Quincy Roof Replacement.pdf
PDF 10 MB Posted
- Attached to
- Roof Replacement #243314
- Solicitation number
- 243314
- Issued by
- Norfolk County, Massachusetts
About this file
This is a project manual and bidding document for the Quincy Housing Authority's roof replacement project at Sawyer Towers in Quincy, Massachusetts. The Quincy Housing Authority is the awarding authority, with SOCOTEC AE Consulting, LLC serving as the prime designer. The project involves roof replacement of all low-sloped roof areas totaling 10,561 square feet with a new 80-mil PVC roof system, along with associated work including replacement of roof drains, lightning protection, through-wall flashing, repointing, skylight infilling, window infilling, steel door replacement, smoke hatch installation, and walkway pad installation. Construction is scheduled to begin around April 15, 2027, with a 90-day construction period. General bids from DCAMM-certified roofing contractors are due by December 23, 2026, with public opening forthwith. Filed sub-bids for masonry, plumbing, and electrical work trades are due by December 9, 2026. A pre-bid conference and site visit are scheduled for November 12, 2026, at 10:00 AM EST at the project site. All bids must be submitted electronically through biddocs.com. The contract will be awarded to the lowest responsible and eligible bidder and is subject to approval by the Undersecretary of the Executive Office of Housing and Livable Communities (EOHLC).
The estimated project cost is $820,000. A bid deposit of not less than five percent of the greatest possible bid amount is required, made payable to the Quincy Housing Authority. The project is subject to Massachusetts General Law Chapter 149, Sections 44A-J, and minimum wage rates as required by M.G.L. c. 149, Sections 26-27H. All contractors and subcontractors must comply with OSHA 10-hour safety training requirements and EPA Lead Renovator certification requirements (40 CFR 745). Minority business enterprise (MBE), women business enterprise (WBE), and veteran business enterprise (VBE) participation benchmarks are established at 5.9% MBE, 6.5% WBE, and 3% VBE. Workforce participation benchmarks are set at 6.9% for women and 15.3% for minorities. General contractors must provide performance and payment bonds in the amount of the contract price. The project is being electronically bid with no hard copy bids accepted.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EOHLC v1.0-20230630 MGL c.149 Over $150K
EOHLC No:
243314
PROJECT MANUAL
MGL c.149 Over $150K
Modernization of State Aided Public Housing
Roof Replacement
STATE AIDED DEVELOPMENT:
Sawyer Towers (667-3) 95 Martensen Street, Quincy, MA 02169
HOUSING AUTHORITY
Quincy Housing Authority 80 Clay Street Quincy, MA 02170
PRIME DESIGNER
SOCOTEC AE Consulting, LLC 75 Hood Park Drive Charlestown, MA 02129 Phone: 617-464-6454
BOARD MEMBERS
Rick Brouillard, LHA PM James Marathas, PM Michael Flaherty, Chairman Brian Clifford, Vice Chairman John Decarli, Resident Representative Josephine Shea, Governer Appointee Timothy Baker, Mayor Appointee
DATE: 04 November 2026
11/04/2026 G en er at ed
B y
B id
D oc s:
1/
/2 at
2:
P
M E
S T
THIS PAGE INTENTIONALLY LEFT BLANK
v1.0-20221001 MGL c.149 Over $150K
Section 00 01 05
LIST OF CONSULTANTS
Roof Replacement Project No. 243314
AWARDING AUTHORITY
Quincy Housing Authority 80 Clay Street Quincy, MA 02170
PRIME DESIGNER
SOCOTEC AE Consulting, LLC 75 Hood Park Drive Charlestown, MA 02129 Phone: 617-464-6454
END OF SECTION
Quincy Housing Authority Roof Replacement Project #243314
11/04/2026
00 01 05 - 1 List of Consultants
G en er at ed B y B id D oc s:
1/
/2 at
2:
P M
E
PROJECT:
Quincy Housing Authority Roof Replacement Project No. 243314
Table of Contents
Specification:
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 00 Project Manual 00 01 05 List of Consultants 00 01 08 Table of Contents 00 11 13 Advertisement to Bid 00 21 13 Instructions to Bidders 00 41 00 Form for General Bid 00 41 01 Bid Deposit 5% - General Contractor 00 41 02 DCAMM Certificate of Eligibility - General Contractor 00 41 03 Prime/General Contractor DCAMM Update Statement 00 41 10 Form for Sub-Bid 00 41 11 Bid Deposit 5% - Subcontractor 00 41 12 DCAMM Certificate of Eligibility - FSB Contractor 00 41 13 Sub-Bidder DCAMM Update Statement 00 52 00 Awarding Authority Contractor Agreement 00 52 03 Form of Subcontract 00 52 06 Form of Corporate Vote 00 61 01 Payment Bond Contractor 00 61 02 Performance Bond Contractor 00 61 03 Subcontractor's Performance and Payment Bond 00 72 00 General Conditions Contract Construction 00 73 36 Equal Employment Opportunity Requirements 00 73 36.01 Form of Contractor's Equal Employment Certification 00 73 36.02 Form of Subcontractor's Equal Employment Certification 00 73 36.03 EEO Contractor's Weekly Manpower Report 00 73 39 Supplier Diversity Program 00 73 43 Wage Rate Requirements
Payroll Report Form Wage Rates
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 22 00 Unit Prices 01 26 00 Contract Modification Procedures 01 26 00.01 Change Order 01 26 00.02 Construction Change Directive 01 29 00 Payment Procedures 01 29 00.01 Application for Payment 01 29 00.02 Continuation Sheet 01 33 00 Submittal Procedures 01 33 01 Substitution Request Form 01 45 00 Quality Control 01 50 00 Temporary Facilities 01 50 10 Temporary Protection and Controls 01 50 20 Cleaning 01 73 29 Cutting and Patching 01 74 19 Construction and Demolition Waste Management 01 74 19.01 Pre-construction Waste Management Report Form for Mandatory Recycling 01 77 00 Project Closeout Procedures 01 77 00.01 Sample Certificate of Substantial Completion Form 01 77 00.02 Sample Certificate of Partial Release of Retainage Form 01 77 00.03 Sample Certificate of Final Completion Form
DIVISION 02 - EXISTING CONDITIONS
Quincy Housing Authority Roof Replacement Project #243314
11/04/2026
00 01 08 - 1 Table of Contents
G en er at ed B y B id D oc s:
1/
/2 at
2:
P M
E
02 35 43 Environmental Procedures 02 41 00 Demolition 02 80 20 Asbestos Remediation
DIVISION 04 - MASONRY
04 20 00.FSB Masonry 04 50 00 Masonry Restoration FSB
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 63 Rough Carpentry
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 22 00 Roof Insulation 07 54 00 PVC Roofing and Flashing
DIVISION 08 - OPENINGS
08 11 10 Steel Doors
DIVISION 09 - FINISHES
09 90 00 Painting
DIVISION 22 - PLUMBING
22 00 00.FSB Plumbing 22 00 01 Plumbing Roof Drains FSB
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 00 01 Temporary Mechanical Disconnects
DIVISION 26 - ELECTRICAL
26 00 00.FSB Electrical Work 26 00 01 Temporary Electrical Disconnects FSB 26 41 00 Lightning Protection FSB
Drawings:
GENERAL
G001 Cover Sheet G002 Roof Compositions, Locus Plan & General Notes A101 Roof Area Plan A102 Tapered Insulation Plan A501 Details A502 Details A503 Details A504 Details S501 Skylight Infill Structural Details AM201 Masonry Filed Sub Bid - Elevator Penthouse Elevations AM202 Masonry Filed Sub Bid - Stairwell Penthouse Elevations AM501 Masonry Filed Sub Bid - Details P101 Plumbing Filed Sub Bid - Roof Plan & Detail E101 Electrical Filed Sub Bid - Roof Plan
END OF TABLE OF CONTENTS
Quincy Housing Authority Roof Replacement Project #243314
11/04/2026
00 01 08 - 2 Table of Contents
G en er at ed B y B id D oc s:
1/
/2 at
2:
P M
E
EOHLC v1.1-20260202 MGL c.149 Over $150K
Section 00 11 13
ADVERTISEMENT TO BID
MGL c.149 Over $150K
The QUINCY HOUSING AUTHORITY, the Awarding Authority, invites sealed bids from Contractors for the Roof Replacement at State Aided Development: Sawyer Towers (667-3) in Quincy, Massachusetts, in accordance with the documents prepared by
SOCOTEC AE CONSULTING, LLC.
The Project consists of but not limited to:
Roof replacement of all low sloped roof areas at Sawyer Towers (10,561 SF) located at 95 Martensen Street, Quincy MA 02169 with a new 80-mil PVC roof system. Additional work includes replacing roof drains, replacing lightning protection, replacing through-wall flashing, repointing, removal & infilling of skylight, removing and infilling windows, replacing steel door, installing smoke hatch, installing walkway pads along with other items. Construction to begin around April 15, 2027.
The work is estimated to cost $820,000.00.
All bidding Requests for Information (RFIs) shall be submitted online by 11/18/2026 at 5:00PM EST for filed sub-bids and by 11/18/2026 at 5:00PM EST for general bids.
Bids are subject to M.G.L. c.149 §44A-J & to minimum wage rates as required by M.G.L. c.149 §§26 to 27H inclusive.
THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL
NOT BE ACCEPTED. Please review the instructions in the bid documents on how to register as an electronic bidder. All Bids shall be submitted online at biddocs.com and received no later than the date and time specified.
General bidders must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) in the following category of work, Roofing, and must submit a current DCAMM Certificate of Eligibility and signed DCAMM Prime/General Contractor Update Statement.
General Bids will be received until 09 December 2026 at 2:00PM EST and publicly opened online, forthwith.
Filed Sub-bids for the trades listed below will be received until 25 November 2026 at 2:00PM EST and publicly opened online, forthwith.
Filed sub-bidders must be DCAMM certified for the trades listed below and bidders must include a current DCAMM Sub-Bidder Certificate of Eligibility and a signed DCAMM Sub-Bidder’s Update Statement.
TRADES
Quincy Housing Authority Roof Replacement Project #243314
11/04/2026
00 11 13 - 1 Advertisement to Bid
G en er at ed B y B id D oc s:
1/
/2 at
2:
P M
E
EOHLC v1.1-20260202 MGL c.149 Over $150K
Masonry Plumbing Electrical Work
General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates) and made payable to the QUINCY HOUSING AUTHORITY. Note: A bid deposit is not required for Projects advertised under $50,000.
Bid Forms and Contract Documents will be available for review at biddocs.com (may be viewed and downloaded electronically at no cost).
General bidders must agree to contract with minority, women and veteran-owned business enterprises as certified by the Supplier Diversity Office (SDO). The participation benchmark reserved for such enterprises shall not be less than 5.9% MBE, 6.5% WBE and 3% VBE for all state and state-assisted construction projects over $150,000.
Request for waivers must be sent to EOHLC (Chad.Howard@mass.gov) 5 calendar days prior to the General Bid date. NO WAIVERS WILL BE GRANTED AFTER THE
GENERAL BIDS ARE OPENED.
The Contractor and all subcontractors (collectively referred to as “the Contractor”) agree to strive to achieve minority and women workforce participation. The Workforce Participation benchmark is set at 6.9% for women and 15.3% for minorities. The Workforce benchmark percentages are a statutory requirement under MGL c. 149 § 44A(2)(G).
PRE-BID CONFERENCE / SITE VISIT: Scheduled Date and Time: 11/12/2026 at 10:00AM EST Address: 95 Martensen Street, Quincy, MA 02169 Instructions: Meet at the front of Sawyer Tower.
The hard copy Contract Documents may be seen at:
Nashoba Blue Inc.
433 Main Street Hudson, MA 01749 978-568-1167
END OF SECTION
Quincy Housing Authority Roof Replacement Project #243314
11/04/2026
00 11 13 - 2 Advertisement to Bid
G en er at ed B y B id D oc s:
1/
/2 at
2:
P M
E S mailto:Chad.Howard@mass.gov
EOHLC v1.3-20260202 MGL c.149 Over $150K
Section 00 21 13
INSTRUCTIONS TO BIDDERS
EOHLC MGL c. 149 over $150,000
THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL
NOT BE ACCEPTED. Please review the instructions in the bid documents on how to register as an electronic bidder. The bids are to be prepared and submitted at biddocs.com .
ARTICLE 1 - BIDDER'S REPRESENTATION
1.1 Each General Bidder or Sub-bidder (hereinafter called the "Bidder") by making a bid or sub-bid (hereinafter called "bid") represents that:
.1 The Bidder has read and understands the Contract Documents and the bid is made in accordance therewith.
.2 The Bidder has visited the site and is familiar with the local conditions under which the Work must be performed.
1.2 Failure to so examine the Contract Documents and site will not relieve any Bidder from any obligation under the bid as submitted.
ARTICLE 2 - GENERAL BIDDER'S AND FILED SUB-BIDDER’S CERTIFICATION
2.1 General bids shall be submitted with the following:
.1 A Certificate of Eligibility on the appropriate form prescribed and issued by the
Division of Capital Asset Management and Maintenance (DCAMM), showing that the Bidder is eligible to bid on projects of this size in the specified category of work (create a pdf file of the Certificate and browse & attach at biddocs.com); and
.2 A DCAMM Contractor Update Statement Form (create a pdf file of the Update Statement and browse & attach at biddocs.com).
.3 The Contractor Update Statement is not a public record as defined in DCAMM regulation 810 CMR 8.06 and will not be open to public inspection.
2.2 Filed sub-bids shall be submitted with the following:
.1 A Sub-Bidder Certificate of Eligibility on the appropriate form prescribed and issued by DCAMM showing that the sub-bidder is eligible to bid on public projects in the specified category of work (create a pdf file of the Certificate and browse & attach at biddocs.com); and
.2 A Sub-Bidder Update Statement on a form prescribed by DCAMM (create a pdf file of the Update Statement and browse & attach at biddocs.com).
.3 The Sub-Bidder Update Statement is not a public record as defined in DCAMM regulation 810 CMR 8.06 and will not be open to public inspection.
Quincy Housing Authority Roof Replacement Project #243314
11/04/2026
00 21 13 - 1 Instructions to Bidders
G en er at ed B y B id D oc s:
1/
/2 at
2:
P M
E S
T http://www.biddocs.com http://www.biddocs.com
2.3 It is the Bidder's responsibility to obtain the necessary forms from DCAMM and make application in sufficient time for evaluation of the application and issuance of a Certificate of Eligibility prior to bid.
2.4 Massachusetts law requires all employees who work on Massachusetts public works construction sites shall have no less than 10 hours of OSHA-approved safety and health training. See Chapter 306 of the Acts of 2004.
.1 This law directs the Massachusetts Attorney General to restrain the award of construction contracts to any contractor who is in violation of this requirement and to restrain the performance of these contracts by non-complying contractors.
.2 The Contractor and all subcontractors on this project will be required to provide certification of compliance with this requirement in accordance with the provisions of Section 00 73 43 – Wage Rates Requirements of these Contract Documents. Non-compliance with this new Massachusetts Law will disqualify you from bidding on public contracts.
2.5 The Contractor and all subcontractors shall be completely responsible for compliance with EPA Lead Renovator Requirements including EPA regulation 40
CFR 745.
ARTICLE 3 – MBE/WBE/VBE PARTICIPATION BENCHMARKS
3.1 Refer to the Advertisement for the applicability of this Article 3.
3.2 The participation benchmarks that must be contracted with minority-owned, women-owned and/or verteran-owned enterprises is stated in the Advertisement.
If the Advertisement does not include participation benchmarks, paragraphs 3.3 –
3.6 below and Section 00 73 39 shall not apply.
3.3 Letters of Intent (Form 00.73.39.02) are not required for filed Subcontractors.
However, filed Subcontractors who are SDO-certified MBEs, WBEs or VBEs should be listed on the Participation Schedule (Form 00.73.39.01.)
3.4 If the General Contractor wants to request a reduction in or a waiver of the participation benchmarks stated in the Advertisement, it must do so via email to the EOHLC. Such requests must be received no later than five (5) calendar days PRIOR to the General Bid opening date and time.
.1 The submitted request should include the reason(s) for the request. If the
EOHLC determines that compliance with participation benchmarks is not feasible, it has the discretion to reduce or waive these benchmarks. If the benchmarks are reduced or waived, an addendum to the project will be issued with the new participation requirements. Reductions or waivers that are granted will be granted for all General Contractors bidding on the project.
Quincy Housing Authority Roof Replacement Project #243314
11/04/2026
00 21 13 - 2 Instructions to Bidders
G en er at ed B y B id D oc s:
1/
/2 at
2:
P M
E
3.5 Filed Sub-bidders are not required to submit a Participation Schedule. Filed Sub-bidders may, at their option, submit a Letter of Intent with their bid if they are an SDO certified enterprise.
3.6 By submitting a Participation Schedule, the Bidder certifies that those firms listed on the Schedule will be supplying the goods and/or services that those firms are certified to supply.
ARTICLE 4 - REQUESTS FOR INTERPRETATION
4.1 Bidders shall promptly notify the contact specified in the Advertisement via written request for information (RFI) of any ambiguity, inconsistency, or error which they may discover upon examination of the Contract Documents, the site, and local conditions.
4.2 Bidders requiring clarification or interpretation of the Contract Documents shall make a written request for information (RFI) as specified in the Advertisement. The Awarding Authority may answer such requests if received before the bid date and/or within the time specified in the Advertisement. The Awarding Authority has no obligation to respond to the written requests.
4.3 Interpretation, correction, or change in the Contract Documents will be made by written Addendum which will become part of the Contract Documents. Neither the Awarding Authority nor the Prime Designer will be held accountable for any oral interpretations, corrections, or changes.
4.4 Copies of addenda will be made available for inspection at the locations listed in the Advertisement where Contract Documents are on file or at biddocs.com. Hard copies of the addenda will not be forwarded to the plan holders. The bidder is solely responsible for reviewing all addenda posted on the project website.
ARTICLE 5 - PREPARATION AND SUBMISSION OF BIDS
5.1 Forms and Bid Preparation
Bids shall be submitted electronically on the "Form for General Bid" or the "Form for Sub-Bid" at biddocs.com, as appropriate and available at no cost.
The forms enclosed in the Project Manual shall not be extracted or used.
All bidders must create at User Profile account at biddocs.com, at no cost, to complete and submit a bid. The Awarding Authority, the Prime Designer or BidDocs ONLINE Inc. will not be held accountable if the bidder fails to create a User Profile in a timely manner.
.1 All entries on the bid form shall be made online. Any documents that are
Quincy Housing Authority Roof Replacement Project #243314
11/04/2026
00 21 13 - 3 Instructions to Bidders
G en er at ed B y B id D oc s:
1/
/2 at
2:
P M
E S
T http://www.biddocs.com.
http://www.biddocs.com, attached to the bid must be in a pdf format.
.2 Sums shall be expressed in both words and figures in the space indicated on the bid form. The electronic bid forms automatically match the “word” amount to the numeric “figure” amount entered.
.3 The system requires that the General Bidder to explicitly acknowledge yes or no regarding the requirement of the Performance and Payment Bonds on filed sub-bid contractors on the Form for General Bid.
.4 Costs for subcontractor's bond premiums shall be paid for by the General Contractor in accordance with M.G.L. c.149 §44F.
5.2 Bid Deposits shall be:
.1 at least five percent (5%) of the greatest possible bid amount, considering all alternates;
.2 made payable to the Awarding Authority.
.3 conditioned upon faithful performance by the principal of the agreements contained in the bid, and .4 in the form of:
.1 cash, .2 certified check, treasurer’s or cashier’s check issued by a responsible bank or trust company, or
.3 bid bond issued by a surety company licensed to do business in the Commonwealth of Massachusetts.
Note: Both the “bid bond” and “check” bid deposits are to be scanned and uploaded to the system as a pdf file. IMPORTANT NOTICE: If the bidder elects to make a bid deposit in the form of “cash” or “check”, the Bidder must have the cash or check physically delivered to the Awarding Authority prior to the date and time of the bid opening.
.5 retained until the execution and delivery of the Awarding Authority / Contractor Agreement if they represent the bid deposit of one of the three (3) lowest responsible and eligible General Bidders or one of the three (3) lowest Sub-bidders in a filed sub-bid trade, or a sub-bidder listed by one of the three (3) lowest General Bidders.
5.3 Electronic Submission of Filed Sub-Bids
Sub-bids, including the bid deposit, DCAMM Sub-Bidder Certificate of Eligibility, DCAMM Sub-Bidder Update Statement and required miscellaneous forms noted in the bid documents shall be submitted electronically online at biddocs.com. No hard copy bids will be accepted.
The Bidder will receive an email and/or system notification confirming submission of the bid. Click on the email link to review and print the submitted bid documents.
Keep the email as a receipt that the bid was submitted. Note: The Bidder may modify the bid at any time prior to the bid date and time advertised. The Bidder will receive a new email each time the Bidder re-submits the bid.
Quincy Housing Authority Roof Replacement Project #243314
11/04/2026
00 21 13 - 4 Instructions to Bidders
G en er at ed B y B id D oc s:
1/
/2 at
2:
P M
E S http://www.biddocs.com.
.1 Date and time for receipt of bids is set forth in the Advertisement.
.2 Timely submission of a bid online shall be the full responsibility of the Bidder.
Note: The project countdown clock on the website is the official clock that will determine when the bids are due.
5.4 Electronic Submission of General Bids
General Bids, including the bid deposit, DCAMM Certificate of Eligibility, Prime /General Contractor Update Statement and required miscellaneous forms noted in the bid documents shall be submitted electronically online at biddocs.com . No hard copy bids will be accepted.
The Bidder will receive an email and/or system notification confirming submission of the bid. Click on the email link to review and print the submitted bid documents.
Keep the email as a receipt that the bid was submitted. Note: The Bidder may modify the bid at any time prior to the bid date and time advertised. The Bidder will receive a new email each time the Bidder re-submits the bid.
.1 Date and time for receipt of bids is set forth in the Advertisement.
.2 Timely submission of a bid online shall be the full responsibility of the Bidder.
Note: The project countdown clock on the website is the official clock that will determine when the bids are due.
5.5 Sub-Trade Solicitations
.1 If the General Bidders are instructed to carry an amount for a given sub-trade listed under Item 2, General Bidders shall list the sub-trade, and amount provided by the Awarding Authority. The line under bonds required on the General Bid Form should be marked “no” for subparagraph 5.5.2.2 to be applicable.
.2 Upon solicitation of a subcontractor to perform the work required by the sub-trade as mentioned in subparagraph 5.5.1, the selected General Contractor’s contract amount will be adjusted as follows:
.1 The difference between the subcontract amount and the amount carried in the bid.
.2 The total cost of the subcontractor's bonds, if the selected General
Contractor requires such bonds after the solicitation is completed and if the selected General Contractor complied with 5.4.1 above, and
.3 The resultant cost difference for General Contractor's Bonds premiums.
.3 Overhead and Profit for supervision of the sub-trade in question shall be included by all General Bidders in Item 1.
.4 Additional overhead and profit is not allowed on the incremental difference as stated in M.G.L. c.149 §44F (4)(a)(2) nor on the costs for the additional bond premiums.
5.6 Addenda
.1 All modifications to the bid documents will be issued via an addendum. All registered plan holders will be electronically notified when addenda are
Quincy Housing Authority Roof Replacement Project #243314
11/04/2026
00 21 13 - 5 Instructions to Bidders
G en er at ed B y B id D oc s:
1/
/2 at
2:
P M
E S issued. Hard copies of the addenda will not be forwarded to the plan holders. The Bidder is solely responsible for reviewing all addenda posted on the project website. The Bidder must acknowledge all addenda have been reviewed by selecting “yes” or “no” as part of the ebidding process. If the Bidder selects “no”, the Bidder will automatically be directed to the Addenda icon on the project page.
ARTICLE 6 - ALTERNATES
6.1 Each General Bidder shall acknowledge Alternates in Section C on the Form for General Bid by entering the dollar amount of addition or subtraction necessitated by each Alternate.
6.2 In the event an Alternate does not involve a change in the amount of the base bid, the Bidder shall so indicate by entering "0" (numeric figure) in the “Add” space provided for that Alternate.
6.3 Sub-bidders shall enter on the Form for Sub-bid the amount of addition or subtraction necessitated by each Alternate which pertains to the work of that trade. If an Alternate does not involve a change in the bid amount, indicate by entering "0" (numeric figure) in the “Add” space provided for that Alternate.
6.4 General Bidders shall enter on the Form for General Bid a single amount for each Alternate which shall consist of the Sub-bidders' amounts (when applicable) and the amount for work performed by the General Contractor.
6.5 The low Bidder will be determined based on the sum of the base bid and the accepted alternates.
6.6 Alternates will be considered in numerical sequence as required by Chapter 149, Section 44G of the Massachusetts General Laws.
ARTICLE 7 - WITHDRAWAL OF BIDS
7.1 Before Opening of Bids
Any bid may be withdrawn (retracted) prior to the time designated for receipt of bids upon clicking the tab to “Retract Bid”. The Bidder and the Awarding Authority will receive an email confirming that the bidder retracted the bid. Withdrawn bids may be modified and resubmitted up to the time designated for the receipt of bids.
7.2 After Opening of Bids
Bidders may withdraw a bid, without penalty, any time up to the time of Award as defined in paragraph 8.1, and upon demonstrating, to the satisfaction of the Awarding Authority, that a bona fide clerical error was made during the preparation
Quincy Housing Authority Roof Replacement Project #243314
11/04/2026
00 21 13 - 6 Instructions to Bidders
G en er at ed B y B id D oc s:
1/
/2 at
2:
P M
E of the bid. Failure to conclusively demonstrate a bona fide clerical error may result in forfeiture of the bid deposit.
7.3 In the event of a general bid withdrawal after opening of bids, the Awarding Authority shall consider the bid from the next lowest eligible and responsible bidder.
7.4 Sub-bid Withdrawal/Substitution
.1 Selection - Should a filed sub-bidder listed on the Form for General Bid of the selected General Contractor (per Article 7 of these instructions) withdraw its bid, be unable to provide performance and payment bonds as required by the selected General Contractor, or otherwise refuse to sign a subcontract with the selected General Contractor, the Awarding Authority and the selected General Contractor shall consider the other sub-bids to which the Awarding Authority and the selected General Contractor make no objection and substitute a new sub- bidder for such trade.
.2 Process: If the selected General Contractor:
.1 required bonds (on the Form for General Bid) for the sub-bidder who withdrew then the selected General Contractor’s contract amount shall be adjusted to account for:
a. the difference between the amount of the sub-bid listed on the Form for
General Bid and the amount of the replacement sub-bid, and
b. the incremental difference in the cost of the General Contractor bonds premiums, but
c. there will be no compensation for additional subcontractor bond premiums.
.2 did not require bonds (on the Form for General Bid) for the sub-bidder who withdrew and now the selected General Contractor wants bonds from the replacement sub-bidder, then the selected General Contractor’s contract amount shall be adjusted:
a. to account for the difference between the amount of the sub-bid listed on the Form for General Bid and the amount of the replacement sub-bid,
b. the amount for the new sub-bidder’s performance and payment bonds, and
c. the incremental difference in the cost of the General Contractor bond premiums.
.3 There shall be no adjustment to the selected General Contractor’s contract amount except as set forth in 7.4.2.1 and 7.4.2.2. Additional overhead and profit are not allowed on the incremental difference in the sub-bids or on the costs for the additional bond premiums.
ARTICLE 8 - CONTRACT AWARD
8.1 Award means both the determination and selection of the lowest, responsible, and
Quincy Housing Authority Roof Replacement Project #243314
11/04/2026
00 21 13 - 7 Instructions to Bidders
G en er at ed B y B id D oc s:
1/
/2 at
2:
P M
E eligible bidder, by the Awarding Authority.
8.2 The Awarding Authority will award the contract to the lowest responsible and eligible bidder within thirty days, Saturdays, Sundays, and legal holidays excluded after the opening of bids in accordance with M.G.L. c.149 §44A.
8.3 The Contract will be awarded to the lowest responsible and eligible Bidder, except in the event of substitution as provided under M.G.L. c.149 §§44E and 44F, in which case the procedure as required by said sections shall govern the award of the Contract.
8.4 The award of this Contract is subject to the approval of the Undersecretary of the Commonwealth of Massachusetts, Executive Office of Housing and Livable Communities (EOHLC) or its Designee. Contracts without EOHLC approval shall not be considered valid.
8.5 The Awarding Authority reserves the right to waive any informalities in or to reject any or all Bids if it is in the public interest to do so.
8.6 The Awarding Authority also reserves the right to reject any sub-bid if it determines that such sub-bid does not represent the bid of a person competent to perform the work as specified, or if less than three sub-bids are received for a sub-trade, or if bid prices are not reasonable for acceptance without further competition.
8.7 As used herein, the term "lowest responsible and eligible bidder" shall mean the General Bidder whose bid is the lowest of those Bidders demonstrably possessing the skill, ability, and integrity necessary for the faithful performance of the work, and who meets the requirements for Bidders set forth in M.G.L. c.149 §44A-J and is not debarred from bidding under M.G.L. c.149 §44C; and who shall certify that they are able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work.
8.8 Bidders’ attention is directed to 01.11.00 for any additional selection criteria that may be a condition of Award of this project.
ARTICLE 9 - FORMS REQUIRED FOR CONTRACT APPROVAL
9.1 Upon Award, the General Bidder shall complete the following forms to ensure prompt contract validation. These forms will be provided to the selected General Bidder by the Awarding Authority.
9.2 Awarding Authority / Contractor Agreement and Form of Corporate Vote.
9.3 Form of Performance Bond and Form of Payment Bond must be submitted by
Quincy Housing Authority Roof Replacement Project #243314
11/04/2026
00 21 13 - 8 Instructions to Bidders
G en er at ed B y B id D oc s:
1/
/2 at
2:
P M
E the General Contractor on the Awarding Authority’s form, in accordance with the General Conditions. The dates on the bonds must coincide with the contract date, and a current Power-of-Attorney must be attached to each bond.
9.4 Performance and Payment Bonds must also be submitted for all filed subcontractors, if required by the General Bidder on its Form for General Bid, in the total amount of the subcontract payable to the General Contractor.
9.5 Insurance Certificates for the General Contractor and all filed subcontractors are required and must be submitted in accordance with the General Conditions.
General Contractors must indicate on Builder’s Risk insurance or installation floater if stored materials are covered.
9.6 Form of Subcontract for all filed subcontractors - executed and submitted on the statutory subcontract form.
9.7 Form of Contractor's Equal Employment Certification in accordance with Specification Section 00 73 36. (Form 00 73 36.01) .1 Form of Sub-Contractor's Equal Employment Certification in accordance with Specification Section 00 73 36. (Form 00 73 36.02) .2 Form of Subcontract for all filed subcontractors - executed and submitted on the statutory subcontract form. (Form 00 52 03).
9.8 Statement of Management on Internal Accounting Controls and a Statement prepared by a CPA expressing an opinion to the state of Management Controls, as required by M.G.L. c.30 §39R. This applies to the General Contractor only.
9.9 Evidence of Certification with 40 CFR part 745 Lead Renovation, Repair and Painting Program.
ARTICLE 10 - CONTRACT VALIDATION
10.1 The Awarding Authority -Contractor Agreement shall not be valid until signed by the Undersecretary of the Executive Office of Housing and Livable Communities (EOHLC) or its Designee.
10.2 The Notice to Proceed for construction shall not be issued until the Awarding Authority/Contractor Agreement has been validated by the Undersecretary of the EOHLC or its Designee.
10.3 Incomplete or unacceptable submissions of forms required by paragraphs 9.2 – 9.9 will delay the validation of the Awarding Authority/Contractor Agreement by the
EOHLC.
END OF SECTION
Quincy Housing Authority Roof Replacement Project #243314
11/04/2026
00 21 13 - 9 Instructions to Bidders
G en er at ed B y B id D oc s:
1/
/2 at
2:
P M
E
Section 00 41 00
FORM FOR GENERAL BID
MGL c.149 Over $150K
TO THE AWARDING AUTHORITY: Quincy Housing Authority
A. The Undersigned proposes to furnish all labor and materials required for Roof Replacement [Project #243314] at Sawyer Towers (667-3) in Quincy, Massachusetts, in accordance with the accompanying plans and specifications prepared by SOCOTEC AE Consulting, LLC for the contract price specified below, subject to additions and deductions according to the terms of the specifications.
B. This bid includes addenda numbered: ___________________________________________________________
C. The proposed contract price is:
__________________________________________________ dollars $__________________________________
Bid Amount in Words Bid Amount in Numbers
For alternate No. ________ Add $______________ Subtract $______________ No. ________ Add $______________ Subtract $______________ No. ________ Add $______________ Subtract $______________ No. ________ Add $______________ Subtract $______________ No. ________ Add $______________ Subtract $______________
D. The subdivision of the proposed contract price is as follows:
ITEM 1. The work of the general contractor, being all work other than that covered by ITEM 2.
TOTAL OF ITEM 1 .............................................................. $__________________________________
Sub-trade Name of Filed Sub-bidder Sub-bid Amount Bond Required Yes No
TOTAL OF ITEM 2 .................................. $__________________________________
The undersigned agrees that each of the above named sub-bidders will be used for the work indicated at the amount stated, unless a substitution is made. The undersigned further agrees to pay the premiums for the performance and payment bonds furnished by sub-bidders as requested herein and that all of the cost of all such premiums is included in the amount set forth in ITEM 1 of this bid.
The undersigned agrees that if he is selected as general contractor, he will promptly confer with the awarding authority on the question of sub-bidders; and that the awarding authority may substitute for any sub-bid listed above a sub-bid filed with the awarding authority by another sub-bidder for the sub-trade against whose standing and ability the undersigned makes no objection; and that the undersigned will use all such finally selected sub-bidders at the amounts named in their respective sub-bids and be in every way as responsible for them and their work as if they had been originally named in this general bid, the total contract price being adjusted to conform thereto.
11/04/2026 G en er at ed
B y
B id
D oc s:
1/
/2 at
2:
P
M E
E. The undersigned agrees that, if he is selected as general contractor, he will within five days, Saturdays, Sundays and legal holidays excluded, after presentation thereof by the awarding authority, execute a contract in accordance with the terms of this bid and furnish a performance bond and also a labor and materials or payment bond, each of a surety company qualified to do business under the laws of the commonwealth and satisfactory to the awarding authority and each in the sum of the contract price, the premiums for which are to be paid by the general contractor and are included in the contract price; provided, however, that if there is more than 1 surety company, the surety companies shall be jointly and severally liable.
The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that he will comply fully with all laws and regulations applicable to awards made subject to section 44A.
The undersigned further certifies under the penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection the word ''person'' shall mean any natural person, joint venture, partnership, corporation or other business or legal entity.
The undersigned further certifies under penalty of perjury that the said undersigned is not presently debarred from doing public construction work in the commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder.
NAME OF BIDDER
SIGNATURE AND TITLE OF PERSON SIGNING BID
Date: _________________________ ______________________________________________
BUSINESS ADDRESS
11/04/2026 G en er at ed
B y
B id
D oc s:
1/
/2 at
2:
P
M E
BID BOND
CONTRACTOR: SURETY:
Name: Name:
Address: Address:
AWARDING AUTHORITY:
Name:
Address:
BOND AMOUNT:
The Contractor and Surety are bound to the Awarding Authority in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Awarding Authority accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Awarding Authority and Contractor, and the Contractor either (1) enters into a contract with the Awarding Authority in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise, acceptable to the Awarding Authority, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or
(2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Awarding Authority may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Awarding Authority and Contractor to extend the time in which the Awarding Authority may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty
(60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Awarding Authority and Contractor shall obtain the Surety’s consent for an extension beyond sixty (60) days.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted here from and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory and not as a common law bond.
IN THE WITNESS WHEREOF,
the Principal and Surety signed and sealed this day of , 20
(Contractor as Principal) (Seal) (Witness)
(Title)
(Surety) (Seal)
(Title)
11/04/2026 G en er at ed
B y
B id
D oc s:
1/
/2 at
2:
P
M E
SAMPLE
11/04/2026 G en er at ed
B y
B id
D oc s:
1/
/2 at
2:
P
M E
Division of Capital Asset Management and Maintenance Page 1 of 11 Prime Contractor Update Statement Effective March 30, 2023
PRIME CONTRACTOR UPDATE STATEMENT
TO ALL BIDDERS AND AWARDING AUTHORITIES
A COMPLETED AND SIGNED PRIME CONTRACTOR UPDATE STATEMENT MUST BE SUBMITTED WITH EVERY PRIME BID FOR A CONTRACT PURSUANT TO M.G.L. c.149, §44A AND M.G.L. c. 149A. ANY PRIME BID SUBMITTED WITHOUT AN APPROPRIATE UPDATE STATEMENT IS INVALID AND MUST BE REJECTED.
Caution: This form is to be used for submitting Prime Contract bids. It is not to be used for submitting Filed Sub-Bids or Trade Sub-Bids.
AWARDING AUTHORITIES
If the Awarding Authority determines that the bidder does not demonstrably possess the skill, ability and integrity necessary to perform the work on the project, it must reject the bid.
BIDDER’S AFFIDAVIT
I swear under the pains and penalties of perjury that I am duly authorized by the bidder named below to sign and submit this Prime Contractor Update Statement on behalf of the bidder named below, that I have read this Prime Contractor Update Statement, and that all of the information provided by the bidder in this Prime Contractor Update Statement is true, accurate, and complete as of the bid date.
Bid Date Print Name of Prime Contractor
Project Number (or name if no number)
Business Address
Awarding Authority Telephone Number
INSTRUCTIONS
SIGNATURE
Bidder’s Authorized Representative
PRIME UPDATE STATEMENTS ARE NOT PUBLIC RECORDS AND
ARE NOT OPEN TO PUBLIC INSPECTION (M.G.L. C.149, §44D)
11/04/2026 G en er at ed
B y
B id
D oc s:
1/
/2 at
2:
P
M E
Division of Capital Asset Management and Maintenance Page 2 of 11
INSTRUCTIONS TO BIDDERS
• This form must be completed and submitted by all Prime contractors bidding on projects pursuant to M.G.L. c. 149, §44A and M.G.L. c. 149A.
• You must give complete and accurate answers to all questions and provide all of the information requested. MAKING A MATERIALLY FALSE
STATEMENT IN THIS UPDATE STATEMENT IS
GROUNDS FOR REJECTING YOUR BID AND FOR
DEBARRING YOU FROM ALL PUBLIC
CONTRACTING.
• This Update Statement must include all requested information that was not previously reported on the Application used for your firm’s most recently issued (not extended or amended) Prime Contractor Certificate of Eligibility. The Update Statement must cover the entire period since the date of your Application, NOT since the date of your Certification.
• You must use this official form of Update Statement. Copies of this form may be obtained from the awarding authority and from the Division of Capital Asset Management and Maintenance Web Site: www.mass.gov/DCAMM.
• If additional space is needed, please copy the appropriate page of this Update Statement and attach it as an additional sheet.
• See the section entitled “Bidding Limits” in the Instructions to Awarding Authorities for important information concerning your bidding limits.
INSTRUCTIONS TO AWARDING AUTHORITIES
Determination of Bidder Qualifications
• It is the awarding authority’s responsibility to determine who is the lowest eligible and responsible bidder. You must consider all of the information in the low bidder’s Update Statement in making this determination. Remember: this information was not available to the Division of Capital Asset Management and Maintenance at the time of certification.
• The bidder’s performance on the projects listed in Parts 1 and 2 must be part of your review.
Contact the project references.
• AWARDING AUTHORITIES ARE STRONGLY
ENCOURAGED TO REVIEW THE LOW BIDDER’S
ENTIRE CERTIFICATION FILE AT THE DIVISION OF
CAPITAL ASSET MANAGEMENT AND
MAINTENANCE. Telephone (617) 727-9320 for an appointment.
Bidding Limits
Single Project Limit: The total amount of the bid, including all alternates, may not exceed the bidder’s Single Project Limit.
Aggregate Work Limit: The annual value of the work to be performed on the contract for which the bid is submitted, when added to the annual cost to complete the bidder’s other currently held contracts, may not exceed the bidder’s Aggregate Work Limit.
Use the following procedure to determine whether the low bidder is within its Aggregate Work Limit:
Step 1 Review Update Statement Question #2 to make sure that all requested information is provided and that the bidder has accurately calculated and totaled the annualized value of all incomplete work on its currently held contracts (column 9).
Step 2 Determine the annual dollar value of the work to be performed on your project.
This is done as follows:
(i) If the project is to be completed in less than 12 months, the annual dollar value of the work is equal to the full amount of the bid.
(ii) If the project will take more than 12 months to complete, calculate the number of years given to complete the project by dividing the total number of months in the project schedule by 12 (calculate to 3 decimal places), then divide the amount of the bid by the calculated number of years to find the annual dollar value of the work.
Step 3 Add the annualized value of all of the bidder’s incomplete contract work (the total of column 9 on page 5) to the annual dollar value of the work to be
11/04/2026 G en er at ed
B y
B id
D oc s:
1/
/2 at
2:
P
M E
S http://www.mass.gov/dcam
Division of Capital Asset Management and Maintenance Page 3 of 11 performed on your project. The total may not exceed the bidder’s Aggregate Work Limit.
Correction of Errors and Omissions in Update Statements
Matters of Form: An awarding authority shall not reject a contractor’s bid because there are mistakes or omissions of form in the Update Statement submitted with the bid, provided the contractor promptly corrects those mistakes or omissions upon request of the awarding authority. [810 CMR 8.05(1)].
Correction of Other Defects: An awarding authority may, in its discretion, give a contractor notice of defects, other than mistakes or omissions of form, in the contractor’s Update Statement, and an opportunity to correct such defects, provided the correction of such defects is not prejudicial to fair competition. An awarding authority may reject a corrected Update Statement if it contains unfavorable information about the contractor that was omitted from the Update Statement filed with the contractor’s bid. [810 CMR 8.05(2)].
11/04/2026 G en er at ed
B y
B id
D oc s:
1/
/2 at
2:
P
M E
Division of Capital Asset Management and Maintenance Page 4 of 11
PART 1 - COMPLETED PROJECTS
LIST ALL PUBLIC AND PRIVATE BUILDING PROJECTS YOUR FIRM HAS COMPLETED SINCE THE DATE OF APPLICATION FOR YOUR MOST RECENTLY ISSUED (NOT EXTENDED OR AMENDED) DCAMM CERTIFICATE OF ELIGIBILITY. YOU MUST REPORT ALL REQUESTED INFORMATION NOT
PREVIOUSLY REPORTED ON THAT DCAMM APPLICATION*.
PROJECT TITLE & LOCATION WORK
CATEGORY
CONTRACT PRICE START DATE DATE
COMPLETED
Attach additional sheets if necessary
* If your firm has been terminated from a project prior to completion of the work or has failed or refused to complete its work under any contract, full details and an explanation must be provided. See Part 3 of this Update Statement.
11/04/2026 G en er at ed
B y
B id
D oc s:
1/
/2 at
2:
P
M E
Division of Capital Asset Management and Maintenance Page 5 of 11
PROVIDE THE FOLLOWING REFERENCE INFORMATION FOR EACH COMPLETED PROJECT LISTED ON THE PREVIOUS PAGE.
PROJECT TITLE COMPANY NAME CONTACT PERSON TELEPHONE
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
Is your company or any individual who owns, manages or controls your company affiliated with any owner, designer or general contractor named above, either through a business or family relationship? YES NO
Are any of the contact persons named above affiliated with your company or any individual who owns, manages or control your company, either through a business or family relationship? YES NO
If you have answered YES to either question, explain. _ _
11/04/2026 G en er at ed
B y
B id
D oc s:
1/
/2 at
2:
P
M E
Division of Capital Asset Management and Maintenance Page 6 of 11
PART 2 - CURRENTLY HELD CONTRACTS
LIST ALL PUBLIC AND PRIVATE BUILDING AND NON-BUILDING CONSTRUCTION PROJECTS YOUR COMPANY HAS UNDER CONTRACT ON THIS DATE
REGARDLESS OF WHEN OR WHETHER THE WORK COMMENCED.
1 2 3 4 5 6 7 8 9
PROJECT TITLE &
LOCATION
WORK
CATEGORY
START AND
END DATES
ON
SCHEDULE
(yes / no)
CONTRACT
PRICE
% NOT
COMPLETE
$ VALUE OF
WORK NOT
COMPLETE
(col. 5 X col.
6)
NO. OF YEARS
REMAINING
(see note below)
ANNUALIZED
VALUE OF
INCOMPLETE
WORK
(col. 7 ÷ col. 8) (divided by)
ANNUALIZED VALUE OF ALL INCOMPLETE CONTRACT WORK (Total of Column 9) $_ _
Column 8 • If less than one year is left in the project schedule, write 1.
• If more than 12 months are left in the project schedule, divide the number of months left in the project schedule by 12 (calculate to three decimal places).
11/04/2026 G en er at ed
B y
B id
D oc s:
1/
/2 at
2:
P
M E
Division of Capital Asset Management and Maintenance Page 7 of 11
PROVIDE THE FOLLOWING REFERENCE INFORMATION FOR EACH CURRENTLY HELD PROJECT LISTED ON THE PREVIOUS PAGE.
PROJECT TITLE COMPANY NAME CONTACT PERSON TELEPHONE
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
Is your company or any individual who owns, manages or controls your company affiliated with any owner, designer or general contractor named above either through a business or family relationship? YES NO
Are any of the contact persons named above affiliated with your company or any individual who owns, manages or control your company, either through a business or family relationship? YES NO
If you have answered YES to either question, explain. _ _
11/04/2026 G en er at ed
B y
B id
D oc s:
1/
/2 at
2:
P
M E
Division of Capital Asset Management and Maintenance Page 8 of 11
For Parts 3 and 4, if you answer YES to any question, please provide on a separate page a complete explanation. You must report all requested information not previously reported on your most recent DCAMM Application for Prime Certificate of Eligibility. Information must supplement all judicial and administrative proceedings involving bidder’s firm, which were instituted or concluded (adversely or otherwise) since your firm’s Application for your most recently issued (not extended or amended) Certificate of Eligibility. Include all details [project name(s) and location(s), names of all parties involved, relevant dates, etc.].
PART 3 – GENERAL PERFORMANCE
Part 3 of the Update Statement corresponds to Section 5 of the Prime Application. The numbering below refers back to the numbered questions in the application for your reference.
Prime Application Section 5 - General Performance
YES NO
5.A. Has your Company been terminated prior to completion of a Contract?
5.B. Has your Company failed or refused to perform or complete any of its Scope of Work under any Contract prior to substantial completion?
5.C. Has your Company and/or any principal, officer, or individual with a Financial Interest in your Company filed for bankruptcy?
5.D. Has a surety for your Company taken over or been asked to complete your Scope of Work under any Contract?
5.E. Has a payment or performance bond been…
This is the start of the file's text. The full file is on GovTribe.