - Alternate Vi--Bureau Of Reclamation September 1995
I.8 52.252-02 Clauses Incorporated By Reference
I.9 1452.204-70 Release of Claims--Department of the Interior July 1996
I.10 52.2204-14 Service Contract Reporting Requirements January 2014
I.11 52.219-14 Limitations On Subcontracting November 2011
I-13 52.225-11 Buy American Act - Construction Materials under Trade Agreements May 2014
I.14 52.228-01 Bid Guarantee September 1996
I.14 52.228-15 Performance and Payment Bonds—Construction October 2010
I.15 52.232-05 Payments under Fixed-Price Construction Contracts May 2014
I.16 52.232-27 Prompt Payment for Construction Contracts May 2014
I.17 52.236-4 Physical Data April 1984
I.18 52.236-06 Superintendence By The Contractor April 1984
I.19 52.236-08 Other Contracts April 1984
I.20 52.236-15 Schedules For Construction Contracts April 1984
I.21 52.236-26 Preconstruction Conference February 1995
I.22 52.246-21 Warranty Of Construction March 1994
I.23 WBR 1452.223-81 Safety and Health--Bureau of Reclamation May 2010
I.24 WBR 1452.231-81 Equipment Ownership and Operating Expense--Bureau of Reclamation July 1998
I.25 WBR 1452.232-81 Alt III Payment for Mobilization and Preparatory Work - Alternate III--Bureau of Reclamation June 2002
I.26 WBR 1452.232-82 Other Invoice Requirements--Bureau of Reclamation July 1998
I.27 WBR 1452.236-84 Preservation of Cultural Resources--Bureau of Reclamation February 2000
I.28 52.252-02 Clauses Incorporated By Reference
I-29 DIAPR 2000-1 Non-Discrimination Notice to US Department of the Interior Contractors, Subcontractors, and Lessors January 2000
I-30 ET 02-20 Authorized Workers Notice to Potential Bureau of Reclamation Contractors September 2002
I.31 1452.203-70 Restriction on Endorsements--Department of the Interior July 1996
I.32 1452.228-70 LIABILITY INSURANCE -- DEPARTMENT OF THE INTERIOR JULY 1996
I.33 1452.236-70 Prohibition Against Use of Lead-Based Paint -- Department of the Interior July 1996
I.34 52.204-09 Personal Identity Verification Of Contractor Personnel January 2011
I.35 52.209-09 Updates Of Publicly Available Information Regarding Responsibility Matters July 2013
I.36 52.219-06 Notice Of Total Small Business Set-Aside November 2011
I.3752.244-06 Subcontracts for Commercial Items October 2014
I.38 52.252-06 Authorized Deviations In Clauses April 1984
I.39 WBR 1452.223-80 Asbestos-Free Warranty--Bureau of Reclamation October 1992
I.40 WBR 1452.223-82 Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace -- Bureau of Reclamation December 2009
I.41 WBR 1452.228-84 Certification of Representatives for Corporate Sureties--Bureau of Reclamation September 1996
I.42 WBR 1452.232-80 Limitation of Funds (Fixed-Price Contract)--Bureau of Reclamation September 2003
I.43 WBR 1452.233-81 Claims Accounting--Bureau of Reclamation July 1993
I.44 WBR 1452.237-80 Security Requirements--Bureau of Reclamation February 2011
I.45 Wbr 1452.243-80 Alt 4 Modification Proposals - Alternate Iv--Bureau Of Reclamation July 1998
SECTION J – List of Attachments
SECTION K -- Representations, Certifications and Other Statements of Offerors
K.1 52.225-18 Place of Manufacture September 2006
K.2 52.203-02 Certificate Of Independent Price Determination April 1985
K.3 52.204-08 Annual Representations and Certifications December 2014
K.4 52.209-07 Information Regarding Responsibility Matters July 2013
K.5 52.236-28 Preparation of Proposals—Construction October 1997
K.6 DIAPR 2012-05 Class Deviation - Limitation with Respect to Felony Criminal Convictions and Delinquent Tax Debts February 2012
K.7 WBR 1452.209-80 Organizational Conflict of Interest -- Bureau of Reclamation July 1997
SECTION L -- Instructions, Conditions and Notices to Bidders
L.1 52.252-01 Solicitation Provisions Incorporated By Reference
L.2 1452.215-71 Use and Disclosure of Proposal Information--Department of the Interior April 1984
L.3 52.215-01 A2 Instructions to Offerors--Competitive Acquisition - Alternate II October 1997
L.4 52.215-20 A4 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data - Alternate IV October 2010
L.5 52.216-01 Type Of Contract April 1984
L.6 52.222-05 Construction Wage Rate Requirements May 2014
L.7 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction February 1999
L.8 52.222-24 Preaward On-Site Equal Opportunity Compliance Review February 1999
L.9 52.225-12 Notice of Buy American Act Requirement - Construction Materials under Trade Agreements May
L.10 52.2233-2 Service of Protest, September 2006
L.11 52.236-27 A1 Site Visit (Construction) - Alternate I February 1995
L.12 52.252-05 Authorized Deviations in Provisioins April 1984
L.13 WBR 1452.211-80 Notice of Intent to Acquire Metric Products and Services -- Bureau of Reclamation March 1993
L.14 WBR 1452.215-80 Source Evaluation and Selection Procedures -- Bureau of Reclamation May 2005
L.15 WBR 1452.215-81 General Proposal Instructions -- Bureau of Reclamation January 1998
L.16 WBR 1452.215-82 Technical Proposal Instructions -- Bureau of Reclamation April 2001
L.17 WBR 1452.215-83 Pricing Proposal Instructions -- Bureau of Reclamation January 1998
L.18 WBR 1452.222-80 Notice of Applicability--Cooperation with Authorities and Remedies - Child Labor-- Bureau of Reclamation January 2004
L.19 WBR 1452.233-82 Notice of Proposed Partnering--Bureau of Reclamation May 1994
L.20 WBR 1452.236-86 Instruction for Mobilization and Preparatory Work Schedule Line Item - Multiple Schedules--Bureau of Reclamation June 2002
SECTION M -- Evaluation Factors for Award
M.1 WBR 1452.215-85 Evaluation Factors for Award -- Quality Predominance -- Bureau of Reclamation May
M.2 WBR 1452.225-82 Notice of World Trade Organization Government Procurement Agreement Evaluations-- Bureau of Reclamation May 2005...147M.3 WBR 1452.246-80 Alt V Evaluation of Equipment Efficiencies and Losses - Alternate V--Bureau of Reclamation September 1995
M.3 WBR 1452.246-80 Alt V Evaluation of Equipment Efficiencies and Losses - Alternate V--Bureau of Reclamation September 1995
M.4 52.217-3 Evaluation Exclusive of Options, April 1984
This page intentionally left blank.
Document No.
R15PS00272
Document Title
GSU Transformers and Associated Equipment Replacement
Continuation of Section B‐Supplies or Services and Price
B.1 Price Schedule
(a) Offers will be considered for award on the following schedules, but no offer will be considered for award on only a part of the schedules.
(b) All offers are subject to the terms and conditions of this solicitation.
(c) The quantities in the schedules are estimated quantities for comparison of offers only, and except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns.
(d) See the contract clause at WBR 1452.232-81 “Payment for Mobilization and Preparatory Work” for CLINs 9, 45, 73, and 102.
(e) Definitions:
CLIN – Contract Line Item Number.
Price Schedule A (SUPPLIES)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 48 19 22 Furnishing and Factory Testing New Generator Isolated Phase Bus and Bushings for Generators 1 and
For the lump sum of $
2 48 19 24 Furnishing and Factory Testing Twelve Potential Transformers, 15kV Surge Arrestors and All Associated Equipment Cubicles for Generators 1 and 2
For the lump sum of $
3 48 19 30 Furnishing and Factory Testing Three New Single Phase 345kV, 125 MVA Transformers – K1A:
For the lump sum of $
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule A (SUPPLIES)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
4 48 19 30 Furnishing and Factory Testing One New Single Phase 345kV, 125 MVA Spare Transformer
For the lump sum of $
5 48 19 30 Perform the Standard or Modified Induced Voltage Test on K1A Transformers
For the lump sum of $
6 48 19 34 Furnishing and Factory Testing New Isolated Phase Bus for Transformer Bank K1A
For the lump sum of $
7 48 19 36 Short Circuit Testing Spare 345kV Power Transformer
For the lump sum of $
8 48 19 32 Furnish Type II Mineral Oil for K1A Transformer Bank and Spare 345kV Transformer
TOTAL FOR Price Schedule A $___________
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule B (CONSTRUCTION)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
9 WBR
1452.23
-81
Mobilization and Preparatory Work
For the lump sum of $
10 52.246-
Extended Warranty for Three Single Phase 345kV, 125 MVA Transformers – K1A
For the lump sum of $
11 52.246-
Extended Warranty for One Single Phase 345kV, 125 MVA Spare Transformer – K1A
For the lump sum of $
12 01 31 30 Contract Document Management System
For the lump sum of $
13 01 33 26 Electrical Drawings and Data For the lump sum of $
14 03 30 00 Concrete 0.32 yd3 $
15 05 12 73 Power Transformer Anchorage Systems
For the lump sum of $
16 05 50 00 Oil Spill Containment For the lump sum of $
17 05 50 04 Removing Existing Oil Spill Protection
For the lump sum of $
18 07 88 10 Modular Fire Barriers For the lump sum of $
19 05 50 04 Reinstalling Existing Oil Spill Protection
For the lump sum of $
20 22 10 04 Removing and Disposing of Cooling Water Piping Systems and Appurtenances for Transformer Bank K1A
For the lump sum of $
21 22 10 12 Furnishing and Installing Cooling Water Systems Pipe, Fittings and Appurtenances for Transformer Bank K1A
For the lump sum of $
22 48 04 00 Removing and Disposing of Existing Isolated Phase Bus for Transformer Bank K1A
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule B (CONSTRUCTION)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
23 48 04 00 Removing and Disposing of Existing Isolated Phase Bus, PT Cubicles, Surge Arrestor Cubicle and Generator Bushing for Generators 1 and
For the lump sum of $
24 48 04 00 Removing and Disposing of Three Existing 345kV Single Phase Transformers - K1A
For the lump sum of $
25 48 04 00 Salvage Credit for Copper in Three Existing Single Phase Transformers – K1A
For the lump sum of $
26 48 04 00 Salvage Credit for Steel and Iron in Three Existing Single Phase Transformers – K1A
For the lump sum of $
27 48 04 00 Removing and Disposing of One Existing Spare Single Phase 345kV Transformer
For the lump sum of $
28 48 04 00 Salvage Credit for Copper in Existing Spare Single Phase 345kV Transformer
For the lump sum of $
29 48 04 00 Salvage Credit for Steel and Iron in Existing Spare Single Phase 345kV Transformer
For the lump sum of $
30 48 04 00 Disposal of Insulation Oil in Three Existing Single Phase 345kV Transformers – K1A
For the lump sum of $
31 48 04 00 Disposal of Insulation Oil in Existing Spare Single Phase 345kV Transformer
For the lump sum of $
32 48 19 22 Installing and Field Testing New Generator Isolated Phase Bus and Bushings for Generators 1 and 2
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule B (CONSTRUCTION)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
33 48 19 24 Installing and Field Testing Twelve Potential Transformers, Six 15kV Surge Arrestors and All Associated Equipment Cubicles for Generators 1 and 2
For the lump sum of $
34 48 19 30 Installing and Field Testing Three New Single Phase 345kV, 125 MVA Transformers – K1A
For the lump sum of $
35 48 19 32 Install Type II Mineral Oil for K1A Transformer Bank and Spare 345kV Transformer
For the lump sum of $
36 48 19 30 Field Test and Prepare for Storage One New Single Phase 345kV, 125 MVA Spare Transformer
For the lump sum of $
37 48 19 30 Provide and Prepare for Storage Extra Materials for 345kV Transformers
For the lump sum of $
38 48 19 34 Installing and Field Testing New Isolated Phase Bus for Transformer Bank K1A
TOTAL FOR Price Schedule B $___________
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule C (SUPPLIES)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
39 48 19 22 Furnishing and Factory Testing New Generator Isolated Phase Bus and Bushings for Generators 3 and 4
For the lump sum of $
40 48 19 24 Furnishing and Factory Testing Twelve Potential Transformers, Six 15kV Surge Arrestors and All Associated Equipment Cubicles for Generators 3 and 4
For the lump sum of $
41 48 19 30 Furnishing and Factory Testing Three New Single Phase 345kV, 125 MVA Transformers – K3A:
For the lump sum of $
42 48 19 30 Perform the Standard or Modified Induced Voltage Test on K3A Transformers
For the lump sum of $
43 48 19 34 Furnishing and Factory Testing New Isolated Phase Bus for Transformer Bank K3A
For the lump sum of $
44 48 19 32 Furnish Type II Mineral Oil for K3A Transformer Bank
TOTAL FOR Price Schedule C $___________
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule D (CONSTRUCTION)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
45 WBR
1452.232
-81
Mobilization and Preparatory Work
For the lump sum of $
46 52.246-21 Extended Warranty for Three Single Phase 345kV, 125 MVA Transformers – K3A
For the lump sum of $
47 01 31 30 Contract Document Management System
For the lump sum of $
48 01 33 26 Electrical Drawings and Data
For the lump sum of $
49 03 30 00 Concrete 0.16 yd3 $
50 05 12 73 Power Transformer Anchorage Systems
For the lump sum of $
51 05 50 00 Oil Spill Containment For the lump sum of $
52 05 50 04 Removing Existing Oil Spill Protection
For the lump sum of $
53 07 88 10 Modular Fire Barriers For the lump sum of $
54 22 10 04 Removing and Disposing of Cooling Water Piping Systems and Appurtenances for Transformer Bank K3A
For the lump sum of $
55 22 10 12 Furnishing and Installing Cooling Water Systems Pipe, Fittings and Appurtenances for Transformer Bank K3A
For the lump sum of $
56 48 04 00 Removing and Disposing of Existing Isolated Phase Bus for Transformer Bank K3A
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule D (CONSTRUCTION)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
57 48 04 00 Removing and Disposing of Existing Isolated Phase Bus, PT Cubicles, Surge Arrestor Cubicle and Generator Bushing for Generators 3 and 4
For the lump sum of $
58 48 04 00 Removing and Disposing of Three Existing 345kV Single Phase Transformers – K3A
For the lump sum of $
59 48 04 00 Salvage Credit for Copper in Three Existing Single Phase Transformers – K3A
For the lump sum of $
60 48 04 00 Salvage Credit for Steel and Iron in Three Existing Single Phase Transformers – K3A
For the lump sum of $
61 48 04 00 Disposal of Insulation Oil in Three Existing Single Phase 345k V Transformers – K3A
For the lump sum of $
62 48 19 22 Installing and Field Testing New Generator Isolated Phase Bus and Bushings for Generators 3 and 4
For the lump sum of $
63 48 19 24 Installing and Field Testing Twelve Potential Transformers, Six 15kV Surge Arrestors and All Associated Equipment Cubicles for Generators 3 and 4
For the lump sum of $
64 48 19 30 Installing and Field Testing Three New Single Phase 345kV, 125 MVA Transformers – K3A
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule D (CONSTRUCTION)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
65 48 19 32 Install Type II Mineral Oil for K3A Transformer Bank
For the lump sum of $
66 48 19 34 Installing and Field Testing New Isolated Phase Bus for Transformer Bank K3A
TOTAL FOR Price Schedule D $___________
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule E (SUPPLIES)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
67 48 19 22 Furnishing and Factory Testing New Generator Isolated Phase Bus and Bushings for Generators 5 and
For the lump sum of $
68 48 19 24 Furnishing and Factory Testing Twelve Potential Transformers, Six 15kV Surge Arrestors and Associated Equipment Cubicles for Generators 5 and 6
For the lump sum of $
69 48 19 30 Furnishing and Factory Testing Three New Single Phase 345 kV, 125 MVA Transformers – K5A
For the lump sum of $
70 48 19 30 Perform the Standard or Modified Induced Voltage Test on K5A Transformers
For the lump sum of $
71 48 19 34 Furnishing and Factory Testing New Isolated Phase Bus for Transformer Bank K5A
For the lump sum of $
72 48 19 32 Furnishing Natural Ester Oil for K5A Transformer Bank
TOTAL FOR Price Schedule E $___________
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule F (CONSTRUCTION)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
73 WBR
1452.23
-81
Mobilization and Preparatory Work
For the lump sum of $
74 52.246-
Extended Warranty for Three Single Phase 345kV, 125 MVA Transformers – K5A
For the lump sum of $
75 01 31 30 Contract Document Management System
For the lump sum of $
76 01 33 26 Electrical Drawings and Data For the lump sum of $
77 03 30 00 Concrete 0.16yd3
78 05 12 73 Power Transformer Anchorage Systems
For the lump sum of $
79 05 50 00 Oil Spill Containment For the lump sum of $
80 05 50 04 Removing Existing Oil Spill Protection
For the lump sum of $
81 07 88 10 Modular Fire Barriers For the lump sum of $
82 22 10 04 Removing and Disposing of Cooling Water Piping Systems and Appurtenances for Transformer Bank K5A
For the lump sum of $
83 22 10 12 Furnishing and Installing Cooling Water Systems Pipe, Fittings and Appurtenances for Transformer Bank K5A
For the lump sum of $
84 48 04 00 Removing and Disposing of Existing Isolated Phase Bus for Transformer Bank K5A
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule F (CONSTRUCTION)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
85 48 04 00 Removing and Disposing of Existing Isolated Phase Bus, PT Cubicles, Surge Arrestor Cubicle and Generator Bushing for Generators 5 and
For the lump sum of $
86 48 04 00 Removing and Disposing of Three Existing 345kV Single Phase Transformers – K5A
For the lump sum of $
87 48 04 00 Salvage Credit for Copper in Three Existing Single Phase Transformers – K5A
For the lump sum of $
88 48 04 00 Salvage Credit for Steel and Iron in Three Existing Single Phase Transformers – K5A
For the lump sum of $
89 48 04 00 Disposal of Insulation Oil in Three Existing Single Phase 345k V Transformers – K5A
For the lump sum of $
90 48 19 22 Installing and Field Testing New Generator Isolated Phase Bus and Bushings for Generators 5 and 6
For the lump sum of $
91 48 19 24 Installing and Field Testing Twelve Potential Transformers, Six 15kV Surge Arrestors and Associated Equipment Cubicles for Generators 5 and 6
For the lump sum of $
92 48 19 30 Installing and Field Testing Three New Single Phase 345 kV, 125 MVA Transformers – K5A
For the lump sum of $
93 48 19 32 Install Natural Ester Oil for K5A Transformer Bank
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule F (CONSTRUCTION)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
94 48 19 34 Installing and Field Testing New Isolated Phase Bus for Transformer Bank K5A
TOTAL FOR Price Schedule F $___________
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule G (SUPPLIES)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
95 48 19 22 Furnishing and Factory Testing New Generator Isolated Phase Bus and Bushings for Generators 7 and 8
For the lump sum of $
96 48 19 24 Furnishing and Factory Testing Twelve Potential Transformers, Six 15kV Surge Arrestors and Associated Equipment Cubicles for Generators 7 and 8
For the lump sum of $
97 48 19 30 Furnishing and Factory Testing Three New Single Phase 230 kV, 125 MVA Transformers – K7A
For the lump sum of $
98 48 19 30 Furnishing and Factory Testing One New Single Phase 230kV, 125 MVA Spare Transformer
For the lump sum of $
99 48 19 30 Perform the Standard or Modified Induced Voltage Test on K7A Transformers
For the lump sum of $
100 48 19 34 Furnishing and Factory Testing New Isolated Phase Bus for Transformer Bank K7A
For the lump sum of $
101 48 19 32 Furnishing Natural Ester Oil for K7A Transformer Bank and Spare Transformer
TOTAL FOR Price Schedule G $___________
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule H (CONSTRUCTION)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
102 WBR
1452.23
-81
Mobilization and Preparatory Work
For the lump sum of $
103 52.246-
Extended Warranty for Three Single Phase 230 kV, 125 MVA Transformers – K7A
For the lump sum of $
104 52.246-
Extended Warranty for One Single Phase 230kV, 125 MVA Spare Transformer – K7A
For the lump sum of $
105 01 31
Contract Document Management System
For the lump sum of $
106 01 33
Electrical Drawings and Data For the lump sum of $
107 03 30
Concrete 0.16yd3
108 05 12
Power Transformer Anchorage Systems
For the lump sum of $
109 05 50
Oil Spill Containment For the lump sum of $
110 05 50
Removing Existing Oil Spill Protection
For the lump sum of $
111 05 50
Reinstalling Existing Oil Spill Protection
For the lump sum of $
112 07 88
Modular Fire Barriers For the lump sum of $
113 22 10
Removing and Disposing of Cooling Water Piping Systems and Appurtenances for Transformer Bank K7A
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule H (CONSTRUCTION)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
114 22 10
Furnishing and Installing Cooling Water Systems Pipe, Fittings and Appurtenances for Transformer Bank K7A
For the lump sum of $
115 48 04
Removing and Disposing of Existing Isolated Phase Bus for Transformer Bank K7A
For the lump sum of $
116 48 04
Removing and Disposing of Existing Isolated Phase Bus, PT Cubicles, Surge Arrestor Cubicle and Generator Bushing for Generators 7 and 8
For the lump sum of $
117 48 04
Removing and Disposing of Three Existing Single Phase 230kV Transformers – K7A
For the lump sum of $
118 48 04
Salvage Credit for Copper in Three Existing Single Phase 230kV Transformers – K7A
For the lump sum of $
119 48 04
Salvage Credit for Steel and Iron in Three Existing Single Phase 230kV Transformers – K7A
For the lump sum of $
120 48 04
Removing and Disposing of Existing Spare Single Phase 230kV Transformer
For the lump sum of $
121 48 04
Salvage Credit for Copper in Existing Spare Single Phase 230kV Transformer
For the lump sum of $
122 48 04
Salvage Credit for Steel and Iron in Existing Spare Single Phase 230kV Transformer
For the lump sum of $
123 48 04
Disposal of Insulation Oil in Three Existing Single Phase 230kV Transformers – K7A
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule H (CONSTRUCTION)
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
124 48 04
Disposal of Insulation Oil in Existing Spare Single Phase 230kV Transformer
For the lump sum of $
125 48 19
Installing and Field Testing New Generator Isolated Phase Bus and Bushings for Generators 7 and 8
For the lump sum of $
126 48 19
Installing and Field Testing Twelve Potential Transformers, Six 15kV Surge Arrestors and Associated Equipment Cubicles for Generators 7 and 8
For the lump sum of $
127 48 19
Installing and Field Testing Three New Single Phase 230 kV, 125 MVA Transformers – K7A
For the lump sum of $
128 48 19
Field Test and Prepare for Storage One New Single Phase 230kV, 125 MVA Spare Transformer
For the lump sum of $
129 48 19
Install Natural Ester Oil for K7A Transformer Bank and Spare Transformer
For the lump sum of $
130 48 19
Provide and Prepare for Storage Extra Materials for 230kV Transformers
For the lump sum of $
131 48 19
Installing and Field Testing New Isolated Phase Bus for Transformer Bank K7A
For the lump sum of $
TOTAL FOR Price Schedule H $___________
TOTAL FOR Price Schedules A through H $___________
Document Title
GSU Transformers and Associated Equipment Replacement
Price Schedule I Options
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
132 48 19 30 Furnishing and Install Optional Fast Depressurization Devices for all transformers in Pricing Schedule A
For the lump sum of $
133 48 19 30 Furnishing and Install Optional System Gas Analyzers for all transformers in Pricing Schedule A
For the lump sum of $
134 48 19 30 Furnishing and Install Optional Fast Depressurization Devices for all transformers in Pricing Schedule C
For the lump sum of $
135 48 19 30 Furnishing and Install Optional System Gas Analyzers for all transformers in Pricing Schedule C
For the lump sum of $
136 48 19 30 Furnishing and Install Optional Fast Depressurization Devices for all transformers in Pricing Schedule E
For the lump sum of $
137 48 19 30 Furnishing and Install Optional System Gas Analyzers for all transformers in Pricing Schedule E
For the lump sum of $
138 48 19 30 Furnishing and Install Optional Fast Depressurization Devices for all transformers in Pricing Schedule G
For the lump sum of $
139 48 19 30 Furnishing and Install Optional System Gas Analyzers for all transformers in Pricing Schedule G
TOTAL FOR Price Schedule I $___________
Document Title
GSU Transformers and Associated Equipment Replacement
B.1 WARRANTED CHARACTERISTICS
(a) Offeror warrants that the losses of each 1-phase transformer shall not exceed the loss requirements furnished below, with rated voltage and frequency applied to each winding.
Failure to furnish the required values will result in an incomplete offer, which will not be considered.
(b) Offers will be evaluated in accordance with the provision at WBR 1452.246-80 “Evaluation of Equipment Efficiency and Losses.” The contract price will be adjusted in accordance with the clause at WBR 1452.246-81 "Failure to Meet Performance Warranties.
(c) Transformers K1A, 3A, 5A losses:
(1) No-load losses, kilowatts ..................................................________________ kW*
(2) Total losses, at the loading condition of:
125,000-kilovolt ampere output at a maximum oil temperature of 85 degrees C ................________________ kW*
(d) Transformer K7A losses:
(1) No-load losses, kilowatts ..................................................________________ kW*
(2) Total losses, at the loading condition of:
125,000-kilovolt ampere output at a maximum oil temperature of 85 degrees C ................________________ kW*
* Round off to nearest tenth of a kilowatt.
(e) Losses measured at a different loading than that which is required, but extrapolated to the required loading, will not be acceptable.
END OF Section B
Document Title
GSU Transformers and Associated Equipment Replacement
This page intentionally left blank.
Document Title
GSU Transformers and Associated Equipment Replacement
SECTION C – Description / Specifications / Statement of work
All Schedules, All Items: The contractor shall perform and deliver the supplies and services hereunder in accordance with the specifications, drawings, and other attachments listed in Section J – List of Attachments, as well as FAR, WBR, and DIAR clauses in this contract.
Document Title
GSU Transformers and Associated Equipment Replacement
The page intentionally left blank.
Document Title
GSU Transformers and Associated Equipment Replacement
SECTION D – Packaging and Marking
All Schedules, All Items: The contractor shall package and mark the supplies provided hereunder in accordance with the packaging and marking instructions that may be included in the specifications listed in Section J – List of Attachments, as well as FAR, WBR, and DIAR clauses in this contract.
Document Title
GSU Transformers and Associated Equipment Replacement
Document Title
GSU Transformers and Associated Equipment Replacement
SECTION E -- Inspection and Acceptance
The following clauses pertain only to Pricing Schedules A, C, E, and G, supply requirements.
E.1 52.246-02 Inspection Of Supplies--Fixed Price August 1996
(a) Definition. "Supplies," as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.
(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.
(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor's or subcontractor's premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.
(e)(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.
Document Title
GSU Transformers and Associated Equipment Replacement
(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.
(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.
(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place,promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.
(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either (1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or (2) terminate the contract for default. Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.
(i) (1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time --
(i) when Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract; and
(ii) When the supplies will be ready for Government inspection.
(2) The Government's request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor's plant, nor more than 7 workdays in other instances.
(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.
(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.
(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other
Document Title
GSU Transformers and Associated Equipment Replacement provisions of this contract, shall have the right to require the Contractor (1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor's plant at the Contracting Officer's election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or (2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor's plant and return to the original point when that point is not the Contractor's plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.
E.2 52.246-16 Responsibility For Supplies April 1984
(a) Title to supplies furnished under this contract shall pass to the Government upon formal acceptance, regardless of when or where the Government takes physical possession, unless the contract specifically provides for earlier passage of title.
(b) Unless the contract specifically provides otherwise, risk of loss of or damage to supplies shall remain with the Contractor until, and shall pass to the Government upon--
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Acceptance by the Government or delivery of the supplies to the Government at the destination specified in the contract, whichever is later, if transportation is f.o.b.
destination.
(c) Paragraph (b) of this section shall not apply to supplies that so fail to conform to contract requirements as to give a right of rejection. The risk of loss of or damage to such nonconforming supplies remains with the Contractor until cure or acceptance. After cure or acceptance, paragraph (b) of this section shall apply.
(d) Under paragraph (b) of this section, the Contractor shall not be liable for loss of or damage to supplies caused by the negligence of officers, agents, or employees of the Government acting within the scope of their employment.
Document Title
GSU Transformers and Associated Equipment Replacement
The following clauses pertain only to Price Schedules B, D, F, and H, service (construction) requirements.
E-3 52.246-12 Inspection of Construction August 1996
(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not--
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary.
The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to