Questions & Clarifications

23 KB Posted

Attached to
New State Prison - State of Georgia
Solicitation number
GBA-198B-DP
Issued by
Georgia

About this file

This file contains questions and clarifications issued by the Georgia State Financing and Investment Commission (GSFIC) on behalf of the Georgia Building Authority (GBA) and the Georgia Department of Corrections (GDC) regarding Request for Qualifications (RFQ) No. GBA-198B-DP for design professional services on a new state prison project. The RFQ solicits architectural and engineering firms to provide design professional services for Project No. GBA-198B. Design services are anticipated to commence in the second quarter of 2023, with construction targeted to begin by the end of 2023 if feasible through early component packages, and material completion projected within 28 months. All dates provided are estimates and subject to change. The actual physical location of the prison was still being finalized at the time of the clarifications.

The clarifications address two primary items: correction of a footer reference in the RFQ document that erroneously mentioned Bryan County, and revision of the project schedule to reflect updated construction timelines. These clarifications were formally issued as Addendum One and posted to the Georgia Procurement Registry. No pricing terms, set-asides, incumbency information, or specific funding amounts are detailed in this clarification document.

Text of this file

Questions & Answers and Clarifications

GBA-198B-DP
Project No. GBA-198B
New State Prison - Georgia

Clarifications:

1) Be advised the footer of the pages in the Request for Qualifications solicitation document posted on the Georgia Procurement Registry contained a typo that included a reference to Bryan County. The reference to Bryan County was made in error. The footer should have read as follows: RFQ No. GBA-198B-DP New State Prison – Georgia

As stated in the Project Description of the RFQ, the determination of the actual physical location of the new prison is still being finalized.

2) Be advised the construction duration stated in the paragraph titled Project Schedule in the Project Description of the Request for Qualifications solicitation document has been revised to reflect the following:

Project Schedule:

The Design Professional’s services are anticipated to commence during the second quarter of 2023. It is envisioned that construction would start by the end of 2023, if feasible to do so through the issuance of an early component package, with a goal of reaching material completion in 28 months. (Note: All of the dates indicated in this section are estimates and as such are subject to change.)

3) Be advised an Addendum One has been issued and post on the Georgia Procurement Registry to address the two clarifications above.

End of Questions & Answers and Clarifications

Other files

File Type Posted
Addendum One GBA-198B-DP —
RFQ —
Award Information —
Shortlisted Finalists —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .