R-26-006-RL_Final RFP_103026_POSTED.pdf
PDF 2 MB Posted
- Attached to
- Rate Consulting Services
- Solicitation number
- R-26-006-RL
- Issued by
- Bexar County, Texas
About this file
This Request for Proposals (RFP) is issued by the San Antonio Water System (SAWS) in San Antonio, Texas, soliciting a comprehensive rate consulting study. SAWS seeks proposals from a consultant or consulting firm to evaluate and provide recommendations regarding rate structures for water delivery, water supply, recycled water, and wastewater operations across SAWS' current service areas, which encompass most of Bexar County and portions of Atascosa, Comal, and Medina Counties. The study shall assess the adequacy, sustainability, and appropriateness of all rates, fees, and charges, considering factors including conservation, cost-of-service principles, fairness among customer classes, financial stability, affordability, and economic development. A virtual pre-submittal conference is scheduled for November 9, 2026, at 1:30 p.m. Central Standard Time. The proposal deadline is November 20, 2026, at 2:00 p.m. Central Standard Time, with electronic submissions only accepted. Interviews, if necessary, are anticipated for December 9–10, 2026, with SAWS Board consideration and award expected in January 2027. Work is anticipated to commence in January 2027, with the Rate Advisory Committee reconvened in February/March 2027 and final rate recommendations to the SAWS Board targeted for August/September 2027.
The compensation proposal shall be submitted as a firm-fixed price fee inclusive of all tasks, travel expenses, staff hours, overhead, and task expenses, with evaluation weighted at 15 of 100 total points. Additional evaluation criteria include Project Approach and Quality Assurance/Control (35 points), Project Team and Team Member Experience (30 points), and Understanding of San Antonio Socio-Political Environment (20 points). Respondents must provide certificates of liability insurance with minimum coverage limits including $1,000,000 professional liability per claim and aggregate, along with completed Good Faith Effort Plans and Conflict of Interest Questionnaires. SAWS prefers consultants with experience conducting rate studies for utilities in Texas, Oklahoma, New Mexico, Arizona, Colorado, Utah, Nevada, and California. The selected consultant must develop integrated financial planning models, conduct cost-of-service analyses, perform revenue requirement determinations, and provide eight to twelve stakeholder presentations over six to eight months. No incumbent is identified. Proposals are limited to 20 pages maximum, excluding required forms, and must be submitted in searchable PDF format with a maximum file size of 10 megabytes.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev.04.8.2026
SOLICITATION NO: R-26-006-RL
RELEASE DATE: October 30, 2026
REQUEST FOR PROPOSALS
RATE CONSULTING SERVICES
VIRTUAL Pre-Submittal Conference:
November 9, 2026, 1:30 p.m. (CST)
Deadline: November 20, 2026, 2:00 p.m. (CST)
**ELECTRONIC SUBMISSIONS ONLY**
TABLE OF CONTENTS
I. Project Information A. Objective B. Background C. Scope of Services D. Additional Requirements E. Estimated Timeline
II. Selection Process A. Selection B. Interviews C. Evaluation Criteria Summary
III. Communication A. Restrictions B. VIRTUAL Pre-Submittal Conference C. Technical Questions D. Good Faith Effort Plan (GFEP) Questions E. Submittal or Status Questions
IV. Submitting a Response A. Deadline B. Submission C. Response Format
V. Other Required Documents to Submit A. Insurance Requirements and Proof of Insurability B. Good Faith Effort Plan C. Conflict of Interest Questionnaire D. Compensation Proposal E. Security Procedures Acknowledgement F. Sample Contract Acknowledgement
VI. Requests for Feedback
VII. Other Requirements
Attachments
Attachment I Submittal Response Checklist Respondent Questionnaire Exhibit A – SAWS Standard Insurance Requirements Exhibit B – Good Faith Effort Plan Exhibit C – Conflict of Interest Questionnaire Exhibit D – Compensation Proposal Form Exhibit E – Security Procedures Exhibit F – Sample Contract (Review Only)
I. Project Information
A. Objective
The San Antonio Water System (“SAWS”) is requesting proposals from a consultant or consulting firm to perform a comprehensive rate study. The purpose of the Rate Study is to evaluate and provide recommendations regarding the rate structures for water delivery, water supply, recycled water, and wastewater operations. The study will encompass SAWS’ current water and wastewater service areas.
The Rate Study shall assess the adequacy, sustainability, and appropriateness of all rates, fees, and charges assessed by SAWS. Recommendations should consider a variety of factors, including, but not limited to, conservation, customer consumption characteristics, cost-of-service principles, fairness and equity among customer classes, financial stability, customer affordability, revenue stability, and economic development.
The Consultant shall evaluate alternative rate structures and provide recommendations that support SAWS’ long-term financial planning, capital investment needs, Water Forward Program objectives, and customer service goals. Recommendations shall also consider the priorities and policy directions established by the San Antonio City Council (City Council), the SAWS Board of Trustees (Board) and the Rate Advisory Committee (RAC). The RAC consists of citizens appointed to make recommendations to the Board about changes to SAWS rate design.
B. Background
SAWS reviews the sufficiency of its rates through the annual budget development process and approximately every five (5) years conducts a comprehensive rate study, including a cost-of-service analysis, with assistance from an independent consultant. The most recent comprehensive rate study was completed in 2022, and the resulting rate structures were implemented in January 2023.
The last comprehensive rate study utilized cost and usage assumptions from the SAWS 2022 Budget. A rate consultant was engaged to perform a cost-of-service analysis, develop rate design alternatives, and facilitate RAC meetings with the goal of submitting recommendations to the SAWS Board of Trustees regarding changes to SAWS rate structures for water delivery, water supply, recycled water, and wastewater operations. The consultant completed the cost-of-service analysis and facilitated seven RAC meetings and submitted final rate recommendations to the SAWS Board of Trustees.
The final report is available at the link below:
https://apps.saws.org/who_we_are/community/rac/docs/FINAL_SAWS_Rate_Design_Study_Technical_Mem orandum_November_2022.pdf
More information for the 2022 Rate Advisory Committee is available at the link below:
https://apps.saws.org/who_we_are/community/rac/
During the development of the 2026 budget, SAWS engaged an independent consultant to evaluate revenue requirements and perform a cost-of-service analysis to support the implementation of a multi-year rate plan.
While this work was focused on near-term revenue sufficiency and rate adjustments, SAWS is seeking a comprehensive rate study to evaluate long-term rate structures, customer classifications, cost allocation methodologies, and industry best practices.
SAWS anticipates reconvening the RAC in February/March 2027 with the goal of submitting the final rate recommendations to SAWS Board of Trustees on later than August/September 2027.
SAWS is the largest water and wastewater utility in the San Antonio region, serving most of Bexar County and portions of Atascosa, Comal, and Medina Counties, including wholesale water service to four utilities and wastewater service to 19 wholesale customers in the region. As of August 31, 2026, SAWS served approximately 590,000 water connections and 531,000 wastewater connections through more than 8,000 miles of water mains, 6,200 miles of sewer mains, 134 water storage facilities, the Agua Vista Water Treatment Plant, and three Water Recycling Centers. The 2027 budget assumes approximately 72.5 billion gallons of billed water consumption and 60.0 billion gallons of billed wastewater volume. SAWS also owns and operates one of the https://apps.saws.org/who_we_are/community/rac/docs/FINAL_SAWS_Rate_Design_Study_Technical_Memorandum_November_2022.pdf https://apps.saws.org/who_we_are/community/rac/docs/FINAL_SAWS_Rate_Design_Study_Technical_Memorandum_November_2022.pdf nation's largest direct recycled water systems, serving more than 90 customers through over 130 miles of pipeline and capable of delivering up to 35,000 acre-feet annually.
New rates were approved by City Council in October 2026 and will be implemented in January 2027. These rates support ongoing investment in the Water Forward capital program and are part of a multi-year rate plan approved by City Council that provides preapproved annual rate increases for potable water and wastewater services through 2030. The approved plan establishes the current financial and rate-setting framework for SAWS and will serve as a key consideration in the development and evaluation of future revenue requirements, cost-of-service analysis, rate design, and financial planning alternatives.
The following summarizes the rate structures currently in effect as a result of previous rate studies and subsequent Board and City Council actions. These structures are provided for information purposes and serve as the baseline for the analyses and recommendations required under this RFP. Schedules effective for 2027 for each rate classification described are outlined in Schedules A through H of Attachment I of this RFP. Each applicable rate schedule will be referenced below and in Section C as appropriate.
1. Potable Water Rate Structure
a. All potable water customers are assessed separate Water Delivery and Water Supply Fee volumetric rates (Schedules A and E). Water Supply Fee volumetric rates utilize the same consumption blocks as the corresponding Water Delivery rates, although the number of blocks vary by customer class. All water customers are also assessed a fixed Water Delivery Water Service Availability charge or meter charge that varies by meter size and customer class.
b. For residential customers, there is a reduced Water Service Availability Charge for customers with no usage above 4,000 gallons per month.
c. The Uplift Assistance Program (Schedule G) is a separate discounted rate structure for residential households with income at or below 150% of the Federal Poverty Level (FPL). The first 2,000 gallons are essentially lifeline usage and there is no volumetric or fixed water charge.
d. Residential Water Delivery and Water Supply Fee volumetric rates have five blocks with increased rates at higher usage levels intended to promote water conservation. Residential Water Delivery Water Service Availability charge or meter charge varies by meter size.
e. The General Class (Schedules B and E) includes municipal, apartment, industrial and commercial customers. General Class customers are assessed base-excess Water Delivery and Water Supply Fee rates with four volumetric, inclining rate blocks and Water Delivery Water Service Availability charge or meter charge that varies by meter size.
f. New General Class customers with no established prior year base usage are initially assigned a default base amount by meter size using the average monthly consumption for the prior calendar year for the average apartment, commercial, or industrial account as applicable until an average can be established.
g. A separate Irrigation rate class (Schedules D and E) exists with four volumetric blocks for both Water Delivery and Water Supply Fee charges with increasing rates which are designed to send the highest price signal to the top 20% of irrigation usage. Irrigation Water Delivery Water Service Availability charge or meter charge is equal to General Class Water Delivery Water Service Availability charge or meter charge.
h. The Water Delivery rate structures for Residential, General Class and Irrigation customers have separate rates for Inside-City-Limits (ICL) and Outside-City-Limits (OCL) customers, while the Water Supply Fee rates for these classes are the same for all customers without regard to ICL or OCL status.
There are no Water Supply Fee meter charges.
i. The Wholesale Class (Schedules C and E) uses a two-block volumetric structure. The first block represents the customer’s prior year average monthly usage or the contractually defined base use amount, while the second block applies to usage above the first block. Wholesale customers are assessed Water Delivery and Water Supply Fee volumetric charges, as well as Water Delivery meter charges based on meter size. Wholesale water rates do not vary by ICL or OCL status.
j. Conservation Fees (Schedule H) use the same five volumetric blocks applicable to residential customers, with conservation volumetric rates assessed beginning at the 12,000 gallon block and increasing at higher usage levels. General and Irrigation Class customers are assessed monthly conservation charges based on meter size. These charges are included within the applicable volumetric rates and monthly service availability charges and are intended to recover costs associated with the SAWS Conservation Program.
2. Wastewater Rate Structure
a. All SAWS customers connected to the SAWS wastewater system are assessed wastewater charges in addition to, and in connection with water service, with the exception of Irrigation and Recycled Water customers.
b. Residential (Schedule A) and General Class (Schedule B) customers are assessed an availability charge. The Wastewater availability charges in all applicable classes vary by water meter size with the exception of the Wholesale class in which the availability charge is a uniform charge for all wholesale wastewater customers.
c. Residential customers are assessed for wastewater volume based on Average Winter Consumption (AWC) of water using volumetric rates divided into two blocks with the second block assessed over 4,000 gallons at a higher rate than the first block rate. The AWC is calculated annually using water consumption from three consecutive billing cycles during the period November 15th and March 15th.
The AWC remains in effect until recalculated during the subsequent annual averaging period.
d. The Uplift Assistance Program (Schedule G) is a separate discounted rate structure for residential households with income at or below 150% of the Federal Poverty Level (FPL). The first 2,000 gallons are essentially lifeline usage and there is no volumetric charge. For wastewater customers there is no availability charge.
e. General Class customers are assessed for wastewater volume based on actual metered water consumption using a single volumetric wastewater rate.
f. The Wastewater rate structures for Residential and General Class customers have separate rates for ICL and OCL customers. There are no separate ICL/OCL Wholesale wastewater rates.
g. Wholesale wastewater customers (Schedule C) are assessed a uniform availability charge and are charged a single wastewater volumetric rate.
h. New Residential wastewater customers with no established AWC are assessed volumetric rates based on an initial assumed consumption of 5,985 gallons a month until an average can be established.
3. Recycled Water Rate Structure
a. Recycled Water customers are divided into two groups (Schedule F)
i. Edwards Exchange customers are those customers that previously transferred their Edwards
Aquifer water rights to SAWS, and who, in exchange, are assessed the first block volumetric rate for all recycled water usage up to the amount of acre-feet of water rights transferred to SAWS, with a higher second block rate for usage above the water rights transferred amount;
and
ii. Non-Edwards Exchange customers are customers who are assessed a two-tiered volumetric rate structure with the first tier covering monthly usage up to 748,000 gallons.
b. Both Edwards Exchange and Non-Edwards Exchange customers are assessed the same monthly service availability or meter charges that vary by size of meter.
c. Recycled Water volumetric rates vary by season, with separate seasonal and non-seasonal rate schedules. Seasonal rates applies to all billings on or about May 1st and ending after five billing months on or about September 30th each year.
d. Recycled Water customers are not assessed wastewater charges.
e. Recycled Water rates do not have separate ICL/OCL rate structures.
C. Scope of Services
The revenue requirement analysis, financial planning model, cost-of-service study, and rate design recommendations shall be developed as an integrated framework utilizing consistent assumptions, forecasts, customer data, financial projections, and planning horizons. The selected Consultant shall perform services and provide deliverables as outlined below:
1. Determination of Revenue Requirements
a. The Consultant shall analyze recent historical operating and financial results, customer and consumption trends, and SAWS revenue and expenditure projections for 2027 and 2028 and recommend an appropriate Test Year and associated assumptions to serve as the basis for the Rate Study.
b. Meet with the SAWS Senior Vice President/Chief Financial Officer and Finance Department staff to review the operating and capital improvement program (CIP) budgets and related revenue requirements models, and to discuss SAWS major financial policies and objectives related to utility revenue requirements.
c. Review, validate, and recommend total utility revenue requirements and assist and review determinations of revenue requirements on both a Cash Basis and Utility Basis for Inside-City-Limits (ICL) and Outside-City-Limits (OCL) services, respectively, consistent with methodologies defined in the AWWA Water Rates Manual.
d. Revenue requirement determinations must be consistent with the expressed financial objectives of SAWS, including the accomplishment of multi-year rate stability and compliance with established SAWS financial policies including reserve levels, debt service coverage targets, liquidity requirements, and capital funding strategies.
e. Evaluate whether existing rates and rate structures generate sufficient revenues by core business and customer class to meet the applicable revenue requirements.
f. Evaluate revenue requirements and financial planning assumptions relative to the City Council-approved multi-year rate plan. Identify any material deviations from the approved plan and recommend adjustments necessary to maintain compliance with financial policies, support Water Forward investments, and ensure long-term financial sustainability.
2. Financial Planning Model Development
a. Develop and implement a comprehensive, dynamic multi-year financial planning model. The model shall support annual budget development, long-term financial planning, revenue requirement analysis, rate planning, capital financing decisions, and evaluation of financial performance under multiple operating and economic scenarios. At a minimum the Consultant shall:
i. Evaluate the existing Multi-Year Financial Plan (MYFP) model and identify opportunities to improve functionality, controls, transparency, usability, and long-term sustainability.
ii. Develop an integrated financial planning model that incorporates historical and projected revenues, expenses, customer growth and consumption assumptions, CIP funding, debt service, cash requirements, reserves, financial policy metrics, revenue requirements, and projected rate adjustments. The model shall include at least two years of historical data tied to audited financial statements.
iii. Provide the ability to evaluate alternative revenue, expenditure, capital funding, customer growth, consumption, debt issuance, conservation, and rate scenarios through a planning horizon of at least ten years.
iv. Integrate the model with the revenue requirement, cost-of-service, and rate design analyses and provide scenario, sensitivity, and customer bill impact analysis capabilities.
v. Include user-controlled assumptions, validation controls, reporting tools, and the ability to produce operating statements, cash flow projections, capital funding analyses, debt affordability metrics, financial policy compliance measures, and revenue requirement calculations.
vi. Recommend the appropriate software platform and identify licensing, maintenance, governance, support, and requirements necessary to ensure the long-term sustainability of the model including recurring costs and any limitations on the number or types of SAWS users.
vii. Ensure the model is fully transparent and auditable, with no proprietary calculations, black-box methodologies, password-protected worksheets, or consultant-dependent features that would prevent SAWS staff from independently reviewing, operating, modifying, maintaining, or updating the model.
viii. Provide all model files, supporting schedules, documentation, data dictionaries, process narratives, administrator guides, and other materials necessary for SAWS to independently operate, maintain, and update the model.
ix. Complete model testing and validation and provide comprehensive training, knowledge transfer, and implementation support for designated SAWS staff including post-implementation support for an agreed period following model acceptance, including correction of model defects and assistance with the first SAWS update cycle. Respondents shall separately identify any optional ongoing support.
3. Cost-of-Service Analysis
a. Water and Wastewater Charges: Recommend and implement a methodology for assigning or allocating each component of revenue requirements to specific utility functions, classifying those requirements, and allocating them to specific customer classes:
i. Analyze historical demand, price elasticity, income elasticity, customer counts and classifications, daily and hourly demand, and peaking factors.
ii. Classify and allocate existing Utility Plant in Service, debt service requirements, and maintenance and operation expense requirements.
iii. Review and evaluate any prior RAC recommendations.
b. Sewer Surcharge Analysis: Analyze the costs associated with mitigating biochemical oxygen demand
(BOD) and total suspended solids (TSS) under the current City of San Antonio Industrial Waste Ordinance and determine if the current sewer surcharges are sufficient to recover the costs of the program and make recommendations for changes as warranted.
c. Fire Line Charges: Determine if the current SAWS Fire Line rates are sufficient to recover the costs of the program and make recommendations for changes as warranted.
d. Liquid Waste Disposal Site Fee: Determine if the current SAWS Liquid Waste Disposal Site Fee is sufficient to recover the costs of the program and make recommendations for changes as warranted.
e. Drought Surcharge: Determine if the current SAWS Drought Surcharge sufficiently recovers direct costs associated with drought restrictions and non-compliance, including but not limited to enforcement activities, replacement of restricted Edwards Aquifer usage with higher-cost water supplies, and additional repair and replacement costs attributable to drought conditions.
f. The results of the Cost-of-service Analysis shall be finalized and presented to the SAWS Board for approval at the February/March 2027 Board meeting, prior to the RAC meetings and evaluation of rate design alternatives.
4. Rate Design and Customer Classification
a. Develop rate strategies that support SAWS' long-term financial sustainability, Water Forward investments, affordability objectives, financial policy compliance, revenue stability, conservation objectives, and projected operating and capital funding needs throughout the planning horizon.
b. Develop fair and equitable rate structures recovering costs for the Test Year for water delivery, water supply, wastewater, and recycled water core businesses, respectively, based on the principle of cost-of-service recovery. Multiple results from various rate design structure options will be provided. Among the options SAWS would like to have presented are the following:
i. Development of a rate structure that combines the Water Delivery and Water Supply core businesses.
ii. Evaluate whether existing recycled water rates support SAWS’ objectives related to conservation, alternative water supply development, and optimization of recycled water usage.
iii. Develop and evaluate alternative rate structures for high-volume recycled water customers.
iv. Evaluate whether the current treatment of multi-family/apartment customers within the General
Class remains appropriate and identify alternative customer classification and rate design approaches.
v. Develop rate design recommendations that are consistent with the City Council-approved multi-year rate plan through 2030 and evaluate potential rate structure modifications that can be implemented within existing approved revenue requirements. Where recommendations extend beyond the approved plan period, identify associated financial, customer, and policy impacts.
vi. Analyze the affordability impacts of proposed rate alternatives on residential, commercial, industrial, irrigation, wholesale, and Uplift Assistance Program customers and identify potential mitigation strategies where appropriate.
vii. Any additional rate design options that align with industry best practices.
5. Education, Presentations and Meetings
a. Educate SAWS staff and RAC members about the process of rate development. This includes traditional rate-setting issues, methodologies and emerging industry practices and innovative rate-setting approaches that are being used or tested in other companies or industries. The educational component of this relationship is paramount to the success of this study. For SAWS staff, the education should include methodology, computer models, and the capability to modify or update the models or computations in the future, if necessary.
b. Brief various stakeholders, including City and SAWS staff, SAWS Board of Trustees, SAWS employees, and the RAC. It is SAWS’ expectation that the Consultant will assist staff in developing the presentation materials, leading the RAC meetings, and participating in stakeholder discussions. The Consultant shall summarize stakeholder feedback received throughout the study process and identify how such feedback was considered in developing the final recommendations. The Consultant shall include eight
(8) to twelve (12) stakeholder presentations over approximately six (6) to eight (8) months in its proposed scope and fee.
c. Various meetings at SAWS offices will also be required from time to time with SAWS staff and/or City officials. Staff will endeavor to combine scheduled meetings of the RAC with desired Selected
Respondent meetings with staff on the same days or allow for virtual meetings. However, attendance at a project kick-off meeting with staff at SAWS offices will be required.
6. Deliverables shall include:
a. Models: Develop and deliver the financial planning, revenue-requirement, cost-of-service, and rate-design models required by this Scope of Services. The models shall be integrated to the extent practical and use consistent assumptions, source data, customer classifications, and financial projections. All models, formulas, supporting schedules, documentation, and related work products shall become the property of SAWS. Models shall not contain locked, hidden, or otherwise inaccessible calculations that prevent SAWS from independently reviewing, operating, updating, or modifying the data. The Consultant shall identify the proposed software platform and all licensing, implementation, maintenance, and third-party support requirements in its proposal and provide comprehensive training to designated SAWS personnel. The Consultant shall provide all native files, assumptions, formulas, supporting schedules, user guides, training materials, and technical documentation necessary for SAWS to independently operate and maintain the models.
b. Benchmarking: Provide comparative benchmarking of SAWS rate structures, financial policies, affordability metrics, conservation pricing strategies, customer assistance programs, and financial performance metrics against comparable water and wastewater utilities.
c. Customer Impact Analysis: Provide bill impact analyses for representative residential, commercial, industrial, irrigation, recycled water, wholesale, and Uplift customers under each major rate alternative evaluated.
d. Draft and Final reports: Provide executive summaries highlighting major issues, alternatives, decisions, and recommendations; detailed documentation of revenue requirements, cost-of-service methodologies, rate-design alternatives, customer bill impacts, public input, assumptions, calculations, and implementation considerations; and background information identifying the data used to develop the recommended and alternative rate designs.
D. Additional Requirements
1. SAWS prefers that Respondent’s firm and/or team member demonstrates experience conducting multiple water/wastewater rate studies for utilities in Texas, Oklahoma, New Mexico, Arizona, Colorado, Utah, Nevada, and/or California.
2. The selected Consultant shall adhere to the Consultant and Contractor Reimbursable Expense Policy, Exhibit I of the Sample Consulting Agreement.
3. All invoices from the Consultant and sub-consultants must include a breakdown of the percentage completion of each task relative to the period of time being invoiced, as outlined in Exhibit I of the attached Sample Consulting Agreement.
4. Pursuant to Texas Government Code §552.372, if the contract amount of the Agreement with the selected firm(s) is at least $1 million or through Amendment at a later date meets this threshold, the selected Respondent will be required to preserve all contracting information, as defined by §552.003, related to the Agreement for the duration of the Agreement and will be required to promptly provide SAWS with any such contracting information in its custody or possession upon SAWS’ request. And, upon the completion of the Agreement will be required to either provide all such contracting information related to the Agreement at no cost to SAWS or preserve such contracting information related to the Agreement per the records retention requirements applicable to SAWS. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Agreement, and the consultant agrees that the Agreement can be terminated if the Consultant knowingly or intentionally fails to comply with a requirement of that subchapter.
E. Estimated Timeline
October 30, 2026............................................................................................................................ RFP Released
November 9, 2026, at 1:30 p.m. (CST) .............................. VIRTUAL Non-Mandatory Pre-Submittal Conference
November 11, 2026, by 3:00 p.m.(CST) .......................................................... Receipt of Written Questions Due
November 12, 2026, by 3:00 p.m.(CST) ........................................................................Q & A Posted to Website
November 20, 2026, by 2:00 p.m.(CST) ........................................................................................ Proposals Due
November/December 2026 .................................................................................................. Proposals Evaluated
December 9/10, 2026 ....................................................................................................... Interviews, if necessary
January 12, 2027..................................................................................... SAWS Board Consideration and Award
January 2027 .......................................................................................................... Non-Selection Notices mailed
January 2027 ........................................................................................................................................ Start Work
The dates listed above are subject to change without notice.
II. Selection Process
A. Selection
1. A Selection Evaluation Committee will review, evaluate, and rank the proposals according to a numerical scoring system based on the responses to the criteria listed below. The Selection Evaluation Committee may select two or more firms to be interviewed, based solely on qualifications.
2. Key Team Members
a. During the evaluation period and up until award, if there is a change to any of the key team members identified on Respondent’s organizational chart, Respondent shall notify the SAWS’ point of contact identified in this RFP, in writing as soon as possible regardless of whether it is the prime consultant’s employee or an employee of a subconsultant. At SAWS sole discretion, SAWS may allow the Respondent to replace the key team member with an alternate member who possesses equal or better qualifications and experience.
b. As outlined in SAWS’ Ethics Policy, a former SAWS employee may not serve in a lead role as a key team member and may not participate in the negotiation of the contract for a period of two (2) years from termination of employment from SAWS. Failure to adhere to this policy may result in the Respondent’s proposal being found non-responsive or a reduction in points during the technical scoring of the proposal.
B. Interviews
In the event interviews are deemed necessary, Respondents will be asked to provide a brief presentation to the Selection Committee summarizing their qualifications and project approach as well as answer any questions posed by the Selection Committee.
C. Evaluation Criteria Summary
Respondents not providing a response to each of the criteria listed in this solicitation may be considered non-responsive and ineligible for consideration.
Project Approach and Quality Assurance/Control ....................................................................................... 35 pts Project Team and Team Member Experience ............................................................................................. 30 pts Understanding of San Antonio Socio-Political Environment ........................................................................ 20 pts Compensation Proposal ............................................................................................................................... 15 pts TOTAL ......................................................................................................................................... 100 pts
III. Communication
A. Restrictions
1. Respondents or their representatives are prohibited from communicating with any City of San Antonio officials to include:
• City Council members (as defined by the City of San Antonio Ethics Code),
• City Council member’s staff, and
• SAWS Board of Trustees regarding the RFP from the time the solicitation is released until it has been acted upon by the Board of Trustees.
2. Respondents or their representatives are prohibited from communicating with SAWS employees regarding this RFP, except as provided under “Technical Questions,” from the time the solicitation is released until the contract is awarded.
3. This includes “thank you” letters, phone calls, emails, and any contact that results in direct or indirect discussion of the RFP and/or proposal submitted by Respondents.
4. Violation of this provision by the Respondent and/or their agent may lead to disqualification of the Respondent’s proposal from consideration.
B. VIRTUAL Pre-Submittal Conference
1. Respondents may ask verbal questions regarding this solicitation at the VIRTUAL non-mandatory Pre- Submittal Conference on:
November 9, 2026 1:30 p.m. Central Standard Time (CST) https://saws.webex.com Meeting Number (access code): 2481 324 8077
Meeting Password: R-26-006-RL Audio Connection: (210) 233-2090
2. Respondent may contact Roxanne Lockhart, Senior Contract Administrator via email at Roxanne.Lockhart@saws.org if assistance logging in is needed.
3. Attendance is encouraged in order for the proposed Respondent to gain a better understanding of the project and ask relevant questions.
4. Any oral responses provided by SAWS staff at the Pre-Submittal Conference shall be preliminary. Any oral response given at the Pre-Submittal Conference shall not be official or binding on SAWS. Only written responses shall be official and all other forms of communication with any officer, employee or agent of SAWS shall not be binding on SAWS.
C. Technical Questions
1. Respondents may submit technical questions concerning the services in this RFP in writing. Electronic inquiries by e-mail will be accepted. The contact person for this solicitation is:
Roxanne Lockhart Contract Administration Department Email: Roxanne.Lockhart@saws.org
2. Questions regarding this RFP received after the deadline will not be answered in order to allow ample time for the distribution of answers and/or addenda to this RFP.
3. Answers to the questions will be posted on the SAWS website.
D. Good Faith Effort Plan (GFEP) Questions
1. Respondents and/or their agents may contact the Director of Business Engagement and Contract Compliance, at 210-233-3420 or Marisol.Robles@saws.org, for assistance or clarification with issues specifically related to the completion of the Good Faith Effort Plan.
Exhibit B contains the required forms in order to respond to this solicitation.
E. Submittal or Status Questions
1. To check the status of this solicitation after the due date, visit our website located at www.saws.org, select Business Center, Contract Solicitations, then select Archive, scroll down to locate the RFP and select More.
The status is located under the solicitation title.
https://saws.webex.com/ mailto:Roxanne.Lockhart@saws.org mailto:Marisol.Robles@saws.org http://www.saws.org/
2. For questions regarding this solicitation or if the website does not provide sufficient information, please call Roxanne Lockhart, Senior Contract Administrator, at 210-233-3095 for assistance.
IV. Submitting a Response
A. Deadline
Respondents are strongly encouraged to submit their proposals at least two (2) hours prior to the Proposal deadline and time to avoid last-minute transmission issues. If you believe there is an issue, please contact Roxanne Lockhart, Senior Contract Administrator at 210-233-3095 for assistance before the due date deadline.
B. Submission – ***Electronic Submittals Accepted Only***
1. Address a PDF of your submittal to contracting@saws.org. Entitle the subject line of the submission email with “R-26-006-RL – Rate Consulting Services RFP Response” and name of Respondent. If any hard copy proposals are submitted in error, they will not be evaluated for consideration. The file size limitation for submission is 10MB. Only two (2) files with all required response information per file as referred to on the Submittal Response Checklist shall be submitted. A brief e-mail response will be provided to acknowledge receipt of your submission. Pages requiring signatures shall be scanned or electronically signed. The submission shall be tabbed and “bookmarked” in PDF to match the response format indicated further in this solicitation. The entire submission shall be in searchable PDF format.
2. SAWS will not be responsible for slow or delayed electronic submissions that do not reach the intended recipient within the designated timeframe regardless of whether it is caused by, but not limited to, the World Wide Web, internet service provider (ISP), third party system, firewalls or infrastructure.
3. Responses are limited to a maximum of twenty (20) pages per proposal. Required forms do not count toward the page limit. Required forms are the Submittal Response Checklist, Respondent Questionnaire, Compensation Proposal Form, Sample Rate Model, W-9 form, Insurance requirements, Good Faith Effort Plan, and the Conflict of Interest Questionnaire. The cover letter, table of contents, and tabs do not count towards the page limit. Number each page starting with the cover letter, including text charts and graphic images.
4. Brochures, visual or other presentations, art work and marketing information beyond those sufficient to present a complete and effective proposal are neither necessary nor desired.
5. Responses should be clear, concise, and complete. They should be submitted using an 8 ½” by 11” portrait format (up to 11” by 17” will be permitted for drawings, where warranted).
6. By submission of a response, Respondent acknowledges that they have read and thoroughly understand the Scope of Services, agree to all terms and conditions stated herein, and acknowledge that it can perform all tasks as required.
7. Once, issued, this RFP is subject to revision via written Addenda any time before the submittal deadline.
Any such Addenda will be available through the SAWS website. Respondent is solely responsible for obtaining all Addenda prior to submitting its Proposal. Respondents should check the SAWS website frequently, including the day of the Proposal Submittal Deadline. SAWS assumes no responsibility or liability whatsoever for the distribution of Addenda to Respondents.
C. Response Format
The response shall be organized as follows, and each section shall be titled accordingly:
1. Submittal Response Checklist
Complete and include the Submittal Response Checklist within the proposal. Verify that the checklist is signed and that all documents on the checklist have been included with the proposal.
2. Respondent Questionnaire mailto:contracting@saws.org
The Respondent Questionnaire captures general information regarding the firm submitting a proposal in response to this solicitation. It also includes acknowledgements for the attached exhibits and addendums.
The document is required and must be completed and included in the proposal.
3. W-9 Form
Submit a completed and signed W-9 Form with your proposal. Respondents may go to http://www.irs.gov/formspubs/index.html?portlet=3 to download this form, if needed. Please also include an email address or fax number.
4. Project Approach and Quality Assurance/Control
a. Provide a three (3) page detailed work plan explaining how the Respondent would complete this project as described in the Scope of Services. The work plan should provide a minimum:
i. Itemized tasks
ii. Resource requirements
iii. Proposed timeline using a start date of Month Date, Year.
b. In addition, the work plan should emphasize maximizing efficiencies in procedures in order for SAWS to meet its goal in a timely manner.
c. Provide a sample rate model prepared by the Respondent for another utility.
d. Provide a two (2) page detailed document that describes the quality assurance (QA) and quality control (QC) procedures and other technical activities that will be implemented to demonstrate that the work performed by the Respondent will satisfy the scope of services in this RFP.
5. Project Team and Team Experience
a. Provide a one (1) page organizational chart identifying each team member and their role in providing the scope of services.
b. Provide a one (1) page resume for each key team member identified in the organizational chart, up to a maximum of six (6) key team members. Each resume must describe the individual’s capabilities, experience with water/wastewater rate studies, and qualifications and include the following:
i. Name
ii. Title
iii. Education
iv. Professional experience with prior Rate Studies captured in a brief overview, and
v. Licenses or professional affiliations
c. Provide a two (2) page summary detailing the unique qualifications of each sub-consultant.
d. Provide summaries of three (3) current and/or previous projects in which the Respondent has performed services similar to those sought in this solicitation within the last five (5) years. The projects should include water or wastewater rate studies for large-scale utilities. Each project summary shall not exceed one (1) page and shall include the following:
i. Name of client
ii. Location (city and state)
iii. Duration of Assignment
iv. Respondent’s role in project
v. Valid and previously verified reference contact information to include name and phone number
6. Understanding of San Antonio Socio-Political Environment
a. Provide a two (3) page summary that demonstrates the Respondent’s understanding of the San Antonio sociopolitical environment which serves as overall context for the comprehensive rate study. Summary should address the following:
i. Economics
ii. Poverty Levels http://www.irs.gov/formspubs/index.html?portlet=3
iii. Governance including Board of Trustees and City Council
iv. Water Supply Issues
7. Compensation Proposal
a. This document will be provided as a separate file and should not be included in the original proposal.
b. Respondent should complete the Compensation Proposal Form; Exhibit D. Compensation Proposal is to include a Total (firm-fixed price) Fee which is what will be taken into consideration for scoring. The Total Fee is to be inclusive of all tasks, travel expenses, staff hours, overhead, and task expenses.
c. In addition to the Compensation Proposal, provide a breakdown of positions, staff hours, and hourly rates to include overhead, travel expenses, and expenses by task. This will not be taken into consideration for scoring but will be necessary for the contract and to maintain the timeline of this project.
V. Other Required Documents to Submit
A. Exhibit A – Insurance Requirements and Proof of Insurability
1. Respondent shall submit a copy of a Certificate(s) of Insurance giving evidence of the various lines of Respondent’s commercial insurance coverage currently in force or provide a letter form the insurance agent indicating the required coverage can be obtained. Respondent should review the SAWS website for instructions on how to prepare the certificate of insurance at the following link:
http://www.saws.org/business_center/contractsol/forms.cfm
2. If awarded a contract under this RFP, verification and tracking of insurance compliance throughout the life of the contract will be performed through the services of CertFocus by Vertikal RMS (See Exhibit A).
The final negotiated contract price will determine the final required limits on Professional Liability Insurance Coverage.
B. Exhibit B – Good Faith Effort Plan (GFEP) Policies on Equal Employment Opportunity and the GFEP
1. Equal Employment Opportunity Requirements - SAWS highly encourages Respondents to implement Affirmative Action practices in their employment programs. This means Respondents should not discriminate against any employee or applicant for employment because of race, color, religion, sex, pregnancy, sexual orientation, national origin, political belief or affiliation, age, disability or genetic information.
2. The successful Respondent is required to electronically submit actual subcontractor payment information using the Subcontractor Payment and Utilization Reporting (S.P.U.R.) System, accessed through a link on SAWS’ “Business Center” webpage. Payment reporting will begin with the first SAWS payment for services under the contract, and with every payment thereafter (for the duration of the contract). The successful Respondent and all sub-consultants or suppliers will be provided a unique log-in credential and password to access the S.P.U.R. System. The link may be accessed through the following internet address:
https://saws.smwbe.com/
Training on the use of the system will be provided by SAWS upon request. After the prime receives payment from SAWS, electronic submittals will require data entry of the actual amount paid to each sub-consultant or supplier listed on the Consultant’s Good Faith Effort Plan. Any unjustified failure to comply with the committed SWMB levels may be considered breach of contract.
If there is not an opportunity to sub-consult any components of the contract, then use of the S.P.U.R. System is not applicable.
3. Please contact the BECC staff for any questions pertaining to the Good Faith Effort Plan and/or S.P.U.R.
System reporting.
http://www.saws.org/business_center/contractsol/forms.cfm https://saws.smwbe.com/
C. Exhibit C - Conflict of Interest Questionnaire
Effective January 1, 2006, Chapter 176 of the Texas Local Government Code requires that persons, or their agents, who seek to contract for the sale or purchase of property, goods, or services with SAWS shall file a completed Conflict of Interest Questionnaire (CIQ) with SAWS.
The CIQ will be submitted as part of the response to this RFP from SAWS. The CIQ is attached as Exhibit C, or is available from the Texas Ethics Commission at www.ethics.state.tx.us.
Please consult your own legal advisor if you have questions regarding the statute or form. This form is required and is considered part of the response to this RFP.
D. Exhibit D – Compensation Proposal
Respondent must complete the Compensation Proposal from attached as Exhibit D. This form is required and is considered part of the response to this RFP. Respondent shall not include any additional payment terms with the firm fixed fee indicated on Exhibit D when submitting a proposal for this RFP.
E. Exhibit E– Security Procedures Acknowledgement
The Security Procedures are attached as Exhibit E. Respondent must acknowledge the requirements of this exhibit on the Respondent Questionnaire Form.
F. Exhibit F – Sample Contract Acknowledgement
The Contract terms and conditions are attached as Exhibit F for review purposes only. Respondent must acknowledge the contract terms and conditions on the Respondent Questionnaire. If Respondent has exceptions to the terms and conditions, they must be submitted with the proposal. Respondents shall submit exceptions with proposed alternative language to SAWS as an attachment accompanying the Respondent Questionnaire Form. Exceptions will not be accepted after the proposal deadline.
VI. Requests for Feedback
Respondents that are not selected for a contract award may request feedback in the form of their score analysis and/or may request one (1), thirty (30) minute debriefing.
1. Scores analysis and/or debriefings will be provided only after the SAWS Board of Trustees has approved the contract award, or awards when there are multiple awards identified within the RFP. Note: In some instances the awards span several months Board meetings.
2. Requests for scores analysis and/or debriefings shall be submitted in writing, to the point of contact identified within Section III. Communication, paragraph C. Technical Questions of the solicitation, within thirty (30) calendar days from the date on the non-selection letter. Requests for debriefs after the thirty (30) calendar days will not be granted.
3. Respondents are eligible for one (1) debriefing per year calculated one (1) year from the date of the last debriefing SAWS conducted (i.e. Debriefing held February 4, 2024. The firm is eligible for the next debriefing after February 4, 2025). There is not a limitation to request score analyses.
VII. Other Requirements
A. Other key requirements that should be noted are as follows:
• Unresolved issues with SAWS may affect your competitiveness.
• All contracts will require the provision for a "Right-to-Audit" clause.
• SAWS shall retain the right to approve or disapprove any changes/variances of proposed sub-consultants and their related percentage of work "as proposed" from the original submittal form of the selected Respondents.
http://www.ethics.state.tx.us/
B. Disclosure of Interested Parties (Form 1295)
For applicable contracts entered into after January 1, 2016, an ethics law was enacted by H.B. 1295 in 2015 that prohibits a governmental entity from entering into a contract with a business entity unless the business entity submits a Disclosure of Interested Parties Form 1295. The Texas Ethics Commission has made available on its website a new filing application that must be used to file Form 1295. A business entity must use the application to enter the required information on Form 1295 and print a copy of the completed form, which will include a certification of filing that will contain a unique certification number.
For further information, please go to the following link:
https://ethics.state.tx.us/whatsnew/elf_info_form1295.htm
C. SAWS reserves the right to:
1. Reject any and all proposals received;
2. Issue a subsequent RFP;
3. Cancel the entire RFP;
4. Remedy technical errors in the RFP process;
5. Negotiate with any, all, or none of the Respondents to the RFP;
6. Accept the written proposal as an offer;
7. Waive informalities and irregularities;
8. Accept multiple proposals;
9. Make multiple recommendations to the Board;
10. Contact any Respondent for clarification after responses are opened and/or to further negotiate with any
Respondent if such is deemed desirable by SAWS.
D. All responses and their contents will become the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .