This is a solicitation for pick-up, transportation, and disposal of trash, garbage, and food waste services in the Daegu area of USAG Daegu in Korea. The contractor will be required to provide personnel, equipment, vehicles, and disposal services to collect trash and food waste from 126 collection points across Camps Henry, George, Walker, and SP-47, two to five times per week depending on the location. The contractor must also remove unserviceable furniture and other bulk items as directed. The period of performance is one base year with four option years. The solicitation includes details on licensing requirements, vehicle and safety standards, reporting requirements, and applicable regulations. Pricing will be firm-fixed price, and proposals are due December 21, 2020.

View the file

Other files

File Type Posted
TE-5 Location Map.ppt PPT presentation
TE-4 Building List.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W91QVN20R0204 16-Nov-2020

b. TELEPHONE NUMBER

315-755-2698

8. OFFER DUE DATE/LOCAL TIME

01:00 PM 21 Dec 2020

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W91QVN9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MS. SINCLAIR, YU-MEI CELINA

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0011530597

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

411TH CSB, KOREA - IMB

UNIT#15289

APO AP 96205

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE WT4KB6 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

DPW, USAG DAEGU

PAK, CHONG HWAN

ATTN: IMKO-ADP-F

UNIT #15746

APO AP 96218-5746

UNITED STATES

TEL: 768-7166 FAX:

FAX:

TEL: 724-6977 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$41,500,000

NAICS:

562111

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF129

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

SPECIAL NOTICE

AVAILABILITY OF FUNDS

“Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.”

"All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA) does not permit the U.S. Government to grant Invited Contractor or Technical Representative Status to any offeror for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. source, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea must submit adequate verification in its initial proposal or quote that it has the requisite business licenses directly from the ROK Government to perform the contract and the capacity to conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. If the initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award.

Whether an offeror demonstrates this authorization and capacity shall be determined by the Contracting Officer."

Contract Period:

Contract Year Period of Performance

Phase-In 1 March 2021 – 31 March 2021 Base Year 1 April 2021 – 28 February 2022 Option Year I 1 March 2022 – 28 February 2023 Option Year II 1 March 2023 – 29 February 2024 Option Year III 1 March 2024 – 28 February 2025 Option Year IV 1 March 2025 – 28 February 2026

Important Information:

1. POC for this Requirement: Ms. Yu-Mei Sinclair, Contract Specialist yu-mei.c.sinclair.civ@mail.mil /0503-355-2698

Ms. Hyon Suk Chong, Contracting Officer hyonsuk.chong1.ln@mail.mil /0503-355-3375

2. Site Visit Date: Wednesday, 18 November 2020 at 11:30 am KST.

*Note: Any offerors who are interested in participation of the site orientation should be present at not later than

Wednesday, 18 November 2020 at 11:30 am with photo Identification card (주민등록증 또는운전면허증) and also provide a list of attendants’ information (company name, attendant name, address & telephone number, ROK ID number and vehicle license plate number) to Ms. Yu-Mei Sinclair through e-mail at yu-mei.c.sinclair.civ@mail.mil or Ms. Chong, Hyon Suk at hyonsuk.chong1.ln@mail.mil by Tuesday, 17 November 2020, 1:00 pm for the installation access process.

3. Questions Due Date: All Questions are due on Monday, 23 November 2020 at 1:00 pm KST.

4. Proposal Due Date: Monday, 21 December 2020 at 1:00 pm KST.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 9 Months Pick Up Trash/2Times Week,3000,C/G

FFP

Pick up trash & garbage two (2) times a week from one (1) trash pick up point B#3000, Elementary School at Camp George.

(Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

FOB: Destination

PURCHASE REQUEST NUMBER: 0011530597

PSC CD: S205

NET AMT

0002 2 Months Pick Up Trash/1Times Week,3000,C/G

FFP

Pick up trash & garbage one (1) time a week from one (1) trash pick up point B#3000, Elementary School at Camp George.

(Date : 16 Jun - 15 Aug )

FOB: Destination

0003 9 Months Pick Up Food Waste/5Times Week, C/G

FFP

Pick up food waste five (5) times a week from one (1) food waste pick up point at Camp George (School) (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

FOB: Destination

0004 11 Months Pick Up Trash/2Times a Week, C/H

FFP

Pick up trash & garbage two (2) times a week from eighteen (18) trash pick up points and three (3) times a week from four (4) trash pick up points (B#1225, 1501, 1650, 1652) at Camp Henry.

FOB: Destination

0005 11 Months Pick Up Food Waste/2Times Week, C/H

FFP

Pick up food waste two (2) times a week from three (3) food waste pick up points and five(5) times a week from one (1) food waste pick up points (B#1610) at Camp Henry.

FOB: Destination

0006 11 Months Pick Up Trash/2Times a Week, C/W

FFP

Pick up trash & garbage two (2) times a week from fifty two (52) trash pick up points and three (3) times a week from one (1) trash pick up point (B#230) at Camp Walker.

FOB: Destination

0007 11 Months Pick Up Trash/2Times a Week, FH,C/W

FFP

Pick up trash & garbage two (2) times a week from fifteen (15) trash pick up points at Family Housing area, at Camp Walker.

FOB: Destination

0008 11 Months Pick Up Trash/5Times Week, Towers

FFP

Pick up trash & garbage five (5) times a week from one (2) trash pick up point AFH, Tower#1 and Tower#2 at Camp Walker.

FOB: Destination

0009 9 Months Pick Up Trash/2Times Week, 170, C/W

FFP

Pick up trash & garbage two (2) times a week from Bldg #170 (new M/H School) at Camp Walker (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

FOB: Destination

0010 2 Months Pick Up Trash/1Time Week, 170, C/W

FFP

Pick up trash & garbage one (1) time a week from one (1) trash pick up point B#170, Middle & High School at Camp Walker (Date : 16 Jun - 15 Aug )

FOB: Destination

0011 11 Months Pick Up Food Waste/2Times Week, C/W

FFP

Pick up food waste two (2) times a week from seven (7) pick up points and four (4) times a week one (1) pick up point (B#230) at Camp Walker.

FOB: Destination

0012 11 Months Pick Up Food Waste/5Times Week, C/W

FFP

Unpack/segregate/dispose food waste five (5) times a week from one (1) food waste pick up point at Bldg#357 (Commissary) at Camp Walker

FOB: Destination

0013 11 Months Pick Up Food Waste/2Times Week FH CW

FFP

Pick up food waste two (2) times a week from fourteen (14) food waste pick up points at Family Housing area, Camp Walker.

FOB: Destination

0014 11 Months Pick Up Food Waste/5Times Week,Tower

FFP

Pick up food waste five (5) times a week from two (2) food waste pick up point AFH, Tower#1 and Tower#2 at Camp Walker.

FOB: Destination

0015 9 Months Pick Up Food Waste/2Times Week,170

FFP

Pick up food waste two (2) time a week from one (1) food waste pick up point B#170, Middle & High School at Camp Walker (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

FOB: Destination

0016 11 Months Pick Up Trash/2 Times Week, SP-47

FFP

Pick up trash & garbage two (2) times a week from one (1) trash pick up points at SP-47

FOB: Destination

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE AMOUNT

0017 220 Actual Tons

Removal Unserviceable Furniture

FFP

Removal of unserviceable furniture & Household appliances, large auto parts, Trees and branches, stumps, pallets, and Other oversize waste, etc from Daegu. THIS IS AN ESTIMATED LINE ITEM.

FOB: Destination

0018 11 Months Pick Up 2 times a week Recycle Items

FFP

Pick up two (2) times a week Recycle items (Labors & Transportation) 104 points listed in Technical Exhibit 5 IAW PWS.

FOB: Destination

0019 1 Job Accounting for Contract Service

FFP

The Department of Army requires Contractor Manpower Reporting (CMR) by 31October of each calendar year during the life of the contract in accordance of the Performance Work Statement (PWS).

FOB: Destination

Estimated Cost for War Hazard Losses

FFP

Zero (0)

0021 1 Months Phase-in Period

FFP

Phase-in Period FOB: Destination

1001 10 Months OPTION Pick Up Trash/2Times Week,3000,C/G

FFP

Pick up trash & garbage two (2) times a week from one (1) trash pick up point B#3000, Elementary School at Camp George.

(Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

1002 2 Months OPTION Pick Up Trash/1Times Week,3000,C/G

FFP

Pick up trash & garbage one (1) time a week from one (1) trash pick up point B#3000, Elementary School at Camp George.

(Date : 16 Jun - 15 Aug )

1003 10 Months OPTION Pick Up Food Waste/5Times Week, C/G

FFP

Pick up food waste five (5) times a week from one (1) food waste pick up point at Camp George (School) (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

1004 12 Months OPTION Pick Up Trash/2Times a Week, C/H

FFP

Pick up trash & garbage two (2) times a week from eighteen (18) trash pick up points and three (3) times a week from four (4) trash pick up points (B#1225, 1501, 1650, 1652) at Camp Henry.

1005 12 Months OPTION Pick Up Food Waste/2Times Week, C/H

FFP

Pick up food waste two (2) times a week from three (3) food waste pick up points and five(5) times a week from one (1) food waste pick up points (B#1610) at Camp Henry.

1006 12 Months OPTION Pick Up Trash/2Times a Week, C/W

FFP

Pick up trash & garbage two (2) times a week from fifty two (52) trash pick up points and three (3) times a week from one (1) trash pick up point (B#230) at Camp Walker.

1007 10 Months OPTION Pick Up Trash/2Times a Week, FH,C/W

FFP

Pick up trash & garbage two (2) times a week from fifteen (15) trash pick up points at Family Housing area, at Camp Walker.

1008 12 Months OPTION Pick Up Trash/5Times Week, Towers

FFP

Pick up trash & garbage five (5) times a week from one (2) trash pick up point AFH, Tower#1 and Tower#2 at Camp Walker.

1009 10 Months OPTION Pick Up Trash/2Times Week, 170, C/W

FFP

Pick up trash & garbage two (2) times a week from Bldg #170 (new M/H School) at Camp Walker (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

1010 2 Months OPTION Pick Up Trash/1Time Week, 170, C/W

FFP

Pick up trash & garbage one (1) time a week from one (1) trash pick up point B#170, Middle & High School at Camp Walker (Date : 16 Jun - 15 Aug )

1011 12 Months OPTION Pick Up Food Waste/2Times Week, C/W

FFP

Pick up food waste two (2) times a week from seven (7) pick up points and four (4) times a week one (1) pick up point (B#230) at Camp Walker.

1012 12 Months OPTION Pick Up Food Waste/5Times Week, C/W

FFP

Unpack/segregate/dispose food waste five (5) times a week from one (1) food waste pick up point at Bldg#357 (Commissary) at Camp Walker

1013 12 Months OPTION Pick Up Food Waste/2Times Week FH CW

FFP

Pick up food waste two (2) times a week from fourteen (14) food waste pick up points at Family Housing area, Camp Walker.

1014 12 Months OPTION Pick Up Food Waste/5Times Week,Tower

FFP

Pick up food waste five (5) times a week from two (2) food waste pick up point AFH, Tower#1 and Tower#2 at Camp Walker.

1015 10 Months OPTION Pick Up Food Waste/2Times Week,170

FFP

Pick up food waste two (2) time a week from one (1) food waste pick up point B#170, Middle & High School at Camp Walker (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

1016 12 Months OPTION Pick Up Trash/2 Times Week, SP-47

FFP

Pick up trash & garbage two (2) times a week from one (1) trash pick up points at SP-47

UNIT UNIT PRICE AMOUNT

1017 240 Actual

OPTION Removal Unserviceable Furniture

Removal of unserviceable furniture & Household appliances, large auto parts, Trees and branches, stumps, pallets, and Other oversize waste, etc from Daegu. THIS IS AN ESTIMATED LINE ITEM.

1018 12 Months OPTION Pick Up 2 times a week Recycle Items

FFP

Pick up two (2) times a week Recycle items (Labors & Transportation) 104 points listed in Technical Exhibit 5 IAW PWS.

1019 1 Job OPTION Accounting for Contract Service

FFP

The Department of Army requires Contractor Manpower Reporting (CMR) by 31October of each calendar year during the life of the contract in accordance of the

OPTION Estimated Cost for War Hazard Losses

FFP

2001 10 Months OPTION Pick Up Trash/2Times Week,3000,C/G

FFP

Pick up trash & garbage two (2) times a week from one (1) trash pick up point B#3000, Elementary School at Camp George.

(Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

2002 2 Months OPTION Pick Up Trash/1Times Week,3000,C/G

FFP

Pick up trash & garbage one (1) time a week from one (1) trash pick up point B#3000, Elementary School at Camp George.

(Date : 16 Jun - 15 Aug )

2003 10 Months OPTION Pick Up Food Waste/5Times Week, C/G

FFP

Pick up food waste five (5) times a week from one (1) food waste pick up point at Camp George (School) (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

2004 12 Months OPTION Pick Up Trash/2Times a Week, C/H

FFP

Pick up trash & garbage two (2) times a week from eighteen (18) trash pick up points and three (3) times a week from four (4) trash pick up points (B#1225, 1501, 1650, 1652) at Camp Henry.

2005 12 Months OPTION Pick Up Food Waste/2Times Week, C/H

FFP

Pick up food waste two (2) times a week from three (3) food waste pick up points and five(5) times a week from one (1) food waste pick up points (B#1610) at Camp Henry.

2006 12 Months OPTION Pick Up Trash/2Times a Week, C/W

FFP

Pick up trash & garbage two (2) times a week from fifty two (52) trash pick up points and three (3) times a week from one (1) trash pick up point (B#230) at Camp Walker.

2007 12 Months OPTION Pick Up Trash/2Times a Week, FH,C/W

FFP

Pick up trash & garbage two (2) times a week from fifteen (15) trash pick up points at Family Housing area, at Camp Walker.

2008 12 Months OPTION Pick Up Trash/5Times Week, Towers

FFP

Pick up trash & garbage five (5) times a week from one (2) trash pick up point AFH, Tower#1 and Tower#2 at Camp Walker.

2009 10 Months OPTION Pick Up Trash/2Times Week, 170, C/W

FFP

Pick up trash & garbage two (2) times a week from Bldg #170 (new M/H School) at Camp Walker (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

2010 2 Months OPTION Pick Up Trash/1Time Week, 170, C/W

FFP

Pick up trash & garbage one (1) time a week from one (1) trash pick up point B#170, Middle & High School at Camp Walker (Date : 16 Jun - 15 Aug )

2011 12 Months OPTION Pick Up Food Waste/2Times Week, C/W

FFP

Pick up food waste two (2) times a week from seven (7) pick up points and four (4) times a week one (1) pick up point (B#230) at Camp Walker.

2012 12 Months OPTION Pick Up Food Waste/5Times Week, C/W

FFP

Unpack/segregate/dispose food waste five (5) times a week from one (1) food waste pick up point at Bldg#357 (Commissary) at Camp Walker

2013 12 Months OPTION Pick Up Food Waste/2Times Week FH CW

FFP

Pick up food waste two (2) times a week from fourteen (14) food waste pick up points at Family Housing area, Camp Walker.

2014 12 Months OPTION Pick Up Food Waste/5Times Week,Tower

FFP

Pick up food waste five (5) times a week from two (2) food waste pick up point AFH, Tower#1 and Tower#2 at Camp Walker.

2015 10 Months OPTION Pick Up Food Waste/2Times Week,170

FFP

Pick up food waste two (2) time a week from one (1) food waste pick up point B#170, Middle & High School at Camp Walker (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

2016 12 Months OPTION Pick Up Trash/2 Times Week, SP-47

FFP

Pick up trash & garbage two (2) times a week from one (1) trash pick up points at SP-47

UNIT UNIT PRICE AMOUNT

2017 240 Actual

Removal of unserviceable furniture & Household appliances, large auto parts, Trees and branches, stumps, pallets, and Other oversize waste, etc from Daegu. THIS IS AN ESTIMATED LINE ITEM.

2018 12 Months OPTION Pick Up 2 times a week Recycle Items

FFP

Pick up two (2) times a week Recycle items (Labors & Transportation) 104 points listed in Technical Exhibit 5 IAW PWS.

2019 1 Job OPTION Accounting for Contract Service

FFP

The Department of Army requires Contractor Manpower Reporting (CMR) by 31October of each calendar year during the life of the contract in accordance of the

OPTION Estimated Cost for War Hazard Losses

FFP

3001 10 Months OPTION Pick Up Trash/2Times Week,3000,C/G

FFP

Pick up trash & garbage two (2) times a week from one (1) trash pick up point B#3000, Elementary School at Camp George.

(Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

3002 2 Months OPTION Pick Up Trash/1Times Week,3000,C/G

FFP

Pick up trash & garbage one (1) time a week from one (1) trash pick up point B#3000, Elementary School at Camp George.

(Date : 16 Jun - 15 Aug )

3003 10 Months OPTION Pick Up Food Waste/5Times Week, C/G

FFP

Pick up food waste five (5) times a week from one (1) food waste pick up point at Camp George (School) (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

3004 12 Months OPTION Pick Up Trash/2Times a Week, C/H

FFP

Pick up trash & garbage two (2) times a week from eighteen (18) trash pick up points and three (3) times a week from four (4) trash pick up points (B#1225, 1501, 1650, 1652) at Camp Henry.

3005 12 Months OPTION Pick Up Food Waste/2Times Week, C/H

FFP

Pick up food waste two (2) times a week from three (3) food waste pick up points and five(5) times a week from one (1) food waste pick up points (B#1610) at Camp Henry.

3006 12 Months OPTION Pick Up Trash/2Times a Week, C/W

FFP

Pick up trash & garbage two (2) times a week from fifty two (52) trash pick up points and three (3) times a week from one (1) trash pick up point (B#230) at Camp Walker.

3007 12 Months OPTION Pick Up Trash/2Times a Week, FH,C/W

FFP

Pick up trash & garbage two (2) times a week from fifteen (15) trash pick up points at Family Housing area, at Camp Walker.

3008 12 Months OPTION Pick Up Trash/5Times Week, Towers

FFP

Pick up trash & garbage five (5) times a week from one (2) trash pick up point AFH, Tower#1 and Tower#2 at Camp Walker.

3009 10 Months OPTION Pick Up Trash/2Times Week, 170, C/W

FFP

Pick up trash & garbage two (2) times a week from Bldg #170 (new M/H School) at Camp Walker (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

3010 2 Months OPTION Pick Up Trash/1Time Week, 170, C/W

FFP

Pick up trash & garbage one (1) time a week from one (1) trash pick up point B#170, Middle & High School at Camp Walker (Date : 16 Jun - 15 Aug )

3011 12 Months OPTION Pick Up Food Waste/2Times Week, C/W

FFP

Pick up food waste two (2) times a week from seven (7) pick up points and four (4) times a week one (1) pick up point (B#230) at Camp Walker.

3012 12 Months OPTION Pick Up Food Waste/5Times Week, C/W

FFP

Unpack/segregate/dispose food waste five (5) times a week from one (1) food waste pick up point at Bldg#357 (Commissary) at Camp Walker

3013 12 Months OPTION Pick Up Food Waste/2Times Week FH CW

FFP

Pick up food waste two (2) times a week from fourteen (14) food waste pick up points at Family Housing area, Camp Walker.

3014 12 Months OPTION Pick Up Food Waste/5Times Week,Tower

FFP

Pick up food waste five (5) times a week from two (2) food waste pick up point AFH, Tower#1 and Tower#2 at Camp Walker.

3015 10 Months OPTION Pick Up Food Waste/2Times Week,170

FFP

Pick up food waste two (2) time a week from one (1) food waste pick up point B#170, Middle & High School at Camp Walker (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

3016 12 Months OPTION Pick Up Trash/2 Times Week, SP-47

FFP

Pick up trash & garbage two (2) times a week from one (1) trash pick up points at SP-47

UNIT UNIT PRICE AMOUNT

3017 240 Actual

Removal of unserviceable furniture & Household appliances, large auto parts, Trees and branches, stumps, pallets, and Other oversize waste, etc from Daegu. THIS IS AN ESTIMATED LINE ITEM.

3018 12 Months OPTION Pick Up 2 times a week Recycle Items

FFP

Pick up two (2) times a week Recycle items (Labors & Transportation) 104 points listed in Technical Exhibit 5 IAW PWS.

3019 1 Job OPTION Accounting for Contract Service

FFP

The Department of Army requires Contractor Manpower Reporting (CMR) by 31October of each calendar year during the life of the contract in accordance of the

OPTION Estimated Cost for War Hazard Losses

FFP

4001 10 Months OPTION Pick Up Trash/2Times Week,3000,C/G

FFP

Pick up trash & garbage two (2) times a week from one (1) trash pick up point B#3000, Elementary School at Camp George.

(Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

4002 2 Months OPTION Pick Up Trash/1Times Week,3000,C/G

FFP

Pick up trash & garbage one (1) time a week from one (1) trash pick up point B#3000, Elementary School at Camp George.

(Date : 16 Jun - 15 Aug )

4003 10 Months OPTION Pick Up Food Waste/5Times Week, C/G

FFP

Pick up food waste five (5) times a week from one (1) food waste pick up point at Camp George (School) (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

4004 12 Months OPTION Pick Up Trash/2Times a Week, C/H

FFP

Pick up trash & garbage two (2) times a week from eighteen (18) trash pick up points and three (3) times a week from four (4) trash pick up points (B#1225, 1501, 1650, 1652) at Camp Henry.

4005 12 Months OPTION Pick Up Food Waste/2Times Week, C/H

FFP

Pick up food waste two (2) times a week from three (3) food waste pick up points and five(5) times a week from one (1) food waste pick up points (B#1610) at Camp Henry.

4006 12 Months OPTION Pick Up Trash/2Times a Week, C/W

FFP

Pick up trash & garbage two (2) times a week from fifty two (52) trash pick up points and three (3) times a week from one (1) trash pick up point (B#230) at Camp Walker.

4007 12 Months OPTION Pick Up Trash/2Times a Week, FH,C/W

FFP

Pick up trash & garbage two (2) times a week from fifteen (15) trash pick up points at Family Housing area, at Camp Walker.

4008 12 Months OPTION Pick Up Trash/5Times Week, Towers

FFP

Pick up trash & garbage five (5) times a week from one (2) trash pick up point AFH, Tower#1 and Tower#2 at Camp Walker.

4009 10 Months OPTION Pick Up Trash/2Times Week, 170, C/W

FFP

Pick up trash & garbage two (2) times a week from Bldg #170 (new M/H School) at Camp Walker (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

4010 2 Months OPTION Pick Up Trash/1Time Week, 170, C/W

FFP

Pick up trash & garbage one (1) time a week from one (1) trash pick up point B#170, Middle & High School at Camp Walker (Date : 16 Jun - 15 Aug )

4011 12 Months OPTION Pick Up Food Waste/2Times Week, C/W

FFP

Pick up food waste two (2) times a week from seven (7) pick up points and four (4) times a week one (1) pick up point (B#230) at Camp Walker.

4012 12 Months OPTION Pick Up Food Waste/5Times Week, C/W

FFP

Unpack/segregate/dispose food waste five (5) times a week from one (1) food waste pick up point at Bldg#357 (Commissary) at Camp Walker

4013 12 Months OPTION Pick Up Food Waste/2Times Week FH CW

FFP

Pick up food waste two (2) times a week from fourteen (14) food waste pick up points at Family Housing area, Camp Walker.

4014 12 Months OPTION Pick Up Food Waste/5Times Week,Tower

FFP

Pick up food waste five (5) times a week from two (2) food waste pick up point AFH, Tower#1 and Tower#2 at Camp Walker.

4015 10 Months OPTION Pick Up Food Waste/2Times Week,170

FFP

Pick up food waste two (2) time a week from one (1) food waste pick up point B#170, Middle & High School at Camp Walker (Date : 1 Apr - 15 Jun & 16 Aug - 28 Feb )

4016 12 Months OPTION Pick Up Trash/2 Times Week, SP-47

FFP

Pick up trash & garbage two (2) times a week from one (1) trash pick up points at SP-47

UNIT UNIT PRICE AMOUNT

4017 240 Actual

Removal of unserviceable furniture & Household appliances, large auto parts, Trees and branches, stumps, pallets, and Other oversize waste, etc from Daegu. THIS IS AN ESTIMATED LINE ITEM.

4018 12 Months OPTION Pick Up 2 times a week Recycle Items

FFP

Pick up two (2) times a week Recycle items (Labors & Transportation) 104 points listed in Technical Exhibit 5 IAW PWS.

4019 1 Job OPTION Accounting for Contract Service

FFP

The Department of Army requires Contractor Manpower Reporting (CMR) by 31October of each calendar year during the life of the contract in accordance of the

OPTION Estimated Cost for War Hazard Losses

FFP

PWS

PERFORMANCE WORK STATEMENT (PWS)

FOR

PICK-UP, TRANSPORTATION, AND DISPOSAL OF TRASH/GARBAGE/FOOD WASTE

FOR DAEGU AREA, USAG DAEGU

1.0. General Information.

1.1. Overview. Solid Waste Management is a comprehensive approach to managing non-hazardous solid waste that encompasses green procurement, waste prevention, and disposal programs. The Contractor, partnering with the installation, shall determine and utilize the most cost effective Recycle and Solid Waste Management services, emphasizing innovation and commercial best practices, to maximize diversion. The Contractor shall dispose of waste in accordance with (IAW) applicable Republic of Korea, and local laws and regulations. The Contractor shall pay all applicable fees associated with disposal.

1.2. Deliverables. The Contractor shall compile historical data, prepare reports, and submit information as specified by the Deliverables as reflected in the Performance Work Statement.

1.3. Co-mingling Waste. The Contractor shall not co-mingle or transport Municipal Solid Waste (MSW) refuse with off-post generated MSW refuse. Solid waste and recyclables generated (excluding regulated medical or hazardous waste) shall be collected, transported, and disposed per this contract.

1.4. Scope. The Contractor shall provide all required personnel, equipment, tools, supplies, supervision, transportation, and any other resources necessary to pick up in accordance with (IAW) pick-up frequencies, segregate out trash not acceptable for dumping into the Landfill Facility, and transport sorted and acceptable trash to the Landfill Facility or Incineration Facility in accordance with the local environmental law, standards, and all other terms and conditions contained herein.

1.5. Period of Performance. The period of performance shall be for one (1) Base Year and four (4) Option Years. The Period of Performance reads as follows:

Phase-In 1 March 2021 – 31 March 2021 Base Year 1 April 2021 – 28 February 2022 Option Year I 1 March 2022 – 28 February 2023 Option Year II 1 March 2023 – 29 February 2024 Option Year III 1 March 2024 – 28 February 2025 Option Year IV 1 March 2025 – 28 February 2026

1.6. General Information

1.6.1. Hours of Operation. The Contractor is responsible for conducting business, between the hours of 0800-1700 hours Monday through Friday IAW pick-up frequencies except Korean holidays. Exceptions are in the event the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

ROK legal holidays

(1) 1 January (New Year)

(2) Lunar New Year (31 December, 1 and 2 January on the Lunar Calendar)

(3) 1 March (Independence Movement Day)

(4) 1 May (Labor Day)

(5) 5 May (Children's Day)

(6) Buddha's Birthday (8 April on the lunar calendar)

(7) 6 June (Memorial Day)

(8) 17 July (Constitution Day)

(9) 15 August (Liberation Day)

(10) Chu-Suk (14, 15, and 16 August on the Lunar Calendar)

(11) 3 October (National Foundation Day)

(12) 9 October (Hangul Proclamation Day)

(13) 25 December (Christmas Day)

(14) ROK Government directed temporary holidays

1.6.2. Place of Performance: The contractor shall perform the requirement in the Daegu area. (Camp Henry/George/Walker and SP #47)

1.6.3. Quality Control Program (QCP): The Contractor shall develop and maintain an effective QCP to ensure services are performed in accordance with (IAW) this PWS.

The QCP must be forwarded to and accepted by the KO and Contracting Officer’s Representative (COR). The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of deficiencies as cited by the Government.

The Contractor’s QCP is the means by which the Contractor assures that the work complies with the requirement of the contract. The QCP should be submitted within fourteen (14) calendar days after award and revised QCP shall be provided to KO within three (3) working days when changes are made thereafter. After acceptance of the QCP, the Contractor shall receive the contracting officer’s acceptance in writing of any proposed change to the QCP. At a minimum, the QCP will include the following:

1.6.3.1. An inspection system covering all the services required under the terms and conditions of the contract. It must specify the areas to be inspected on both a scheduled or unscheduled basis, how often inspections will be conducted, and the title of the individual(s) who shall perform the inspections.

1.6.3.2. On-site records of all inspections conducted by the Contractor and necessary corrective action taken, shall be made available to the Government during the term of the contract.

1.6.3.3. Daily performance report, deficiency list, the QCP and other related documents shall be maintained by the Contractor. The documents shall be readily available to the Government at any time during the term of the contract.

1.6.4. Quality Assurance: The Contractor shall comply with the government’s quality assurance program as defined in the Quality Assurance Surveillance Plan. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable quality level(s) (AQL). Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this PWS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.

1.6.4.1. The Government reserves the right to inspect the Contractor’s performance.

The Government will record all surveillance observations. When an observation indicates defective performance, the COR will request the Contractor’s representative to initial the observation.

1.6.4.2. Performance Rating: The COR will evaluate Contractor’s performance based on the checklist, USFK Form173-R-E or Procurement Integrated Enterprise Environment (PIEE)/Post Award Admin under Surveillance and Performance Monitoring (SPM). Contractor’s performance rating will be prepared and submitted to the contracting officer on monthly basis.

1.6.4.3. Performance Evaluation Meetings: The Contract Manager (CM) shall be required to meet bi-weekly with the COR during the first two months of the contract.

Meetings will take place as often as necessary thereafter as determined by the Government. The written minutes will be prepared by the Government and these minutes will be signed by both parties.

1.6.5. Type of Contract: The Government will award a Firm-Fixed-Price contract with one (1) estimated CLIN for Removal of Unserviceable Furniture.

1.6.6. Physical Security: The Contractor shall safeguard all government equipment, information and property provided for Contractor use. Contractor shall maintain a physical security checklist/log which will be forwarded to the COR on a monthly or quarterly basis. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.7. Special Qualifications: The Contractor shall maintain all required Republic of Korea (ROK) licenses and qualifications for the disposal of solid waste in accordance with the PWS of this contact.

1.6.7.1. Sanitation Requirements:

1.6.7.1.1. Collection Vehicles: The Contractor shall submit proposed container and collection vehicle cleaning procedures within fourteen (14) calendar days after contract award and schedules for the COR’s review. Collection vehicle, including the body of the vehicle, used for hauling solid wastes, shall be washed as often as determined by the Government to maintain a clean condition at all times. No cleaning facility or area shall be provided by the Government. Cleaning will be in full compliance with applicable ROK environmental laws and regulation. The Contractor shall be responsible for cleaning vehicles, and submitting a report for cleaning vehicles to the COR on a monthly basis by the 1st Monday of each month.

1.6.7.1.2. Cleaning of Surrounding Service Area: Upon completion of work, the Contractor shall clean waste pick-up area within a three (3) meters radius from the pick-up of trash and food waste. The Contractor shall submit to the COR a report of all waste areas cleaned by the 1st Monday of each month.

1.6.7.1.3. Spills:

1.6.7.1.3.1. The Contractor shall be responsible for the complete clean-up of all spills caused by the Contractor during the transportation of solid wastes. The Contractor shall submit procedures plan for cleaning spills to the COR for acceptance that is employed by the contractor as their standard for operations with the QCP submittal.

1.6.7.1.3.2. Contractor’s failure to remedy spills within one (1) calendar day after the spill incident may result in a reduction in payment to the Contractor in an amount equal to Government cleanup costs. Further, a non-compliance report may be issued for corrective action.

1.6.7.2. Prime Contractor’s License Requirement: The Prime Contractor shall possess current and valid license(s) for waste collection and transportation business for Household Waste or Plant Discharge Facility Waste issued by ROK Government

(사업장생활계폐기물 또는 사업장배출시설계 폐기물 수집 및 운반업 허가증) or Business Permit in Intermediate or Synthesis or Final Treatment of Facility Waste for business categories of Plant Household Waste/Plant Discharge Facility Waste

(사업장생활계 폐기물 또는 사업장 배출시설계 폐기물이 영업대상에 포함된 폐기물

사업장 폐기물 중간처리, 또는 종합처리, 또는 최종 처리업 허가증) issued by ROK

Government. Agreement with a disposal company for final waste processing (폐기물

최종 처리 방법에 대한 증빙) is required for Contractor who submits a business permit in waste pick-up and transport.

1.6.7.3. Prime Contractor’s Prior Experience: The Prime Contractor shall have at least two (2) years of experience within the last five (5) years in performing trash/garbage/food waste pick-up/transportation/disposal work as specified in the solicitation.

Relevant past performance shall be the "same or similar" as determined by the U.S.

Government, for services on size, scope and complexity. The Contractor shall provide all necessary information of prior experience as a part of technical evaluation factor when submitting the proposal. The experience of a Subcontractor cannot be substituted for the Prime Contractor's experience. The offeror shall provide evidence of relevant past experience as required below:

- Title of the contract/project

- A brief description of work completed

- Amount of contract

- Length of contract/project (year/month/date - year/month/date)

- Complete name of point of contact at Client Organization

1.6.7.4. Trash Sorting/Holding Storage: The Contractor shall have the trash sorting area (minimum 1,393 SM) with a holding storage (minimum 929 SM) to segregate recycling materials or waste recycling facility within 30 km from Daegu Metropolitan city which are authorized and registered by ROK Government. (시에서 승인한 폐기물

보관장소 또는 폐기물 재활용 시설). The contractor shall provide evidence document to the COR within 20 days from the beginning date of Phase-In.

1.6.7.5. Personnel Qualification Requirements: The Contractor shall provide an on-site Contract Manager (CM) to interact with government representatives and to supervise the contractor’s performance under this contract. The CM shall have full authority to act for the Contractor on the installation at all times during the performance of the work in order to comply with all requirements of this contract. The CM shall have a minimum two (2) years’ experience as a CM performing in the same or similar trash/garbage/food waste removal services. The CM shall be able to read, write, speak and understand English. The Contractor shall notify the Contracting Officer and the COR of any changes in CM. The CM shall be available within one (1) hour during normal duty hours from the time notified by the COR to meet on the installation at the location specified by the COR.

1.6.8. Base Passes and Vehicle Permits

1.6.8.1. Contractor employees and representatives shall be required to have proper identification prior to entering each Government installation. Such identification shall be controlled as prescribed by the Security Section, Provost Marshal, or equivalent security control authority at the installation concerned.

1.6.8.1.1. Base Pass: Upon notice of award, the Contractor shall obtain all passes and necessary vehicle permits required for entry by authorized Contractor personnel IAW base policy, and the point of contact information for this action will be provided upon contract award. All Contractor employees and representatives shall have in their possession a Korean Citizen Identification Card during performance under this contract.

1.6.8.2. The Contractor shall ensure that employees have a current and valid driver’s license before allowing the employee to operate a Contractor-owned vehicle on the base. The Contractor and its employees shall comply with all security requirements imposed by the local installation commander at all times while on the military installation. Any Contractor traffic violations may result in the denial of driving privileges on the installations. A copy of all licenses shall be provided to the COR within fourteen

(14) calendar days after contract award.

1.6.8.3. All Contractor employees shall abide by all Government installation regulations during performance under this contract.

1.6.8.4. The COR will not be responsible for providing escorts for the Contractor.

1.6.8.5. The Contractor will be authorized escort privileges only for people working under this contract and only during hours stated under this contract.

1.6.9. Safety

1.6.9.1. Safety Requirements. The Contractor shall exercise safety and health precautions as necessary to prevent safety hazards to personnel, materials, and equipment. Unsafe practices and/or conditions will be immediately called to the attention of the Project Manager for remedial or corrective action. Conditions beyond the Contractor’s responsibility will be referred to the COR for corrective action.

Contractor’s employees shall be thoroughly indoctrinated on safe operating procedures and precautions essential to the accomplishment of their tasks. Safety measures shall be implemented and adhered to by the Contractor and shall be in accordance with EM 385-1-1 Safety and Health Requirements Manual (latest edition). The latest version of the EM 385-1-1 can be found at http://www.usace.army.mil/publications/eng-manuals/em385-1-1/toc.htm. It is the contractor’s responsibility to maintain most current applications of this version during the performance of the contract period.

1.6.9.2. The Contractor shall immediately correct all safety deficiencies upon notification of the deficiencies by the COR and shall notify the COR of the corrective action to be taken. The Contractor shall be responsible for ensuring that all equipment that is utilized during the performance of this contract is functional and is used in a safe manner.

1.6.9.3. The Contractor shall submit a safety plan to the COR for review within fourteen

(14) calendar days after contract award.

1.6.10. Inspection

1.6.10.1. The Contractor shall provide a monthly pick-up schedule 10 workdays prior to the beginning of following month. If the work has not been performed, or has not been performed satisfactorily, the COR will notify the Contractor immediately. The Contractor shall render immediate corrective action within four (4) hours of notice of non-performance or unsatisfactory performance. Respective reductions of payment may be ensued by the Government for unsatisfactory performance.

1.6.11. Work Schedule

1.6.11.1. The Contractor shall establish a plan for vehicle routes and collection schedules based on the trash and food waste pick-up points from various locations at Camps Henry/George/Walker/SP #47 in accordance with TE-4, Trash and Food Waste Pick-up Points and Quantity and Frequency Schedule, and submit to the COR for review and acceptance within fourteen (14) calendar days after contract award. The Contractor shall schedule and arrange work to accommodate the normal Government business and mission. The frequency schedule shall not be changed without written acknowledgement of the COR.

1.6.11.2. In the event of inclement weather or Acts of God in which the Contractor has no control and prevents the Contractor from completing trash collection as scheduled, the Contractor shall notify the COR of such conditions immediately. If the Government excuses the Contractor from performing the services due to severe weather or Acts of God, the Contractor shall accomplish missed collections within 24 hours after severe weather or Acts of God have passed. If all make-up collections cannot be made within 24 hours, a revised schedule shall be submitted to the COR for review and acceptance.

1.6.12. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5.

1.6.13. Contracting Officer’s Representative (COR). An employee of the U.S.

Government appointed by the contracting officer to provide technical oversight of the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract. Only the Contracting Officer has this authority.

1.6.14. Other Direct Costs: All fees associated with disposal are the responsibility of the Contractor.

1.6.15. Antiterrorism (AT) and Operations Security (OPSEC)

1.6.15.1. AT Level I Training: This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility, or area. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 14 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the KO, if a COR is not assigned within 14 calendar days after completion of training by all employees and subcontractor personnel.

1.6.15.2. Access and General Protection/Security Policy and Procedures: This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility, or area. Contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services, or Security Office.

Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.6.15.3. iWATCH Training: The Contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism and Operations (ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 14 calendar days of contract award and within 14 calendar days of new employees commencing performance with the results reported to the COR NLT 14 calendar days after contract award.

1.6.16. Emergency Services

1.6.16.1. The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor of their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor will, in turn, notify the KO or COR within thirty (30) minutes of the incident.

1.6.16.2. Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.

1.6.17. Phase-In Period:

1.6.17.1. To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have key personnel on board, during the thirty (30) calendar day phase-in period. During the phase-in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date. The phase-in only applies to a new Contractor and not to the incumbent. The phase-in is billable under the contract, but will not be allowed in the event the incumbent is awarded the contract.

1.6.17.2. Phase-in is a one-time performance that allows the new Contractor to work with the incumbent Contractor to take over operations. The thirty (30) calendar days prior to the contract start date will constitute the phase-in period. During the phase-in period, the new Contractor shall prepare to assume full responsibility for all areas of operation in accordance with the terms and conditions of this contract and, at a minimum, have key personnel in place. The new Contractor shall take all actions necessary for a smooth transition of the contracted operations. The Government will make all facilities and equipment accessible to the new Contractor during the phase-in period. During this time, the new Contractor's management personnel will be permitted to observe any on-going operations, as coordinated by the COR. During the phase-in period, the new Contractor shall, at a minimum, accomplish the following tasks during the phase-in period.

Task Description Days to comply once phase-in is started Safety Plan 14 Quality Control Plan (QCP) 14 Base Pass and Decal, Valid Driver’s Licenses, List of Personnel and Equipment

Work Schedule 14 AT Level I Training 14 iWATCH Training 14 Trash sorting area with a holding storage

2.0. Description of Services.

2.1. Scope. The Contractor shall determine the best disposal method for solid waste management to avoid picking up an empty dumpster or container. The disposal method shall be approved by the Government.. The Contractor shall empty refuse containers, and roll-offs 2~5 times per week for 94 trash pick-up points and 2~5 times per week for 32 food waste pick-up points as indicated in the Location Map. In the event of demand fluctuations, frequency adjustments shall be approved by the Government. The Contractor shall remove all litter and waste on the ground within a three (3) meters radius of the waste container. The Contractor shall track and report to the COR/ACOR all container weights and number of services per month. The Contractor shall perform services IAW approved scheduled routes for pick-up and respond to calls for service when dumpsters reach full before scheduled pick-up.

2.1.1. Ordnance. Under no circumstances shall the Contractor knowingly accept ammunition,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .